Kerala Electrical And Allied Engineering Company Limited Tender

Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Kerala Electrical And Allied Engineering Company Limited - KEL Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date11 Apr 2024
Closing Date18 Apr 2024
Tender Amount₹ 4,09,36,038 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
75.8.1 : Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4 course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as required including compaction, finishing and tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixed in concrete mixer etc complete as per specification (i) Nominal mix (1:2:4) a)Materials

158.49

-

-

... More
Road Maintenance works-Ward 2

-

-

-

... More
3.5.1 : Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3

351

-

-

... More
4.9 : Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead

175.5

-

-

... More
75.8.1 : Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4 course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as required including compaction, finishing and tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixed in concrete mixer etc complete as per specification (i) Nominal mix (1:2:4) a)Materials

175.5

-

-

... More
Road Maintenance works-Ward 3

-

-

-

... More
3.5.1 : Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3

248.7

-

-

... More
4.9 : Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead

124.35

-

-

... More
75.8.1 : Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4 course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as required including compaction, finishing and tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixed in concrete mixer etc complete as per specification (i) Nominal mix (1:2:4) a)Materials

124.35

-

-

... More
Road Maintenance works-Ward 4

-

-

-

... More
3.5.1 : Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3

342

-

-

... More
4.9 : Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead

171

-

-

... More
75.8.1 : Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4 course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as required including compaction, finishing and tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixed in concrete mixer etc complete as per specification (i) Nominal mix (1:2:4) a)Materials

171

-

-

... More
Road Maintenance works-Ward 5

-

-

-

... More
3.5.1 : Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3

342.36

-

-

... More
4.9 : Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead

171.18

-

-

... More
75.8.1 : Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4 course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as required including compaction, finishing and tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixed in concrete mixer etc complete as per specification (i) Nominal mix (1:2:4) a)Materials

171.18

-

-

... More
Road Maintenance works-Ward6

-

-

-

... More
3.5.1 : Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3

315.9

-

-

... More
4.9 : Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead

157.95

-

-

... More
75.8.1 : Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4 course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as required including compaction, finishing and tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixed in concrete mixer etc complete as per specification (i) Nominal mix (1:2:4) a)Materials

157.95

-

-

... More
Road Maintenance works-Ward 7

-

-

-

... More
3.5.1 : Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3

177

-

-

... More
4.9 : Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead

88.5

-

-

... More
75.8.1 : Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4 course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as required including compaction, finishing and tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixed in concrete mixer etc complete as per specification (i) Nominal mix (1:2:4) a)Materials

88.5

-

-

... More
Road Maintenance works-Ward 8

-

-

-

... More
3.5.1 : Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3

234

-

-

... More
4.9 : Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead

117

-

-

... More
75.8.1 : Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4 course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as required including compaction, finishing and tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixed in concrete mixer etc complete as per specification (i) Nominal mix (1:2:4) a)Materials

117

-

-

... More
Road Maintenance works-Ward 9

-

-

-

... More
3.5.1 : Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3

372.6

-

-

... More
4.9 : Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead

186.3

-

-

... More
75.8.1 : Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4 course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as required including compaction, finishing and tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixed in concrete mixer etc complete as per specification (i) Nominal mix (1:2:4) a)Materials

186.3

-

-

... More
Road Maintenance works-Ward 10

-

-

-

... More
3.5.1 : Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3

432

-

-

... More
4.9 : Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead

216

-

-

... More
75.8.1 : Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4 course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as required including compaction, finishing and tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixed in concrete mixer etc complete as per specification (i) Nominal mix (1:2:4) a)Materials

216

-

-

... More
Road Maintenance works-Ward 11

-

-

-

... More
3.5.1 : Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3

337.5

-

-

... More
4.9 : Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead

168.75

-

-

... More
75.8.1 : Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4 course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as required including compaction, finishing and tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixed in concrete mixer etc complete as per specification (i) Nominal mix (1:2:4) a)Materials

