Kerala Electrical And Allied Engineering Company Limited Tender

Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Kerala Electrical And Allied Engineering Company Limited - KEL Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date7 Jan 2025
Closing Soon14 Jan 2025
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
2.33.2 : Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth

10

-

-

... More
2.33.3 : Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyond 120 cm girth up to and including 240 cm girth

2

-

-

... More
2.1.1 : Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil

2456.9

-

-

... More
16.78.3 : Construction of granular sub- base by Providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, Carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in- Charge.With material conforming to Grade - III ( size range 26.5 mm to 0.075 mm) having CBR Value - 20

299.39

-

-

... More
5.9.1 : Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete

580.5

-

-

... More
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more

515.61

-

-

... More
5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size

450.74

-

-

... More
od339796/2023_2024 : Dry rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement: 6 course sand: 12 graded stone aggregate 20mm nominal size) including cost of through stone and bond stone.

275.55

-

-

... More
10.1 : Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.

620

-

-

... More
13.52.1 : Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work

124.5

-

-

... More
50.2.25.1 : Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge

98.4

-

-

... More
od339814/2023_2024 : Hire charges for constructing temporary bridge by using ISMB 250, ISMB 300 and 8mm chequred plate including charges of transportation, loading, Unloading, cutting, welding and grinding

10.5

-

-

... More
KSEB electric Post position changing and shifting including the cost of labour and material charges. etc. complete as per the instruction of KSEB Engineers- in charge (4Nos. X Rs. 6500/ each)

1

-

-

... More
EXCLUSIVE OF GST

-

-

-

... More
Note :1 All materials, Items, Equipment shall be best branded items with IS and approved by client/KEL

-

-

-

... More
2:Rate should be inclusive of Insurance,Transportation, delivery and installation cost for all items

-

-

-

... More
3.Rate should be Exclusive of GST.

-

-

-

... More
4.Work should be executed as per DSR/PWD specification and direction of Engineer at site.

-

-

-

... More
5.CEMENT: Make use Malabar cement only as per Govt. direction and in case of non availabilty of Malabar cement use Ultra Tech, Dalmia, Ramco or eq. brand in the order of preference.

-

-

-

... More
6.ELECTRICAL: Note: Rate should be inclusive of preparation of schematic diagram and getting approval from KSEB/Electrical Inspectorate. Statutory fees paid to KSEB/EI shall be paid by us separately.

-

-

-

... More
Make of Electrical equipments/materials

-

-

-

... More
All electrical materials/equipments shall be of best branded items with ISI, strictly as per schedule specification

-

-

-

... More
7.STEEL REINFORCEMENT: Make: Tata,Vaishak, SAIL, JSW or eq primary make in the order of preference

-

-

-

... More
8.CENTERING & SHUTTERING: (Centering and shuttering for different category of work may be considered separately.)

-

-

-

... More
9.DELUXE MULTI SURFACE PAINT SYSTEM: Make: JOTUN, Asian, Berger, Nerolas or eq. in the order of pref.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.