Irrigation Department Tender

... More
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Irrigation Department Tender

Works
Civil And Construction
Irrigation Work
Eprocure
Opening Date1 Mar 2025
Closing Soon10 Mar 2025
Tender Amount₹ 25,42,363 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
60.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site

7

-

-

... More
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site

1.25

-

-

... More
7.2.1:Random rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including leveling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) at window sills, ceiling level and the like.Cement mortar 1:6 (1 cement : 6 coarse sand)

18.9

-

-

... More
15.56:Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead.

58

-

-

... More
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete

58

-

-

... More
OD1159/2024-2025:Labour for cleaning the expansion joints

1

-

-

... More
OD32713/2024-2025:Grinding and cleaning the concrete surfaces to lines and levels where expansion joint to be provided, filling the joint with Polyurethane backer rod of required size intact and then applying Ist layer of epoxy adhesive ReArm Bond 4031 and sticking MYK Flexi Joint tape TPE of suitable width over it. Once the bottom layer (Ist layer) adhesive sets, over coat the tape with one more layer of adhesive so that tape shall be completely locked inside the epoxy adhesive layers (size of tape shall be such that each side of concrete there shall be a minimum offset of 50mm) and providing protection cover to the expansion joint with Aluminum sheet of thickness not less than 0.04mm and having a width of 30cm throughout the length of joint by fixing the same in concrete surface with screw and screw fixtures etc. complete as per the directions of the departmental officers at site. Rate per running meter

11

-

-

... More
5.26:Providing and filling in position, blow bitumen in expansion joints.

0.21

-

-

... More
Rectification work Moolakkayam aqueduct

-

-

-

... More
26.28.3:Chipping of unsound/weak concrete material from slabs, beams, columns etc. with manual Chisel and/ or by standard power driven percussion type or of approved make including tapering of all edges, making square shoulders of cavities including cleaning the exposed concrete surface and reinforcement with wire brushes etc. and disposal of debris for all lead and lifts all complete as per direction of Engineer-In-Charge25 mm average thickness

514.5

-

-

... More
26.29.2:Cleaning of reinforcement from rust from the reinforcing bars to give it a total rust free steel surface by using alkaline chemical rust remover of approved make with paint brush and removing loose particles after 24 hours of its application with wire brush and thoroughly washing with water and allowing it to dry, all complete as per direction of Engineer-In-Charge.Bars above 12 mm diameter

330

-

-

... More
OD32728/2024-2025:Applying corrosion inhibitor one coat of nitozinc / approved equivalent make primer (two component system based on metallic zinc and epoxy resin and shall be mixed until a homogenous mixture is obtained) on the cleaned and dried reinforcing bar using a small paint brush such that the zinc rich primer coated should make an unbroken continuous film on the bars. ( If in doubt of having achieved an unbroken coating, a second application should be made as soon as the first coat is fully dry). After drying the treated surface, apply one coat of bonding agent Nitobond A R/SBR. Measurement is made for whole exposed area including cost of materials, labour charges, conveyance of materials to site, hire charges of tools etc complete.

128.63

-

-

... More
26.31.2:Providing, mixing and applying bonding coat of approved adhesive on chipped portion of RCC as per specifications and direction of Engineer-In-charge complete in all respect.Epoxy bonding adhesive having coverage 2.20 sqm/kg of approved make

514.5

-

-

... More
26.32.2:Providing, mixing and applying SBR polymer (of approved make) modified Cement mortar in proportion of 1:4 (1 cement: 4 graded coarse sand with polymer minimum 2% by wt. of cement used) as per specifications and directions of Engineer-in-charge. Note: Measurement and payment: The pre-measurement of thickness shall be done just after the surface preparation is completed and Payment under this item shall be made only after proper wet curing has been done and surface has been satisfactorily evaluated by sounding / tapping with a blunt metal instrument and/or the 75mm size cube crushing strength at the end of 28 days to be not less than 30 N/Sqmm2).25 mm average thickness in 2 layers.

