Irrigation Department Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 2,526Document Cost
₹ 555Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_Irrig_719422_1Tender No
IRR/MH/TR/7245/2023_16_7_6/1Tender Authority
Irrigation Department ViewPurchaser Address
-Website
http://http://www.irrigation.kerala.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
OD34816/2023-2024:Fabrication and supply of Structural steel canal shutters ( Up to 2 tonne weight ) /Hoisting Bridge / Platform and accessories etc. for the same as per approved specifications, drawings and directions of deptl officer at site including cost of labour, machinery, all leads and lifts, incidental and handling charges etc complete but excluding cost of material already supplied.
133.45
55
7339.75
... More
85.114:Painting all the exposed surfaces of the gate and embedded parts with two coats of epoxy coal tar black paint confirming to IS14948 with a minimum film thickness of 150+/-5 microns per each coat over two coats of priming coat applied with zinc primer containing not less than 85% of zinc on dry film with a film thickness of 70+/-5 microns , so that the total film thickness of all coats including priming coat at any rate is not less than 350 microns after cleaning the surface using hand and power tool cleaning including cost of all materials, labour charges , cost of testing all painting materials, all incidental charges, hire of T&P etc. complete as per the direction of department officers at site
61.37
472
29018.33
... More
85.115:Cost of painting with 2 coats of enamel paint over 1 coat of zinchromate primer as per IS1477:1994 after hand and power tool cleaning including cost of all materials, labour charges, cost of testing all painting materials, all incidental charges, hire of T&P etc. complete as per the direction of department officers at site
20.1
214
4318.62
... More
OD9968/2024-2025:Overhauling the gear box and locking arrangement for 1 no.shutter including oiling and greasing the gear teeth etc.complete as directed by the dept.officials at site.
2
4217
8435.6
... More
OD34819/2023-2024:Overhauling of gearbox and locking arrangement for shutters including oiling the gear teeth , replacing of thrust , taper roller bearing and oil seal, greasing etc. complete as directed by the Departmental officials at site. Cost includes cost of all materials and labour complete.
1
11671
11671.14
... More
OD34764/2023-2024:Erection of the Canal Shutter ( Up to 2 Tonne weight ) / Hoisting Bridge / Platform including hand rails , lader etc. for the same including . alignment correcting and setting complete including cost of all labour, machinery, incidental and conveyance , lead and lift charges etc complete but excluding cost of materials already supplied
1158.87
5
5852.28
... More
Ovehauling and Painting to the head Regulator at Ch.0 m of Ramamangalam Branch
-
-
-
... More
85.114:Painting all the exposed surfaces of the gate and embedded parts with two coats of epoxy coal tar black paint confirming to IS14948 with a minimum film thickness of 150+/-5 microns per each coat over two coats of priming coat applied with zinc primer containing not less than 85% of zinc on dry film with a film thickness of 70+/-5 microns , so that the total film thickness of all coats including priming coat at any rate is not less than 350 microns after cleaning the surface using hand and power tool cleaning including cost of all materials, labour charges , cost of testing all painting materials, all incidental charges, hire of T&P etc. complete as per the direction of department officers at site
26.46
472
12511.61
... More
85.115:Cost of painting with 2 coats of enamel paint over 1 coat of zinchromate primer as per IS1477:1994 after hand and power tool cleaning including cost of all materials, labour charges, cost of testing all painting materials, all incidental charges, hire of T&P etc. complete as per the direction of department officers at site
15.12
214
3249.44
... More
OD35434/2023-2024:Greasing of Bevel gear mechanism and locking arrangement for shutters including oiling and greasing of thegear teeth, greasing of screw rod etc. complete as directed by the Departmental officials at site. Cost includes cost of all materials and labour complete.
2
2111
4222.76
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements