Indian Oil Adani Gas Private Limited Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_AGPL_37822_1Bid Award Id
ViewTender No
IOAGPL/STLYNG/OPEN/2019/18Tender Authority
Indian Oil Adani Gas Private Limited ViewPurchaser Address
-Website
http://https://ioagpl.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
8" NB/ 6.4 MM (0.252")/ API 5L GR. B (ERW)
200
-
3
... More
4" NB/ 6.4 MM (0.252")/ API 5L GR. B (ERW)
100
-
4
... More
PIPELINE LAYING IN ROCKY TERRAIN WITH NORMAL/ UNPREPARED SURFACE (KATCHA SURFACE)
-
-
-
... More
8" NB/ 6.4 MM (0.252")/ API 5L GR. B (ERW)
-
-
-
... More
4" NB/ 6.4 MM (0.252")/ API 5L GR. B (ERW)
-
-
-
... More
PIPELINE LAYING IN ROCKY TERRAIN WITH BUILT-UP SURFACE/ HARD SURFACE (PUCCA SURFACE)
-
-
-
... More
8" NB/ 6.4 MM (0.252")/ API 5L GR. B (ERW)
-
-
-
... More
4" NB/ 6.4 MM (0.252")/ API 5L GR. B (ERW)
-
-
-
... More
MDPE PIPE LAYING WITH STEEL PIPELINE LAYING IN COMMON TRENCH THROUGH OPEN CUT METHOD Over and above SOR Item Nos. defined under 1.0 as mentioned above, this SOR Item shall be paid additional for Laying of MDPE Pipe of 125 MM, 90 MM, 63 MM or as per Site requirement as per the relevant standard/ specification etc. The minimum depth of the top of either pipeline shall be 1.2 mtrs measured from top of pipeline/ pipeline coating to the top of undisturbed surface of the soil or as per SCC/ relevant code, PNGRB regulations whichever is higher. Transportation/ Stringing/ Uncoiling of the MDPE line pipe on the pipeline, laying of MDPE line pipe along with steel pipeline of sizes as mentioned, including executing all works; supply of all materials (except Owner supplied materials), consumables, labour and other incidental works and handing over the same after return of the surplus pipes to the Owner's designated stockyard(s); carrying out all temporary, ancillary, auxiliary works required to make the MDPE pipeline ready for commissioning as per drawings, specifications, PNGRB regulations, scope of work indicated in PJS and other provisions of Contract document and instructions of Engineer-in-charge. The other activities are as per SOR 1.0 including its notes.
-
-
-
... More
PIPELINE LAYING + MDPE IN NORMAL/ MIXED STRATA TERRAIN WITH NORMAL/ UNPREPARED SURFACE (KATCHA SURFACE)
-
-
-
... More
LAYING UPTO BCKFLNG 8NB +125/90 PE
1750
-
13
... More
LAYING UPTO BCKFLNG 4NB +125/90 PE
500
-
14
... More
PIPELINE LAYING+MDPE IN NORMAL/ MIXED STRATA TERRAIN WITH BUILT-UP SURFACE/ HARD SURFACE (PUCCA SURFACE)
-
-
-
... More
LAYING UPTO BCKFLNG,BUILTUP,8NB+125/90PE
200
-
16
... More
LAYING UPTO BCKFLNG,BUILTUP,4NB+125/90PE
100
-
17
... More
INSTALLATION OF CARRIER PIPE BY HDD METHOD - UNCASED CROSSING/ LAYING
SCOPE - Complete work of installation of carrier pipe at crossings/ laying along route (between the limits as defined in approved drawings) or wherever required by HDD method for roads, nala, drain and canal wherever required in all types of soils/ murram and terrains including scope covered in SOR Item 1 above but not limited to string preparation of pipes, welding, welding repair, radiography, coating of field joints with special type of Heat Shrink Sleeve (Direx) and repair of pipeline coating with special repair patch materials as per Specification, pre-testing/ post testing etc. of complete string made for crossing, but not limited to, following works in accordance with specifications and instruction of Engineer-in-Charge and as per all provision of Contract Document. PRE-HYDROTEST SHALL NOT BE REQUIRED FOR INSTALLATION/ LAYING OF PIPELINE THROUGH HDD ALONG THE ROAD/ ROUTE.
SURVEY - Pre-Construction survey based on site visit, collection of data (if required) from concerned Authority including design and detail engineering and making of crossing/ laying along route drawings for getting their approval from concerned Authority/ Engineer-in-Charge, getting work permit/ NOC for crossings as well as utility crossings (if any) encountered during crossings prior to start of the execution of work. Additional land required for placement of HDD equipments and/ or string preparation shall be in Contractors scope. DRILLING - Drilling to required depth including maintenance/ restoration of drill hole in all types of soils/ murram/ mixed strata, all depth to accommodate the pipeline at all conditions encountered during crossing/ laying along route by approved HDD methods procedure for providing minimum cover specified in code/ specification/ PNGRB regulations or as decided by concerned authority, whichever is more.
RESTORATION - Backfilling of the ditch/ trench including restoration and clean-up of area and all other works including cleaning, gauging and final hydro testing etc. along with mainline works required as per specification, approved drawings, calculations, methods and to the satisfaction of Engineer-in-Charge and/ or as directed by concerned Authority. MEASUREMENT - The length of HDD mentioned is tentative and may vary to the considerable extent depending upon requirements as per site conditions. The length mentioned in SOR is indicative for all the crossing to be done by HDD, numbers and locations shall be decided by Engineer-in-Charge depending upon site condition.
PAYMENT - Payment for the length of final tie-in carrier pipeline string with mainline laid by HDD are inclusive in this item rate. No separate payment shall be made under other clauses mentioned elsewhere. Payment shall be based on the actual length (i.e. length between tie-in joints) of pipeline laid by HDD. Exact location of tie-in shall be approved by Owner/ Owner's representative. Rate for this SOR item for steel pipeline laying is inclusive of carrier pipe string preparation (Welding, NDT, Pretesting, Coating, Hydro testing, Pre-commissioning etc.).
-
-
-
... More
INSTALLATION OF CARRIER PIPE BY HDD METHOD - UNCASED CROSSING/ LAYING (WITHOUT MDPE)
-
-
-
... More
8" NB/ 6.4 MM (0.252")/ API 5L GR. B (ERW)
8100
-
20
... More
4" NB/ 6.4 MM (0.252")/ API 5L GR. B (ERW)
1600
-
21
... More
INSTALLATION OF CARRIER PIPE BY HDD METHOD - UNCASED CROSSING/ LAYING (WITH MDPE)
-
-
-
... More
HDD, WITHOUT CASING PIPE, 4NB WITH MDPE
500
-
23
... More
INSTALLATION OF MDPE PIPE BY HDD METHOD
-
-
-
... More
LAYING, HDD, W/O CASING, 125MM
1500
-
25
... More
LAY, PIPE, HDD, W/O CASING, 90 MM
500
-
26
... More
INSTALLATION OF CARRIER PIPE - CASED CROSSING
Laying cased crossings by auger boring/ jacking method/ Horizontal Directional Drilling (HDD) method using casing pipes and 3LPE coated carrier pipes of various sizes with or without MDPE as per requirement according to drawings/ specification(s) and providing all works, labour, inputs and materials/ consumables necessary to perform and complete the works in all respect in accordance with the contract. Taking delivery and transportation of Owner-supplied 3LPE coated pipes, MDPE pipes to the work site from designated stockpile location, inspection of the coated pipes visually and/ or with holiday detector for defects, arranging all necessary intermediate storage area required thereof till the pipes are installed in permanent position, setting out the works, aligning and welding the casing and carrier pipes, 100% radiography of weld joints of carrier pipes, field joint coating, holiday detection & repair of coating, applying at least two coats of bitumastic paint over a coat of suitable primer to external surface of casing pipe, and two component epoxy coating for internal surface of casing pipe.
Excavation/ trenching and/ or drilling/ boring in all kinds of soil, mixed strata or rocky strata, inserting the casing pipe into the bore, pre-hydrostatic testing of the carrier pipe and replacement/ rectification of defects/ pipes, suitably tying MDPE pipe with carrier pipe (after installation of insulators on carrier pipe) where ever required, carefully inserting the carrier pipe (with MDPE pipe tied to it) where ever required inside casing pipe by jacking/ pushing method taking care not to damage the insulator, MDPE Pipe and coated carrier pipe, sealing the ends of the casing pipe, as per procedure given in specifications, with heat shrinkable wraparound type end seal of approved make, fixing of vent pipes at the ends of the casing pipe, priming and applying two coats of coal tar based epoxy paint on underground portion of vent pipes, measuring final resistance between carrier pipe and casing, and doing preparation work necessary to produce correct resistance, applying one coat of primer and two coats of epoxy paint to all exposed and overground fittings & piping, proper compaction of backfill below carrier pipe at either ends, independently supporting the carrier pipe outside each end of the casing pipe by suitable RCC supports on firm base with neoprene rubber sheet below carrier pipe and strengthening with sand bags and proper compaction of earth below pipe, to prevent settlement of carrier pipe and damage to insulators, final clean-up and restoration of the site and disposal of wastes and surplus in accordance with the contract and supply of all materials (other than those specifically undertaken to be supplied by the Owner under contract) necessary for or in the performance of the work or for temporary or permanent incorporation in the works, and all other acts, matters and things necessary to make the pipeline ready for commissioning in all respects.
