Irrigation Department Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Irrigation Department Tender
Electrical and Electronics
Electrical Works
Eprocure
Opening Date4 Jan 2025
Closing Date14 Jan 2025
Tender Amount₹ 3,77,680
Costs
EMD
₹ 9,442Document Cost
₹ 835Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_Irrig_722571_11Tender No
C-ETN-JAN/EL/24-25Tender Authority
Irrigation Department ViewPurchaser Address
-Website
http://http://www.irrigation.kerala.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
FORM OF TENDER,PRELIMINARY AGREEMENT,Requisition form for e payment,Affidavit,Integrity pact certificate,special conditions and accepted list of materials(6 DOCUMENTS)
BOQ Items
... More
OD135671/2024-2025:Lifting the 61-110 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
2
-
-
... More
OD135667/2024-2025:Lifting the 16HP to 60 HP star delta starters after disconnecting the wire connection, detaching from the Panel board or Metal Frame and placing them conveniently to a safe place
1
-
-
... More
OD135668/2024-2025:Lifting the 5HP to 15 HP DOL / star delta starters after disconnecting the wire connection, detaching from the Panel board or Metal Frame and placing them conveniently to a safe place.
1
-
-
... More
OD135672/2024-2025:Lifting the MCCB above 250A to 630 A after disconnecting the wire connection, detaching from the Panel board and placing them conveniently to a safe place
1
-
-
... More
OD135628/2024-2025:Lowering down and erecting 31-60 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
1
-
-
... More
OD135627/2024-2025: Lowering down and erecting 5-10 HP motor/vacuum motor pump set, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
2
-
-
... More
OD135629/2024-2025:Lowering down and erecting 61-110 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
2
-
-
... More
OD207588/2024-2025:Fully Comprehensive Annual Maintenance contract of 5-15 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, maintenance of the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition(excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc)all time during the period of contract and the faults should be rectified with in the time allowed
1
-
-
... More
OD207589/2024-2025: Fully Comprehensive Annual Maintenance contract of 31-60 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board, etc including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump, motor and starter through out the year as required ( excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc ) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
1
-
-
... More
OD207592/2024-2025: Fully Comprehensive Annual Maintenance contract of 61-110 HP slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board, etc including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump, motor and starter through out the year as required( excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc ) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
1
-
-
... More
OD167121/2024-2025:Replacing old bearing and supply new bearing bearing no NU314 SKF/FAG OR equivalent
1
-
-
... More
OD167124/2024-2025:Replacing old bearing and supply new bearing bearing no 6311SKF/FAG OR equivalent
4
-
-
... More
Moochipparatha LIS
-
-
-
... More
OD135698/2024-2025:Lifting the 16HP to 60 HP star delta starters after disconnecting the wire connection, detaching from the Panel board or Metal Frame and placing them conveniently to a safe place
2
-
-
... More
OD135699/2024-2025:Lifting the 5HP to 15 HP DOL / star delta starters after disconnecting the wire connection, detaching from the Panel board or Metal Frame and placing them conveniently to a safe place.
1
-
-
... More
OD135700/2024-2025:Lifting the MCCB above 250A to 630 A after disconnecting the wire connection, detaching from the Panel board and placing them conveniently to a safe place
1
-
-
... More
OD135678/2024-2025:Dismantling the 31-60 HP pump of motor pump set taking out the impeller shaft assembly,detaching impeller shaft assembly,Reconditioning the worn out shaft by welding ,mettaling ,cutting,grinding ,and dynamically balancing etc. refitting the same in pump
1
-
-
... More
OD207600/2024-2025:Dismantling the 31-60 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, including scrapping, cleaning and painting with enamel paint.
1
-
-
... More
OD135688/2024-2025:Refitting 31-60 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
2
-
-
... More
OD135689/2024-2025:Refitting 61-110 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
1
-
-
... More
OD207603/2024-2025:Fully Comprehensive Annual Maintenance contract of 5-15 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, maintenance of the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition(excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc)all time during the period of contract and the faults should be rectified with in the time allowed
1
-
-
... More
OD207604/2024-2025: Fully Comprehensive Annual Maintenance contract of 61-110 HP slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board, etc including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump, motor and starter through out the year as required( excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc ) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
1
-
-
... More
OD167129/2024-2025:Replacing old bearing and supply new bearing bearing no 6309SKF/FAG OR equivalent
2
-
-
... More
Kaduvakuzhi 2nd stage LIS
-
-
-
... More
OD135754/2024-2025:Lifting the 61-110 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
3
-
-
... More
OD135752/2024-2025:Lifting the 5HP to 15 HP DOL / star delta starters after disconnecting the wire connection, detaching from the Panel board or Metal Frame and placing them conveniently to a safe place.
1
-
-
... More
OD135761/2024-2025:Lifting the 61HP to 125 HP star delta starters after disconnecting the wire connection, detaching from the Panel board or Metal Frame and placing them conveniently to a safe place
2
-
-
... More
OD135707/2024-2025:Dismantling the 61-110 HP pump of motor pump set taking out the impeller shaft assembly,detaching impeller shaft assembly,Reconditioning the worn out shaft by welding ,mettaling ,cutting,grinding ,and dynamically balancing etc. refitting the same in pump
3
-
-
... More
OD207627/2024-2025:Dismantling the 61-110 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling,including scrapping, cleaning and painting with enamel paint.
1
-
-
... More
OD207634/2024-2025:Fully Comprehensive Annual Maintenance contract of 5-15 HP Vacuum motor pump set ,controlling electrical accessories , etc including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, maintenance of the motor pump sets , pipes , and valves electrical accessories etc complete in good working condition(excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc and starter AMC)all time during the period of contract and the faults should be rectified with in the time allowed
1
-
-
... More
OD207635/2024-2025:Fully Comprehensive Annual Maintenance contract of 61-110 HP slip ring induction motor with split case / End suction pump set controlling electrical accessories , panel board ,etc including attending all repairs ,replacing of damaged coupling bush, carbon brush and coupling bolts, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump and motor through out the year as required( excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etcand starter AMC) and maintain the motor pump sets , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
1
-
-
... More
OD207636/2024-2025: Fully Comprehensive Annual Maintenance contract of above 61-110 HP squirrel cage induction motor with split case / End suction pump set controlling electrical accessories , panel board ,etc, including attending all repairs ,overhauling & , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump and motor through out the year as required ( excluding motor rewinding , works arrived due to natural and man made disaster like flood, landslide etcand starter AMC ) and maintain the motor pump sets , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
1
-
-
... More
OD135718/2024-2025:Lowering down and erecting 61-110 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
3
-
-
... More
OD167208/2024-2025:Replacing old bearing and supply new bearing bearing no 6314 SKF/FAG OR equivalent
1
-
-
... More
OD207655/2024-2025:Replacing old bearing and supply new bearing bearing no NU312 SKF/FAG OR equivalent
1
-
-
... More
OD167210/2024-2025:Replacing old bearing and supply new bearing bearing no 6309SKF/FAG OR equivalent
2
-
-
... More
OD159269/2024-2025: Supply & renewal of bearing No. 7312 BECBP
2
-
-
... More
OD161909/2024-2025:Supply and fixing the coupling tyre in the existing coupling pulley set
2
-
-
... More
OD161913/2024-2025:Replacing the existing brush holder with new one
2
-
-
... More
OD161922/2024-2025:Supply and fixing Nut and Bolt suitable for Motor foundation of 60-100HP ratings
12
-
-
... More
OD167203/2024-2025:Supply, and filling of good quality LT grade transformer oil
30
-
-
... More
OD161956/2024-2025:Replacing the slip ring unit of induction motor pump set up to 90 HP with new one
1
-
-
... More
OD161964/2024-2025:Replacing the existing coupling pully set of the 90HP motor pump set with new set including supply of suitable pully set,necessary industrial works and correcting the alignment of the motor pump set
1
-
-
... More
OD164000/2024-2025:Lowering down and erecting 61-110 HP pump and erecting the pump on the base plate coupling with motor, etc in position, checking correct alignment and trial run on full load
1
-
-
... More
OD164001/2024-2025:Lifting the 61-110 HP pump after disconnecting from the motor, decoupling the pump, detaching from the base plate, etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements