Kerala Industrial Infrastructure Development Corporation Tender

Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Kerala Industrial Infrastructure Development Corporation - KINFRA Tender

Works
Electrical and Electronics
Electrical Works
Eprocure
Opening Date2 Aug 2022
Closing Date17 Aug 2022
Tender Amount₹ 9,05,42,950 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Dry stone pitching 22.5 cm thick including supply of stones andbrpreparing surface complete.

4500

-

-

... More
4.1.8 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)

652.5

-

-

... More
4.1.3 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

180

-

-

... More
7.1.1 Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)

2430

-

-

... More
Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing

2430

-

-

... More
15.3 Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.

3.8

-

-

... More
5.9.1 Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete

750

-

-

... More
Lowering PVC rigid pipes and specials to trench and laying to proper grade and alignment, jointing with PVC couplers with cement paste.br140 mm dia PVC 6KSC to 225 mm dia PVC 6KSC

93.75

-

-

... More
CONSTRUCTION OF DUCT - 600 m length on the side of existing road

-

-

-

... More
15.24 Demolishing dry brick pitching in floors, drains etc. including stacking serviceable material and disposal of unserviceable material with in 50 metes lead:

50.62

-

-

... More
15.40.2 Dismantling precast concrete or stone slabs in walls, partition walls etc. including stacking within 50 metres lead:Thickness above 40 mm upto 75 mm

48.45

-

-

... More
2.8.1 Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil

730.5

-

-

... More
15.43.2 Dismantling manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in-Charge:Bituminous road

48

-

-

... More
15.58 Demolishing R.C.C. work by mechanical means and stockpiling at designated locations and disposal of dismantled materials up to a lead of 1 kilometre, stacking serviceable and unserviceable material separately including cutting reinforcement bars.

2.07

-

-

... More
4.1.8 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)

69.75

-

-

... More
5.36 Providing and placing in position precast reinforced cement concrete waffle units, square or rectangular as per design and shape for floors and roofs in 1:11/2:3 ( 1 cement : 1 1/2 coarse sand : 3 graded stone aggregate 10 mm nominal size), including flush or deep ruled pointing at joints in cement mortar 1:2 (1 cement : 2 Fine sand), making necessary holes of required sizes for carrying through service lines etc., providing steel hooks for lifting etc, form work in precasting, handling, hoisting, centering and erection complete for all floor levels but excluding the cost of reinforcement .

148.13

-

-

... More
13.35.1 Pointing on stone slab ceiling with cement mortar 1:2 ( 1 cement : 2 fine sand):Flush / Ruled pointing

637.5

-

-

... More
4.1.3 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

53.63

-

-

... More
5.9.1 Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete

467.5

-

-

... More
13.18 Neat cement punning

517.5

-

-

... More
13.4.1 12 mm cement plaster of mix:1:4 ( 1 cement : 4 coarse sand)

250

-

-

... More
5.22.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more

19800

-

-

... More
10.25.2 Item Shifted to head 14 as item 14.74Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works

6871.88

-

-

... More
CONSTRUCTION OF ROAD : 7m wide T road with side drain and cable duct

-

-

-

... More
2.8.1 Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil

351.15

-

-

... More
Earth work excavation for foundation in in all classes of soil other than rock including under water excavation where ever required ,conveying and dumping the excavated soil or liquid mud in convenient places with all leads and lifts including filling the lower portions / undulations if necessary including charges for bailing out water using required capacity pumps if found required and levelling the earth to correct profile, breaking clods , watering ramming etc. complete.

458.2

-

-

... More
4.1.8 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)

108.53

-

-

... More
5.36 Providing and placing in position precast reinforced cement concrete waffle units, square or rectangular as per design and shape for floors and roofs in 1:11/2:3 ( 1 cement : 1 1/2 coarse sand : 3 graded stone aggregate 10 mm nominal size), including flush or deep ruled pointing at joints in cement mortar 1:2 (1 cement : 2 Fine sand), making necessary holes of required sizes for carrying through service lines etc., providing steel hooks for lifting etc, form work in precasting, handling, hoisting, centering and erection complete for all floor levels but excluding the cost of reinforcement .

322.88

-

-

... More
5.9.1 Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete

617.5

-

-

... More
13.18 Neat cement punning

671.25

-

-

... More
4.1.3 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

67.13

-

-

... More
5.22.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more

41877.15

-

-

... More
15.3 Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.

