Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 5,00,000Document Cost
₹ 17,700Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_KINFR_461659_1Bid Award Id
ViewTender No
KIN/IITP/29/2021-22Tender Authority
Kerala Industrial Infrastructure Development Corporation ViewPurchaser Address
-Website
http://http://kinfra.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Construction of Drains, Roads and Miscellenaeous Works
Drains: RCC open storm water drains including centering and shuttering, straightening, cutting, bending, placing in position of reinforcement on both sides of the roads. Run off coefficient for paved areas and unpaved areas shall be assumed to be 0.9 and 0.6. The maximum velocity of drain shall be limited to 2.4m/sec and 1.8m/sec for pipe drains and open drains. For pipe drains, concrete pipes of class NP2 conforming to IS:458 shall be used, for road crossing NP3 pipe shall be used. Drains from tank /channel/chambers etc. Road – 4 m Pre-cast road wide including curbs, finishes, etc. Width of carriageway shall be 4 m minimum. Roads shall be of P.C.C interlocking paver block of M30 grade with necessary compacted bed of coarse sand as per specification over the compacted base as per site condition etc. complete.
1
-
-
... More
Gardening around the plants and open space - Shall be landscaped with Grass Lawns, Hedge, Shrubs – heliconia psittacorum(parrot Heliconia), Red Dhalia, Duranta Golden, Murraya Exotica, Jatropha, Croton, Tulsi, Rose, Jasmine (Chameli), Bougainvillea, China rose, Henna (mehndi), cactus plant, cana, etc.
1
-
-
... More
AERATOR
-
-
-
... More
Design, construction of Cascade aerator in RCC M30- Earth work Excavation, providing and laying in position cement concrete of specified grade including the cost of centering and shuttering at all levels and reinforced cement concrete M30 grade using cement content as per approved design mix including pumping of concrete to site of laying, centering, shuttering and straightening, cutting, bending, placing in position of steel reinforcement at all levels. All internal and external surfaces shall be provided with required thickness of plastering. Finishing walls with waterproof cement paint of required shade and finishing with epoxy paint at all location prepared and applied as per manufacturer specifications. Supply, fabrication and fixing of structural steel materials, MS pipes at all levels for hand railing in walkways, platforms, staircase etc. with two or more coat of synthetic enamel painting including two coat of primer etc complete as approved. Cement concrete Flooring with a floating coat of neat cement including cement slurry etc. complete as per specification with all allied civil works – Civil works
1
-
-
... More
Design and construction of channels from Cascade Aerator upto Distribution Chamber in RCC M30: Earth work Excavation, providing and laying in position cement concrete of specified grade including the cost of centering and shuttering at all levels and reinforced cement concrete M30 grade using cement content as per approved design mix including pumping of concrete to site of laying, centering, shuttering and straightening, cutting, bending, placing in position of steel reinforcement at all levels.All internal and external surfaces shall be provided with required thickness of plastering. Finishing walls with waterproof cement paint of required shade and finishing with epoxy paint at all location prepared and applied as per manufacturer specifications. Supply, fabrication and fixing of structural steel materials, MS pipes at all levels for hand railing in walkways, platforms, staircase etc. with two or more coat of synthetic enamel painting including two coat of primer etc complete as approved. Cement concrete Flooring with a floating coat of neat cement including cement slurry etc.. complete as per specification with all allied civil works – Civil works
1
-
-
... More
Design and construction of Distribution Chamber in RCC M30 - Earth work Excavation, providing and laying in position cement concrete of specified grade including the cost of centering and shuttering at all levels and reinforced cement concrete M30 grade using cement content as per approved design mix including pumping of concrete to site of laying, centering, shuttering and straightening, cutting, bending, placing in position of steel reinforcement at all levels. All internal and external surfaces shall be provided with required thickness of plastering. Finishing walls with waterproof cement paint of required shade and finishing with epoxy paint at all location prepared and applied as per manufacturer specifications. Supply, fabrication and fixing of structural steel materials, MS pipes at all levels for hand railing in walkways, platforms, staircase etc. with two or more coat of synthetic enamel painting including two coat of primer etc complete as approved. Cement concrete Flooring with a floating coat of neat cement including cement slurry etc.. complete as per specification with all allied civil works – Civil Works
1
-
-
... More
Design and construction of Channels from Distribution Chamber upto Flash mixer Chamber in RCC M30 : Earth work Excavation, providing and laying in position cement concrete of specified grade including the cost of centering and shuttering at all levels and reinforced cement concrete M30 grade using cement content as per approved design mix including pumping of concrete to site of laying, centering, shuttering and straightening, cutting, bending, placing in position of steel reinforcement at all levels. All internal and external surfaces shall be provided with required thickness of plastering. Finishing walls with waterproof cement paint of required shade and finishing with epoxy paint at all location prepared and applied as per manufacturer specifications. Supply, fabrication and fixing of structural steel materials, MS pipes at all levels for hand railing in walkways, platforms, staircase etc. with two or more coat of synthetic enamel painting including two coat of primer etc complete as approved. Cement concrete Flooring with a floating coat of neat cement including cement slurry etc. complete as per specification with all allied civil works- Civil Works
1
-
-
... More
FLASH MIXER
Design and construction of Flash mixer in RCC M30 - Earth work Excavation, providing and laying in position cement concrete of specified grade including the cost of centering and shuttering at all levels and reinforced cement concrete M30 grade using cement content as per approved design mix including pumping of concrete to site of laying, centering, shuttering and straightening, cutting, bending, placing in position of steel reinforcement at all levels. All internal and external surfaces shall be provided with required thickness of plastering. Finishing walls with waterproof cement paint of required shade and finishing with epoxy paint at all location prepared and applied as per manufacturer specifications. Supply, fabrication and fixing of structural steel materials, MS pipes at all levels for hand railing in walkways, platforms, staircase etc. with two or more coat of synthetic enamel painting including two coat of primer etc complete as approved. Cement concrete Flooring with a floating coat of neat cement including cement slurry etc. complete as per specification with all allied civil works. Supply, delivery and erection of complete flash mixer mechanical equipments with shafts, motor, gear arrangements with all necessary fittings, pipe connection, controls etc. complete as per specification with all allied mechanical works.
-
-
-
... More
Civil Works
1
-
-
... More
Flash mixer mechanism as per specification with all allied mechanical works- Mechanical Works
1
-
-
... More
FLOCCULATOR Design and construction of Flocculator in RCC M30- Earth work Excavation, providing and laying in position cement concrete of specified grade including the cost of centering and shuttering at all levels and reinforced cement concrete M30 grade using cement content as per approved design mix including pumping of concrete to site of laying, centering, shuttering and straightening, cutting, bending, placing in position of steel reinforcement at all levels. All internal and external surfaces shall be provided with required thickness of plastering. Finishing walls with waterproof cement paint of required shade and finishing with epoxy paint at all location prepared and applied as per manufacturer specifications. Supply, fabrication and fixing of structural steel materials, MS pipes at all levels for hand railing in walkways, platforms, staircase etc. with two or more coat of synthetic enamel painting including two coat of primer etc complete as approved. Cement concrete Flooring with a floating coat of neat cement including cement slurry etc.. complete as per specification with all allied civil works. Supply, delivery and erection of complete mechanical equipments with flocculating mechanism, motors, stirring paddles, gear box/gear motor, etc. complete as per specification with all allied mechanical works.
-
-
-
... More
Civil Works
1
-
-
... More
Flocculator mechanism as per specification with all allied mechanical works - Mechanical Works
1
-
-
... More
Design and construction of Flocculator in RCC M30- Earth work Excavation, providing and laying in position cement concrete of specified grade including the cost of centering and shuttering at all levels and reinforced cement concrete M30 grade using cement content as per approved design mix including pumping of concrete to site of laying, centering, shuttering and straightening, cutting, bending, placing in position of steel reinforcement at all levels, including necessary arrangements as per specification with all allied works etc complete - Construction up to foundation level.
1
-
-
... More
PLATE SETTLER Design and construction of Plate settler clarifier with plate settlers and channels in RCC M30 : Earth work Excavation, providing and laying in position cement concrete of specified grade including the cost of centering and shuttering at all levels and reinforced cement concrete M30 grade using cement content as per approved design mix including pumping of concrete to site of laying, centering, shuttering and straightening, cutting, bending, placing in position of steel reinforcement at all levels. All internal and external surfaces shall be provided with required thickness of plastering. Finishing walls with waterproof cement paint of required shade and finishing with epoxy paint at all location prepared and applied as per manufacturer specifications. Supply, fabrication and fixing of structural steel materials, MS pipes at all levels for hand railing in walkways, platforms, staircase etc. with two or more coat of synthetic enamel painting including two coat of primer etc complete as approved as per specification with all allied civil works - Civil works.
1
-
-
... More
Design and construction of Plate settler units : Plate settler units consist of RCC M30 channels inside and launder outside with walkway platforms with handrail all around of each tank, required staircase RCC / structural staircase including necessary fittings with two or more coat of synthetic enamel painting including two coat of primer etc complete as approved. RCC M30 grade using cement content as per approved design mix including pumping of concrete to site of laying, centering, shuttering and straightening, cutting, bending, placing in position of steel reinforcement at all levels with necessary finishing works. RCC Tank with epoxy paint at all location prepared and applied as per manufacturer specifications etc.. complete as per specification with all allied civil works - Civil works.
1
-
-
... More
Supply and fixing of Sludge transfer pump - Dewatering sludge pump for each parallel plate settler as per specification etc. complete.
2
-
-
... More
GRAVITY SAND FILTER
-
-
-
... More
Design and construction of Gravity Sand Filter including Filter House Building - Gravity Sand Filter in RCC M30, Filter media inside the Filter beds and filter operation gallery shall be covered with RCC frame with masonry walls. Gravity Sand Filter of 3 Nos. with required capacity as per specification and back wash over head tank of necessary capacity as per specification. Design and construction of Filter house with RCC framed structures in RCC M30 and footings for filters including pipe gallery, inlet channel etc. Providing and laying in position cement concrete of specified grade including the cost of centering and shuttering at all levels and reinforced cement concrete M30 grade using cement content as per approved design mix including pumping of concrete to site of laying, centering, shuttering and straightening, cutting, bending, placing in position of steel reinforcement at all levels. Supplying, fabrication and fixing of structural steel materials, MS pipes for hand railing in walkways, platforms, staircase etc. with two or more coat of synthetic enamel painting including two coat of primer etc complete as approved. Finishing walls with Acrylic Smooth exterior paint of required shade including priming coat of two or more coat, waterproof cement paint of required shade and finishing with epoxy paint at all location and wherever is required, applied as per manufacturer specifications, flooring, providing and fixing of doors windows, PVC rain water pipes etc as per specifications with all allied civil works - Civil works
1
-
-
... More
Design and construction of Filtered water channel from Rapid Gravity Sand filter to Clear water reservoir - Earth work Excavation, providing and laying in position cement concrete of specified grade including the cost of centering and shuttering at all levels and reinforced cement concrete M30 grade using cement content as per approved design mix including pumping of concrete to site of laying, centering, shuttering and straightening, cutting, bending, placing in position of steel reinforcement at all levels. Finishing walls with plastering, waterproof cement paint of required shade and finishing with epoxy paint at all location prepared and applied as per manufacturer specifications and all allied Civil Work - Civil works.
1
-
-
... More
Firefighting arrangement with hydrant pumps, Firefighting pump: horizontal centrifugal pumps, piping arrangement, Sprinkler system and potable fire extinguishers including necessary approvals with all allied civil works, Mechanical and electrical works as per norms.
1
-
-
... More
CLEAR WATER RESERVIOR & PUMP HOUSE.
-
-
-
... More
Design and construction of Clear water reservoir of capacity 1250 m3 in RCC M30 - Earth work Excavation, providing and laying in position cement concrete of specified grade including the cost of centering and shuttering at all levels and reinforced cement concrete M30 grade using cement content as per approved design mix including pumping of concrete to site of laying, centering, shuttering and straightening, cutting, bending, placing in position of steel reinforcement at all levels. Including all finishing works, supplying, fabrication and fixing of structural steel materials / MS pipes with two or more coat of synthetic enamel painting including two coat of primer etc complete as approved.. Cost including supplying and fixing of required CI Manhole cover with frame confirming to IS 1726 , CI cowl over CI ventilation pipe with minimum 100mm dia. etc complete with necessary fittings as per specification with all allied civil works.