514.5

-

-

... More
26.34.2:Providing and laying SBR Polymer modified (of approved make @ minimum 2% by wt. of cement used) plain/reinforced concrete jacket for the structural members e.g. columns, pillars, piers, beams etc with concrete having the specified minimum characteristic compressive strength [with ordinary portland cement, coarse sand and graded stone aggregate of 10mm maximum size in proportion as per design criteria] with specified average thickness all-round existing core of RCC member. Note: Rates shall be for finished surface area of concrete and shall include the cost of making holes in existing RCC slab, if required, for pouring concrete in shuttering mould of jacket and appropriate approved Super-Plasticiser for rendering concrete as flowable self compacting and SBR polymer but shall exclude cost of reinforcement, bond coat, Shear Keys, centering and shuttering, strutting, propping etc (Payment under this item shall be made only after proper wet curing has been done and surface has been satisfactorily evaluated by sounding/tapping with a blunt metal instrument)75mm thick in Grade M 25 with cement content not less than 330 kg per cum

2

-

-

... More
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more

77.7

-

-

... More
14.72:Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done .

120

-

-

... More
5.26:Providing and filling in position, blow bitumen in expansion joints.

0.45

-

-

... More
6.4.2:Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in:Cement mortar 1:6 (1 cement : 6 coarse sand)

20

-

-

... More
13.4.2:12 mm cement plaster of mix:1:6 ( 1 cement : 6 coarse sand)

425

-

-

... More
Rectification work Kunnumanal aqueduct

-

-

-

... More
26.28.3:Chipping of unsound/weak concrete material from slabs, beams, columns etc. with manual Chisel and/ or by standard power driven percussion type or of approved make including tapering of all edges, making square shoulders of cavities including cleaning the exposed concrete surface and reinforcement with wire brushes etc. and disposal of debris for all lead and lifts all complete as per direction of Engineer-In-Charge25 mm average thickness

262.5

-

-

... More
26.29.2:Cleaning of reinforcement from rust from the reinforcing bars to give it a total rust free steel surface by using alkaline chemical rust remover of approved make with paint brush and removing loose particles after 24 hours of its application with wire brush and thoroughly washing with water and allowing it to dry, all complete as per direction of Engineer-In-Charge.Bars above 12 mm diameter

350

-

-

... More
OD32729/2024-2025:Applying corrosion inhibitor one coat of nitozinc / approved equivalent make primer (two component system based on metallic zinc and epoxy resin and shall be mixed until a homogenous mixture is obtained) on the cleaned and dried reinforcing bar using a small paint brush such that the zinc rich primer coated should make an unbroken continuous film on the bars. ( If in doubt of having achieved an unbroken coating, a second application should be made as soon as the first coat is fully dry). After drying the treated surface, apply one coat of bonding agent Nitobond A R/SBR. Measurement is made for whole exposed area including cost of materials, labour charges, conveyance of materials to site, hire charges of tools etc complete.

65.63

-

-

... More
26.31.2:Providing, mixing and applying bonding coat of approved adhesive on chipped portion of RCC as per specifications and direction of Engineer-In-charge complete in all respect.Epoxy bonding adhesive having coverage 2.20 sqm/kg of approved make

262.5

-

-

... More
26.32.2:Providing, mixing and applying SBR polymer (of approved make) modified Cement mortar in proportion of 1:4 (1 cement: 4 graded coarse sand with polymer minimum 2% by wt. of cement used) as per specifications and directions of Engineer-in-charge. Note: Measurement and payment: The pre-measurement of thickness shall be done just after the surface preparation is completed and Payment under this item shall be made only after proper wet curing has been done and surface has been satisfactorily evaluated by sounding / tapping with a blunt metal instrument and/or the 75mm size cube crushing strength at the end of 28 days to be not less than 30 N/Sqmm2).25 mm average thickness in 2 layers.

262.5

-

-

... More
14.72:Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done .

80

-

-

... More
5.26:Providing and filling in position, blow bitumen in expansion joints.

0.24

-

-

... More
Rectification work Manalil aqueduct

-

-

-

... More
26.28.3:Chipping of unsound/weak concrete material from slabs, beams, columns etc. with manual Chisel and/ or by standard power driven percussion type or of approved make including tapering of all edges, making square shoulders of cavities including cleaning the exposed concrete surface and reinforcement with wire brushes etc. and disposal of debris for all lead and lifts all complete as per direction of Engineer-In-Charge25 mm average thickness

227.5

-

-

... More
26.29.2:Cleaning of reinforcement from rust from the reinforcing bars to give it a total rust free steel surface by using alkaline chemical rust remover of approved make with paint brush and removing loose particles after 24 hours of its application with wire brush and thoroughly washing with water and allowing it to dry, all complete as per direction of Engineer-In-Charge.Bars above 12 mm diameter