0.15

-

-

... More
Lowering PVC rigid pipes and specials to trench and laying to proper grade and alignment, jointing with PVC couplers with cement paste.br140 mm dia PVC 6KSC to 225 mm dia PVC 6KSC

2.3

-

-

... More
15.5 Extra for cutting reinforcement bars manually/ by mechanical means in R.C.C. or R.B. work ( Payment shall be made on the cross sectional area of R.C.C. or R.B work) as per direction of Engineer-in-charge.

4.18

-

-

... More
16.1 Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earth with lead upto 50 metres.

2450

-

-

... More
16.91.2 Providing and laying factory made chamfered edge Cement Concrete paver blocksin footpath, parks, lawns, drive ways or light traffic parking etc, of required strength,thickness & size/ shape, made by table vibratory method using PU mould, laid inrequired colour & pattern over 50mm thick compacted bed of sand, compacting andproper embedding/laying of inter locking paver blocks into the sand bedding layerthrough vibratory compaction by using plate vibrator, filling the joints with sand andcutting of paver blocks as per required size and pattern, finishing and sweepingextra sand. complete all as per direction of Engineer-in-Charge.80 mm thick C.C. paver block of M-30 grade with approved color design and pattern.

2475

-

-

... More
15.24 Demolishing dry brick pitching in floors, drains etc. including stacking serviceable material and disposal of unserviceable material with in 50 metes lead:

3

-

-

... More
13.4.1 12 mm cement plaster of mix:1:4 ( 1 cement : 4 coarse sand)

2444.4

-

-

... More
13.61.1 Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work

280

-

-

... More
10.25.2 Item Shifted to head 14 as item 14.74Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works

137.46

-

-

... More
19.6.4 Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 ( 1 cement : 2 fine sand) including testing of joints etc. complete:300 mm dia R.C.C. pipe

50

-

-

... More
Supplying, stacking & filling quarry sand in standard profile, for stack measurement and pipe laying brwithout causing any hindrance of traffic etc. as directed by the Engineer-in-charge at site including all leadsbrand lifts, cost and conveyance of all materials etc. complete as directed by the Engineer- in - Charge.

8.47

-

-

... More
ROAD - 7 m wide T Road

-

-

-

... More
4.1.A.1 Construction of granular sub-base by providing graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 Grading-I - Plant Mix Method

495

-

-

... More
4.12 Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.

495

-

-

... More
CONSTRUCTION OF CULVERT : 4 NoS.

-

-

-

... More
15.43.2 Dismantling manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in-Charge:Bituminous road

35.1

-

-

... More
15.24 Demolishing dry brick pitching in floors, drains etc. including stacking serviceable material and disposal of unserviceable material with in 50 metes lead:

7.2

-

-

... More
15.40.2 Dismantling precast concrete or stone slabs in walls, partition walls etc. including stacking within 50 metres lead:Thickness above 40 mm upto 75 mm

68.4

-

-

... More
15.58 Demolishing R.C.C. work by mechanical means and stockpiling at designated locations and disposal of dismantled materials up to a lead of 1 kilometre, stacking serviceable and unserviceable material separately including cutting reinforcement bars.

15.55

-

-

... More
15.5 Extra for cutting reinforcement bars manually/ by mechanical means in R.C.C. or R.B. work ( Payment shall be made on the cross sectional area of R.C.C. or R.B work) as per direction of Engineer-in-charge.

3.46

-

-

... More
5.2.2 Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)

2.94

-

-

... More
5.9.1 Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete

90.03

-

-

... More
5.9.2 Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.

526.72

-

-

... More
5.22.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more

30642.94

-

-

... More
5.22A.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more

706.56

-

-

... More
13.4.1 12 mm cement plaster of mix:1:4 ( 1 cement : 4 coarse sand)

267.44

-

-

... More
11.20.1 Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete on 20 mm thick bed of cement mortar 1:4 ( 1 cement : 4 coarse sand).Light shade pigment using white cement

68.4

-

-

... More
20.3.1 Boring, providing and installing cast in situ single under reamed piles of specified diameter and length below pile cap in M -25 cement concrete, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and the length of the pile to be embedded in pile cap etc. all complete. (Length of pile for payment shall be measured upto to the bottom of pile cap):300 mm dia piles

342

-

-

... More
20.2.1 Boring, providing and installing bored cast-in-situ reinforced cement concrete piles of grade M-25 of specified diameter and length below the pile cap to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring, with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc. all complete, including removal of excavated earth with all lifts and leads (Length of pile for payment shall be measured upto bottom of pile cap).300 mm dia piles

342

-

-

... More
20.6.1.2 Vertical load testing of piles in accordance with IS 2911( Part IV) including installation of loading platform and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & the direction of engineer -in-Charge.Single pile upto 50 tonne capacityRoutine test

2

-

-

... More
4.1.5 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)

319.92

-

-

... More
5.9.5 Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers

110.11

-

-

... More
5.33.1 Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.All work upto plinth level

140.11

-

-

... More
19.36.1 Providing and laying Non Pressure NP-4 class (Heavy duty) R.C.C. pipes includingcollars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2(1 cement : 2 fine sand) including testing of joints etc. complete.450 mm dia RCC pipes.

52

-

-

... More
2.27 Supplying and filling in plinth with Jamuna sand under floors, including watering, ramming consolidating and dressing complete.

26

-

-

... More
GATE AND SECURITY CABIN

-

-

-

... More
2.8.1 Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil

8.02

-

-

... More
4.1.5 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)

1.23

-

-

... More
7.1.1 Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)

0.44

-

-

... More
2.27 Supplying and filling in plinth with Jamuna sand under floors, including watering, ramming consolidating and dressing complete.

0.41

-

-

... More
2.25 Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.

3.97

-

-

... More
4.3.1 Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns

2.42

-

-

... More
5.9.6 Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and struts

9.72

-

-

... More
5.9.5 Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers

6.48

-

-

... More
5.33.1 Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.All work upto plinth level

2.26

-

-

... More
5.33.2 Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.All work above plinth level upto floor V level

1.01

-

-

... More
5.22.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more

453.06

-

-

... More
5.22A.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more

303.9

-

-

... More
10.16.1 Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Hot finished welded type tubes

350

-

-

... More
10.19 Providing and fixing mild steel round holding down bolts with nuts and washer plates complete.

25

-

-

... More
Providing and Fixing of Security Cabin of Concrete platform size- 2.4 x 2.1 x 0.20m, Cabin size - 1.80 x 1.50x1.90m Height (Average)brwith Powder coated Aluminium (4” x 1.5”) with Aluminium Glazed Door and Window with Lock & Key and Aluminium Corrugated Roofing sheet / zinc-Alum Sheet Back side and Bottom side Cabin Hilum sheet with all necessary electrical fittings with switches for 1 tube light , 2 socket pins, and a fan point as per the direction of Engineer in Charge

1

-

-

... More
CONSTRUCTION OF COMPOUND WALL

-

-

-

... More
2.8.1 Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil

101.25

-

-

... More
2.27 Supplying and filling in plinth with Jamuna sand under floors, including watering, ramming consolidating and dressing complete.

33.75

-

-

... More
4.1.5 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)

22.5

-

-

... More
7.1.1 Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)

75.94

-

-

... More
4.3.1 Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns

75

-

-

... More
5.9.5 Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers

150

-

-

... More
5.1.2 Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size

15

-

-

... More
5.22A.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more

900

-

-

... More
16.19 Supplying at site Angle iron post & strut of required size including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia. etc. complete.

1518.75

-

-

... More
16.71 Providing and fixing G.I. chain link fabric fencing of required width in mesh size 25x25 mm made of G.I wire of dia 3 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer - in- Charge.

750

-

-

... More
FOUNDATION WORKS FOR ELECTRICAL

-

-

-

... More
20.2.1 Boring, providing and installing bored cast-in-situ reinforced cement concrete piles of grade M-25 of specified diameter and length below the pile cap to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring, with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc. all complete, including removal of excavated earth with all lifts and leads (Length of pile for payment shall be measured upto bottom of pile cap).300 mm dia piles

76

-

-

... More
Boring, providing and installing cast in situ single under reamed piles of specified diameter and length below pile cap in M -25 cement concrete, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and the length of the pile to be embedded in pile cap etc. all complete. (Length of pile for payment shall be measured upto to the bottom of pile cap):300 mm dia piles

133

-

-

... More
15.3 Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.

0.78

-

-

... More
5.22.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more

2286.88

-

-

... More
4.1.5 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)

1.14

-

-

... More
5.9.5 Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers

26.67

-

-

... More
5.9.6 Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts

14.51

-

-

... More
5.33.1 Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.All work upto plinth level

7.43

-

-

... More
2.31 Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared

12

-

-

... More
2.8.1 Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil

7.82

-

-

... More
4.3.1 Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns

14.27

-

-

... More
5.1.2 Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size

0.8

-

-

... More
4.1.8 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)

0.7

-

-

... More
2.25 Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.

5.87

-

-

... More
13.16.1 6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand)

12.15

-

-

... More
10.25.2 Item Shifted to head 14 as item 14.74Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works

28.56

-

-

... More
Supply of Treated Water from KEPIP to EMC

-

-

-

... More
2.32 Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.

2306

-

-

... More
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m including charges for bailing out water using required capacity pumps if found required and levelling the earth to correct profile, breaking clods , watering ramming etc. complete.

1875

-

-

... More
2.6.1 Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil

90.72

-

-

... More
2.7.1 Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.Ordinary rock

60.48

-

-

... More
2.7.3 Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.Hard rock (blasting prohibited

5

-

-

... More
2.26.1 Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil

40.32

-

-

... More
2.26.2 Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.Ordinary or hard rock

26.88

-

-

... More
Filling available excavated earth in(excluding rock) trenches, under floors,plinth,sides of foundation,in areas etc. in layers not exceeding 20cm in depth,consoldating each deposited layer by ramming and watering,lead upto 50m and lift upto 1.5m including cost and conveyance of all materials,labour charges, etc complete at all levels as directed by the Engineer-in-Charge

1781.77

-

-

... More
18.72.5 Providing and laying S & S Centrifugally Cast (Spun) / Ductile Iron Pipes conforming to IS : 8329:300 mm dia Ductile Iron CLass K-7 pipes

1500

-

-

... More
100.35.5 Testing 300mm DI/CI pipeline with potable water to the required test pressure. 300 mm dia Observed Data derived from item no.1023 of PHED DATA

1500

-

-

... More
18.68.1 Providing and laying D.I specials of class K - 12 suitable for push - on jointing as per IS : 9523 :Upt 600 mm dia

3

-

-

... More
18.30.7 Providing flanged joints to double flanged C.I./ D.I pipes and specials, including testing of joints:300 mm diameter pipe

3

-

-

... More
18.69.1 Providing and laying D.I Specials of Class K - 12 suitable for mechanical jointing as per IS : 9523 :Upto 600 mm dia

0.5

-

-

... More
18.70.5 Providing push - on-joints to Centrifugally (Spun) Cast Iron Pipes or Ductile Iron Pipes including testing of joints and including the cost of rubber gasket:300 mm dia pipe

300

-

-

... More
Supplying & spreading quarry sand for filling in standard profile, without causing any hindrance of traffic as directed by the Engineer-in-charge at site including all leads and lifts, cost and conveyance of all materials etc. complete as directed by the Engineer- in -Charge.

6.75

-

-

... More
Cutting of DI pipes of all classes diametrically, the cut being diametrically perpendicularbrto the axis of pipe and smoothening the cut ends, etc. complete -: 300 mm

55

-

-

... More
Providing and fixing ISI marked C.I. sluice valves with cap or wheel (with caps below ground level and with wheels above ground level as the case may be) complete with bolts, nuts, rubber insersions etc. PN 1.6 as per IS 14846 : 2000 - 300 mm(Multi door)

4

-

-

... More
Providing and fixing ISI marked C.I. double acting air valve of approved quality with isolation valves asbrper IS 14845 : 2000 - 100 mm dia

2

-

-

... More
4.1.8 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)

8.38

-

-

... More
5.37.1 Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of laying, excluding the cost of centering, shuttering finishing and reinforcement including cost of admixtures in recommended proportions as per IS: 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in -charge. Note:- Cement content considered in this item is @330 kg/cum. Excess /less cement used as per design mix is payable/recoverable separately.All wiork upto plinth level

68.16

-

-

... More
5.22.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more

5717.96

-

-

... More
5.9.1 Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete

158.56

-

-

... More
5.9.2 Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.

