Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 50,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_INKEL_296736_1Tender No
NIT/INKEL/ALP/2019-20/081 dated 26/08/2019Tender Authority
INKEL Limited ViewPurchaser Address
-Website
http://etenders.kerala.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50 metres lead of:Asbestos sheet
50
-
-
Dismantling and removing the wrought and framed work of timbers in roof,brackets doors,windows and floors including removing cleats and wooden nails end of balustrades including lowering, stacking the useful materials and disposal of debris etc including extra lowering charge and scaffolding charges complete within a distance of 50m.
6.9
-
-
Dismatling and removing any thickness of walls in laterite or bricks in lime or cement mortar including disposal of debris within a distance of 50 m etc. complete
2.44
-
-
Dismantling wooden boardings in lining of walls and partitions,excluding supporting members but including stacking within 50 metres lead :Thickness above 10 mm up to 25 mm
113
-
-
Dismantling cement asbestos or other hard board ceiling or partition walls including stacking of serviceable materials and disposal of unserviceable materials within 50 metres lead.
76
-
-
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge
1.05
-
-
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
5
-
-
Demolishing lime concrete manually/ by mechanical means and disposal of material within 50 metres lead as per direction of Engineer- in-charge.
4.16
-
-
Dismantling carefully Electric supply lines and pipe fittings including stacking serviceable materials within 50 metre lead as directed by Engineer in charge
500
-
-
Dismantling aluminium/ Gypsum partitions, doors, windows, fixed glazing and false ceiling including disposal of unserviceable surplus material and stacking of serviceable material with in 50 meters lead as directed by Engineer-in-charge.
126
-
-
Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead :Of area 3 sq. metres and below
21
-
-
Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead ::Of area beyond 3 sq. metres
8
-
-
Raking out joints in lime or cement mortar and preparing the surface for re-pointing or replastering, including disposal of rubbish to the dumping ground, all complete as per directions of Engineer-In-Charge.
340
-
-
Removing the paint from old timber surfaces using chemical paint remover like methylene chloride etc (not with sodium hyroxide) method and cleaning surfaces with sand paper, cotton waste, etc. including cost and conveyance of all materials ,labour charges,scaffolding etc as per the specifications
940
-
-
Removing the paint from old timber surfaces using flame method and cleaning surfaces with sand paper, cotton waste, etc. as per the specification
94
-
-
Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles 10 mm to 25 mm
263
-
-
Thoroughly scrubbing, scrapping and cleaning the thickly white washed surface in several layers over the lime plastering using proper tools and different grade sand papers without making any damages in the wall surface and rectifying the petty damages wherever seen using proper materials to match the existing surface
1890
-
-
Thoroughly scrubbing, scrapping and cleaning the thickly white washed surface in several layers over the wood work using proper tools and different grade sand papers without making any damages in the wood surface and rectifying the petty damages wherever seen using proper materials to match the existing surface
43
-
-
Dismantling of flushing cistern of all types (C.I./PVC/Vitrious China) including stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead.
3
-
-
Disconnecting damaged overhead/terrace PVC water storage tank of any size from water supply line and removing from the terrace including shifting at ground level as per direction of Engineer-in- charge.
1
-
-
Dismantling W.C. of all sizes including disposal of dismantled materials i/c malba all complete as per directions of Engineer-in- Charge
6
-
-
Wood Work
-
-
-
Fixing available well seasoned second class teak wood roof members in places of damaged one and already removed from position such as door and window frames, rafters, ridge, wall plate, collar, collar pin, flooring joists etc including all labour for ornamental cutting, steps, moulding etc. wherever necessary as per the existing size and shape using already dismantled departmental roof members including all scaffolding charges.
3.8
-
-
Providing and fixing well seasoned second class teak wood roof members in places of damaged one and already removed from position such as door and window frames, rafters, ridge, wall plate,collar, collar pin, flooring joists etc including all labour for ornamental cutting, steps, moulding etc. wherever necessary as per the existing size and shape including all scaffolding charges.Wooden members has to undergo seasoning and season certificate may be produced.
4.91
-
-
Providing and fixing panelled or panelled and glazed shutters for doors, windows and clerestory windows, including ISI marked M.S. pressed butt hinges bright finished of required size with necessary screws, excluding panelling which will be paid for separately, all complete as per direction of Engineer-in-charge. Second class teak wood
35mm thick shutter frame
10
-
-
Providing and fixing panelled or panelled and glazed shutters for doors, windows and clerestory windows, including ISI marked M.S. pressed butt hinges bright finished of required size with necessary screws, excluding panelling which will be paid for separately, all complete as per direction of Engineer-in-charge. Second class teak wood.
32
-
-
Providing and fixing panelling or panelling and glazing in panelled or panelled and glazed shutters for doors, windows and clerestory windows (Area of opening for panel inserts excluding portion inside grooves or rebates to be measured). Panelling for panelled or panelled and glazed shutters 25 mm to 40 mm thick :Second class teak wood 30 mm thick shutter
42
-
-
Fixing available second class teak wood reepers using departmental reepers after cutting, sizing making columb/special lap joint and providing the same in position with new nails including all cost of fixing etc as directed by Engineer in charge.
1.15
-
-
Providing and fixing second quality teak wood reepers of required size after cutting, shaping,making Columb/special lap joint and providing the same in position including cost of all materials as directed by Engineer in charge
1.72
-
-
Providing and fixing staircase and balcony hand rail /carved grills using teak wood planks of specified size including cost and conveyance of all materials ,labour charges etc complete as directed by Engineer in charge and as per the drawing
0.11
-
-
Supplying and fixing up to 40 mm thick teak wood planks for ceiling/flooring over the joists and secondary already fixed using 60 mm GI screws and removing the decayed ceiling planks etc. complete.First floor
0.63
-
-
Filling the gaps of existing floor planks of any thickness upto 6m height,cleaning and removing all dust from joints with special tools,brushing and levelling uneven surface,then filling and levelling the joints with saw dust mixed with glue(fevicol or equivalent) and finally a dowel to combine the mixture as you gradually add more and more glue, making sure that you thoroughly combine the two components. Continue in this manner until a putty-like substance, that can be manipulated with clean fingers.
232
-
-
Supplying and fixing 12 mm thick teak wood planks for ceiling/flooring below the joists ,rafter already fixed using necessary GI screws after removing the decayed ceiling planks etc. complete as per the direction of Engineer in Charge
76
-
-
Taking out existing wooden door shutter, repair by cutting, painting etc. and refixing of repaired door shutters to existing door frames, including replacement of hinges with screws, etc. as required, all complete as per the direction of the Engineer-in-charge.
20
-
-
Renewing glass panes, with wooden fillets wherever necessary: Float glass panes of thickness 4 mm
10.46
-
-
Providing and fixing 150x10 mm passivated bolt with 50mm x 4mm passivated rod welded to bolt head for holdfast including fixing to frame embedding in cement concrete block 30x10x15cm 1:3:6 mix (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size).
120
-
-
Providing and fixing bright finished brass butt hinges with necessary screws etc. complete ::125x85x5.5 mm (heavy type)
64
-
-
Providing and fixing bright finished brass butt hinges with necessary screws etc. complete : 75x65x4 mm (heavy type)
90
-
-
Providing and fixing bright finished brass handles with screws etc. complete: 125 mm
26
-
-
Providing and fixing bright finished brass 100 mm mortice latch and lock with 6 levers and a pair of lever handles of approved quality with necessary screws etc. complete.
5
-
-
Providing and fixing bright finished brass 100 mm mortice latch and lock, ISI marked, with six levers and a pair of anodised (anodic coating not less than grade AC 10 as per IS : 1868) aluminium lever handles of approved quality with necessary screws etc. complete.
4
-
-
Providing and fixing bright finished brass tower bolts (barrel type) with necessary screws etc. complete : 250x10 mm
48
-
-
Providing and fixing bright finished brass tower bolts (barrel type) with necessary screws etc. complete :100x10 mm
56
-
-
Providing and fixing bright finished brass door latch with necessary screws etc. complete :300x16x5 mm
18
-
-
Providing and fixing bright finished brass hard drawn hooks and
eyes :300 mm
32
-
-
Strengthening the existing wooden beams,columns etc by inserting steel plates, angles flats etc. as per drawing, including cost and conveyance of steel plates, nuts, bolts, screw, fabricating, fixing complete as directed by Engineer-in-charge.
150
-
-
Making joints with available wood work like rafter, beams,wall plate of cross sectional area upto 100 sq. centimetres including cutting and making Half-lap joints upto 45 cm lapping including drilling 10mm dia holes for receiving bolts for reusing old timber work.complete job as per the direction of Engineer in charge.
15
-
-
Making joints with available wood work like rafter, beams,wall plate of cross sectional area beyond 100 sq. centimetres upto 600 sq.centimetres including cutting and making Half-lap joints upto 60 cm lapping including drilling 10mm dia holes for receiving bolts for reusing old timber work.complete job as per the direction of Engineer in charge.
10
-
-
Providing and fixing second class teak wood Eve boards of size 150 mm X 20 mm at the edges of rafter roof with necessary screws & per the existing design including charges for scafolding charges as directed by Engineer in Charge.
90
-
-
Masonry
-
-
-
Laterite masonry in lime mortar 1:2:9(1cement:2 lime:9 fine sand ) using existing size or nearest available size of laterite for superstructure.including cost and conveyance of all materials, labour,scaffolding, curing, lead lift , etc complete at all levels and as directed by Engineer-in-charge.Preparation of lime may be as per specification.
9.49
-
-
Roofing Work
-
-
-
Cleaning MP tiles, hip and ridge tiles by removing water weeds, fungi etc using wire brush and lime water including extra lowering charge and scaffolding charges(considered only resuable tile)
434
-
-
Labour charge for Roofing with departmentaly supplied MP roofing tiles including extra labour with raised up mughappu, false ceiling, obstructions, additional works in valleying areas etc. including necessary scaffolding complete as per the instruction of engineer in charge
434
-
-
Providing and laying approved make, MP tiles of 320 mm or nearest size over reeper bands (already done) to correct lines and levels including the cost, conveyance of all materials etc. including extra lowering charge and scaffolding charges complete as directed by Engineer-in-charge.
277
-
-
Labour charge for Laying available departmental MP hip and ridge tiles set in lime mortar 1:11/2 including finishing edges using red oxide powder etc. including necessary scaffolding complete as per the instruction of engineer in charge.(Over First Floor Roof)
41
-
-
Providing and laying MP hip and ridge tiles 1st class set in surki mortar (1: 1/2:8) including finishing edges, etc. complete as directed by Engineer-in-Charge.
54
-
-
Providing & fixing on ceiling factory pressed clay decorative floral tile (under mangalore tile roof) of 320mm x 200 mm x 12mm and as per approved pattern on timber frame work complete including extra lowering charge and scaffolding charges as directed by Engineer-in-Charge.(Timber frame work to be paid separately).
284
-
-
Providing valley by using 20 gauge plain Aluminium sheet or equivalent quality with necessary overlaps at ends,with necessary steel nails ,eve plate etc including necessary scaffolding complete as per the instruction of engineer in charge
8.1
-
-
Flooring Works
-
-
-
Providing and laying pressed clay tiles (as per approved pattern 20 mm nominal thickness of approved size) on floors jointed with white cement mortar 1:4 (1 white cement : 4 coarse sand) mixed with pigment to match the shade of tile , laid over a bed of 20 mm thick cement mortar 1:4 (1 cement : 4 coarse sand) and finished neat complete
198
-
-
Polishing the existing clay tile flooring by rubbing with 80 grade grinding stone,cleaning and pointing the damaged edges with white cement mixed with pigments to match the existing flooring,then grinding with 120grade stone and final with finishing stone so as to get a uniform glossy finish.The entire flooring shall be polished with floor polish.
70
-
-
Providing and laying flamed finish Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4
coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. Flamed finish granite stone slab Jet Black, Cherry Red, Elite Brown, Cat Eye or equivalent.
18
-
-
Providing edge moulding to 18 mm thick marble stone counters, Vanities etc., including machine polishing to edge to give high gloss finish etc. complete as per design approved by Engineer-in-Charge.Granite work
20
-
-
Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer) of 1st quality conforming to IS : 15622 of approved make in colours such as White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick cement mortar 1:4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry @ 3.3kg/sqm including pointing the joints with white cement and matching pigment etc., complete
17
-
-
Providing and fixing Ist quality ceramic glazed wall tiles conforming to IS: 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer-in-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg per sqm, including pointing in white cement mixed with pigment of matching shade complete.
58
-
-
Finishing Works
-
-
-
Plastering with lime mortar 1:2:9,(1cement:2 lime:9 fine sand )12mm thick using lime mortar and adequate quantity of herbals such as Jaggery, kadukka water and etc for old surface for traditional works including cost and conveyance of all materials, labour,scaffolding, curing, lead lift , etc complete at all levels and as directed by Engineer-in-charge. .Preparation of lime may be as per specification .
340
-
-
12 mm cement plaster finished with a floating coat of neat cement of mix :1:3 (1 cement: 3 fine sand)
68
-
-
Filling the major cracks by providing and applying approved products like Asian Paints-Smartcare Hybrid PU Sealant in proportion recommended by the manufacturer into cracks/honey-comb area of concrete/masonry by suitable method including cutting of nipples after curing etc. complete as per directions of Engineerin- Charge.
60
-
-
Finishing with anti-rust paint of approved brand (Rustolin or Equivalent) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work
32
-
-
Applying white or colour wash by mixing glue & indigo as per requirement three or more coats to surfaces such as walls,columns, ceiling etc, after scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete including cost and conveyance of all materials, labour, scaffolding etc. complete as directed by Engineer-in-charge. Preparation of lime may be as per specification and test certificate of lime may be produced by the agency
2230
-
-
Providing and applying sealer compound after prepairing the surface / cracks with suitable wooden fillets after cleaning and smoothing the surface and the grovees with special chisel /tools applying one or more coat of wooden filler diluted in special thinner.Entire surface will be sand papering smooth manually with out disturbing the wooden carving details.Then apply second coat of wooden filler and sandpapering smoothly .Entire surface will be applied with two or more coats of sealer compounds (MRF, sheenlac )
888
-
-
Aplying sealer compound one or more coat ( MRF,sheenlac etc.) after filling cracks and undulations in wood work with suitable wooden fillets then cleaning and smoothing the surface with special chisel/tools then sandering with suitable sandering paper so as to get a uniform smooth surface for applying sealer compound in roof members like rafter,wallplates,reeper etc upto 10m height including cost of scaffolding etc complete job as per the direction of Engineer in charge
1165.43
-
-
Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work
123
-
-
Concrete Works
-
-
-
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stoneaggregate 20 mm nominal size).
5
-
-
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishig and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size).
2
-
-
Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete above plinth level.Thermomechanically treated bars of Fe-500 D or more
220
-
-
Centering and shuttering including strutting, propping etc. and removal of form for all heights : Lintels, beams, plinth beams, girders, bressumers and cantilevers
48
-
-
Water Supply
-
-
-
Providing, fixing, testing, and commissioning at site White Vitreous China Floor Mounted EWC, Complete Set with 3/6 LPF Dual Cistern, overall size 640 x 360 x 820mm. or as per approved model and shape, including Cistern Fittings, Soft Close Seat Cover, bolts, nuts, washers, expansion/ rawl sleeves, gasket, etc. complete, and fixing to wall, as per manufacturer's instruction and to the approval of Engineer-in-charge.
4
-
-
Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar taps, 32 mm C.P. brass waste of standard pattern, including painting of fittings and brackets, cutting and making good the walls wherever require:White Vitreous China Wash basin size 630x450 mm with a single 15 mm C.P. brass pillar tap
2
-
-
Providing and fixing C.P. brass angle valve of approved quality conforming to IS:8931 15mm nominal bore
6
-
-
Providing and fixing 600x450 mm beveled edge mirror of superior glass (of approved quality) complete with 6 mm thick hard board ground fixed to wooden cleats with C.P. brass screws and washers complete.
2
-
-
Providing and fixing C.P. brass long body bib cock of approved quality conforming to IS standards and weighing not less than 690 gms. 15 mm nominal borevels
4
-
-
Providing and fixing CP brass Soap tray as directed by Engineer-in-Charge at all levels.
2
-
-
Providing and fixing uplasticised PVC connection pipe with brass unions :45 cm length,15 mm nominal bore
6
-
-
Providing and fixing PTMT towel rail complete with brackets fixed to wooden cleats with CP brass screws with concealed fittings arrangement of approved quality and colour. 450 mm long towel rail with total length of 495 mm, 78mm wide and effective height of 88 mm, weighing not less than 170 gms
2
-
-
Providing and fixing CP brass health faucets with 8mm dia 1 meter long flexible tube and wall hook with all fittings and fixtures complete inlcuding cutting and making good the walls and floors wherever required including cost and conveyance of all materials, labour charges, sundries etc complete as directed by the Engineer in charge at all levels.
4
-
-
Providing and fixing floor trap of PVC,110 mm outer dia(multi trap) including Heavy duty SS (304) cockroach free floor grating with cup etc including cost and conveyance of all materials, labour charges, sundries etc complete as directed by the Engineer in charge at all levels
6
-
-
Providing and Fixing, water test and commission Drainage Pipe Work with uPVC SWR Pipes (IS 13592) Type - B, solvent cement welded type, and SWR solvent cement welded type fittings such as bends, tees, couplers, Y-junctions, reducers, adaptors, sockets, end plugs etc. jointed with solvent cement and fixing in position with clamps, hanging supports, fasteners, masonry supports etc, as per requirement, including cutting, chasing, drilling etc, in Block Walls etc. wherever required and making good walls, floors, duct etc. Core Cutting In RCC Structure shall measured separately. - 110 mm. O.D.
30
-
-
Providing and Fixing, water test and commission Drainage Pipe Work with uPVC SWR Pipes (IS 13592) Type - B, solvent cement welded type, and SWR solvent cement welded type fittings such as bends, tees, couplers, Y-junctions, reducers, adaptors, sockets, end plugs etc. jointed with solvent cement and fixing in position with clamps, hanging supports, fasteners, masonry supports etc, as per requirement, including cutting, chasing, drilling etc, in Block Walls etc. wherever required and making good walls, floors, duct etc. Core Cutting In RCC Structure shall measured separately. - 75 mm. O.D.
24
-
-
Providing and fixing, water test and commission Drainage Pipe Work with uPVC Pipes 6.0 Kg/Cm2 (IS: 4985) and injection moulded PVC fittings (IS: 7834) such as bends, tees, couplers, Y-junctions, reducers, adaptors, sockets, end plugs etc. jointed with solvent cement and fixing in position with clamps, hanging supports, fasteners, masonry supports etc, as per requirement, including cutting, chasing, drilling etc, in Block Walls etc. wherever required and making good walls, floors, duct etc. Core Cutting in RCC Structure shall measured separately. - 50 mm. O.D.
30
-
-
Providing and Fixing, water test and commission Rain Water Pipe Work with uPVC SWR Pipes (IS 13592) Type - A, and Rubber Ring Seal (IS 5382) moulded PVC fittings (IS 14735) such as bends, tees, couplers, Y-Joints, reducers, adaptors, sockets, end plugs etc. jointed and fixing in ducts with approved G.I. Supporting Systems consisting of slotted rails, legs, clamps, fasteners, bolts nuts etc, as per requirement, including cutting, chasing, drilling etc, in Block Walls etc, wherever required and making good walls, floors, duct etc. Core Cutting in RCC Structure shall measured separately. - 110mm. O.D. Down Pipe
80
-
-
Providing, fixing, water test and commission Under Ground Drainage Pipe Work with uPVC Pipes 6kg/cm² (IS: 4985) jointed and laid in trenches with required slopes, as specified, and kept in position with masonry supports, thrust blocks, anchors including excavation and refilling etc. - 110mm. O.D.
80
-
-
Providing, fixing, pressure testing and commission Concealed Cold Water Services Pipe Work, with High Pressure uPVC Pipes, Sch. 40 (ASTM D 1785) and Sch. 80 (ASTM D 2467) Fittings, including all required uPVC plain & brass threaded fittings and fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step solvent cement for pressure pipes and fittings, and the cost of cutting chases and making good the same as per direction of Engineer- in -Charge. - 20 mm. dia. (3/4").
24
-
-
Providing, fixing, pressure test and commission Exposed Cold Water Services Pipe Work, with High Pressure uPVC Pipes, Sch. 40 (ASTM D 1785) and with Sch. 80 (ASTM D 2467) Fittings, including fixing the pipe with clamps at required spacing. This includes jointing of pipes & fittings with one step solvent cement for pressure pipes and fittings, including testing of joints complete as per direction of Engineer in Charge. - 20 mm. dia. (3/4")
20
-
-
Providing, fixing, pressure test and commission Exposed Cold Water Services Pipe Work, with High Pressure uPVC Pipes, Sch. 40 (ASTM D 1785) and with Sch. 80 (ASTM D 2467) Fittings, including fixing the pipe with clamps at required spacing. This includes jointing of pipes & fittings with one step solvent cement for pressure pipes and fittings, including testing of joints complete as per direction of Engineer in Charge. - 25 mm. dia. (1")
35
-
-
Providing, fixing, pressure test and commission Exposed Cold Water Services Pipe Work, with High Pressure uPVC Pipes, Sch. 80 (ASTM D 1785) and with Sch. 80 (ASTM D 2467) Fittings, including fixing the pipe with clamps at required spacing. This includes jointing of pipes & fittings with one step solvent cement for pressure pipes and fittings, including testing of joints complete as per direction of Engineer in Charge. For Pipe Work on Terrace and shaft - 32 mm. dia. (1¼") for Cold Water Pumping Line from Pump Room to Roof Level
35
-
-
Supply, fix at site in position, test and commission, Forged Brass Ball Valves. PN;25, complete with all necessary accessories. 20mm. (3/4")
2
-
-
Supply, fix at site in position, test and commission, Forged Brass Ball Valves. PN;25, complete with all necessary accessories. 25mm. (1")
2
-
-
Supply, fix at site in position, test and commission PVC P - Trap, 110mm, as Gully Trap, including all inlet and outlet connections to pipes using solvent cement/ring seal joints, complete and placed inside masonry chamber. (Construction of Gully Trap Chambers shall measured separately under)
2
-
-
Constructing Brick Masonry Rectangular Chambers, for above Square Gully Traps, 30x30cm. internal size and depth up to 75cm. with 75 class designation brick wall, 115mm. thick in cement mortar 1:5 on a foundation of P.C.C. 1:4:8, 10cm. thick, inside and outside cement plaster 1:3, 12 mm thick with a neat cement flushing coat, surrounding the installed gully trap with P.C.C. 1:1.5:3, including curing, fixing 10x10cm. C.I. grating and Heavy Duty D. I. Manhole Covers with Frame, 300 x 300mm, weight 33Kg, over the chamber including cost of materials and excavation, refilling, compaction etc.
2
-
-
Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Electric resistance or induction butt welded tubes
1816
-
-
Constructing brick masonry manhole in cement mortar 1:4 ( 1 cement : 4 coarse sand ) with R.C.C. top slab with 1:2:4 mix (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size), foundation concrete 1:4:8 mix (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size), inside plastering 12 mm thick with cement mortar 1:3 (1 cement : 3 coarse sand) finished with floating coat of neat cement and making channels in cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) finished with a floating coat of neat cement complete as per standard design : Inside size 90x80 cm and 45 cm deep including C.I. cover with frame (light duty) 455x610 mm internal dimensions, total weight of cover and frame to be not less than 38 kg (weight of cover 23 kg and weight of frame 15 kg) : With common burnt clay F.P.S. (non modular) bricks of class designation 7.5
3
-
-
Providing and placing on terrace (at all floor levels) polyethylene water storage tank, IS : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank.Circular tank
2000
-
-
Miscellaneous Works
-
-
-
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared.
30
-
-
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
10
-
-
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating Each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
8
-
-
Supplying chemical emulsion in sealed containers including delivery as specified.BiFlex TC
20
-
-
Diluting and injecting chemical emulsion for POST-CONSTRUCTIONAL anti-termite treatment (excluding the cost of chemical emulsion) :Along the external wall below concrete or masonry apron using chemical emulsion as per manufacturers specification including drilling and plugging holes etc.:With Biflex TC 0.05 concentration.
100
-
-
Providing anti-termite treatment to the useable members of wooden doors, windows and reapers, beams and rafters of roof ceiling etc. with two coat Biflex TC chemical diluted with kerosene or Turpentine after properly cleaning the wooden members etc complete conforming to manufacturer's specifications and as directed by the Engineer-in-charge.
2114.57
-
-
Removing the pipes and connections in washbasin area,removing the debris and closing the holes.
4
-
-
Making plinth protection 50mm thick of cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) over 75mm thick bed of dry brick ballast 40 mm nominal size, well rammed and consolidated and grouted with fine sand, including necessary excavation, levelling & dressing & finishing the top smooth.
76.5
-
-
Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S.clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after .The scaffolding system shall be stiffened with bracings, runners,connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineerin-charge .The elevational area of the scaffolding shall be measured for payment purpose .The payment will be made once irrespective of duration of scaffolding.Note: - This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done.
104
-
-
Removal of tree growth from walls and floors of the building by using a chemical mix combination as specified.Phenol=250gms,Sodium Hydroxide=250gms,Caseine=200gms,Arsenic Trioxide=500gms.These chemicals are to be mixed thoroughly and applied to the roots of the trees and wait for a period of three months to ensure that the trees has died and shrunk.complete as per the instruction of Engineer in charge. Trees upto girth 30cm
2
-
-
Removal of tree growth from walls and floors of the building by using a chemical mix combination as specified.Phenol=250gms,Sodium Hydroxide=250gms,Caseine=200gms,Arsenic Trioxide=500gms.These chemicals are to be mixed thoroughly and applied to the roots of the trees and wait for a period of three months to ensure that the trees has died and shrunk.complete as per the instruction of Engineer in charge. Trees upto girth 10cm
4
-
-
Supplying following manpower for repairing damaged wooden windows, ventilators, doors, staicases etc .Carpenter&mason
25
-
-
Supplying following manpower for repairing damaged wooden windows, ventilators, doors, staicases etc . Man Mazdoor
15
-
-
Supplying following manpower for repairing damaged wooden windows, ventilators, doors, staicases etc .Wood cutter
5
-
-
Documenting the structure by means of photography and CD at the times of before execution, during execution and after xecution of individual work.
1
-
-