Kerala Electrical And Allied Engineering Company Limited Tender

... More
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Kerala Electrical And Allied Engineering Company Limited - KEL Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date26 Mar 2025
Closing Date2 Apr 2025
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
75.8.1 Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (i) Nominal mix (1:2:4)

43.95

-

-

... More
11.1.1.1 Excavation for Structures br Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. br I. Ordinary soil br (i) Upto 3 m depth

12.38

-

-

... More
11.4.1.1 Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 br I. P.C.C grade M 10 br (i) Nominal mix 1:3:6

4.5

-

-

... More
12.5.3 Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204<br> For height upto 5 m <br> III. R.C.C grade M 20

13.95

-

-

... More
12.7 Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202

0.77

-

-

... More
OD64907/2024-2025 Supplying and fixing Granite Name board 0.60mx0.45m with CC1:2:4, 1.00mx1.00m

1

-

-

... More
PARLASSERI-THEKKUMURI ROAD

-

-

-

... More
3.5.2 Excavation in Soil with Dozer with lead upto 100 m br Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections

90.52

-

-

... More
4.1.A.1 Granular Sub-base with Well Graded Material (Table 400.1) br (A) By Mix in Place Method br Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. br (i) For Grading I Material

67.89

-

-

... More
75.8.1 Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (i) Nominal mix (1:2:4)

66.8

-

-

... More
OD64906/2024-2025 Filling with Quarry Muck ,Filling up low lying and water logged areas with local material/quarry muck

17.52

-

-

... More
OD64905/2024-2025 Supplying and fixing Granite Name board 0.60mx0.45m with CC1:2:4, 1.00mx1.00m

4

-

-

... More
DUBAIPADI-VADAKKUMPURAM-CHOLA ROAD

-

-

-

... More
2.8.1 Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil

30.82

-

-

... More
4.1.8 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)

3.54

-

-

... More
4.1.3 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)

48.12

-

-

... More
4.3.3 Centering and shuttering including strutting, propping etc. and removal of form work for:Columns, piers, abutments, pillars, posts and struts

169.64

-

-

... More
5.3 Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15sup0/sup landings, balconies, shelves, chajjas, lintels, bands,plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size).

4.3

-

-

... More
5.22.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more

1941

-

-

... More
5.9.3 Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform

13.75

-

-

... More
OD67101/2024-2025 Supplying and fixing granite board 0.60m x0.45m with cc 1:2:4 1.00m x 1.00m

1

-

-

... More
PANAYUR VAYANASALA- UNNATHU PADI ROAD

-

-

-

... More
2.8.1 Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil

17.96

-

-

... More
4.1.8 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)

5.84

-

-

... More
5.1.3 Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

64.97

-

-

... More
4.3.2 Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.

221.2

-

-

... More
5.22.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more

634.11

-

-

... More
OD67100/2024-2025 Supplying and fixing granite board 0.60m x0.45m with cc 1:2:4 1.00m x 1.00m

1

-

-

... More
EXCLUSIVE OF GST

-

-

-

... More
Note :1 All materials, Items, Equipment shall be best branded items with IS and approved by client/KEL

-

-

-

... More
2:Rate should be inclusive of Insurance,Transportation, delivery and installation cost for all items

-

-

-

... More
3.Rate should be Exclusive of GST.

-

-

-

... More
4.Work should be executed as per DSR/PWD specification and direction of Engineer at site.

-

-

-

... More
5.CEMENT: Make use Malabar cement only as per Govt. direction and in case of non availabilty of Malabar cement use Ultra Tech, Dalmia, Ramco or eq. brand in the order of preference.

-

-

-

... More
6.RCC: (Assessment of strength of concrete by Cube testing at Approved Govt labs as per IS) Cement make: Use Malabar cement only as per Govt. direction and in case of non availabilty of Malabar cement use Ultra Tech, Dalmia, Ramco or eq. brand in the order of preference.

-

-

-

... More
7.STEEL REINFORCEMENT: Make: Tata,Vaishak, SAIL, JSW or eq primary make in the order of preference

-

-

-

... More
8.CENTERING & SHUTTERING: (Centering and shuttering for different category of work may be considered separately.)

-

-

-

... More
GRANULAR SUB BASE: Quantity by level calculation & reporting to CTE as per norms

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.