Irrigation Department Tender

Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Irrigation Department Tender

Works
Civil And Construction
Road Construction
Consultancy Services
Civil And Architectural Services
Eprocure
Opening Date31 Dec 2024
Closing Date9 Jan 2025
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Investigation Of Kakkavayal Vazhavatta -ambalavayal Road

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
SOIL COLLECTION AND TESTING

-

-

-

... More
OD14780/2024-2025:CBR-COLLECTION OF SUBGRADE SOIL SAMPLE AT 500M INTERVAL CAREFULLY BY EXCAVATING PIT OF AREA 1.0*0.6M THROUGH OVERLYING BITUMINOUS AND GRANUALAR LAYER OR FROM SUBGRADE OF FORMATION AREA AS DIRECTED BY THE ENGINEER IN CHARGE FOR LAB TEST AND FILLING BACK AND COMPACTING THE EXCAVATED PIT TO LINES AND LEVELS WITH EXCAVATED MATERIALS AS DIRECTED BY THE DEPARTMENTAL OFFICER AT SITE.

24

-

-

... More
OD14712/2024-2025:CONDUCTING SOIL CLASSIFICATION TEST, STANDARD PROCTER TEST AND CBR TEST AS PER THE IS CODE GUIDELINES AND MAKING REPORT OF ONE SOIL SAMPLE.

24

-

-

... More
TOPOGRAPHIC SURVEY

-

-

-

... More
OD14786/2024-2025:Detailed topographic survey using total station /mobile lider and preparation of site plan of minimum 10M on either side of center line and taking cross section details at 15M intervals on straight roads and 10M interval on curves (survey includes details of all features as mentioned in the scope of plain terrain work with in the limit of survey).The survey shall include establishing DGPS control points at starting and ending of the project in pairs and at 4KM intervals(in pairs) in plain and rolling terrain and 2.5KM intervals (in pairs) in hilly terrains. It shall also include establishing inter visible traverse control points note more than 250M apart with accuracy at least 1:10000 and desirable 1:20000 in distance measurement .elevations on each of the control points connected to MSL and GTS bench marks using precision levelling. Separate BM need not be established including taking sufficient copy prints(5nos)

24

-

-

... More
OD14785/2024-2025:Establishing DGPS control points on TOR steel bar of 10mm dia fixed in RCC pillar of size 20 x 20 x 70 CM embedded in concrete M15 up to a depth of 40 CM and the balance 30CM above the ground shall be painted yellow.

8

-

-

... More
OD14784/2024-2025:Establishing traverse control points with elevations on pillar of size 15 x 15 x 60 CM M20 grade RCC pillar with a nail fixed on top surface. The pillar shall be embedded in the concrete. Spacing 250M apart as BM -CONTROL PILLAR. The spacing shall be maximum 250M apart and intervisible. No separate BM need to be established.

50

-

-

... More
OD15023/2024-2025:Preparation of Detailed Project Report including detailed estimate of the road works containing alignment plan, contour plan , index map, longitudinal and cross section of road and structural drawing and CD works, calculation including neat filing and supplying five set DPR etc. as per the directions of the departmental officers, and based on the recommendations from test results

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.