Technopark Tender

Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Technopark Tender

Works
Civil And Construction
Excavation
Eprocure
Opening Date22 Dec 2023
Closing Date23 Jan 2024
Tender Amount₹ 35,12,983 
Notes
Download

Costs

Summary

Earth Filling In Proposed Rehabilitation Area At Technopark Phase Iii Campus, Trivandrum

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Centering and shuttering including strutting, etc. and removal of form for: Foundations, footings, sides and cover slab of retaining wall and drains etc for concrete. Complete as per the direction of engineer in charge. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from Technopark campus etc. complete as per the direction of engineer in charge.

706.86

-

-

... More
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level for drain and retaining wall: 1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size. Complete as per the direction of engineer in charge. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from Technopark campus etc. complete as per the direction of engineer in charge.

100.34

-

-

... More
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth level for drain and retaining wall Thermo - Mechanically Treated bars of grade Fe-500D or more. Complete as per the direction of engineer in charge. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from Technopark campus etc. complete as per the direction of engineer in charge.

8291.03

-

-

... More
Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material outside Technopark campus as per direction of Engineer -in- Charges The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from Technopark campus etc. complete as per the direction of engineer in charge.

1.1

-

-

... More
Filling with available excavated (excluding rock) from places of availability with in a lead of 5 km gravelly earth in which particle size more than 475 microns should not be less than 20% and particle size less than 2 microns should not be more than 5% including conveyance to site, laying and spreading in layers not more than 30cm including all leads and lifts, breaking clods, watering at optimum moisture content and consolidating each layer using power roller of 8T to 10T capacity for every layer and taking extra care for top most layer to give an even level compact surface including all labour charges etc. complete The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from Technopark campus etc. complete as per the direction of engineer in charge.

2484.42

-

-

... More
Supplying and fixing RCC precast slab 1:2:4 (including steel reinforcement) - 100X50X10 cm or nearest as per site condition and direction of engineer in charge. For the cover slab of the drain. The rate includes all material charges, side maintenance, leveling, fixing in proper alignment, labour, Transportation, scaffolding (if needed) loading/ unloading at the workspace and removal of debris from the work site, etc. complete as per the direction of the engineer in charge.

99

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.