Infopark Tender

Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Infopark Tender

Services
Eprocure
Opening Date13 Dec 2021
Closing Date20 Jan 2022
Tender Amount₹ 11,51,90,313 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Network Engineer( 1 person per month)

12

-

-

... More
Assistant Manager - Maintenance (MEP)( 4 persons per month)

48

-

-

... More
Assistant Maintenance Engineer( 21 persons per month)

252

-

-

... More
Shift Assistant( 27 persons per month)

324

-

-

... More
Assistant Manager -Maintenance (CIVIL & PLUMBING )( 2 persons per month)

24

-

-

... More
Senior Plumber( 1 person per month)

12

-

-

... More
Plumber ( 6 persons per month)

72

-

-

... More
Shift Operator - 110kv ( 3 persons per month)

36

-

-

... More
Carpenter( 1 person per month)

12

-

-

... More
Shift Operator -220KV substation( 3 persons per month)

36

-

-

... More
Network assistant( 1 person per month)

12

-

-

... More
False ceiling technician( 1 person per month)

12

-

-

... More
Painter( 1 person per month)

12

-

-

... More
AME reliever( 2 persons per month)

24

-

-

... More
Shift Assistant - Reliever( 3 persons per month)

36

-

-

... More
Operation and Maintenance of Electrical System (2nd year). (In the basic rate column, per month rate exclusive of taxes to be quoted by bidder). The bidder shall quote for the item 2.01 to 2.17 considering minimum 7% increment from previous year every year to the operating staff).

-

-

-

... More
Manager - Maintenance (MEP) over all coordinator ( 1 person per month)

12

-

-

... More
Fire Officer ( 1 person per month)

12

-

-

... More
Network Engineer( 1 person per month)

12

-

-

... More
Assistant Manager - Maintenance (MEP)( 4 persons per month)

48

-

-

... More
Assistant Maintenance Engineer( 21 persons per month)

252

-

-

... More
Shift Assistant( 27 persons per month)

324

-

-

... More
Assistant Manager -Maintenance (CIVIL & PLUMBING )( 2 persons per month)

24

-

-

... More
Senior Plumber( 1 person per month)

12

-

-

... More
Plumber ( 6 person per month)

72

-

-

... More
Shift Operator - 110kv ( 3 persons per month)

36

-

-

... More
Carpenter( 1 person per month)

12

-

-

... More
Shift Operator -220KV substation( 3 person per month)

36

-

-

... More
Network assistant( 1 person per month)

12

-

-

... More
False ceiling technician( 1 person per month)

12

-

-

... More
Painter( 1 person per month)

12

-

-

... More
AME reliever( 2 persons per month)

24

-

-

... More
Shift Assistant - Reliever( 3 persons per month)

36

-

-

... More
Operation and Maintenance of Electrical System Operation and Maintenance of Electrical System (3rd year). (In the basic rate column, per month rate exclusive of taxes to be quoted by bidder). The bidder shall quote for the item 3.01 to 3.17 considering minimum 7% increment from previous year to the operating staff).

-

-

-

... More
Manager - Maintenance (MEP) over all coordinator ( 1 person per month)

12

-

-

... More
Fire Officer ( 1 person per month)

12

-

-

... More
Network Engineer( 1 person per month)

12

-

-

... More
Assistant Manager - Maintenance (MEP)( 4 person per month)

48

-

-

... More
Assistant Maintenance Engineer( 21 person per month)

252

-

-

... More
Shift Assistant( 27 person per month)

324

-

-

... More
Assistant Manager -Maintenance (CIVIL & PLUMBING )( 2 persons per month)

24

-

-

... More
Senior Plumber( 1 person per month)

12

-

-

... More
Plumber ( 6 person per month)

72

-

-

... More
Shift Operator - 110kv ( 3 persons per month)

36

-

-

... More
Carpenter( 1 person per month)

12

-

-

... More
Shift Operator -220KV substation( 3 persons per month)

36

-

-

... More
Network assistant( 1 person per month)

12

-

-

... More
False ceiling technician( 1 person per month)

12

-

-

... More
Painter( 1 person per month)

12

-

-

... More
AME reliever( 2 person per month)

24

-

-

... More
Shift Assistant - Reliever( 3 person per month)

36

-

-

... More
Non Comprehensive AMC of DG sets including preventive /breakdown maintenance. Rate per DG set for 3 year to be quoted in the rate column. Scope is mentioned in the technical bid caluse No:8

-

-

-

... More
1010 KVA MTU make LT DG sets installed in Athulya building

3

-

-

... More
1010 KVA (HT) Cummins make DG sets installed in Vismaya building

2

-

-

... More
625kVA Cummins make DG sets installed in Vismaya building

1

-

-

... More
750kVA Cummins make DG sets installed in Thapasya building

1

-

-

... More
500 KVA Cummins make DG sets installed in Thapasya building

1

-

-

... More
1010 kva Cummins make DG sets installed in Jyothirmaya building

3

-

-

... More
1010kVA Perkins make DG sets installed in Chaithanya building

2

-

-

... More
500 kVA Cummins make DG sets installed in villas

1

-

-

... More
1010Kva Perkins make DG sets installed in Indeevaram building

3

-

-

... More
500 kVA Perkins make DG sets installed in Indeevaram building

1

-

-

... More
125kVA DG set Cummins make DG sets installed in TBC , kaloor

2

-

-

... More
125kVA DG set Kirloskar make DG sets installed in TBC , kaloor

1

-

-

... More
62.5 kVA DG set Kirloskar make DG sets installed in Thapasya

1

-

-

... More
125 kVA DG set Cummins make DG sets installed in Thapasya

1

-

-

... More
62.5 kVA DG set Eicher make DG sets installed in SEZ office

1

-

-

... More
50 kVA DG set Cummins make DG sets installed in 220kV Substation

1

-

-

... More
40 kVA DG set Kirlosker make DG sets installed in 110kV Substation

1

-

-

... More
B-Check of DG sets including consumables -Rate per DG set for 3 year to be quoted in the rate column. Scope is mentioned in the technical bid clause No:10

-

-

-

... More
1010 Kva MTU make LT DG sets installed in Athulya building

3

-

-

... More
1010 Kva (HT) Cummins make DG sets installed in Vismaya building

2

-

-

... More
625kVA Cummins make DG sets installed in Vismaya building

1

-

-

... More
750kVA Cummins make DG sets installed in Thapasya building

1

-

-

... More
500 Kva Cummins make DG sets installed in Thapasya building

1

-

-

... More
1010 kva Cummins make DG sets installed in Jyothirmaya building

3

-

-

... More
1010kVA Perkins make DG sets installed in Chaithanya building

2

-

-

... More
500 kVA Cummins make DG sets installed in villas

1

-

-

... More
1010Kva Perkins make DG sets installed in Indeevaram building

3

-

-

... More
500 kVA Perkins make DG sets installed in Indeevaram building

1

-

-

... More
125kVA DG set Cummins make DG sets installed in TBC , kaloor

2

-

-

... More
125kVA DG set Kirloskar make DG sets installed in TBC , kaloor

1

-

-

... More
62.5 kVA DG set Kirloskar make DG sets installed in Thapasya

1

-

-

... More
125 kVA DG set Cummins make DG sets installed in Thapasya

1

-

-

... More
62.5 kVA DG set Eicher make DG sets installed in SEZ office

1

-

-

... More
50 kVA DG set Cummins make DG sets installed in 220kV Substation

1

-

-

... More
40 kVA DG set Kirlosker make DG sets installed in 110kV Substation

1

-

-

... More
Comprehensive AMC of UPS. Rate per UPS sets for 3 year to be quoted in the rate column. Scope is mentioned in the technical bid caluse No:9.

-

-

-

... More
Numeric make 5Nos 10KVA, 1No 5KVA and 2Nos 2KVA UPS installed at Cherthala (Details in annexure 1)

1

-

-

... More
2KVA Emerson make UPS installed at Cherthala (Details in annexure 2 )

1

-

-

... More
1No 2KVA APC make UPS installed at Cherthala (Details in annexure 3 )

1

-

-

... More
Numeric make 1No 20KVA, 2Nos 10KVA, 1No 7.5 KVA, 1No 5KVA and 4Nos 2KVA UPS installed in Infopark Kochi Phase -1 & Phase-2 (Details in annexure 4 )

1

-

-

... More
APC make 1No 6KVA, and 3Nos 2KVA UPS installed in Jyothirmaya (Details in annexure 5 )

1

-

-

... More
APC 2Nos 2KVA UPS(4th floor), 2Nos 3KVA UPS (Ground floor), 7Nos 3KVA UPS (Lift room) at Jyothirmaya, Infopark Phase-2 SEZ (Details in annexure 6)

1

-

-

... More
2KVA Emerson make UPS installed at Jyothirmaya (Entrance gate,4th floor common area electrical room, Network room) (Details in annexure 7 )

3

-

-

... More
APC make 4Nos 1KVA UPS &1No 2KVA UPS installed in Indeevaram (Details in annexure 8 )

1

-

-

... More
Emerson make 6KVA UPS installed in Indeevaram (Details in annexure 9 )

3

-

-

... More
Emerson make 12 nos 3KVA and 1 No 6KVA UPSs at Thapasya (Details in annexure 10 )

1

-

-

... More
10Nos Emerson make 3KVA UPSs at Thapasya (Details in annexure 11 )

1

-

-

... More
Emerson 20KVA and 10 KVA UPSs at Athulya (Details in annexure 12 )

1

-

-

... More
APC make 2Nos 3KVA and 4Nos 2KVA UPSs at Thapsya and Vismaya (Details in annexure 13 )

1

-

-

... More
SOCOMEC make 1No 3KVA and 2Nos 7KVA Ups at Indeevaram (Details in annexure 14 )

1

-

-

... More
Emerson make make 1No 3KVA UPS at TBC Kaloor (Details in annexure 15 )

1

-

-

... More
Relay testing. Rate per set for 3 years to be entered in the rate column. Scope is mentioned in the technical bid caluse No:11.

-

-

-

... More
Athulya building ( details in Annexure - 16)

1

-

-

... More
Vismaya building ( details in Annexure - 17)

1

-

-

... More
Thapasya building ( details in Annexure - 18)

1

-

-

... More
Jyothirmaya building ( details in Annexure - 19 )

1

-

-

... More
Chaithanya building (details in Annexure - 20)

1

-

-

... More
Villas ( details in Annexure - 21 )

1

-

-

... More
Indeevaram building ( details in Annexure - 22 )

1

-

-

... More
110kV Substation ( details in Annexure - 23)

1

-

-

... More
Street Light repair

-

-

-

... More
Repair of street light fixture above 6 meters using mobile crane ( labour charges only ) - single / double arm . Rate to be quoted per light fixture.

300

-

-

... More
Repair of Mini high mast above 6 meters using mobile crane ( labour charges only ) - Rate to be quoted per light fixture.

75

-

-

... More
Non comprehensive AMC of 110kV substation, Infopark Cherthala

-

-

-

... More
Checking the BDV of Transformer Oil (Including Station transformer) cost includes Transportation/Collection Charges

30

-

-

... More
Checking the PPM of Transformer Oil (Including Station transformer) cost includes Transportation/Collection Charges

30

-

-

... More
Checking the DGA of Transformer Oil (Including Station transformer) cost includes Transportation/Collection Charges

30

-

-

... More
Checking the acidity of Transformer Oil (Including Station transformer) cost includes Transportation/Collection Charges

30

-

-

... More
Checking the sediment and sludge of Transformer Oil (Including Station transformer) cost includes Transportation/Collection Charges

30

-

-

... More
Filtration of transformer oil to improve dielectric strength to the optimum value for 110 kV, 10/12.5MVA Power transformers( 2 Nos.) & 1 no. station transformer.

65100

-

-

... More
General Half yearly maintenance of 110 kV, 10/12.5MVA Power transformers( 2 Nos.) & 1 no. station transformer including gasket changing,Terminal box inspection,Teflon washer replacing of radiator tubes,Buchholz relay Operation Checking, WTI & OTI caliberation,Silica Gel replacement, Cooler fan bearings motor & operating mechanism,Pressure release valve operation etc. ( 2 times a year )

6

-

-

... More
One Time Checking of Isolator Alignment & Operation and Maintenance of motorised gang operated 3 pole center rotating post isolator of 110 KV,800 A for satisfactory normal operation including lubrication of moving parts etc. as per the instruction of Engineer in Charge Complete.

27

-

-

... More
110 kV Substation equipment's General Maintenance. frequency of work - Yearly once . (Details attached in technical bid clause no : 13)

3

-

-

... More
Non comprehensive AMC of 220kV GIS substation, Infopark Phase-2 SEZ, Kochi

-

-

-

... More
Non Comprehensive AMC of 220kV GIS substation -- Charges for undertaking yearly routine maintenance and tests of Siemens make 220kV GIS system (One line bay and two Tranformer bays) - SF6 Dew point measurement, Gas purity check, tests for detection of SO2 and HF (impurities), Gas leakage detection tests in all the compartments in the 220kV GIS system, SF6 gas top up, if required, Contact resistance measurement and timing tests of 220kV circuit breakers, Close coil/Trip coil resistance checking Dynamic contact resistance measurement of 220kV circuit breakers, Partial discharge tests at all PD ports installed in the GIS room and outdoor GIS busduct. Scope includes charges for the GIS Testing/maintenance Engineer, Tests kits, sensors and all other components for the completion of work. Detailed scope given in the technical document. Once in a year. Note: All the works /tests under this shall undertake through M/s Siemens or Authroized service dealer/ Testing agency of M/s Siemens GIS.

3

-

-

... More
Charges for undertaking routine maintenance works and tests in the 220kV yard - Watt loss cheking of 220kV Lightning arresters (6Nos), cleaning of outdoor euipment installed in the yard, Thermograhpy of all electrical equipment installed in the yard, inspection and maintenance of online water content analyser. Detailed scope of works given in the technical document.Scope includes testing Engineer and test kits, scaffoldings, ladder, remove and re-fixing of tubular Aluminium conductors, and all other arrangement for the completion of work. Once in a year

3

-

-

... More
Charges for undertaking routine maintenance and tests of 220/33kV, 31.5MVA transformers (2Nos), 33/11kV 16.5MVA transformers (2Nos), 11/0.433kV 200KVA transformer (1No) -- Tan delta measurement of 220kV bushings, Tan delta measurement of windings, Insulation resisistance of HV and LV windings, maintenance and functionality check of WTI, OTI, PRV and Bucholz relay, yearly inspection of OLTC diverter switch, replacement of all gasket joints including conservator tank top joints, cable end boxes joints, checking, cleaning and insualtion epoxy painting of cable boxes (HV and LV). Scope includes supply of gaskets, supply of epoxy insulation paint, testing Engineer and test kits, scaffoldings, ladder, Cranes, remove and re-fixing of tubular Aluminium conductors in the yard to undertake various tests, and all other arrangement for the completion of work. Once in a year

3

-

-

... More
Charges for undertaking oil tests in the main tank and OLTC tank of 220/33kV, 31.5MVA transformers (2Nos), 33/11kV 16.5MVA transformers (2Nos), 11/0.433kV 200KVA transformer (1No) -- Dissolved Gas Analysis (DGA) of oil sample in the main tank and OLTC tank as per IS 10593/IEC 60599. Scope include collection of oil sample in oil sampling bottle and tests at Telk Lab/ NABL accredited LAB and submission of detailed reports.

51

-

-

... More
Charges for undertaking oil tests in the main tank and OLTC tank of 220/33kV, 31.5MVA transformers (2Nos), 33/11kV 16.5MVA transformers (2Nos), 11/0.433kV 200KVA transformer (1No) -- Check Acidity resistivity. Scope include collection of oil sample in oil sampling bottle and tests at Telk Lab/ NABL accredited LAB and submission of detailed reports.

51

-

-

... More
Charges for undertaking oil tests in the main tank and OLTC tank of 220/33kV, 31.5MVA transformers (2Nos), 33/11kV 16.5MVA transformers (2Nos), 11/0.433kV 200KVA transformer (1No) -- Check Sludge.Scope include collection of oil sample in oil sampling bottle and tests at Telk Lab/ NABL accredited LAB and submission of detailed reports.

51

-

-

... More
Charges for undertaking oil tests in the main tank and OLTC tank of 220/33kV, 31.5MVA transformers (2Nos), 33/11kV 16.5MVA transformers (2Nos), 11/0.433kV 200KVA transformer (1No) -- Tan delta.

51

-

-

... More
Charges for undertaking oil tests in the main tank and OLTC tank of 220/33kV, 31.5MVA transformers (2Nos), 33/11kV 16.5MVA transformers (2Nos), 11/0.433kV 200KVA transformer (1No) -- BDV. Scope include collection of oil sample in oil sampling bottle and tests at Telk Lab/ NABL accredited LAB and submission of detailed reports.

51

-

-

... More
Charges for undertaking oil tests in the main tank and OLTC tank of 220/33kV, 31.5MVA transformers (2Nos), 33/11kV 16.5MVA transformers (2Nos), 11/0.433kV 200KVA transformer (1No) -- Water content PPM. Scope include collection of oil sample in oil sampling bottle and tests at Telk Lab/ NABL accredited LAB and submission of detailed reports.

51

-

-

... More
Charges for undertaking filtration of transformer oil in the main tank and OLTC tank of 220/33kV, 31.5MVA transformers (2Nos), 33/11kV 16.5MVA transformers (2Nos), 11/0.433kV 200KVA transformer (1No). Scope include

126420

-

-

... More
Charges for undertaking testing of Relays installed in the 220kV and 33kV Control and relay panels, 33kV and 11kV HT panels and relays in the LT panel. Detailed list of relays furnished in the technical document (Details in annexture 24 ). Once in a year.

3

-

-

... More
Charges for undertaking static contact resistance, insulation resistance and timing tests of Vaccum circuit breakers in the 33kV and 11kV HT panels. Once in a year

3

-

-

... More
Charges for visit of M/s Siemens GIS expert to attend the breakdown of M/s Siemens make 220kV GIS, if any. (Quoted rates valid for 3 years). Quoted rates inclusive of Engineer charges, travelling To and Fro to site, insurance, accomadation, local conveyence.

10

-

-

... More
Charges for visit of M/s Siemens SCADA/ Engineer attend the breakdown of Siemens make SCADA system installed in the 220kV GIS substation (Quoted rates valid for 3 years). Quoted rates inclusive of Engineer charges, travelling To and Fro to site, insurance, accomadation, local conveyence.

12

-

-

... More
Charges for visit of Service Engineer from M/s HBL to attend the preventive/breakdown maintenance of 110V DC battery system, battery bank installed in the substation (Quoted rates valid for 3 years). Quoted rates inclusive of Engineer charges, travelling To and Fro to site, insurance, accomadation, local conveyence.

5

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.