168.75

-

-

... More
Road Maintenance works-Ward 12

-

-

-

... More
3.5.1 : Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3

297

-

-

... More
4.9 : Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead

148.5

-

-

... More
75.8.1 : Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4 course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as required including compaction, finishing and tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixed in concrete mixer etc complete as per specification (i) Nominal mix (1:2:4) a)Materials

148.5

-

-

... More
Road Maintenance works-Ward 13

-

-

-

... More
3.5.1 : Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3

310.5

-

-

... More
4.9 : Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead

155.25

-

-

... More
75.8.1 : Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4 course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as required including compaction, finishing and tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixed in concrete mixer etc complete as per specification (i) Nominal mix (1:2:4) a)Materials

155.25

-

-

... More
Road Maintenance works-Ward 14

-

-

-

... More
3.5.1 : Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3

337.5

-

-

... More
4.9 : Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead

168.75

-

-

... More
75.8.1 : Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4 course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as required including compaction, finishing and tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixed in concrete mixer etc complete as per specification (i) Nominal mix (1:2:4) a)Materials

168.75

-

-

... More
Road Maintenance works-Ward 15

-

-

-

... More
3.5.1 : Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3

337.5

-

-

... More
4.9 : Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead

168.75

-

-

... More
75.8.1 : Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4 course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as required including compaction, finishing and tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixed in concrete mixer etc complete as per specification (i) Nominal mix (1:2:4) a)Materials

168.75

-

-

... More
Road Maintenance works-Ward 16

-

-

-

... More
3.5.1 : Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3

375.3

-

-

... More
4.9 : Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead

187.65

-

-

... More
75.8.1 : Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4 course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as required including compaction, finishing and tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixed in concrete mixer etc complete as per specification (i) Nominal mix (1:2:4) a)Materials

187.65

-

-

... More
Road Maintenance works-Ward 17

-

-

-

... More
3.5.1 : Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3

329.4

-

-

... More
4.9 : Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead

164.7

-

-

... More
75.8.1 : Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4 course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as required including compaction, finishing and tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixed in concrete mixer etc complete as per specification (i) Nominal mix (1:2:4) a)Materials

164.7

-

-

... More
Road Maintenance works-Ward 18

-

-

-

... More
3.5.1 : Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3

329.4

-

-

... More
4.9 : Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead

164.7

-

-

... More
75.8.1 : Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4 course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as required including compaction, finishing and tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixed in concrete mixer etc complete as per specification (i) Nominal mix (1:2:4) a)Materials

164.7

-

-

... More
Road Maintenance works-Ward 19

-

-

-

... More
3.5.1 : Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3

345.6

-

-

... More
4.9 : Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead

172.8

-

-

... More
75.8.1 : Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4 course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as required including compaction, finishing and tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixed in concrete mixer etc complete as per specification (i) Nominal mix (1:2:4) a)Materials

172.8

-

-

... More
Road Maintenance works-Ward 20

-

-

-

... More
3.5.1 : Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3

297

-

-

... More
4.9 : Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead

148.5

-

-

... More
75.8.1 : Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4 course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as required including compaction, finishing and tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixed in concrete mixer etc complete as per specification (i) Nominal mix (1:2:4) a)Materials

148.5

-

-

... More
Road Maintenance works-Ward 21

-

-

-

... More
3.5.1 : Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3

334.8

-

-

... More
4.9 : Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead

167.4

-

-

... More
75.8.1 : Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4 course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as required including compaction, finishing and tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixed in concrete mixer etc complete as per specification (i) Nominal mix (1:2:4) a)Materials

167.4

-

-

... More
EXCLUSIVE OF GST

-

-

-

... More
Note :1 All materials, Items, Equipment shall be best branded items with IS and approved by client/KEL

-

-

-

... More
2:Rate should be inclusive of Insurance,Transportation, delivery and installation cost for all items

-

-

-

... More
3.Rate should be Exclusive of GST.

-

-

-

... More
4.Work should be executed as per DSR/PWD specification and direction of Engineer at site.

-

-

-

... More
5.CEMENT: Make use Malabar cement only as per Govt. direction and in case of non availabilty of Malabar cement use Ultra Tech, Dalmia, Ramco or eq. brand in the order of preference.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.