300

-

-

... More
OD32735/2024-2025:Applying corrosion inhibitor one coat of nitozinc / approved equivalent make primer (two component system based on metallic zinc and epoxy resin and shall be mixed until a homogenous mixture is obtained) on the cleaned and dried reinforcing bar using a small paint brush such that the zinc rich primer coated should make an unbroken continuous film on the bars. ( If in doubt of having achieved an unbroken coating, a second application should be made as soon as the first coat is fully dry). After drying the treated surface, apply one coat of bonding agent Nitobond A R/SBR. Measurement is made for whole exposed area including cost of materials, labour charges, conveyance of materials to site, hire charges of tools etc complete.

56.88

-

-

... More
26.31.2:Providing, mixing and applying bonding coat of approved adhesive on chipped portion of RCC as per specifications and direction of Engineer-In-charge complete in all respect.Epoxy bonding adhesive having coverage 2.20 sqm/kg of approved make

227.5

-

-

... More
26.32.2:Providing, mixing and applying SBR polymer (of approved make) modified Cement mortar in proportion of 1:4 (1 cement: 4 graded coarse sand with polymer minimum 2% by wt. of cement used) as per specifications and directions of Engineer-in-charge. Note: Measurement and payment: The pre-measurement of thickness shall be done just after the surface preparation is completed and Payment under this item shall be made only after proper wet curing has been done and surface has been satisfactorily evaluated by sounding / tapping with a blunt metal instrument and/or the 75mm size cube crushing strength at the end of 28 days to be not less than 30 N/Sqmm2).25 mm average thickness in 2 layers.

227.5

-

-

... More
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more

61.6

-

-

... More
14.72:Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done .

80

-

-

... More
5.26:Providing and filling in position, blow bitumen in expansion joints.

0.24

-

-

... More
Rectification work Chittar aqueduct

-

-

-

... More
26.28.3:Chipping of unsound/weak concrete material from slabs, beams, columns etc. with manual Chisel and/ or by standard power driven percussion type or of approved make including tapering of all edges, making square shoulders of cavities including cleaning the exposed concrete surface and reinforcement with wire brushes etc. and disposal of debris for all lead and lifts all complete as per direction of Engineer-In-Charge25 mm average thickness

297.5

-

-

... More
26.29.2:Cleaning of reinforcement from rust from the reinforcing bars to give it a total rust free steel surface by using alkaline chemical rust remover of approved make with paint brush and removing loose particles after 24 hours of its application with wire brush and thoroughly washing with water and allowing it to dry, all complete as per direction of Engineer-In-Charge.Bars above 12 mm diameter

100

-

-

... More
OD32736/2024-2025:Applying corrosion inhibitor one coat of nitozinc / approved equivalent make primer (two component system based on metallic zinc and epoxy resin and shall be mixed until a homogenous mixture is obtained) on the cleaned and dried reinforcing bar using a small paint brush such that the zinc rich primer coated should make an unbroken continuous film on the bars. ( If in doubt of having achieved an unbroken coating, a second application should be made as soon as the first coat is fully dry). After drying the treated surface, apply one coat of bonding agent Nitobond A R/SBR. Measurement is made for whole exposed area including cost of materials, labour charges, conveyance of materials to site, hire charges of tools etc complete.

74.38

-

-

... More
26.31.2:Providing, mixing and applying bonding coat of approved adhesive on chipped portion of RCC as per specifications and direction of Engineer-In-charge complete in all respect.Epoxy bonding adhesive having coverage 2.20 sqm/kg of approved make

297.5

-

-

... More
26.32.2:Providing, mixing and applying SBR polymer (of approved make) modified Cement mortar in proportion of 1:4 (1 cement: 4 graded coarse sand with polymer minimum 2% by wt. of cement used) as per specifications and directions of Engineer-in-charge. Note: Measurement and payment: The pre-measurement of thickness shall be done just after the surface preparation is completed and Payment under this item shall be made only after proper wet curing has been done and surface has been satisfactorily evaluated by sounding / tapping with a blunt metal instrument and/or the 75mm size cube crushing strength at the end of 28 days to be not less than 30 N/Sqmm2).25 mm average thickness in 2 layers.

297.5

-

-

... More
14.72:Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done .

80

-

-

... More
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more

46.2

-

-

... More
5.26:Providing and filling in position, blow bitumen in expansion joints.

0.24

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.