Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 50,000Document Cost
₹ 2,950Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_KEL_725109_1Tender No
KRO/BDC/1800/2025Tender Authority
Kerala Electrical And Allied Engineering Company Limited ViewPurchaser Address
-Website
http://https://www.kel.co.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
2.7.1
Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means
over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan)
including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed
earth to be levelled and neatly dressed.Ordinary rock
73.49
-
-
... More
2.6.1
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means
over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan)
including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed
earth to be levelled and neatly dressed.All kinds of soil
139.06
-
-
... More
4.1.8
Providing and laying in position cement concrete of specified grade excluding the
cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4
coarse sand : 8 graded stone aggregate 40 nominal size)
28.79
-
-
... More
4.1.6
Providing and laying in position cement concrete of specified grade excluding the
cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3
coarse sand : 6 graded stone aggregate 40 mm nominal size)
61.84
-
-
... More
4.1.5
Providing and laying in position cement concrete of specified grade excluding the
cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3
coarse sand : 6 graded stone aggregate 20 mm nominal size)
242.49
-
-
... More
5.1.2
Providing and laying in position specified grade of reinforced cement concrete,
excluding the cost of centering, shuttering, finishing and reinforcement - All work up
to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm
nominal size
1.29
-
-
... More
5.2.2
Reinforced cement concrete work in walls (any thickness), including attached
pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,
abutments, posts and struts etc. up tot floor five level excluding cost of centering,
shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded
stone aggregate 20 mm nominal size)
0.19
-
-
... More
4.3.1
Centering and shuttering including strutting, propping etc. and removal of form work
for:Foundations, footings, bases for columns
927.8
-
-
... More
4.3.2
Centering and shuttering including strutting, propping etc. and removal of form work
for:Retaining walls, return walls, (any thickness) including attached pilasters,
buttresses, plinth and string courses fillets, kerbs and steps etc.
237.4
-
-
... More
5.9.6
Centering and shuttering including strutting, etc. and removal of form for:Columns,
Pillars, Piers, Abutments, Posts and Struts
3.84
-
-
... More
5.22.6
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing
in position and binding all complete upto plinth levelThermo - Mechanically Treated
bars of grade Fe-500D or more
4956.15
-
-
... More
14.1.2
Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq meters and
under, including cutting the patch in proper shape, raking out joints and preparing and
plastering the surface of the walls complete, including disposal of rubbish to the
dumping ground within 50 meters lead:Cement mortar 1:4 ( 1 cement: 4 coarse sand)
156
-
-
... More
14.65.2
Finishing walls with textured exterior paint of required shade:Old work( one or more
coats) applied @ 1.82 ltr/ 10 sqm
228.8
-
-
... More
10.25.2
Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting,
fixing in position and applying a priming coat of approved steel primer using
structural steel etc. as required.In gratings, frames, guard bar, ladder, railings,
brackets, gates and similar works
220.5
-
-
... More
13.61.1
Painting with synthetic enamel paint of approved brand and manufacture to give an
even shade:Two or more coats on new work
14.18
-
-
... More
2.28.1
Surface dressing of the ground including removing vegetation and in-equalities not
exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5
m.All kinds of soil
822.96
-
-
... More
51.2.3
Filling with Quarry Muck <br> Filling up low lying and water logged areas
with local material/ quarry muck, spreading in layers, leveling the top at site and
consolidation by ramming, etc complete for improving the CBR value of subgrade
119.84
-
-
... More
4.1.3
Providing and laying in position cement concrete of specified grade excluding the
cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse
sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
119.84
-
-
... More
60.6
PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working
pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc.
complete.
87.7
-
-
... More
OD42304/2024-2025
Providing and fixing Granite of any colour and shade for Name board, of required
size laid over base of cement mortar 1:4 ( 1 cement : 4 coarse sand), including all
charges etc. complete at all, levels, including lettering & fixing
1
-
-
... More
EXCLUSIVE OF GST
-
-
-
... More
Note :1 All materials, Items, Equipment shall be best branded items with IS and approved by client/KEL
-
-
-
... More
2:Rate should be inclusive of Insurance,Transportation, delivery and installation cost for all items
-
-
-
... More
3.Rate should be Exclusive of GST.
-
-
-
... More
4.Work should be executed as per DSR/PWD specification and direction of Engineer at site.
-
-
-
... More
5.CEMENT: Make use Malabar cement only as per Govt. direction and in case of non availabilty of Malabar cement use Ultra Tech, Dalmia, Ramco or eq. brand in the order of preference.
-
-
-
... More
6.RCC: (Assessment of strength of concrete by Cube testing at Approved Govt labs as per IS) Cement make: Use Malabar cement only as per Govt. direction and in case of non availabilty of Malabar cement use Ultra Tech, Dalmia, Ramco or eq. brand in the order of preference.
-
-
-
... More
7.STEEL REINFORCEMENT: Make: Tata,Vaishak, SAIL, JSW or eq primary make in the order of preference
-
-
-
... More
8.CENTERING & SHUTTERING: (Centering and shuttering for different category of work may be considered separately.)
-
-
-
... More
9.Rigid PVCPipes/Casing & Capping - A-ONE/REPUTED MAKE with ISI , Precession, Balco, GEO
-
-
-
... More
10. ACRYLIC SMOOTH EXTERIOR PAINT/ SYNTHETIC ENAMEL PAINT/WHITE CEMENT BASED PUTTY/ CEMENT PRIMER: Make: Asian, Berger, Nerolas or eq. in the order of pref.
-
-
-