Infopark Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 5,00,000Document Cost
₹ 17,700Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_INFOP_460034_1Bid Award Id
ViewTender No
Infopark/e-tender/013/2021Tender Authority
Infopark ViewPurchaser Address
-Website
http://etenders.kerala.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Network Engineer( 1 person per month)
12
-
-
Assistant Manager - Maintenance (MEP)( 4 persons per month)
48
-
-
Assistant Maintenance Engineer( 21 persons per month)
252
-
-
Shift Assistant( 27 persons per month)
324
-
-
Assistant Manager -Maintenance (CIVIL & PLUMBING )( 2 persons per month)
24
-
-
Senior Plumber( 1 person per month)
12
-
-
Plumber ( 6 persons per month)
72
-
-
Shift Operator - 110kv ( 3 persons per month)
36
-
-
Carpenter( 1 person per month)
12
-
-
Shift Operator -220KV substation( 3 persons per month)
36
-
-
Network assistant( 1 person per month)
12
-
-
False ceiling technician( 1 person per month)
12
-
-
Painter( 1 person per month)
12
-
-
AME reliever( 2 persons per month)
24
-
-
Shift Assistant - Reliever( 3 persons per month)
36
-
-
Operation and Maintenance of Electrical System (2nd year). (In the basic rate column, per month rate exclusive of taxes to be quoted by bidder). The bidder shall quote for the item 2.01 to 2.17 considering minimum 7% increment from previous year every year to the operating staff).
-
-
-
Manager - Maintenance (MEP) over all coordinator ( 1 person per month)
12
-
-
Fire Officer ( 1 person per month)
12
-
-
Network Engineer( 1 person per month)
12
-
-
Assistant Manager - Maintenance (MEP)( 4 persons per month)
48
-
-
Assistant Maintenance Engineer( 21 persons per month)
252
-
-
Shift Assistant( 27 persons per month)
324
-
-
Assistant Manager -Maintenance (CIVIL & PLUMBING )( 2 persons per month)
24
-
-
Senior Plumber( 1 person per month)
12
-
-
Plumber ( 6 person per month)
72
-
-
Shift Operator - 110kv ( 3 persons per month)
36
-
-
Carpenter( 1 person per month)
12
-
-
Shift Operator -220KV substation( 3 person per month)
36
-
-
Network assistant( 1 person per month)
12
-
-
False ceiling technician( 1 person per month)
12
-
-
Painter( 1 person per month)
12
-
-
AME reliever( 2 persons per month)
24
-
-
Shift Assistant - Reliever( 3 persons per month)
36
-
-
Operation and Maintenance of Electrical System Operation and Maintenance of Electrical System (3rd year). (In the basic rate column, per month rate exclusive of taxes to be quoted by bidder). The bidder shall quote for the item 3.01 to 3.17 considering minimum 7% increment from previous year to the operating staff).
-
-
-
Manager - Maintenance (MEP) over all coordinator ( 1 person per month)
12
-
-
Fire Officer ( 1 person per month)
12
-
-
Network Engineer( 1 person per month)
12
-
-
Assistant Manager - Maintenance (MEP)( 4 person per month)
48
-
-
Assistant Maintenance Engineer( 21 person per month)
252
-
-
Shift Assistant( 27 person per month)
324
-
-
Assistant Manager -Maintenance (CIVIL & PLUMBING )( 2 persons per month)
24
-
-
Senior Plumber( 1 person per month)
12
-
-
Plumber ( 6 person per month)
72
-
-
Shift Operator - 110kv ( 3 persons per month)
36
-
-
Carpenter( 1 person per month)
12
-
-
Shift Operator -220KV substation( 3 persons per month)
36
-
-
Network assistant( 1 person per month)
12
-
-
False ceiling technician( 1 person per month)
12
-
-
Painter( 1 person per month)
12
-
-
AME reliever( 2 person per month)
24
-
-
Shift Assistant - Reliever( 3 person per month)
36
-
-
Non Comprehensive AMC of DG sets including preventive /breakdown maintenance. Rate per DG set for 3 year to be quoted in the rate column. Scope is mentioned in the technical bid caluse No:8
-
-
-
1010 KVA MTU make LT DG sets installed in Athulya building
3
-
-
1010 KVA (HT) Cummins make DG sets installed in Vismaya building
2
-
-
625kVA Cummins make DG sets installed in Vismaya building
1
-
-
750kVA Cummins make DG sets installed in Thapasya building
1
-
-
500 KVA Cummins make DG sets installed in Thapasya building
1
-
-
1010 kva Cummins make DG sets installed in Jyothirmaya building
3
-
-
1010kVA Perkins make DG sets installed in Chaithanya building
2
-
-
500 kVA Cummins make DG sets installed in villas
1
-
-
1010Kva Perkins make DG sets installed in Indeevaram building
3
-
-
500 kVA Perkins make DG sets installed in Indeevaram building
1
-
-
125kVA DG set Cummins make DG sets installed in TBC , kaloor
2
-
-
125kVA DG set Kirloskar make DG sets installed in TBC , kaloor
1
-
-
62.5 kVA DG set Kirloskar make DG sets installed in Thapasya
1
-
-
125 kVA DG set Cummins make DG sets installed in Thapasya
1
-
-
62.5 kVA DG set Eicher make DG sets installed in SEZ office
1
-
-
50 kVA DG set Cummins make DG sets installed in 220kV Substation
1
-
-
40 kVA DG set Kirlosker make DG sets installed in 110kV Substation
1
-
-
B-Check of DG sets including consumables -Rate per DG set for 3 year to be quoted in the rate column. Scope is mentioned in the technical bid clause No:10
-
-
-
1010 Kva MTU make LT DG sets installed in Athulya building
3
-
-
1010 Kva (HT) Cummins make DG sets installed in Vismaya building
2
-
-
625kVA Cummins make DG sets installed in Vismaya building
1
-
-
750kVA Cummins make DG sets installed in Thapasya building
1
-
-
500 Kva Cummins make DG sets installed in Thapasya building
1
-
-
1010 kva Cummins make DG sets installed in Jyothirmaya building
3
-
-
1010kVA Perkins make DG sets installed in Chaithanya building
2
-
-
500 kVA Cummins make DG sets installed in villas
1
-
-
1010Kva Perkins make DG sets installed in Indeevaram building
3
-
-
500 kVA Perkins make DG sets installed in Indeevaram building
1
-
-
125kVA DG set Cummins make DG sets installed in TBC , kaloor
2
-
-
125kVA DG set Kirloskar make DG sets installed in TBC , kaloor
1
-
-
62.5 kVA DG set Kirloskar make DG sets installed in Thapasya
1
-
-
125 kVA DG set Cummins make DG sets installed in Thapasya
1
-
-
62.5 kVA DG set Eicher make DG sets installed in SEZ office
1
-
-
50 kVA DG set Cummins make DG sets installed in 220kV Substation
1
-
-
40 kVA DG set Kirlosker make DG sets installed in 110kV Substation
1
-
-
Comprehensive AMC of UPS. Rate per UPS sets for 3 year to be quoted in the rate column. Scope is mentioned in the technical bid caluse No:9.
-
-
-
Numeric make 5Nos 10KVA, 1No 5KVA and 2Nos 2KVA UPS installed at Cherthala (Details in annexure 1)
1
-
-
2KVA Emerson make UPS installed at Cherthala (Details in annexure 2 )
1
-
-
1No 2KVA APC make UPS installed at Cherthala (Details in annexure 3 )
1
-
-
Numeric make 1No 20KVA, 2Nos 10KVA, 1No 7.5 KVA, 1No 5KVA and 4Nos 2KVA UPS installed in Infopark Kochi Phase -1 & Phase-2 (Details in annexure 4 )
1
-
-
APC make 1No 6KVA, and 3Nos 2KVA UPS installed in Jyothirmaya (Details in annexure 5 )
1
-
-
APC 2Nos 2KVA UPS(4th floor), 2Nos 3KVA UPS (Ground floor), 7Nos 3KVA UPS (Lift room) at Jyothirmaya, Infopark Phase-2 SEZ (Details in annexure 6)
1
-
-
2KVA Emerson make UPS installed at Jyothirmaya (Entrance gate,4th floor common area electrical room, Network room) (Details in annexure 7 )
3
-
-
APC make 4Nos 1KVA UPS &1No 2KVA UPS installed in Indeevaram (Details in annexure 8 )
1
-
-
Emerson make 6KVA UPS installed in Indeevaram (Details in annexure 9 )
3
-
-
Emerson make 12 nos 3KVA and 1 No 6KVA UPSs at Thapasya (Details in annexure 10 )
1
-
-
10Nos Emerson make 3KVA UPSs at Thapasya (Details in annexure 11 )
1
-
-
Emerson 20KVA and 10 KVA UPSs at Athulya (Details in annexure 12 )
1
-
-
APC make 2Nos 3KVA and 4Nos 2KVA UPSs at Thapsya and Vismaya (Details in annexure 13 )
1
-
-
SOCOMEC make 1No 3KVA and 2Nos 7KVA Ups at Indeevaram (Details in annexure 14 )
1
-
-
Emerson make make 1No 3KVA UPS at TBC Kaloor (Details in annexure 15 )
1
-
-
Relay testing. Rate per set for 3 years to be entered in the rate column. Scope is mentioned in the technical bid caluse No:11.
-
-
-
Athulya building ( details in Annexure - 16)
1
-
-
Vismaya building ( details in Annexure - 17)
1
-
-
Thapasya building ( details in Annexure - 18)
1
-
-
Jyothirmaya building ( details in Annexure - 19 )
1
-
-
Chaithanya building (details in Annexure - 20)
1
-
-
Villas ( details in Annexure - 21 )
1
-
-
Indeevaram building ( details in Annexure - 22 )
1
-
-
110kV Substation ( details in Annexure - 23)
1
-
-
Street Light repair
-
-
-
Repair of street light fixture above 6 meters using mobile crane ( labour charges only ) - single / double arm . Rate to be quoted per light fixture.
300
-
-
Repair of Mini high mast above 6 meters using mobile crane ( labour charges only ) - Rate to be quoted per light fixture.
75
-
-
Non comprehensive AMC of 110kV substation, Infopark Cherthala
-
-
-
Checking the BDV of Transformer Oil (Including Station transformer) cost includes Transportation/Collection Charges
30
-
-
Checking the PPM of Transformer Oil (Including Station transformer) cost includes Transportation/Collection Charges
30
-
-
Checking the DGA of Transformer Oil (Including Station transformer) cost includes Transportation/Collection Charges
30
-
-
Checking the acidity of Transformer Oil (Including Station transformer) cost includes Transportation/Collection Charges
30
-
-
Checking the sediment and sludge of Transformer Oil (Including Station transformer) cost includes Transportation/Collection Charges
30
-
-
Filtration of transformer oil to improve dielectric strength to the optimum value for 110 kV, 10/12.5MVA Power transformers( 2 Nos.) & 1 no. station transformer.
65100
-
-
General Half yearly maintenance of 110 kV, 10/12.5MVA Power transformers( 2 Nos.) & 1 no. station transformer including gasket changing,Terminal box inspection,Teflon washer replacing of radiator tubes,Buchholz relay Operation Checking, WTI & OTI caliberation,Silica Gel replacement, Cooler fan bearings motor & operating mechanism,Pressure release valve operation etc. ( 2 times a year )
6
-
-
One Time Checking of Isolator Alignment & Operation and Maintenance of motorised gang operated 3 pole center rotating post isolator of 110 KV,800 A for satisfactory normal operation including lubrication of moving parts etc. as per the instruction of Engineer in Charge Complete.
27
-
-
110 kV Substation equipment's General Maintenance. frequency of work - Yearly once . (Details attached in technical bid clause no : 13)
3
-
-
Non comprehensive AMC of 220kV GIS substation, Infopark Phase-2 SEZ, Kochi
-
-
-
Non Comprehensive AMC of 220kV GIS substation -- Charges for undertaking yearly routine maintenance and tests of Siemens make 220kV GIS system (One line bay and two Tranformer bays) - SF6 Dew point measurement, Gas purity check, tests for detection of SO2 and HF (impurities), Gas leakage detection tests in all the compartments in the 220kV GIS system, SF6 gas top up, if required, Contact resistance measurement and timing tests of 220kV circuit breakers, Close coil/Trip coil resistance checking Dynamic contact resistance measurement of 220kV circuit breakers, Partial discharge tests at all PD ports installed in the GIS room and outdoor GIS busduct. Scope includes charges for the GIS Testing/maintenance Engineer, Tests kits, sensors and all other components for the completion of work. Detailed scope given in the technical document. Once in a year. Note: All the works /tests under this shall undertake through M/s Siemens or Authroized service dealer/ Testing agency of M/s Siemens GIS.
3
-
-
Charges for undertaking routine maintenance works and tests in the 220kV yard - Watt loss cheking of 220kV Lightning arresters (6Nos), cleaning of outdoor euipment installed in the yard, Thermograhpy of all electrical equipment installed in the yard, inspection and maintenance of online water content analyser. Detailed scope of works given in the technical document.Scope includes testing Engineer and test kits, scaffoldings, ladder, remove and re-fixing of tubular Aluminium conductors, and all other arrangement for the completion of work. Once in a year
3
-
-
Charges for undertaking routine maintenance and tests of 220/33kV, 31.5MVA transformers (2Nos), 33/11kV 16.5MVA transformers (2Nos), 11/0.433kV 200KVA transformer (1No) -- Tan delta measurement of 220kV bushings, Tan delta measurement of windings, Insulation resisistance of HV and LV windings, maintenance and functionality check of WTI, OTI, PRV and Bucholz relay, yearly inspection of OLTC diverter switch, replacement of all gasket joints including conservator tank top joints, cable end boxes joints, checking, cleaning and insualtion epoxy painting of cable boxes (HV and LV). Scope includes supply of gaskets, supply of epoxy insulation paint, testing Engineer and test kits, scaffoldings, ladder, Cranes, remove and re-fixing of tubular Aluminium conductors in the yard to undertake various tests, and all other arrangement for the completion of work. Once in a year
3
-
-
Charges for undertaking oil tests in the main tank and OLTC tank of 220/33kV, 31.5MVA transformers (2Nos), 33/11kV 16.5MVA transformers (2Nos), 11/0.433kV 200KVA transformer (1No)
-- Dissolved Gas Analysis (DGA) of oil sample in the main tank and OLTC tank as per IS 10593/IEC 60599. Scope include collection of oil sample in oil sampling bottle and tests at Telk Lab/ NABL accredited LAB and submission of detailed reports.
51
-
-
Charges for undertaking oil tests in the main tank and OLTC tank of 220/33kV, 31.5MVA transformers (2Nos), 33/11kV 16.5MVA transformers (2Nos), 11/0.433kV 200KVA transformer (1No)
-- Check Acidity resistivity. Scope include collection of oil sample in oil sampling bottle and tests at Telk Lab/ NABL accredited LAB and submission of detailed reports.
51
-
-
Charges for undertaking oil tests in the main tank and OLTC tank of 220/33kV, 31.5MVA transformers (2Nos), 33/11kV 16.5MVA transformers (2Nos), 11/0.433kV 200KVA transformer (1No)
-- Check Sludge.Scope include collection of oil sample in oil sampling bottle and tests at Telk Lab/ NABL accredited LAB and submission of detailed reports.
51
-
-
Charges for undertaking oil tests in the main tank and OLTC tank of 220/33kV, 31.5MVA transformers (2Nos), 33/11kV 16.5MVA transformers (2Nos), 11/0.433kV 200KVA transformer (1No)
-- Tan delta.
51
-
-
Charges for undertaking oil tests in the main tank and OLTC tank of 220/33kV, 31.5MVA transformers (2Nos), 33/11kV 16.5MVA transformers (2Nos), 11/0.433kV 200KVA transformer (1No)
-- BDV. Scope include collection of oil sample in oil sampling bottle and tests at Telk Lab/ NABL accredited LAB and submission of detailed reports.
51
-
-
Charges for undertaking oil tests in the main tank and OLTC tank of 220/33kV, 31.5MVA transformers (2Nos), 33/11kV 16.5MVA transformers (2Nos), 11/0.433kV 200KVA transformer (1No)
-- Water content PPM. Scope include collection of oil sample in oil sampling bottle and tests at Telk Lab/ NABL accredited LAB and submission of detailed reports.
51
-
-
Charges for undertaking filtration of transformer oil in the main tank and OLTC tank of 220/33kV, 31.5MVA transformers (2Nos), 33/11kV 16.5MVA transformers (2Nos), 11/0.433kV 200KVA transformer (1No). Scope include
126420
-
-
Charges for undertaking testing of Relays installed in the 220kV and 33kV Control and relay panels, 33kV and 11kV HT panels and relays in the LT panel. Detailed list of relays furnished in the technical document (Details in annexture 24 ). Once in a year.
3
-
-
Charges for undertaking static contact resistance, insulation resistance and timing tests of Vaccum circuit breakers in the 33kV and 11kV HT panels. Once in a year
3
-
-
Charges for visit of M/s Siemens GIS expert to attend the breakdown of M/s Siemens make 220kV GIS, if any. (Quoted rates valid for 3 years). Quoted rates inclusive of Engineer charges, travelling To and Fro to site, insurance, accomadation, local conveyence.
10
-
-
Charges for visit of M/s Siemens SCADA/ Engineer attend the breakdown of Siemens make SCADA system installed in the 220kV GIS substation (Quoted rates valid for 3 years). Quoted rates inclusive of Engineer charges, travelling To and Fro to site, insurance, accomadation, local conveyence.
12
-
-
Charges for visit of Service Engineer from M/s HBL to attend the preventive/breakdown maintenance of 110V DC battery system, battery bank installed in the substation (Quoted rates valid for 3 years). Quoted rates inclusive of Engineer charges, travelling To and Fro to site, insurance, accomadation, local conveyence.
5
-
-