Irrigation Department Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 10,242Document Cost
₹ 905Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_Irrig_694209_18Bid Award Id
ViewTender No
PWD/BLDG/RLM/6773/2024-2025Tender Authority
Irrigation Department ViewPurchaser Address
-Website
http://http://www.irrigation.kerala.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
OD240779/2023-2024:Dismantling the 90 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, refitting the motor in position coupling with pump correcting alignment and giving connection, test running with full load including scrapping, cleaning and painting the motor pumpset, base plate etc.with enamel paint.
1
-
-
... More
OD240834/2023-2024:Dismantling the 100 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, refitting the motor in position coupling with pump correcting alignment and giving connection, test running with full load including scrapping, cleaning and painting the motor pumpset, base plate etc.with enamel paint.
3
-
-
... More
OD240835/2023-2024:Dismantling the 110 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, refitting the motor in position coupling with pump correcting alignment and giving connection, test running with full load including scrapping, cleaning and painting the motor pumpset, base plate etc.with enamel paint.
1
-
-
... More
OD103842/2024-2025:Revamping of LT switch boards described as following, measured per square meter area of the front face of panel : 1.External painting - Re painting the panel with superior quality Ivory color paint (using suitable spray painting gun with compressor) including scrapping, cleaning, minor repairs etc. ,and sheet metal works as required. 2.Panel Board repairs & Repair of hinges, minor sheet metal work etc. 3.Replacing rubber beading as required. 4.Panel board interior cleaning including repair of loose termination, bus bars, mountings etc. 5.Renewal of perished fasteners, terminals etc. 6.Trouble shooting the control the wiring including rectifications 7.Renewal of Terminal sockets as required 8.Insulation checks and correction of earthing 9.Filling of un necessary holes in the panel board using suitable sheet metal work. 10. Sealing the cable entry point using expandable PU Foam insulation sealant spray to safeguard from rats. 10. Lettering and identification marking.
2.85
-
-
... More
Motor Lowering Works
-
-
-
... More
OD240772/2023-2024: Lowering down and erecting 5 HP motor/vacuum motor pump set, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
4
-
-
... More
OD240773/2023-2024:Lowering down and erecting 25 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
1
-
-
... More
OD241566/2023-2024:Lowering down and erecting 30 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
1
-
-
... More
OD240775/2023-2024: Lowering down and erecting 90 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
1
-
-
... More
OD241643/2023-2024: Lowering down and erecting 100 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
3
-
-
... More
OD241644/2023-2024: Lowering down and erecting 110 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
2
-
-
... More
Consumables and Supplies
-
-
-
... More
OD240781/2023-2024:Supply and filling of transformer oil of good quality to the Transformer /starter/ regulator etc as required
65
-
-
... More
OD240783/2023-2024: Supply and renewal of the LED Indication lamps in panel board after dismantling the damaged one
9
-
-
... More
OD240784/2023-2024:Supply and Installing 20 W LED Tube light.
7
-
-
... More
OD240786/2023-2024:Supply and renewal of Three Phase digital Ammeter accuracy class 1 in panel board after dismantling the damaged one, L&T or equivalent make.
4
-
-
... More
OD240787/2023-2024:Supply and renewal of Three Phase Digital Voltmeter accuracy class 1 in panel board after dismantling the damaged one, L&T or Equivalent make.
4
-
-
... More
OD240789/2023-2024:Replacing the damaged bearing, supply and fixing new industrial type ball bearing 6316 , SKF / FAG or equivalent, suitable for 110 HP motor / pump set as per the direction of Departmental staff at site.
4
-
-
... More
OD240790/2023-2024:Replacing the damaged bearing, supply and fixing new industrial type ball bearing 6314 , SKF / FAG or equivalent, suitable for 30 HP motor / pump set as per the direction of Departmental staff at site.
2
-
-
... More
OD242566/2023-2024:Replacing the damaged bearing, supply and fixing new industrial type ball bearing 6309 , SKF / FAG or equivalent, suitable for pump (50-120 HP) as per the direction of Departmental staff at site.
8
-
-
... More
OD240791/2023-2024:Dismantling the damaged power contactor and Supply, fixing and testing of following capacity 3 pole power contactor, AC 3 rating at 415 V, with AC Coil, Auxiliary contacts, 2 NO/2NC, L&T MNX 140 or equivalent suitable for 90/100 HP motor's fully automatic star delta starter
2
-
-
... More
OD122799/2024-2025:Revamping of LT switch boards described as following, measured per square meter area of the front face of panel : 1.External cleaning, minor repairs etc. ,and sheet metal works as required. 2.Panel Board repairs & Repair of hinges, minor sheet metal work etc. 3.Replacing rubber beading as required. 4.Panel board interior cleaning including repair of loose termination, bus bars, mountings etc. 5.Renewal of perished fasteners, terminals etc. 6.Trouble shooting the control the wiring including rectifications 7.Renewal of Terminal sockets as required 8.Insulation checks and correction of earthing 9.Filling of un necessary holes in the panel board using suitable sheet metal work. 10. Sealing the cable entry point using expandable PU Foam insulation sealant spray to safeguard from rats. 11. Lettering and identification marking.
5
-
-
... More
OD122820/2024-2025:Providing and fixing following rating Operating Handle , ABB made for existing SDF in the panel board with separate connecting rode, 250 Amps (OESA250 G1)
1
-
-
... More
2.13.1:Supplying and fixing following rating, four pole, 415 volts, isolator in the existing MCB DB complete with connections, testing and commissioning etc. as required.40 amps
1
-
-
... More
2.14.1:Supplying and fixing following rating, double pole, (single phase and neutral), 240 volts, residual
current circuit breaker (RCCB), having a sensitivity current upto 300 milliamperes in the existing MCB DB complete with connections, testing and commissioning etc. as required.25 amps
1
-
-
... More
2.15.2:Supplying and fixing following rating, four pole, (three phase and neutral), 415 volts, residual current circuit breaker (RCCB), having a sensitivity current upto 300 milliamperes in the existing MCB DB complete with connections, testing and commissioning etc. as required.40 amps
1
-
-
... More
OD122824/2024-2025:Providing and fixing following rating Operating Handle , ABB made for existing SDF in the panel board with separate connecting rode, 125 Amps (OESA125 G1)
1
-
-
... More
OD122825/2024-2025:Providing and fixing following rating Operating Handle , ABB made for existing SDF in the panel board with separate connecting rode, 32 Amps (OESA32 G1)
1
-
-
... More
OD123041/2024-2025: Dismantling the 30 HP motor pump set from the base plate, after dismantling the suction & delivery pipes, and removing the old broken foundation bolts from position after demolishing the surrounding layer of the concrete foundation up to 30 cm , providing new foundation bolt / extend from original bolt, and strengthening the base plate, filling the basement with concrete,(excluding concrete) and refitting the motor pump set in correct alignment and fitting suction & delivery pipes and taking trial run at full load
1
-
-
... More
OD125726/2024-2025:Revamping of LT switch boards described as following, measured per square meter area of the front face of panel : 1.External cleaning, minor repairs etc. ,and sheet metal works as required. 2.Panel Board repairs & Repair of hinges, minor sheet metal work etc. 3.Replacing rubber beading as required. 4.Panel board interior cleaning including repair of loose termination, bus bars, mountings etc. 5.Renewal of perished fasteners, terminals etc. 6.Trouble shooting the control the wiring including rectifications 7.Renewal of Terminal sockets as required 8.Insulation checks and correction of earthing 9.Filling of un necessary holes in the panel board using suitable sheet metal work. 10. Sealing the cable entry point using expandable PU Foam insulation sealant spray to safeguard from rats. 10. Lettering and identification marking.
18.7
-
-
... More
OD125727/2024-2025:Charges for scraping , cleaning , painting the existing rusted panel board and dismantling the burnt out wire connection of switches, meters ,cleaning the terminals , attending all minor repairs, painting two coats of enamel paint over a coat of red oxide primmer and making the panel board ( including the naming of separate switches marking ) in good working condition( measured per square meter area of the fron face of the panel)
18.7
-
-
... More
Motor AMC
-
-
-
... More
OD240793/2023-2024:Fully Comprehensive Annual Maintenance of 5 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts, replacing spares with original make as per sample, dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, overhauling of the motor, maintenance of motor thorughout the AMC period whenver necessary (excluding rewinding) repairs of vaccum pipe line, starter, valves electrical accessories etc as required complete in good working condition including painting the motor pumpset, base plate all time during the period of contract and the faults should be rectified with in the time allowed.(Total 3 Motors, 12 months for Each Motor).
1095
-
-
... More
OD240795/2023-2024: Fully Comprehensive Annual Maintenance of 30 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt relese coil, overload coil, reconditioning and refil oil, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, and coupling bolts, Overhauling and reconditioning the pumpset by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base palte, pumpset and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed . "
200
-
-
... More
OD240797/2023-2024: Fully Comprehensive Annual Maintenance of 90 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt relese coil, overload coil, reconditioning and refil oil, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, and coupling bolts, Overhauling and reconditioning the pumpset by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base palte, pumpset and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
265
-
-
... More
OD241766/2023-2024: Fully Comprehensive Annual Maintenance of 100 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt relese coil, overload coil, reconditioning and refil oil, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, and coupling bolts, Overhauling and reconditioning the pumpset by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base palte, pumpset and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
100
-
-
... More
OD240799/2023-2024: Fully Comprehensive Annual Maintenance of 25 HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt relese coil, overload coil, reconditioning and refil oil, reconditioning the slipring unit as required, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, carbon brush and coupling bolts, Overhauling and reconditioning the pumpset by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base palte, pumpset and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
165
-
-
... More
OD240801/2023-2024: Fully Comprehensive Annual Maintenance of 100 HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt relese coil, overload coil, reconditioning and refil oil, reconditioning the slipring unit as required, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, carbon brush and coupling bolts, Overhauling and reconditioning the pumpset by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base palte, pumpset and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .(Total 2 Motors, 12 months for Each Motor).
365
-
-
... More
OD241780/2023-2024: Fully Comprehensive Annual Maintenance of 110 HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt relese coil, overload coil, reconditioning and refil oil, reconditioning the slipring unit as required, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, carbon brush and coupling bolts, Overhauling and reconditioning the pumpset by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base palte, pumpset and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
365
-
-
... More
Motor Lifting Works
-
-
-
... More
OD240804/2023-2024: Lifting the 5 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
4
-
-
... More
OD240805/2023-2024: Lifting the 25 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform. "
1
-
-
... More
OD241790/2023-2024: Lifting the 30 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform. "
1
-
-
... More
OD240807/2023-2024:Lifting the 90 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
1
-
-
... More
OD241795/2023-2024:Lifting the 100 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
3
-
-
... More
OD241797/2023-2024:Lifting the 110 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
2
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements