Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 25,000Document Cost
₹ 2,000Tender Fee
Refer Documents
Summary
Alappuzha Heritage Project Conservation Of Maritime Signalling Museum, Alappuzha
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_INKEL_392692_1Tender No
NIT/INKEL/ALP/2020-21/184 dated 17/10/2020Tender Authority
INKEL Limited ViewPurchaser Address
-Website
http://etenders.kerala.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
15.23.1 : Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles 10 mm to 25 mm
50.15
-
-
Dismantling and removing any thickness of walls in laterite or bricks in lime or cement mortar including disposal of debris within a distance of 50 m etc. complete
1.66
-
-
15.3 : Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
0.29
-
-
15.2.1 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
2.19
-
-
15.1 : Demolishing lime concrete manually / by mechanical means and disposal of material within 50 metres lead as per direction of Engineer - in- Charges.
1.36
-
-
Dismantling carefully Electric supply lines and pipe fittings including stacking serviceable materials within 50 metre lead as directed by Engineer in charge
500
-
-
15.12.1 : Dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:Of area 3 sq. metres and below
4
-
-
15.39.2 : Dismantling wooden boardings in lining of walls and partitions, excluding supporting members but including stacking with in 50 metres lead:Thickness above 10mm upto 25 mm
5.25
-
-
15.56 : Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead.
119.41
-
-
Removing the paint from old timber surfaces using chemical paint remover like methylene chloride etc (not with sodium hydroxide) method and cleaning surfaces with sand paper, cotton waste, etc. including cost and conveyance of all materials ,labour charges,scaffolding etc as per the specifications no. 4.2.2 attached
127.19
-
-
14.43 : Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete.
477.6
-
-
15.60 : Disposal of building rubbish/ malba/ similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved
10
-
-
Wood work
-
-
-
Fixing available well seasoned second class teak wood members in places of damaged one and already removed from position such as door and window frames, rafters, ridge, wall plate, collar, collar pin, flooring joists etc including all labour for ornamental cutting, steps, moulding etc. wherever necessary as per the existing size and shape using already dismantled departmental roof members including all scaffolding charges.
0.12
-
-
Providing and fixing well seasoned second class teak wood roof members in places of damaged one and already removed from position such as rafters, ridge, wall plate,collar, collar pin, flooring joists etc including all labour for ornamental cutting, steps, moulding etc. wherever necessary as per the existing size and shape including all scaffolding charges.Wooden members has to undergo seasoning and season certificate may be produced as per 4.3 of special condition attached
0.34
-
-
9.5.1.1 : Providing and fixing panelled or panelled and glazed shutters for shutters for doors, windows and clerestory windows, including ISI marked M.S. pressed butt hinges bright finished of required size with necessery screws, excluding panelling which will be paid for separately, all complete as per direction of Engineer - in-charge.Second class teak wood35 mm thick shutters
2.59
-
-
9.5.1.2 : Providing and fixing panelled or panelled and glazed shutters for shutters for doors, windows and clerestory windows, including ISI marked M.S. pressed butt hinges bright finished of required size with necessery screws, excluding panelling which will be paid for separately, all complete as per direction of Engineer - in-charge.30 mm thick shutters
2.09
-
-
9.7.1 : Providing and fixing panelling or panelling and glazing in panelled or panelled and glazed shutters for doors, windows and clerestory windows (Area of opening for panel inserts excluding portion inside grooves or rebates to be measured), Panelling for panelled or panelled and glazed shutters 25 mm to 40 mm thick:Second class teak wood
3.13
-
-
Supplying and fixing up to 40 mm thick teak wood planks for ceiling/flooring over the joists and secondary already fixed using 60 mm GI screws and removing the decayed ceiling planks etc. complete.First floor
4.27
-
-
14.6.1 : Renewing glass panes, with wooden fillets wherever necessary: Float glass panes of thickness 4 mm
4.18
-
-
14.85 : Taking out existing wooden door shutter, repair by cutting, painting etc. andrefixing of repaired door shutters to existing door frames, including replacementof hinges with screws, etc. as required, all complete as per the direction of the Engineer-in-charge.