165.12

-

-

... More
5.9.3 Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform

21.84

-

-

... More
WATER SUPPLY LINES

-

-

-

... More
"Supply and fixing IS 4985:2000 unplasticized PVC pipes and specials at a depth of 1m including trenching, bedding of soil, lowering to trenches, placing in position, aligning the pipe line to line and levels, jointing the pipes and specials with solvent cement, refilling the trenches after removing rocks if any and testing the pipe line to a pressure of 3kg/cm2 or twice the maximum working pressure which ever is greater, maintaining the test pressure for least 6 hours ,providing thrust / anchor blocks at all bends, reducer, Tee, valves etc complete as specified and directed by engineer in charge. (Distribution line)br200mm dia 6kgf/cm2

1250

-

-

... More
"Supply and fixing IS 4985:2000 unplasticized PVC pipes and specials at a depth of 1m including trenching, bedding of soil, lowering to trenches, placing in position, aligning the pipe line to line and levels, jointing the pipes and specials with solvent cement, refilling the trenches after removing rocks if any and testing the pipe line to a pressure of 3kg/cm2 or twice the maximum working pressure which ever is greater, maintaining the test pressure for least 6 hours, providing thrust / anchor blocks at all bends, reducer, Tee, valves etc complete as specified and directed by engineer in charge. (Distribution line)br160mm dia 6kgf/cm2

600

-

-

... More
"Supply and fixing IS 4985:2000 unplasticized PVC pipes and specials at a depth of 1m including trenching,bedding of soil, lowering to trenches, placing in position, aligning the pipe line to line and levels, jointing the pipes and specials with solvent cement, refilling the trenches after removing rocks if any and testing the pipe line to a pressure of 3kg/cm2 or twice the maximum working pressure which ever is greater, maintaining the test pressure for least 6 hours, providing thrust / anchor blocks at all bends, reducer, Tee, valves etc complete as specified and directed by engineer in charge. (Distribution line)br110mm dia 6kgf/cm2

25

-

-

... More
Supply and fixing IS 4985:2000 unplasticized PVC pipes and specials at a depth of 1m including trenching, bedding of soil, lowering to trenches, placing in position, aligning the pipe line to line and levels, jointing the pipes and specials with solvent cement, refilling the trenches after removing rocks if any and testing the pipe line to a pressure of 3kg/cm2 or twice the maximum working pressure which ever is greater, maintaining the test pressure for least 6 hours, providing thrust / anchor blocks at all bends, reducer, Tee, valves etc complete as specified and directed by engineer in charge. (Distribution line)br90mm dia 6kgf/cm2

100

-

-

... More
Supply and fixing IS 4985:2000 unplasticized PVC pipes and specials at a depth of 1m including trenching, bedding of soil, lowering to trenches, placing in position, aligning the pipe line to line and levels, jointing the pipes and specials with solvent cement, refilling the trenches after removing rocks if any and testing the pipe line to a pressure of 3kg/cm2 or twice the maximum working pressure which ever is greater, maintaining the test pressure for least 6 hours, providing thrust / anchor blocks at all bends, reducer, Tee, valves etc complete as specified and directed by engineer in charge. (Distribution line)75 mm dia 6kgf/cm2

500

-

-

... More
"Supply and fixing IS 4985:2000 unplasticized PVC pipes and specials at a depth of 1m including trenching,bedding of soil, lowering to trenches, placing in position, aligning the pipe line to line and levels, jointing the pipes and specials with solvent cement, refilling the trenches after removing rocks if any and testing the pipe line to a pressure of 3kg/cm2 or twice the maximum working pressure which ever is greater, maintaining the test pressure for least 6 hours, providing thrust / anchor blocks at all bends, reducer, Tee, valves etc complete as specified and directed by engineer in charge. (Distribution line)63 mm dia 6kgf/cm2

700

-

-

... More
"Providing and fixing CI sluice valve conforming to IS : 14846 hand wheel operated, Non rising stainless steel stem with gunmetal parts : 50 mm (PN - 1.0) flanged end

8

-

-

... More
"Providing and fixing CI sluice valve conforming to IS : 14846 hand wheel operated, Non rising stainless steel stem with gunmetal parts : 65 mm (PN - 1.0) flanged end

2

-

-

... More
"Providing and fixing CI sluice valve conforming to IS : 14846 hand wheel operated, Non rising stainless steel stem with gunmetal parts : 80 mm (PN - 1.0) flanged end

2

-

-

... More
Providing and fixing CI sluice valve conforming to IS : 14846 hand wheel operated, Non rising stainless steel stem with gunmetal parts : 100 mm (PN - 1.0) flanged end

1

-

-

... More
"Providing and fixing CI sluice valve conforming to IS : 14846 hand wheel operated, Non rising stainless steel stem with gunmetal parts : 150 mm (PN - 1.0) flanged end

5

-

-

... More
"Providing and fixing CI sluice valve conforming to IS : 14846 hand wheel operated, Non rising stainless steel stem with gunmetal parts : 200 mm (PN - 1.0) flanged end

6

-

-

... More
"Providing and fixing CI Y type strainer : 200 mm (PN - 16) flanged end

1

-

-

... More
"Providing and fixing Forged brass Air release valve of approved quality (screwed end) : 25 mm diameter

5

-

-

... More
Constructing masonry chamber 90x90x100 cm inside, in brick work in cement mortar 1:4 (1 cement : 4 coarse sand) for sluice valve, with C.I. surface box 100 mm top diameter, 160 mm bottom diameter and 180 mm deep (inside) with chained lid and RCC top slab 1:2:4 mix (1 cement : 2 coarse sand: 4 graded stone aggregate 20 mm nominal size), i/c necessary excavation, foundation concrete 1:5:10 (1 cement : 5 fine sand: 10 graded stone aggregate 40 mm nominal size) and inside plastering with cement mortar 1:3 (1 cement : 3 coarse sand) 12 mm thick, finished with a floating coat of neat cement complete as per standard design:With common burnt clay F.P.S. (non modular) bricks of class designation 7.5

30

-

-

... More
Constructing masonry chamber 60x45x50 cm inside, in brick work in cement mortar 1:4 ( 1 cement : 4 coarse sand) for water meter complete with C.I double flap surface box 400x200x200 mm ( inside ) with locking arrangement and RCC top slab 1:2:4 mix ( 1 cement : 2 coarse sand : 4 grades stone aggregate 20 nominal size), i/c necessary excavation, foundation concrete 1:5:10 ( 1 cement : 5fine sand : 10 graded stone aggregate 40 mm nominal size) and inside plastering with cement mortar 1:3 ( 1 cement : 3 coarse sand) 12 mm thick, finished with a floating coat of neat cement complete as per standard design:With common burnt clay F.P.S. ( non modular ) bricks of class designation 7.5

1

-

-

... More
18.60.4 Providing and fixing enclosed type water meter (bulk type) conforming to IS: 2373 and tested by Municipal Board complete with bolts, nuts, rubber insertions etc. ( The tail pieces if required will be paid separately):200 mm dia nominal bore

1

-

-

... More
Supply and fixing of Ductile iron flanged puddle pipe of 1m length in tank slab/wall and in plane verticaly and horizontally with necessary projection to the outside as instructed by the site engineer in charge : 65 mm inner diameter

2

-

-

... More
Supply and fixing of Ductile iron flanged puddle pipe of 1m length in tank slab/wall and in plane verticaly and horizontally with necessary projection to the outside as instructed by the site engineer in charge : 100mm inner diameter

13

-

-

... More
Supply and fixing of Ductile iron flanged puddle pipe of 1m length in tank slab/wall and in plane verticaly and horizontally with necessary projection to the outside as instructed by the site engineer in charge : 200mm inner diameter

9

-

-

... More
Supply and fixing 65 mm DI Flanged Mechanical Adapter suitable for 75 mm PVC pipe in position.

2

-

-

... More
Supply and fixing 100mm DI Flanged Mechanical Adapter suitable for 110 PVC pipe in position.

13

-

-

... More
Supply and fixing 200mm DI Flanged Mechanical Adapter suitable for 200 PVC pipe in position.

9

-

-

... More
Supply,erection, testing, commissioning of 200 mm PVC 6Kgf connection from main water supply line including excavation, cutting main pipe, providing CI detachable joints (CID) on either ends and Tee including supply of materials and labour and refilling the pit with soil, complete.

1

-

-

... More
19.32.1 Making soak pit 2.5 m diameter 3.0 metre deep with 45 x 45 cm dry brick honey comb shaft with bricks and S.W. drain pipe 100 mm diameter, 1.8 m long complete as per standard design.With common burnt clay F.P.S. (non modular) bricks of class designation 7.5

4

-

-

... More
18.72.3 Providing and laying S & S Centrifugally Cast (Spun) / Ductile Iron Pipes conforming to IS : 8329:200 mm dia Ductile Iron Class K-7 pipes

15

-

-

... More
Supplying & spreading quarry sand for filling in standard profile, without causing any hindrance of traffic as directed by the Engineer-in-charge at site including all leads and lifts, cost and conveyance of all materials etc. complete as directed by the Engineer- in -Charge.

125.48

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.