Irrigation Department Tender
... More
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 16,800Document Cost
₹ 1,500Tender Fee
Refer Documents
Summary
Bsp-investigation Of Distributaries
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_Irrig_400938_1Bid Award Id
ViewTender No
AEE/BSP-SD1/E-T/01/2020-21Tender Authority
Irrigation Department ViewPurchaser Address
-Website
http://http://www.irrigation.kerala.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
4.81
-
-
... More
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
0.19
-
-
... More
60.11.1 : FIXING TBM- Supplying and fixing TBM with RCC 1:1.5:3 pillar block having a size of 30*30*75 cm, steel reinforcement for RCC work, painting top and sides of pillar with synthetic enamel paint, lettering in the pillar block with 8cm high "TBM" on one face and the reduced level on the outer face, etc complete, fixed in CC1:3:6 using 40 mm metal 55*55*60 cm etc complete and centering and shuttering including strutting , propping and removal of form work for pillar and foundation.
17
-
-
... More
16.24.1 : Providing and fixing precast reinforced cement concrete 1:1.5:3 ( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) Kilo metre stone as per standard design including finishing smooth in 1:3 cement mortar ( 1 cement : 3 fine sand) but excluding the cost of earth work, concrete in foundation, painting and lettering etc. which shall be paid for separately.35x111x25 cm size
8
-
-
... More
13.43.1 : Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer
5.6
-
-
... More
13.61.1 : Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work
5.6
-
-
... More
13.71 : Lettering with black Japan pint of approved brand and manufacture
200
-
-
... More
56.16 : Preparation of Detailed Project Report of the bridge works containing alignment plan, key plan, contour plan , index map, longitudinal and cross section of road and River/Thodu cross section of bridge hydraulic and velocity calculations including neat filing and supplying five set DPR etc. as per the directions of the departmental officers.
3
-
-
... More
Appendix B
-
-
-
... More
60.11.9 : BORING- with boring equipment through various strata including providing casing pipe and pulling up the same wherever necessary in all kinds of soil including gravelly soil and clay or mixture including all cost of diesel, grease, engine oil and all other labour charges etc complete.(1st depth rate for drilling up to 10 m below G L)
30
-
-
... More
60.11.10 : BORING- with boring equipment through various strata including providing casing pipe and pulling up the same wherever necessary in all kinds of soil including gravelly soil and clay or mixture including all cost of diesel, grease, engine oil and all other labour charges etc complete.(2nd depth rate for drilling 10 m to 20 m below G L) .
6
-
-
... More
60.11.12 : BORING- with boring equipment through hard rock including providing casing pipe and pulling up the same wherever necessary in all kinds of soil including gravelly soil and clay or mixture including all cost of diesel, grease, engine oil and all other labour charges etc complete.(Drilling in hard rock out turn 1 m/day)
3
-
-
... More
60.11.6 : LEVELLING THE BORE HOLE- location site and making platform using sand filled gunny bags including cost of gunny bags and labour charges etc compete for setting the boring rigs ( 60 nos of gunny bags are required for each setting) ./Each
3
-
-
... More
56.1.a : Mobilization including transportation of all necessary plan and equipment's and materials of boring field testing and sampling and demobilization after completing the workFor machine boring
1
-
-
... More
56.2.a : Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location.For machine boring.
3
-
-
... More
60.11.8 : SHIFTING OF PLANT- from bore holes to bore holes by head load including labour etc. complete.
2
-
-
... More
56.7 : Conducting standard penetration test in bore hole at any depth.
3
-
-
... More
56.11.a : Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate)Machine boring for 5 bore holes.
1
-
-
... More
56.11.c : Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab tests (report in triplicate)Additional set for machine boring(extra for bore holes exceeding 5 nos)
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements