Technopark Tender

Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Technopark Tender

Works
Security and Emergency Services
Eprocure
Opening Date20 Sep 2024
Closing Date4 Oct 2024
Tender Amount₹ 1,00,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
100 MM Dia

240

-

-

... More
80 MM Dia

6

-

-

... More
Supply, Fixing, Welding, and Testing of Class-C/Heavy Duty G.I. Pipes (Underground Piping) conforming to IS: 1239/3589 standards, including all necessary accessories such as tees, elbows, flanged joints, reducers, nuts, and bolts. Proper pipe support must be used as required to ensure structural integrity. The rate must include excavation up to a depth of 1.5 meters, as well as coating the buried pipes with an anti-corrosive primer and wrapping them with a 4mm thick polymer corrosion-resistant tape, as per IS: 10221, ensuring a minimum of 15mm overlap. A Holiday Test must be conducted on the wrapped pipes to identify any defects or discontinuities in the protective coating and the Radiographic test must be conducted as mentioned in the tender conditions. The test results must meet the required standards, and any detected issues must be rectified before proceeding with the backfilling. All work must be carried out under the supervision and direction of the Site In Charge of Technopark, adhering to the detailed specifications. All work must be performed in accordance with the tender document reference no ETPK/PH-I/2024-25/AT-245 Approved Makes: Tata/Jindal

-

-

-

... More
150 MM Dia

10

-

-

... More
100 MM Dia

380

-

-

... More
Supply, Installation, Testing, and Commissioning of UL Listed Grooved Fittings for pipes above 50mm dia and UL listed threaded fittings for pipes below 50mm dia, used for jointing the pipes. The installation must adhere strictly to manufacturer’s guidelines and industry standards to ensure leak-proof and durable connections. All the fittings must be UL listed for compliance with safety and performance standards. All work must be performed in accordance with the detailed specifications outlined in the tender document reference no ETPK/PH-I/2024-25/AT-245 Approved Makes: NEW/Victaulic/Sant

-

-

-

... More
Elbow 100mm dia

19

-

-

... More
Tee 100mm dia

7

-

-

... More
Flange 100mm dia

18

-

-

... More
Flange 80mm dia

11

-

-

... More
Mechanical Tee 100x80mm dia

11

-

-

... More
Mechanical Tee 100x25mm dia (Threaded)

17

-

-

... More
Coupling 100mm dia

82

-

-

... More
Elbow 25mm dia (DI threaded)

11

-

-

... More
Union 25mm dia (DI threaded)

11

-

-

... More
Coupling 25mm dia (DI threaded)

11

-

-

... More
End cap 100mm dia

7

-

-

... More
Reducer bush 25mm x 3/8 inch

5

-

-

... More
Reducer bush 25mm x 1/4 inch

5

-

-

... More
Hex nipple 3/8 inch

5

-

-

... More
Supply, Installation, Testing, and Commissioning of Slim Seal Type Cast Iron Butterfly Valves (PN-16), with stainless steel disc and lever-operated mechanism. Each valve must include all necessary accessories such as flanges, rubber insertion gaskets, nuts, and bolts to ensure a secure and leak-proof installation. The valves must conform to PN-16 pressure rating standards, and the installation must comply with site-specific requirements and industry best practices. The valves' diameters are as specified below in this BOQ. All work must be performed in accordance with the detailed specifications outlined in the tender document reference no ETPK/PH-I/2024-25/AT-245. Approved Makes : Zoloto/Intervalve/Lehery

-

-

-

... More
150 MM Dia

8

-

-

... More
100 MM Dia

5

-

-

... More
Supply, Installation, Testing, and Commissioning of Wafer Type Single Plate Cast Iron Non-Return Valves (PN-16), complete with all necessary accessories including flanges, nuts, bolts, and rubber gaskets for proper seating and leak-proof installation. The non-return valves must conform to PN-16 pressure rating standards, and the installation must meet all applicable site and industry requirements for ensuring proper flow control and backflow prevention. All work must be performed in accordance with the detailed specifications outlined in the tender document reference no ETPK/PH-I/2024-25/AT-245. Approved Makes : Zoloto/Intervalve/Lehery

-

-

-

... More
100 MM Dia

2

-

-

... More
Supply, Installation, Testing, and Commissioning of Single-Headed Hydrant Valve, made of stainless steel (SS), 63mm dia, oblique type, with instantaneous hose coupling adapter conforming to IS: 5290 standards. The hydrant valve must be installed in line with the site-specific fire safety system requirements to ensure optimal performance and compliance with fire safety standards. All necessary accessories, including couplings, gaskets, and supports, must be provided, and the valve must be fully tested for operational readiness. The installation must adhere to the specifications in the tender document and ensure seamless integration with the fire protection network. All work must be performed in accordance with the detailed specifications outlined in the tender document reference no ETPK/PH-I/2024-25/AT-245. Approved Makes: Newage/Winco/Safex.

16

-

-

... More
Supply, Installation, Testing, and Commissioning of Hydraulic Hose Reel, complete with a swing-type drum, 19mm dia PVC hose with a length of 30 meters, stop cock, and gunmetal nozzle at one end, along with all necessary fixing materials. The hose reel must be connected to the main riser via a 25mm dia GI Class C pipe and accessories, ensuring a rigid and secure connection. The entire assembly must be installed to meet the fire safety standards outlined in the specifications, ensuring proper functionality and ease of use during emergencies. All work must be performed in accordance with the detailed specifications outlined in the tender document reference no ETPK/PH-I/2024-25/AT-245. Approved Makes: Newage/Safex/Winco

8

-

-

... More
Supply, installation, testing, and commissioning of an internal fire hose box designed to accommodate two pieces of fire hose pipes and one branch pipe. The box must be constructed from durable 2mm thick Fiber Reinforced Plastic (FRP), ensuring long-term durability and resistance to corrosion. The box must have a glass-fronted hinged door with a locking mechanism to prevent unauthorized access while ensuring easy access during emergencies. The door should feature a spring-loaded latch for quick release when needed. The internal compartment must be designed to securely hold the hose and branch pipe, providing easy and organized access during firefighting operations. The fire hose box must be painted with scarlet red color and the paint should conform to IS standards for fire safety, durability, and visibility. All work must be carried out in accordance with the detailed specifications outlined in the tender document reference no ETPK/PH-I/2024-25/AT-245. Approved Makes: Friends/Metelex/Capital Gain

8

-

-

... More
Supply, installation, testing, and commissioning of double-door external yard hose boxes fabricated from FRP (Fiber Reinforced Plastic). The hose box must be designed to withstand outdoor conditions, ensuring durability and weather resistance. The box must have a glass-fronted hinged door with a locking mechanism to prevent unauthorized access, while ensuring easy access during emergencies. It should be painted scarlet red as per fire safety standards, using a two-coat red enamel finish over a zinchromate primer for corrosion protection. The hose box must be large enough to accommodate two 63 mm diameter x 15 meter long fire hoses (controlled percolation type as per IS:901) and one branch pipe conforming to IS:903. It must be mounted on a secure metal stand or appropriate support structure using stainless steel bolts and brackets. The installation height must ensure ease of use for firefighting personnel. Signage, including glow-in-the-dark or reflective "Fire Hose" identification, must be provided as per local safety codes. All materials and installation must conform to relevant IS standards (IS:901 and IS:903) and meet the fire safety guidelines outlined in NBC 2016. Testing and commissioning must be conducted to ensure all components are in working condition, and the installation must be approved by the Technopark site in charge. This item must be executed as per tender document reference ETPK/PH-I/2024-25/AT-245. Approved Makes: Friends/Metelex/Capital Gain

8

-

-

... More
Supply, installation, testing, and commissioning of controlled percolation fire hose, 63 mm in diameter and 15 meters in length, tested to a bursting pressure of 15 kg/cm². The hose must be equipped with stainless steel couplings conforming to IS:901 standards. The couplings must be securely bound to the hose using GI wire for a firm and leak-proof connection. The hose should be designed for controlled percolation, ensuring proper water flow under pressure while being durable and resistant to wear and tear during firefighting operations. All materials and workmanship must adhere to the relevant IS standards (IS:901), and the hose must be tested and approved for use in firefighting systems. Installation should ensure proper storage within the fire hose box, with testing and commissioning done as per industry standards to guarantee full functionality. This item must be executed in accordance with the specifications detailed in tender document reference ETPK/PH-I/2024-25/AT-245. Approved Makes: Newage/CRC/Winco

16

-

-

... More
Supply, installation, testing, and commissioning of Stainless Steel (SS) ISI marked Branch Pipe, complete with a 63 mm male hexagonal base nozzle, conforming to IS:903 standards. The branch pipe must be constructed from high-quality stainless steel for durability and corrosion resistance, ensuring long-term reliability in firefighting operations. The nozzle must be designed for efficient water jet control, providing a steady and controlled water stream to target the fire effectively. The installation must include all necessary components, ensuring compatibility with the fire hose and hydrant system. All work must conform to IS:903 standards and must meet the fire safety guidelines outlined in NBC 2016. Testing and commissioning must be conducted to ensure operational readiness, and approval from the Technopark site in charge must be obtained. Approved Makes: Newage/Winco/Safex

8

-

-

... More
Supply, installation, testing, and commissioning of a 3-way Fire Brigade Inlet connection, complete with 3 nos. of 63 mm diameter built-in Gun Metal Non-Return Valves (NRV) with instantaneous coupling type. The inlet must be arranged on a 100 mm diameter pipe manifold and connected to the wet riser main, providing a reliable and quick connection point for external fire brigade vehicles to pump water into the fire protection system. The Fire Brigade Inlet must be designed for ease of use during emergency operations, allowing the fire brigade to augment the building's water supply for firefighting. The gun metal construction ensures corrosion resistance and durability, while the non-return valves prevent backflow, ensuring safe and efficient water delivery. The system must conform to IS standards for firefighting equipment and meet the fire safety guidelines outlined in NBC 2016. Testing and commissioning must be carried out to ensure the inlet operates correctly, with approval obtained from the Technopark site in charge. Approved Makes: Newage/Winco/Safex

1

-

-

... More
Supply, installation, testing, and commissioning of an Electromechanical Type Industrial Pressure Switch, surface-mounted, with an operating range of 45-215 psi. The pressure switch must be designed for industrial applications, ensuring accurate pressure control and monitoring in the fire protection system. The device must be surface-mounting type, durable, and suitable for the specified pressure range. The pressure switch will be used to regulate and monitor pressure in the system, ensuring safe and reliable operation by triggering necessary actions (such as pump start/stop) when the pressure reaches the set threshold. It must come with necessary mounting accessories and connection points as required for integration into the existing system. The installation must adhere to relevant IS standards and fire safety guidelines, with testing and commissioning performed to ensure full functionality under operating conditions. Approval from the Technopark site in charge is mandatory upon completion. Approved Makes: Indfoss/Danfoss

1

-

-

... More
Supply, installation, testing, and commissioning of a pressure gauge with a 0 to 16 kg/cm² range and a 4" dial. The pressure gauge must be durable and designed for industrial use in fire protection systems, ensuring accurate and reliable pressure measurement. It should be capable of withstanding high-pressure conditions and provide precise readings for operational safety and monitoring purposes. The pressure gauge must include all necessary accessories for proper mounting and connection to the fire protection system. The gauge must be easy to read, with clear markings on the 4" dial, and should be installed in easily accessible locations for regular monitoring and maintenance. The installation, testing, and commissioning must comply with IS standards and relevant fire safety regulations. All components and connections must be tested to ensure proper functioning under operating conditions, with final approval from the Technopark site in charge. As mentioned in the tender document, all works must follow the specifications outlined in reference no. ETPK/PH-I/2024-25/AT-245. Approved Makes: Febig/ H Guru

1

-

-

... More
Supply, installation, testing, and commissioning of ball valves of the following diameter:The ball valve must be of industrial-grade quality, capable of providing reliable on/off control for fluid flow in fire protection systems. It must be constructed of corrosion-resistant materials, ensuring durability and longevity in high-pressure and high-temperature environments. The ball valve must be installed with appropriate fittings and accessories, ensuring leak-proof connections and proper alignment within the system. Testing and commissioning should verify smooth operation, with no leakage, under the specified working pressure conditions. The installation and testing must adhere to IS standards and local safety regulations, ensuring compliance with fire protection system requirements. As mentioned in the tender document, all works must follow the specifications outlined in reference no. ETPK/PH-I/2024-25/AT-245. Approved Makes: Zoloto/NVR/Lehery

-

-

-

... More
20 MM Dia

8

-

-

... More
Supply, installation, testing, and commissioning of air release valve of 20mm dia. The air release valve must be designed to automatically expel trapped air from the fire protection system, ensuring smooth operation and preventing airlocks. The valve should be constructed from durable, corrosion-resistant materials to withstand high-pressure conditions and provide long-term reliability. The valve must be installed with all necessary fittings and accessories, ensuring proper integration into the system. The installation must also include appropriate measures for ensuring leak-proof connections and proper alignment. Testing and commissioning should verify the effective release of trapped air and proper functioning under the specified working pressure conditions. The installation, testing, and commissioning must be carried out in accordance with the IS standards and local safety regulations, complying with the fire protection system requirements. As mentioned in the tender document, all works must follow the specifications outlined in reference no. ETPK/PH-I/2024-25/AT-245. Approved Makes: Newage/Zoloto/NVR

4

-

-

... More
Supply, installation, testing, and commissioning of ABC type fire extinguisher of 4 kg capacity, complete with initial charges and installation brackets. The extinguisher must be designed to handle Class A (combustibles), Class B (flammable liquids), and Class C (electrical) fires, offering versatile protection for various emergency situations. The extinguisher must be provided with a wall-mounting bracket, securely installed in an accessible location, ensuring ease of use during an emergency. The unit should be fully charged and ready for immediate use upon installation, and all fire extinguishers must undergo proper testing and commissioning to verify operational readiness. The installation and testing must comply with IS standards and local fire safety regulations, ensuring effective protection and performance. As mentioned in the tender document, all works must follow the specifications outlined in reference no. ETPK/PH-I/2024-25/AT-245. Approved Makes: Kanex/Safex/Bharat

18

-

-

... More
Supply, installation, testing, and commissioning of CO₂ type fire extinguisher of 4.5 kg capacity, complete with initial charges and installation brackets. The extinguisher must be suitable for Class B (flammable liquids) and electrical fires, offering efficient firefighting capability without leaving any residue, making it ideal for sensitive equipment areas. The extinguisher must be equipped with a wall-mounting bracket for secure installation, ensuring ease of access in case of an emergency. It should be fully charged and tested for immediate readiness upon installation. All units must undergo proper testing and commissioning to ensure functionality. The installation and testing must adhere to IS standards and local fire safety regulations to ensure compliance. As mentioned in the tender document, all works must follow the specifications outlined in reference no. ETPK/PH-I/2024-25/AT-245. Approved Makes: Kanex/Safex/Bharat

6

-

-

... More
Supply, installation, testing, and commissioning of 5 nos. of automatic clean agent fire extinguisher of 10 kg capacity, ceiling-mounted type, with a mild steel body and pressure gauge, suitable for B and C classes of fire. The extinguisher must be refillable and include a gas release panel, safety release device, brass valve, and be fully charged with an HFC Blend. The system must include a pressure gauge to indicate the internal pressure, equipped with a squeeze grip lever and a tamper-proof seal to ensure functionality and safety. The setup must include an abort switch, 4 nos. smoke detectors, 4 nos. heat detectors, and all necessary cabling and accessories for complete installation. This configuration is specifically intended for the first-floor electrical room to protect sensitive equipment from fire hazards. Testing and commissioning must be carried out as per relevant fire safety regulations and standards. As mentioned in the tender document, all works must follow the specifications outlined in reference no. ETPK/Ph-1/2024-25/AT-245. Approved Makes: AEW/Safex/Kanex

1

-

-

... More
Supply, installation, testing, and commissioning of 1 no. of automatic clean agent fire extinguisher with a 10 kg capacity, ceiling-mounted type, with a mild steel body and pressure gauge. The extinguisher must be suitable for B and C classes of fire and be a refillable device. It must include a gas release panel, safety release device, and a brass valve, charged with an HFC Blend. The extinguisher shall be equipped with a pressure gauge indicating internal pressure and feature a squeeze grip lever with a tamper-proof seal for safety. The installation shall include an abort switch, 1 no. smoke detector, and 1 no. heat detector, along with all necessary cabling and accessories. This configuration is designed for fire protection in the ground floor electrical room. Testing and commissioning must comply with relevant fire safety regulations and standards. As mentioned in the tender document, all works must follow the specifications outlined in reference no. ETPK/PH-I/2024-25/AT-245. Approved Makes: AEW/Safex/Kanex

1

-

-

... More
Supply, installation, testing, and commissioning of MS structural supports, including cutting, welding, and fixing with nuts, bolts, and anchor fasteners. The supports must be fabricated as per site requirements and specifications. The installation shall include proper alignment, anchoring, and securing of all structural members to ensure stability and strength. The MS structural supports must be coated with two coats of steel primer followed by one coat of enamel paint to prevent corrosion and provide durability. All work shall be executed in accordance with relevant standards and specifications mentioned in the tender document, including proper surface preparation before painting. Testing and commissioning of the structural supports must ensure that all components are securely installed, aligned, and capable of withstanding the necessary load and environmental conditions. As mentioned in the tender document reference no. ETPK/Ph-1/2024-25/AT-245, this specification must be adhered to for successful completion. Approved Makes: Tata / Jindal

110

-

-

... More
Supply, installation, testing, and commissioning of a manual pull station with an integrally mounted addressable module that monitors and reports contact status in real time. The pull station must be designed for reliable and immediate fire alarm activation during emergencies. The quoted rate must include metal boxes and all required mounting accessories for secure installation. The installation must ensure proper alignment, ease of access, and visibility, complying with fire safety regulations and standards. All electrical and communication connections must be completed as per the project requirements, ensuring integration with the overall fire alarm system. Testing and commissioning must verify that the manual pull station operates seamlessly within the fire alarm system, and that all reporting and monitoring features function accurately. As per the terms and conditions of tender document reference no. ETPK/PH-I/2024-25/AT-245, the installation must meet the project specifications and standards. Approved Makes: Morley/Cooper/Edward

8

-

-

... More
Supply, installation, testing, and commissioning of a Horn cum Strobe, wall-mounted type, rated at 82 dBA @ 3 meters for audible annunciation and 75cd flashing at 1 Hz for visual indication during emergency conditions. The strobe must be designed to provide both audio and visual alerts, ensuring safety and awareness in the event of fire or other emergencies. The quoted rate must include metal boxes and all necessary accessories for mounting the unit securely. The installation must guarantee proper visibility and audibility in all designated areas, conforming to fire safety and alarm system regulations. All wiring and connections must be completed according to the project requirements for seamless integration with the fire alarm system. Testing and commissioning must ensure the horn and strobe function correctly, with both audible and visual alerts operating as specified. As per the terms and conditions of tender document reference no. ETPK/PH-I/2024-25/AT-245, all work must comply with the project specifications and safety standards. Approved Makes: Morley/Cooper/Edward

8

-

-

... More
Supply, Installation, Testing, and Commissioning of Addressable Multi-Sensor (Optical Smoke + Heat) detector including mounting base with LED indication for alarm status, junction box, and all other accessories as required for complete installation. The multi-sensor must be capable of detecting both smoke and heat, providing enhanced detection sensitivity and reducing false alarms. The detector must be designed to seamlessly integrate into the existing fire alarm system, ensuring proper communication with the control panel. The quoted rate must include all necessary wiring, junction boxes, mounting accessories, and testing to ensure reliable and accurate performance of the device. Testing and commissioning must verify the functionality of both smoke and heat detection, along with proper communication with the fire alarm system. As per the terms and conditions of tender document reference no. ETPK/PH-I/2024-25/AT-245, the system must comply with relevant safety standards and installation guidelines. Approved Makes: Morley/Cooper/Edward

120

-

-

... More
Supply, Installation, Testing, and Commissioning of Analog Addressable Fire Alarm Control Panel with battery backup to support 24 hours of normal operation and 15 minutes of alarm operation. The control panel must include a battery charger and all necessary software for programming and management. The system must comply with EN standards. The panel must be a two-loop configuration, featuring an adequate character LCD display for system status and control. It must have IP/RS 485 ports for networking capabilities, allowing integration with building management systems. The panel must be software-compatible with advanced features, such as: Upload/download of system information to and from the Fire Alarm Control Panel (FACP) Graphics compatibility with AutoCAD for visualization Real-time detector information, including address and sensitivity changes The system must be thoroughly tested to ensure proper functionality, including networking and integration with other systems. As per the terms and conditions of tender document reference no. ETPK/PH-I/2024-25/AT-245, all components must adhere to the relevant standards and guidelines. Approved Makes: Morley/Cooper/Edward

1

-

-

... More
Supply, Installation, Testing, and Commissioning of Intelligent Addressable Control Module to interface with the Fire Alarm Annunciating System, Lift Panels, Public Address System, and other relevant systems. The control module must comply with the specified requirements, ensuring seamless integration for monitoring and controlling these systems. The module must support addressable functionality, enabling real-time communication with the fire alarm system for efficient and accurate monitoring. It must be fully compatible with the intelligent fire alarm system, offering reliable performance and easy maintenance. All work, including fixing and commissioning, must comply with the terms and conditions outlined in tender document reference no. ETPK/PH-I/2024-25/AT-245, ensuring adherence to relevant standards and safety regulations. Approved Makes:Morley/Cooper/Edward

2

-

-

... More
Supply, Installation, Testing, and Commissioning of Intelligent Addressable Relay Module for interfacing with various systems such as AHUs (Air Handling Units), Ventilation Systems, Smoke Management Systems, LPG Systems, Power Distribution Systems, and other related systems. The relay module must be designed to communicate seamlessly with the fire alarm and control systems, enabling real-time monitoring and control of the integrated systems. The module must be addressable, allowing it to provide accurate status and control information to the central fire alarm system. It should be compatible with the overall intelligent building management and fire safety systems for smooth operation. The quantity mentioned is tentative/approximate and may change based on the final design of the connected systems and their requirements. All work, including fixing and commissioning, must comply with the terms and conditions outlined in tender document reference no. ETPK/PH-I/2024-25/AT-245, ensuring adherence to relevant standards and safety regulations. Approved Makes: Morley/Cooper/Edward

2

-

-

... More
Supply, Installation, Testing, and Commissioning of Intelligent Addressable Fault Isolator Module capable of monitoring short-circuit conditions within the loop circuit. The module must be designed to isolate the portion of the loop affected by the short, ensuring that communication with unaffected devices continues without interruption. Once the shorted condition is corrected, the module should automatically restore communication across the entire loop, maintaining system integrity and functionality. The Fault Isolator Module must be fully compatible with the fire alarm system and conform to all relevant technical specifications and safety regulations as outlined in the project requirements. All work, including fixing and commissioning, must comply with the terms and conditions outlined in tender document reference no. ETPK/PH-I/2024-25/AT-245, ensuring adherence to relevant IS standards. Approved Makes: Morley/Cooper/Edward

6

-

-

... More
Supply, Installation, Testing, and Commissioning of GSM Auto Dialer designed to send instant SMS and voice alerts whenever the fire alarm panel is triggered. The GSM dialer must be a microcontroller-based unit capable of sending separate intrusion and fire messages. The system should support automatic voice and SMS alerts, ensuring immediate communication of fire alarms to designated personnel. The quoted rate must include SIM card maintenance charges and recharging charges for the entire duration of the 2-year Defect Liability Period (DLP). All work must be executed as per the terms and conditions outlined in tender document reference no. ETPK/PH-I/2024-25/AT-245, and in compliance with the relevant IS standards. Approved Makes: Securico/Proteck

1

-

-

... More
Supply, Installation, Testing, and Commissioning of 2x1.5 sq.mm Copper Armoured FRLS Cable conforming to IS standards. The cable must be fire-resistant, low-smoke (FRLS), and armoured for enhanced durability and protection. It is to be used for power supply and communication between fire safety systems and other electrical components. The installation includes all necessary accessories such as cable glands, lugs, saddles, clamps, and junction boxes, ensuring proper termination and grounding. Testing must be performed to verify insulation resistance and continuity. All work must be executed as per the terms and conditions outlined in tender document reference no. ETPK/PH-I/2024-25/AT-245, and must adhere to IS standards for fire safety and electrical installations. Approved Makes: Finolex/Havells/Polycab

1300

-

-

... More
Supply and Installation in Position of LED Light Glowing Sign Board for each floor, complete with alternative power supply. The sign board must be highly visible, energy-efficient, and designed for continuous operation. It should glow clearly under both normal and emergency power conditions, ensuring high visibility during evacuation or power outages. The board must conform to relevant fire safety and electrical standards, with all required accessories for mounting, wiring, and connection to both the primary and backup power systems. Installation must include proper wiring, termination, and testing to ensure uninterrupted functionality. All work must comply with the specifications and guidelines as mentioned in tender document reference no. ETPK/PH-I/2024-25/AT-245. Approved Makes: AEW/Prolight/Autolight

25

-

-

... More
Supply and Installation of Glow Sign Board made of 3mm thick PVC foam board, with dimensions of "12x4". The signboard must be designed for high visibility in low-light conditions, ensuring clear communication of essential information. The PVC foam board must be durable and weather-resistant, with a smooth finish and vibrant colors that conform to fire safety guidelines. Proper mounting and support accessories must be included to securely fix the sign on each floor as per the required location. The installation must include wiring, if necessary, and all the required accessories for mounting. The signage must be aligned with Technopark’s safety protocols and clearly visible under various lighting conditions. All work must comply with the specifications and guidelines as mentioned in tender document reference no. ETPK/PH-I/2024-25/AT-245. Approved Makes: Prolight/Autolight

10

-

-

... More
Supply and Installation of Assembly Point Sign Board with dimensions "16x16". The signboard must be constructed from durable and weather-resistant materials suitable for outdoor or indoor installation, ensuring high visibility and clear identification of the assembly point during emergencies. The board must be installed in strategic locations as designated in the building’s evacuation plan and must adhere to fire safety standards. The installation includes all necessary mounting accessories, brackets, and supports to securely fix the sign at the appropriate height for easy visibility. All work must conform to the specifications and safety guidelines mentioned in tender document reference no. ETPK/PH-I/2024-25/AT-245. Approved Makes: Prolight/Autolight

1

-

-

... More
Supply and Installation of Fire Escape Route Map in A3 sheet format, printed in color, plastic laminated, and framed for durability and long-lasting clarity. The map must clearly depict the fire escape routes, location of fire safety equipment, emergency exits, and assembly points, following the building's approved evacuation plan. The laminated map must be framed with a sturdy, corrosion-resistant material and mounted securely on the walls in prominent locations such as lobbies, staircases, and corridors. Installation includes all necessary mounting hardware to ensure proper placement and visibility for occupants. The escape route map must conform to local fire safety regulations

8

-

-

... More
Preparation of Fire Fighting System Drawings, in compliance with the latest fire safety rules and regulations, including all necessary documentation. This includes designing detailed layouts for fire protection systems, ensuring adherence to IS and NBC 2016 standards, and incorporating all fire safety equipment, hydrant systems, fire alarms, extinguishers, and escape routes. The scope also includes arranging and conducting fire force inspections in coordination with the Fire and Rescue Department, addressing any observations or modifications as required, and ensuring the system meets all safety standards. Additionally, the contractor is responsible for obtaining the Final NOC (No Objection Certificate) from the Fire Force Department. This process covers all necessary liaisons, submission of documents, drawings, and inspection reports to the fire authorities. All work must be completed as per tender document reference no. ETPK/PH-I/2024-25/AT-245.

1

-

-

... More
Supply, installation, testing, and commissioning of a computer system configured with an Intel Core i7 processor, 64 GB RAM, and dual 1 TB hard drives for storage and backup. The system must include a 2 GB dedicated graphic card to support the graphical interface required for the BMS software. The operating system should be the latest licensed version of Microsoft Windows. The setup must also include a 21" flat-panel LED color monitor, USB keyboard, and mouse. Additionally, an all-in-one A4 inkjet printer (with print, scan, and copy functions) must be supplied. The computer must be equipped with the latest anti-virus software and should be fully compatible with the BMS software for seamless operation, data visualization, and system control. Proper integration with the IBMS network is mandatory to avoid any communication or performance issues. All necessary software licenses must be legally procured, and the system should be thoroughly tested for performance and stability before final acceptance. The contractor must provide comprehensive documentation, including warranty details, technical manuals, and software licenses. All work must comply with the terms and conditions outlined in the tender document reference no. ETPK/PH-I/2024-25/AT-245.

1

-

-

... More
Supply, installation, testing, and commissioning of cloud-based BMS energy dashboard software, designed to provide real-time monitoring and control of building utilities and energy consumption. The BMS software must include a user-friendly interface with a graphical representation of the IO summary, as specified in the tender. The dashboard should support remote viewing capabilities and must be accessible from Park Center building for efficient remote monitoring and management of the building systems. The software must be integrated with the IBMS platform and provide features such as real-time data updates, alarm management, energy optimization, and historical data reporting. It should be scalable and capable of handling future system expansions without requiring additional licenses. The system must allow multi-user access with role-based security settings to prevent unauthorized access. Testing must ensure that the software is fully functional, including remote connectivity and seamless integration with all other building systems. The contractor must provide detailed documentation, including user manuals, licenses, and training for Technopark personnel. All work must comply with the terms and conditions outlined in the tender document reference no. ETPK/PH-I/2024-25/AT-245.

1

-

-

... More
Supply, installation, testing, and commissioning of on-premise Plant Room Optimizer software, designed to optimize the performance and energy efficiency of the plant room systems. The software must include real-time monitoring, control, and optimization features for the plant equipment, as specified in the IO summary provided in the tender document. The Plant Room Optimizer software must support remote viewing capabilities from Park Centre building, Technopark, allowing for efficient management and monitoring of plant room operations. The software should be equipped with advanced algorithms to optimize chiller performance, pump operation, and other plant equipment based on real-time load and ambient conditions. The system must be fully integrated with the IBMS platform and offer user-friendly dashboards, alarm management, and historical data logging for performance analysis and reporting. It should be scalable to handle future system expansions without additional licensing requirements. Multi-user access with role-based security must be provided to ensure authorized personnel can access and manage the system. Testing and commissioning must ensure full functionality, including remote access, integration with existing systems, and performance optimization features. The contractor must provide comprehensive documentation, including user manuals, licenses, and operator training for Technopark staff. All work must comply with the terms and conditions outlined in the tender document reference no. ETPK/PH-I/2024-25/AT-245.

1

-

-

... More
Supply, installation, testing, and commissioning of billing software for BTU Meter, Energy Meter, and tenant utilities. The software must be capable of calculating, monitoring, and generating bills for individual tenants based on the real-time energy consumption data collected from BTU meters and energy meters installed throughout the building. The billing software must include the following features: Automated data collection from BTU and energy meters. Tenant-wise utility billing, including electricity, cooling, and other utilities. Detailed consumption reports and real-time monitoring of tenant utilities. Provision for generating customized billing cycles and reports as per tenant agreements. Integration with IBMS to enable seamless data flow from meters. Remote viewing capabilities at the Park Center building,Technopark for real-time monitoring and report generation. An intuitive dashboard with role-based access for building managers, tenants, and other authorized personnel. Multi-tenant support with a scalable architecture to accommodate future expansions. The software must be capable of being integrated with Technopark’s Oracle Enterprise Asset Management (EAM) platform to enable centralized asset performance tracking and utility management. Testing and commissioning must ensure complete functionality, including integration with existing systems, real-time data collection, accurate billing, and report generation. The contractor must provide training for Technopark personnel and submit detailed documentation, including user manuals and licenses. All work must comply with the terms and conditions outlined in the tender document reference no. ETPK/PH-I/2024-25/AT-245.

1

-

-

... More
Supply, installation, testing, and commissioning of the following IP-based Direct Digital Controllers (DDCs) with the required control panel, power supply, internal wiring, and all necessary accessories. The DDC controllers must support communication via standard industry protocols like BACnet/IP or Modbus/IP, as specified in the tender document. Each DDC must be programmed to integrate seamlessly with the Building Management System (BMS) and perform its specific functions. Each DDC system must include: The required control panel with all essential components and accessories. Internal wiring to integrate seamlessly into the building's electrical and control systems. Power supply provisions as necessary. Testing and commissioning services to ensure full functionality, including calibration and configuration for remote viewing via the BMS at Park Centre building. All work must conform to the terms and conditions specified in tender document reference no. ETPK/PH-I/2024-25/AT-245.

-

-

-

... More
DDC for Type A

2

-

-

... More
DDC for Type B

1

-

-

... More
DDC for Type C

1

-

-

... More
DDC for Type D

1

-

-

... More
DDC for Plant Optimizer

1

-

-

... More
Supply, installation, testing, and commissioning of integration for controllers and converters using Modbus-RTU, native BACnet, and M-Bus protocols. The BMS vendor must provide the necessary serial converters (RS 485 to RS 232), while the ACMV vendor will accommodate the software address required for integration. The integration covers systems such as HVAC, fire safety, lighting control, electrical power distribution, and chiller plant optimization. The scope of work includes the installation of converters, controllers, and communication interfaces, ensuring seamless communication between systems. Configuration and testing are essential to ensure full functionality, with coordination between the BMS and ACMV vendors for proper address allocation. All work must comply with the specifications outlined in the tender document reference no. ETPK/PH-I/2024-25/AT-245.

1

-

-

... More
Supply, installation, testing, and commissioning of the following sensors, switches, and transmitters, complete with all required accessories. The scope includes proper mounting, wiring, calibration, and seamless integration into the Building Management System (BMS) as per the project requirements outlined in tender document reference no. ETPK/PH-I/2024-25/AT-245. The items to be supplied and installed are as follows.

-

-

-

... More
Air DP Switch

22

-

-

... More
Level Switch 3 Mtr Hi/Low

3

-

-

... More
Fuel Level Senor - Max 2 Mtr

1

-

-

... More
Outside Air Temperature and RH

1

-

-

... More
Water DP transmitter for chiller Header

1

-

-

... More
Immersion Temp Sensor + Thermowell

10

-

-

... More
Water Pressure Transmitter

3

-

-

... More
Supply, installation, testing, and commissioning of the following cables, complete with all necessary accessories. The cables must meet industry standards for safety and performance, including Fire Retardant Low Smoke (FRLS) properties, armouring for protection, and shielding where specified. The cables will be used for data transmission, power, and signal connections, ensuring seamless integration with the overall system. Installation must include proper laying, termination, labeling, and testing to ensure optimal functionality as per project requirements. All work is to be carried out as per the tender document reference no. ETPK/PH-1/2024-25/AT-245.

-

-

-

... More
Cat 6 Armoured Cable

610

-

-

... More
2 Core 1 sqmm Shielded FRLS armoured cable

1650

-

-

... More
4 Core 1 sqmm Shielded FRLS armoured cable

1500

-

-

... More
2 Core 1.5 sqmm Shielded FRLS armoured cable

1200

-

-

... More
3 core 2.5sqmm FRLS Armoured cable

300

-

-

... More
Supply, installation, testing, and commissioning of the following network accessories as per the tender document reference no. ETPK/PH-I/2024-25/AT-245. The items must be installed and configured to provide a reliable and secure network infrastructure. All equipment must meet industry standards for performance, security, and compatibility.

-

-

-

... More
Switch 24 Port Managed Switch

4

-

-

... More
24 Port Patch Panel

4

-

-

... More
Patch Cord - 1 Mtr Cat6

20

-

-

... More
4 U Rack with 1 nos of FAN , 1 Cable manager , 6 socket PDU and accessories as required to complete Fixing of switch and other items

4

-

-

... More
Supply, installation, testing, and commissioning of BTU Meters with Modbus/M-Bus communication protocol for accurate measurement of thermal energy consumption. Each BTU meter must be of appropriate size as listed below and must be fully integrated into the Building Management System (BMS) as per the requirements of the tender document reference no. ETPK/PH-I/2024-25/AT-245. The installation must include all necessary accessories, wiring, and configuration to ensure proper operation and data collection.

-

-

-

... More
200 MM

1

-

-

... More
Supply and laying of Hot Dipped Galvanized Perforated Cable Tray with covers, as per the following sizes, including all necessary supports, fittings, and accessories for complete installation. The cable trays must be installed with proper anchoring, routing, and fixing to ensure durability, support, and protection of cables. All trays and accessories must meet IS standards for corrosion resistance and structural integrity. The work must be executed in accordance with the tender document reference no. ETPK/PH-I/2024-25/AT-245.

-

-

-

... More
Hot Dipped galvanized Perforated Cable Tray - 300x50X2mm with cover

50

-

-

... More
Hot Dipped galvanized Perforated Cable Tray - 150x50x2mm with cover

50

-

-

... More
Hot Dipped galvanized Perforated Cable Tray - 50x50x2mm with cover

90

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.