The work will include the provision of temporary supports for existing installations in the road, railroads and canals including provision of diversions, restoration of the canals/ road/ railroad/ embankment to its original state, maintenance for subsidence and all other precaution(s), work(s) and/ or maintenance expressed or implied in the contract.
The work will also include providing necessary support to carrier pipe on either side, after coming out of casing, proper compaction of backfill below carrier pipe at either ends and strengthening with sand bags and/ or other suitable means, so as to prevent differential settlement of the casing pipe and damage to insulators including all labour, materials etc. as per direction of Site Engineer / Engineer-in-Charge.
All materials (other than the Owner-supplied materials) required for performance of the work shall be supplied by the Contractor at his own cost.
Installation of casing end seal shall be done by skilled personnel as per laid down procedure and as per demonstration to be done by manufacturer's representative (to be arranged by Contractor).
Carrier pipe to be brought to the desired level of crossing by providing natural gradient to trench bottom from sufficient distance and avoiding field bends so as to keep provision for any future widening of Railway/ Highway etc.
Supply of casing pipe of size 8" OD, 6.4 mm wall thk. of material API 5L Gr. B/ IS:3589 or equivalent ERW Pipe with minimum 2 mm PE tape externally coated is in contractors scope.
Supply of casing pipe of size 12"/14" OD, 6.4/7.9 mm wall thk. of material API 5L Gr. B / IS:3589 or equivalent ERW Pipe with minimum 2 mm PE tape externally coated is in contractors scope.
-
-
-
... More
INSTALLATION OF CARRIER PIPE WITH CASING - CASED CROSSING (WITHOUT MDPE)
-
-
-
... More
USING 8" NB X 6.4 MM THK OF API 5L GRADE X-42, 3LPE COATED CARRIER PIPE in 14” NB X 6.4 MM THK OF API 5L GR. B (ERW) CASING PIPE AND ABOUT 1" THICK INSULATORS SO AS TO SUITABLY ACCOMMODATE THE CARRIER PIPE INSIDE THE CASING PIPE.
50
-
29
... More
USING 4" NB X 6.4 MM THK OF API 5L GRADE X-42, 3LPE COATED CARRIER PIPE in 8” NB X 6.4 MM THK OF API 5L GR. B (ERW) CASING PIPE AND ABOUT 1" THICK INSULATORS SO AS TO SUITABLY ACCOMMODATE THE CARRIER PIPE INSIDE THE CASING PIPE.
-
-
-
... More
INSTALLATION OF CARRIER PIPE BY HDD METHOD WITH CASING - CASED CROSSING (WITH MDPE)
-
-
-
... More
USING 4" NB X 6.4 MM THK OF API 5L GRADE X-42, 3LPE COATED CARRIER PIPE & 125/90 MM MDPE PIPE IN 12"/14” NB X 6.4/7.9 MM THK OF API 5L GR. B (ERW) CASING PIPE ALONG WITH 125/90 MM MDPE PIPE BETWEEN CASING & CARRIER PIPE AND ABOUT 1" THICK INSULATORS SO AS TO SUITABLY ACCOMMODATE THE MDPE TIED TO CARRIER PIPE INSIDE THE CASING PIPE.
-
-
-
... More
SUBMERGED CROSSINGS WITH OR WITHOUT ANTI-BUOYANCY MEASURES
Laying submerged crossings using pipes with or without concrete sheathing across major water course crossings and providing all works, labour, inputs and materials/ consumable necessary to perform and complete the work in all respects in accordance with the contract, including taking delivery and transportation of owner-supplied coated pipes to the work site from designated stockpile location, inspection of the coated pipes visually and with holiday detector for defects, arranging all necessary intermediate storage area required thereof till the pipes are installed in permanent position, arranging the required additional land for construction purpose, preparation of site, aligning, bending, lining up and welding the pipe, 100% radiographic inspection of weld joints, coating of field weld joints, holiday detection and repair of coating, hydro testing (both pre- & post-installation) and replacement of pipes/ defects, excavation of the trench to required depth, as per specifications, in all kinds of soil and conditions including rock trenching and maintenance of trench in all kinds of soil, mixed strata or rocky strata, if any, making bunds for stoppage of water flow, de-watering including installation of well-point system, and laying of the pipeline in approved trench, including de-watering, backfilling and final clean-up, stabilisation of the excavated banks by additional means, disposal of waste and surplus in accordance with the contract, and supply of materials (other than those specifically undertaken to be supplied by the Owner under the contract) necessary for or in the performance of the work or for temporary or permanent incorporation in the works and all other acts, matters and things necessary to complete the pipeline/ crossings in all respects according to the contract and as per directions of Site Engineer/ Engineer-in-Charge.
Depending upon the site condition & location of each submerged crossing, the Engineer-in-Charge, in consultation with the Contractor, shall decide upon the precise operations necessary for the performance of the work to lay the pipeline across the canal/ drain/ rivers and the cost of all such operations necessary shall be deemed to have been included in the rate for this item. Profile of drain / canal bed, ground & top of laid pipe shall be established jointly in presence of Owner both before and after laying the crossing, by taking levels with reference to nearby permanent structure.
The banks of the crossing shall be stabilised and suitable brick/ stone masonry bank protection works shall be carried out for the entire ROW width to prevent bank erosion leading to exposure of the pipeline. The procedure for such measures shall be submitted for Owner's approval prior to execution.
Concrete sheathing work for submerged crossings shall be paid for separately under relevant item of Schedule of Rates.
Continuous Concrete Coating - Supply of all consumables, materials and application of 25 mm-80 mm thk for various size of pipe, continuous concrete weight coating of minimum density 2245 kg/m3 of minimum grade M-20 and field joints thereof in all areas of work wherever required as per site condition and performing all works as per specification on the line pipe.
Concrete Saddle Weights - Fabrication and installation of concrete saddle weights on pipeline including supply of all consumables and materials including supply of 3mm, HDPE sheets, and performing all works as per specifications, drawings, and instructions of Engineer-in-charge and other provisions of the Contract document.
-
-
-
... More
WITHOUT ANTI-BUOYANCY MEASURES
-
-
-
... More
8" NB/ 6.4 MM (0.252")/ API 5L GR. B (ERW)
-
-
-
... More
WITH CONCRETE CONTINUOUS COATING
-
-
-
... More
8" NB/ 6.4 MM (0.252")/ API 5L GR. B (ERW)
-
-
-
... More
WITH CONCRETE SADDLE WEIGHTS
-
-
-
... More
8" NB/ 6.4 MM (0.252")/ API 5L GR. B (ERW)
-
-
-
... More
LIAISONING AND GETTING PERMISSIONS FROM THE STATUTORY AUTHORITIES Applying permission, follow-up, and getting permission from the statutory authorities, obtaining work permits/ NOC from various statutory authorities having jurisdiction before execution of the work and complying with all stipulations/ conditions/ recommendations of the said authorities. Only R.R. charges shall be paid by the Owner. This shall be applicable for any kind of permission/ approvals directly or indirectly required for execution of work.
-
-
-
... More
ALL KIND OF PERMISSIONS (STEEL/ MDPE/ SV/ CGS ETC…)
15800
-
41
... More
RESTORATION OF ROADS
Restoration of asphalt/ concrete/ red stone roads/ pavement/ Footpath/ Paver block including compaction of soil, to original condition as per requirement and to the entire satisfaction of EIC and/ or concerned Owners having jurisdiction.
This item shall be executed on the specific approval and instruction of Engineer-in-Charge.
