Irrigation Department Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 8,906Document Cost
₹ 930Tender Fee
Refer Documents
Summary
General Annual Maintenance Annual Maintenance Kip Dam At Parappar Annual Maintenance Of Weir At Ottakkal And Saddle Dam At Pallamvetty Under Kip Rb Section 1/2 Thenmala For The Year 2024 25 General Civil Work
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_Irrig_699126_1Bid Award Id
ViewTender No
IRR/PII/TR/2726/2024_5_1_1/1Tender Authority
Irrigation Department ViewPurchaser Address
-Website
http://http://www.irrigation.kerala.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
OD665/2024-2025:Engaging man mazdoor for for maintaining garden at weir as per the direction of departmental officers in charge.
15
-
-
OD666/2024-2025:Cost of labour for cutting and removing vegetation growth such as banyan trees etc from leading channel at LB canal, sides of canal bucket, and other shutters as per the direction of departmental officer at site.
2
-
-
OD667/2024-2025:Engaging labour for clearing the blockage of water by removing floating logs, biological waste, vandals and branches of trees etc. accumulated at LB ,RB shutters and trash rack of river sluice at weir by swimming and diving underwater etc, as and when necessary as directed by the departmental officers at site for the smooth functioning of regulators.
6
-
-
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
0.04
-
-
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
0.04
-
-
50.10.1:Steel work in built up G I tubular ( round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete
3.61
-
-
10.1:Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
10.5
-
-
Saddle Dam
-
-
-
2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
13417.5
-
-
OD668/2024-2025:Engaging labour for clearing vertical and horizontal drains as per the direction of departmental officer at site .
6
-
-
OD669/2024-2025:Engaging labour for collecting and removing zoological waste , floating materials , wood logs and other sediments accumulated on the u/s of saddle dam
6
-
-
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
4
-
-
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
1.68
-
-
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
1.5
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements