Irrigation Department Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 50,000Document Cost
₹ 2,760Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_Irrig_725097_1Tender No
19/EE/KDT/2024-25Tender Authority
Irrigation Department ViewPurchaser Address
-Website
http://http://www.irrigation.kerala.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
OD24237/2024-2025:Driving down coconut pile to lines and levels through soft to medium clay soil strata including all hire charges and labour and all other appliances necessary for pile driving down after pointing the bottom end. Details for one post of 6m long 15 numbers per day 6X15=90m Details for 90m length.
52
-
-
... More
OD24282/2024-2025:60.64.3. Coconut pile -Supplying 1/4 split well matured and straight coconut wailing pieces of required length and tied to the post with iron wires etc complete as per standard specification.
91
-
-
... More
OD24967/2024-2025:Cutting and removing the excess length of Wooden/ Coconut piles to lines and levels and removing the cut end of piles and stacking within 150m
40
-
-
... More
OD24300/2024-2025:Covering both sides of the earthern bund using Separation Membrane of impermeable plastic sheeting 125 micron etc.complete including cost ,conveyance and all other incidental charges as per the direction of the departmental officers at site.
30
-
-
... More
OD24236/2024-2025:Bund formation : earth work in rough excavation,banking excavated earth in layers not exceeding 20cm in depth , breaking clods,rolling,each layer with 1/2 tonne roller or wooden or steel rammers and dressing up in embankments for roads , flood banks, marginal banks and guide banks or fillling up ground depressions,lead upto 50m and lift upto 1.5m ;all kinds of soil
45
-
-
... More
Repair of retaining wall of outer thodu portion & bund formation
-
-
-
... More
60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m.
103.49
-
-
... More
60.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site
72.44
-
-
... More
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
136.26
-
-
... More
OD39590/2023-2024:Common Approved OD-1.4 : Dry stone packing under foundation with good quality blasted rubble including conveyance o material and labour charges etc. complete as per direction of departmental officers at site.
68.13
-
-
... More
OD39589/2023-2024:Common Approved OD-1.2: Dry rubble masonry (without concrete levelling course) with good quality blasted rubble and packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
219.38
-
-
... More
7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
184.8
-
-
... More
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
113.63
-
-
... More
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
28.39
-
-
... More
OD24185/2024-2025:Bund formation : earth work in rough excavation,banking excavated earth in layers not exceeding 20cm in depth , breaking clods,rolling,each layer with 1/2 tonne roller or wooden or steel rammers and dressing up in embankments for roads , flood banks, marginal banks and guide banks or fillling up ground depressions,lead upto 50m and lift upto 1.5m ;all kinds of soil
1064.53
-
-
... More
OD24968/2024-2025:Strengthening slopes/ earthern bund using coir geo textile(740 GSM) etc.complete including cost ,conveyance and all other incidental charges as per the direction of the departmental officers at site.
1892.5
-
-
... More
50.18.9.10.1:Providing and fixing PVC pipes includings jointing of pipes with one step pvc solvent cement, trenching , refilling & testing of joints complete as per direction of Engineer in Charge. 150 mm dia 6 Kgf/cm2
25
-
-
... More
Formation of drainage channel
-
-
-
... More
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
483.13
-
-
... More
Bund formation along vachaal sides
-
-
-
... More
OD24189/2024-2025:Bund formation : earth work in rough excavation,banking excavated earth in layers not exceeding 20cm in depth , breaking clods,rolling,each layer with 1/2 tonne roller or wooden or steel rammers and dressing up in embankments for roads , flood banks, marginal banks and guide banks or fillling up ground depressions,lead upto 50m and lift upto 1.5m ;all kinds of soil
490
-
-
... More
OD24970/2024-2025:Strengthening slopes/ earthern bund using coir geo textile(740 GSM) etc.complete including cost ,conveyance and all other incidental charges as per the direction of the departmental officers at site.
1960
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%