6
-
-
9.72.3 : Providing and fixing bright finished brass butt hinges with necessary screws etc. complete:100x85x5.5 mm (heavy type)
14
-
-
9.72.1 : Providing and fixing bright finished brass butt hinges with necessary screws etc. complete:125x85x5.5 mm (heavy type)
6
-
-
9.81.1 : Providing and fixing bright finished brass handles with screws etc. complete:125 mm
4
-
-
9.81.2 : Providing and fixing bright finished brass handles with screws etc. complete:100 mm
10
-
-
9.103 : Providing and fixing bright finished brass 100 mm mortice latch and lock, ISI marked, with six levers and a pair of anodised (anodic coating not less than grade AC 10 as per IS: 1868) aluminium lever handles of approved quality with necessary screws etc . complete.
2
-
-
9.74.1 : Providing and fixing bright finished brass tower bolts (barrel type) with necessary screws etc. complete: 250x10 mm
4
-
-
9.74.4 : Providing and fixing bright finished brass tower bolts (barrel type) with necessary screws etc. complete: 100x10 mm
6
-
-
9.101.2 : Providing and fixing aluminium hanging floor door stopper, ISI marked, anodised (anodic coating not less than grade AC 10 as per IS: 1868) transparent or dyed to required colour and shade, with necessary screws etc. complete.Twin rubber stopper
2
-
-
9.83 : Providing and fixing aluminium die cast body tubular type universal hydraulic door closer (having brand logo with ISI, IS : 3564, embossed on the body, door weight upto 35 kg and door width upto 700 mm), with necessary accessories and screws etc. complete.
2
-
-
10.2 : Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
50
-
-
Masonry work
-
-
-
Laterite masonry in lime mortar 1:2:9(1cement:2 lime:9 fine sand ) using existing size or nearest available size of laterite for superstructure.including cost and conveyance of all materials, labour,scaffolding, curing, lead lift , etc complete at all levels and as directed by Engineer-in-charge.
4.6
-
-
Roofing work
-
-
-
Providing and laying approved make, MP tiles of 320 mm or nearest size over reeper bands (already done) to correct lines and levels including the cost, conveyance of all materials etc. including scaffolding charges complete as directed by Engineer-in-charge.
79.38
-
-
Providing and laying MP hip and ridge tiles 1st class set in surki mortar (1: 1/2:8) including finishing edges, etc. complete as directed by Engineer-in-Charge.
20.32
-
-
Providing & fixing on ceiling factory pressed clay decorative floral tile (under mangalore tile roof) of 320mm x 200 mm x 12mm and as per approved pattern on frame work complete including scaffolding charges as directed by Engineer-in-Charge.( frame work to be paid separately).
79.38
-
-
Finishing
-
-
-
26.32.2 : Providing, mixing and applying SBR polymer (of approved make) modified Cement mortar in proportion of 1:4 (1 cement: 4 graded coarse sand with polymer minimum 2% by wt. of cement used) as per specifications and directions of Engineer-in-charge.
Note: Measurement and payment: The pre-measurement of thickness shall be done just after the surface preparation is completed and Payment under this item shall be made only after proper wet curing has been done and surface has been satisfactorily evaluated by sounding / tapping with a blunt metal instrument and/or the 75mm size cube crushing strength at the end of 28 days to be not less than 30 N/Sqmm2).25 mm average thickness in 2 layers.
32.54
-
-
Providing and laying pressed clay tiles (as per approved pattern 20 mm nominal thickness of approved size) on floors jointed with white cement mortar 1:4 (1 white cement : 4 coarse sand) mixed with pigment to match the shade of tile , laid over a bed of 20 mm thick cement mortar 1:4 (1 cement : 4 coarse sand) including machine rubbing and floor polishing complete as per the direction of engineering in charge.
59.99
-
-
Plastering with lime mortar 1:2:9,(1cement:2 lime:9 fine sand )12mm thick using lime mortar and adequate quantity of herbals such as Jaggery, kadukka water and etc for old surface for traditional works including cost and conveyance of all materials, labour,scaffolding, curing, lead lift , etc complete at all levels and as directed by Engineer-in-charge.Preparation of lime may be as per specification no.6.0
153.01
-
-
13.7.1 : 12 mm cement plaster finished with a floating coat of neat cement of mix:1:3 ( 1 cement : 3 fine sand)
63
-
-
13.24.2 : Extra for plastering done on moulding cornices or architraves including neat finish to line and level:In two coats
30.6
-
-
Filling the major cracks by providing and applying approved products like Asian Paints-Smartcare Hybrid PU Sealant in proportion recommended by the manufacturer into cracks/honey-comb area of concrete/masonry by suitable method including cutting of nipples after curing etc. complete as per directions of Engineer in- Charge.
80
-
-
Removing Rust using Rustolin or Equivalent at all locations by applying as per manufacturer's specifications and cleaning throughly etc complete On steel work
19.24
-
-
Applying white or colour wash by mixing glue & indigo as per requirement three or more coats to surfaces such as walls,columns, ceiling etc, including necessary repairs to scratches etc. complete including cost and conveyance of all materials, labour, scaffolding etc. complete as directed by Engineer-in-charge. Preparation of lime may be as per specification no 11.7 and test certificate of lime may be produced by the agency
619.1
-
-
Applying sealer compound after Preparing the surface/cracks with suitable wooden fillets after cleaning and smoothing the surface and grooves with special chisel/tools applying 1 or more coat of wooden filler diluted in special thinner.Entire surface will be sand papering smooth manually without disturbing the wooden carving details.Then Apply second coat of wooden filler and sand papering smoothly.Then the entire surface will be applied with two or more coat of sealer compound
140.59
-
-
14.54.1 : Painting with synthetic enamel paint of approved brand and manufacture of required colour to an give even shade:One or more coats on old work
16.2
-
-
13.52.1 : Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work
69.39
-
-
RCC Works
-
-
-
5.3 : Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15 degree landings,balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement :1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size).
1.47
-
-
26.30.1 : Drilling suitable holes in reinforced or plain cement concrete with power driven drill machine to a minimum depth of 100mm upto 200mm in RCC beams, lintels,columns and slabs to introduce steel bars for sunshades/balconies including fixing the steel bars in position using epoxy resin anchor grout of approved make but excluding the cost of reinforcement, all complete as per direction of Engineer-In-Charge.Upto and including 12mm dia.
48
-
-
4.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
3.39
-
-
5.22A.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more
150
-
-
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo - Mechanically Treated bars of grade Fe-500D or more
380
-
-
5.9.3 : Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
16.52
-
-
4.17 : Making plinth protection 50 mm thick of cement concrete 1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) over 75 mm thick bed of dry brick ballast 40 mm nominal size, well rammed and consolidated and grouted with fine sand, including finishing the top smooth.
31.5
-
-
Steel Works
-
-
-
10.16.3 : Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Electric resistance or induction butt welded tubes
604.49
-
-
Miscellaneous works
-
-
-
2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil
5.04
-
-
2.25 : Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
5.04
-
-
Supplying chemical emulsion in sealed containers including delivery as specified.BiFlex TC
10
-
-
Diluting and injecting chemical emulsion for POST-CONSTRUCTIONAL anti termite treatment (excluding the cost of chemical emulsion) : Along the external wall below concrete or masonry apron using chemical emulsion as per manufacturers specification including drilling and plugging holes etc.:With Biflex TC 0.05 concentration
39.99
-
-
Providing anti-termite treatment to the useable members of wooden doors, windows and reapers, beams and rafters of roof ceiling etc. with two coat Biflex TC chemical diluted with kerosene or Turpentine after properly cleaning the wooden members etc complete conforming to manufacturers specifications and as directed by the Engineer-in-charge.
140.59
-
-
14.72 : Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done .
81
-
-
Supplying manpower :Mason
1
-
-
Supplying manpower: Carpenter
1
-
-
Supplying manpower: Man Mazdoor
4
-
-
Supplying manpower: Wood Cutter
1
-
-
Supplying manpower: Painter
2
-
-
Documenting the structureby means of photography and videography before execution,during execution and after execution of individual work
1
-
-