1
-
-
... More
Design and construction of Clear water reservoir of capacity 1250 m3 in RCC M30 up to foundation level - Earth work Excavation, providing and laying in position cement concrete of specified grade including the cost of centering and shuttering at all levels and reinforced cement concrete M30 grade using cement content as per approved design mix including pumping of concrete to site of laying, centering, shuttering and straightening, cutting, bending, placing in position of steel reinforcement up to plinth level - Construction up to Foundation levels as per specification with all allied civil works.
1
-
-
... More
Design and construction clear water reservoir pump house : Earth work Excavation, providing and laying in position cement concrete of specified grade including the cost of centering and shuttering at all levels and reinforced cement concrete M30 grade using cement content as per approved design mix including pumping of concrete to site of laying, centering, shuttering and straightening, cutting, bending, placing in position of steel reinforcement at all levels. Masonry wall for superstructure upto floor two level all finishing works including painting of required shade, flooring , supply and fixing of doors windows, rolling shutters with two or more coat of synthetic enamel painting including two coat of primer etc complete as approved as per specification with all allied civil works.
1
-
-
... More
CHLORINATOR
-
-
-
... More
Design and construction of Chlorination building:
Chlorination shed and chlorine cylinder storage area. : Earth work Excavation, providing and laying in position cement concrete of specified grade including the cost of centering and shuttering at all levels and reinforced cement concrete M25 grade using cement content as per approved design mix including pumping of concrete to site of laying, centering, shuttering and straightening, cutting, bending, placing in position of steel reinforcement at all levels. Masonry works for superstructure upto floor two level thickness , all finishing works including painting of required shade, flooring , supply and fixing of doors windows, rolling shutters with two or more coat of synthetic enamel painting including two coat of primer etc complete as approved as per specification with all allied civil works.
1
-
-
... More
Chlorinator capacity of 2 kg/hour (one working and one standby) for pre and post chlorination with chlorine cylinder, safety arrangements, etc. Mechanical work such as diffuser for pre-chlorination, etc. as per specification with all fittings
1
-
-
... More
PIPE WORK All inter connecting pipes used for various facilities in WTP
All interconnecting piping’s with CI/DI flanged pipes, valves and other accessories. Gate valve shall be made up of forged steel provided up to DN 50. All gate valves shall conform to API 600. as per specification with all necessary fittings, Hydraulic testing of pipe lines etc complete as per specifications with all allied works.
1
-
-
... More
INSTRUMENTATION AND AUTOMATION SCADA arrangements and automatic control mechanism for all unit operations. Online monitoring arrangement for quality at the beginning and end of each unit operations and self adjusting mechanism for the entire plant. The system shall generally be PLC based, field proven multitasking WINDOWS OS, Antivirus Ms Office, Printer Installation Soft Ware, Brief Specification for Computer System: Processor Type Intel Core i7 processor or better with latest clock speed, RAM :16 GB DDR3, RAM expandable up to 32 GB, HDD Drive :1TB SSD (Min) ,Operating System : Windows based latest at the time of procurement, Other Accessories :Anti-virus software, Mouse: Optical/Scroll type, Keyboard : Standard- Industrial type, CD/DVD Drive :DVD combo drives (R&W),Ethernet interface card :10/100/1000 Base T(Redundant),Additional ports: Four (4) USB, two (2) serial, Colour monitor :22’’ LED as per specifications
-
-
-
... More
CCTV system (IP based CCTV with DVR a storage capacity of min. 2TB or min 30 days and Monitoring PC and other accessories as per TS)
1
-
-
... More
PLC (PLC with Hot Redundant controller communication and power supply configuration)
1
-
-
... More
Controller for chlorine gas Dosing system & its panels
1
-
-
... More
Plant Communication System & FDA (Plant Telephone and Public addressing system)
1
-
-
... More
Field instruments (HART), Online monitoring system, cables, JB & cable tray etc.
1
-
-
... More
UPS for Automation system with maintenance free sealed lead acid batteries of with 30mins backup shall be provided
1
-
-
... More
MISCELLANEOUS WORK Switch gear room, Laboratory room, office room, PLC room and cable trenches of RCC framed construction (Two storey building). Earth work Excavation, providing and laying in position cement concrete of specified grade including the cost of centering and shuttering at all levels and reinforced cement concrete M25 grade using cement content as per approved design mix including pumping of concrete to site of laying, centering, shuttering and straightening, cutting, bending, placing in position of steel reinforcement at all levels. Masonry wall for superstructure upto floor two level, all finishing works including plastering, painting, Flooring, suply and fixing of Doors and windows as per specification with all allied civil works.
1
-
-
... More
CHEMICAL HOUSE
-
-
-
... More
Chemical house including storage of chemicals, overhead tank, mixing and dosing arrangements for alum, lime and poly electrolyte etc. Alum preparation and dosing tanks, Lime preparation and dosing tanks). Earth work Excavation, providing and laying in position cement concrete of specified grade including the cost of centering and shuttering at all levels and reinforced cement concrete M25 grade using cement content as per approved design mix including pumping of concrete to site of laying, centering, shuttering and straightening, cutting, bending, placing in position of steel reinforcement at all levels. Masonry wall for superstructure upto floor two level, all finishing works including plastering, painting, flooring , doors windows etc. as per specification with all allied civil works.
1
-
-
... More
Chemical house including storage of chemicals, overhead tank, mixing and dosing arrangements for alum, lime and poly electrolyte etc. Alum preparation and d o s i n g t a n k s Lime preparation and dosing tanks, Civil Work - Construction up to foundation level. Earth work Excavation, providing and laying in position cement concrete of specified grade including the cost of centering and shuttering at all levels and reinforced cement concrete M25 grade using cement content as per approved design mix including pumping of concrete to site of laying, centering, shuttering and straightening, cutting, bending, placing in position of steel reinforcement at all levels as per specification with all allied works up to foundation level.
1
-
-
... More
PUMPS AND BLOWERS
-
-
-
... More
Supply and fixing of Dosing pumps - alum dosing pump capacity 162 lph 2 no’s of 1 working and 1 stand by., Lime dosing pump capacity 811 lph , 2 no’s of 1 working and 1 standby, Poly electrolyte dosing pump capacity 91 lph, 2 no’s 1 working and 1 standby.
1
-
-
... More
Dirty back wash collection sump from GSF approximate capacity of 186 cum per specification with all allied civil works - top covered - Earth work Excavation, providing and laying in position cement concrete of specified grade including the cost of centering and shuttering at all levels and reinforced cement concrete M30 grade using cement content as per approved design mix including pumping of concrete to site of laying, centering, shuttering and straightening, cutting, bending, placing in position of steel reinforcement at all levels all internal and external surfaces shall be cement plaster. Finishing walls with waterproof cement paint of required shade and finishing with epoxy paint at all location prepared and applied as per manufacturer specifications. Supplying, fixing and fabrication of structural steel materials, MS pipe with two or more coat of synthetic enamel painting including two coat of primer etc complete as approved as per specification with all allied civil works.
1
-
-
... More
Supply and fixing of Dirty back wash transfer pump 44 cum/hr, 30 m head of submersible type, RPM of pump shall be less than 1000, minimum size of particle handle by pump is 10mm Type of pump: Dry motor submersible waste water pump Pump and accessories as per specification.
2
-
-
... More
Supply and fixing of Back wash water feeding pump to OHT -Capacity 107 cum/hr, 30m head Impeller: SS gr.CF8M ASTMA 351, Bowl :CI as per IS:210 Gr. FG 260, Pump shaft: SS410 ASTMA 276, line shaft: SS410 ASTMA 276, Column pipe: Steel grade-A as per IS:2062 and accessories as per specification.
2
-
-
... More
Supply and fixing of Air blower for filter back wash capacity- 1485 cum/hr., 0.4 kg/cm2, the blowers shall be operated with a speed less than 1000 rpm and the noise level from the blower shall be less than 85dB at the distance of 1m from blower. Epoxy painting after blast cleaning shall be provided for blower. MOC OF BLOWER: casing: CI -IS:210, Gr. FG260, rotor: CI -IS:210, Gr. FG260, shaft: EN19, timing gear: alloy steel and accessories as per specification.
2
-
-
... More
Supply and fixing of Air blower for back wash water sump agitation- capacity 213 cum/hr., 0.5 kg/cm2 1 no of submersible agitators with SS:316 cutter and impeller shall be provided, RPM of agitator shall be less than 1000, the submersible agitators shall have guide rails for easy lifting from sumpand accessories as per specification.
1
-
-
... More
Supply and fixing of High pressure jet pump for flushing 10 cum/hr.as per specification.
1
-
-
... More
SLUDGE HANDLING SYSTEM Tube settler sludge will be transferred to sludge thickener through sludge transfer pumps and thickened sludge will be dried in the sludge drying bed before disposed off as dry solid cake.
Sludge thickener approximate capacity of 134 kg/hr solids loading rate. Earth work Excavation, providing and laying in position cement concrete of specified grade including the cost of centering and shuttering at all levels and reinforced cement concrete M30 grade using cement content as per approved design mix including pumping of concrete to site of laying, centering, shuttering and straightening, cutting, bending, placing in position of steel reinforcement at all levels. All internal and external surfaces shall be cement plaster and finishing walls with waterproof cement paint of required shade and finishing with epoxy paint at all location prepared and applied as per manufacturer specifications. Supplying, fixing and fabrication of structural steel materials, MS pipes for hand railing in walkways, platforms, staircase, roft etc. with two or more coat of synthetic enamel painting including two coat of primer etc complete as approved with all finishing works etc complete as per specification with all allied civil works and all allied mechanical works for Sludge thickener mechanism -
-
-
-
... More
Civil works
1
-
-
... More
Sludge thickener mechanism as per specification with all allied works - Mechanical Works
1
-
-
... More
Supply and fixing of sludge drying bed feed pump approximate capacity 2 cum/hr, 30 m head, including motor, rotatory screw type pumps, PCC for base support of pump etc including necessary fitting and allied works as per specification.
2
-
-
... More
Sludge drying bed of 3 no’s - Earth work Excavation, providing and laying in position cement concrete of specified grade including the cost of centering and shuttering at all levels and reinforced cement concrete M30 grade using cement content as per approved design mix including pumping of concrete to site of laying, centering, shuttering and straightening, cutting, bending, placing in position of steel reinforcement at all levels. Masonry wall with plastering, flooring and all finishing works including painting of required shade and finishing with epoxy paint at all location prepared and applied as per manufacturer specifications. Supplying and fixing of MS pipes with two or more coat of synthetic enamel painting including two coat of primer etc complete as approved, as per specification with all allied works.
1
-
-
... More
Design and construction of Blower room: Excavation, providing and laying in position cement concrete of specified grade including the cost of centering and shuttering at all levels and reinforced cement concrete M25 grade using cement content as per approved design mix including pumping of concrete to site of laying, centering, shuttering and straightening, cutting, bending, placing in position of steel reinforcement at all levels. Masonry wall with plastering, flooring and all finishing works including painting of required shade and finishing with epoxy paint at all location prepared and applied as per manufacturer specifications. Supplying and fixing of MS pipes with two or more coat of synthetic enamel painting including two coat of primer etc complete as approved, as per specification with all allied works.
1
-
-
... More
AUXILLIARY AND ANCILLARY SYSTEM
-
-
-
... More
Design and construction of Time Office : Excavation, providing and laying in position cement concrete of specified grade including the cost of centering and shuttering at all levels and reinforced cement concrete M25 grade using cement content as per approved design mix including pumping of concrete to site of laying, centering, shuttering and straightening, cutting, bending, placing in position of steel reinforcement at all levels. Masonry wall with plastering, flooring and all finishing works including painting of required shade and finishing with epoxy paint at all location prepared and applied as per manufacturer specifications. Supplying and fixing of MS pipes with two or more coat of synthetic enamel painting including two coat of primer etc complete as approved, as per specification with all allied works.
1
-
-
... More
Split Air-Conditioning System as per specifications of five-star energy rating unit, evaporating unit shall be wall mounted, the fan impeller shall be of low speed design, without noise and vibration, compressor temperature as high as 45oC, for Control Room, Chlorination PLC room, Office Room & Laboratory etc
13
-
-
... More
Ventilation Fan System with tube axial fan of minimum thickness of the casing, flanges, and base plate will be 3.15, 6, and 6mm respectively, and fan speed will be 1500rpm,the face air velocity of inlet louver will be 2-2.5 m/sec, air filter will be 3 ply HDPE, with GI/Aluminum frame of 610 x 610x 50mm thick for Electrical Switch Gear Room, Chemical storage room, Clear water pump house & toilet.
1
-
-
... More
Auxiliary material handling system for pump house and chemical house as per specification with all allied works.
1
-
-
... More
Supply and fixing of Laboratory equipments as per specifications: Laboratory for WTP shall be provided with all necessary equipment and facilities required to test at least the following physical, chemical and bacteriological properties of water (raw water, clarified water, clear water, underflow of clarifier(sludge)) pH meter, turbidi meter, flame photometer: Spectrophotometer visible, scanning spectrophtot meter, Gas chromatograph
Atomic absorption spectrophotometer, Spectrophotometer, Chemical and reagent, Water purifier, COD DIGESTOR THERMOREACTER, COD analyser, BOD analyser: WTW/MERCK, BOD incubator etc complete as per specification.
The instruments, glassware, chemicals, furniture to be provided in the laboratory as per specifications.
1
-
-
... More
ELECTRICAL SYSTEM
Electrification from Main PCC in the substation to all units including yard and street lighting, building, earthing, interlocking, etc.
-
-
-
... More
LT Switchgear panels including PCC, MCC, PDBs, ACDBs etc (PCC includes outgoing feeders for future MCCs of 12.5 MLD).
1
-
-
... More
Illumination works as per specifications
Complete lighting system for the Electrical Control Rooms, Chemical House, and Chemical Dosing Unit, Clear Water pump House, Blower room, Chlorination Buildin all other buildings, pump houses, cascade areator, all other buildings, and road lighting etc. For Switch Gear Room 200 Lux, Control Room 300 Lux, Office Room 500 Lux, Pump House 100-150 Lux, Laboratory 150-200 Lux, stores 50-100 Lux, Scale Pit/Settling Tank 100 Lux, Emergency Water Tanks 10-20 Lux, Road Lighting 10-20 Lux
1
-
-
... More
Interconnecting power and control cables from PCC Switch Boards to MCCs, PDBs, LDBs, ACDBs etc and MCC to Motors/valves/ various other low voltage consumers, local push button stations, space heaters etc as per the specfications. LT cabling (Power & control cabling) and cabling materials, LPBS etc. with 1.1kv grade heavy duty pvc insulated and pvc sheathed armoured cables minimum size of cable shall be 4 sq. mm copper for power and 2.5 sq.mm copper for control circuits.
1
-
-
... More
Earthing & Lightning protection as per specifications
Earthing station in accordance with IS:3043 shall comprise cast iron pipes of 100mm diameter,3000mm long and 13mm thick with good electrical continuity, backfill with charcoal common salt, earth, masonry chamber, markers etc. For earthing of building columns, crane/movable equipment, rails etc. minimum 40 x 6 mm galvanized steel flats shall be used,6 sqmm stranded GS wire to be full satisfcation of Electrical Inspectorate Lightning Protection shall comply IEC 62305, shall comprise air termiations, in the form of horizontal conductors, down conductors and earth electrodes and full satisfaction of Electrical Inspectorate
1
-
-
... More
Cable trench and Miscellaneous works Earth work Excavation, providing and laying in position cement concrete of specified grade including the cost of centering and shuttering at all levels and reinforced cement concrete M25 grade using cement content as per approved design mix including pumping of concrete to site of laying, centering, shuttering and straightening, cutting, bending, placing in position of steel reinforcement at all levels as per specification with all allied works up to Plinth level.
1
-
-