Construction of GSB includes restoration of built-up surface by proper consolidation of the good earth portion, filling up of gravels along with M sand, compaction of the same and getting NOC from the authroities post completion of GSB. The filling of M sand mixed gravels shall be for a depth of 300 mm
-
-
-
... More
RESTORATION OF ASPHALT ROAD UPTO 10 CM THICKNESS
1200
-
43
... More
RESTORATION OF ASPHALT ROAD BEYOND 10 CM UPTO 20 CM THICKNESS
400
-
44
... More
RESTORATION OF CONCRETE ROAD UPTO 10 CM THICKNESS
400
-
45
... More
RESTORATION OF RED STONE ROAD / FOOTPATH / PAVEMENT/ PAVER BLOCK UPTO 4 CM THICKNESS
400
-
46
... More
CONSTRUCTION OF GSB
-
-
-
... More
LEAK/ BURST (ATTRIBUTABLE TO OWNER)
All works for locating leak / burst in Company's supplied material only (occurred during hydro-static testing) including necessary repairing/replacing defective pipe lengths including cutting and out and removing the defective pipe, pre-testing and welding of replacement pipe, NDT of welds, repair and retesting of defective welds, coating/painting of replacement pipe, pretesting the replacement pipe into mainline/branch line, coating/painting of welding joints, clean-up, retesting including cost of all labour materials, consumables and performing all works in accordance with the provisions of the Contract document and as directed by Owner /Engineer-in-charge/ Engineer in-charge
-
-
-
... More
8" NB/ 6.4 MM (0.252")/ API 5L GR. B (ERW)
1
-
49
... More
4" NB/ 6.4 MM (0.252")/ API 5L GR. B (ERW)
1
-
50
... More
FUTURE TAP OFF POINTS
Complete work of design, engineering, installation of all piping, valves, fittings at all depths inside the pit in all types of terrains and soils including transportation ,handling of all owner supplied materials from owners's designated issue points(s) to work site,supply of contractors's supplied materials to work site(s),all mechanical works including fabrication,welding,non destructive testing of welds,weld repairs/retesting ,cleaning/flushing,pre-hydrostatic testing ,dewatering,functional testing,cutting of mainline and beveling(if required),tie-in of valve assembly,including radiography of tie-in joints,corrosion,coating and external painting as required.All civil works including excavation of pit, piping supports including all PCC and RCC works for pedestals with insert plates as required,clean up and restoration of sites, filling and grading of area around valve station for avoiding any local flooding of area and as per specification and instruction of owner/owners's representative. Preparation of as-built drawings, documents and project records and performing all works as per drawings,specification, other provsionsof Contrcat document and instructions of Engineer-in-charge.
Transition pieces whererver required, Bolts, nuts, washer, U-clamps, gaskets etc. required for piping facilities shall be procured and supplied by the contractor within rate quoted. These items shall not be separately measured and paid.
-
-
-
... More
8"x8"
4
-
52
... More
8"x4"
8
-
53
... More
4"x4"
3
-
54
... More
HOOK -UP
Hook-up of proposed pipeline by welding of final tie-in-joint with any existing laid pipeline portion, existing Tap-off & battery limit of different section including Hook-up point of the existing pipeline to be made ready for welding by cutting of Sections including Hook-up point of the existing pipeline to be made ready for welding by cutting of flanges / valves / headers at all depth in all type of soil etc. Venting of N2 / gas / gas mixture as required purging of N2 Gas (if required), rebevelling as required, radiography and other NDT examination, joint coating as per specification. Contractor shall supply of all consumables, manpower, machineries, materials, N2 gas etc. and carry out all works as per the provisions of Contract document and instructions of Engineer-in-charge.
-
-
-
... More
8" NB/ 6.4 MM (0.252")/ API 5L GR. B (ERW)
5
-
56
... More
4" NB/ 6.4 MM (0.252")/ API 5L GR. B (ERW)
10
-
57
... More
PRE-COMMISSIONING AND ASSISTANCE IN COMMISSIONING OF PIPELINE SYSTEM
Swabbing, drying, purging with nitrogen of the complete pipeline network and the associated facilities being installed to the specified acceptance criteria, carrying out pre-commissioning works, providing assistance during the complete duration of commissioning operations for entire pipeline network system including supply of all equipment, man-power, consumables (including pigs & nitrogen required for purging with maintaining nitrogen column of minimum 10% of pipeline geometric volume) materials for all temporary works and performing all associated works, complete as per the relevant specifications, other provisions of Contract document and instructions of Engineer-in-charge.
-
-
-
... More
8" NB/ 6.4 MM (0.252")/ API 5L GR. B (ERW)
5
-
59
... More
4" NB/ 6.4 MM (0.252")/ API 5L GR. B (ERW)
10
-
60
... More
IDLE TIME PRESERVATION OF PIPELINE
Preservation of complete pipeline and associated facilities forming part of the pipeline as per Bid document and its maintenance including supply of all consumables, all equipment, manpower, etc. complete as per the requirements of specifications, other provisions of Contract document and instructions of Engineer-in-charge by filling and pressurizing with Nitrogen to a pressure of 2 bar(g). Note: Owner reserves the right to exercise either or none of the rates below.
-
-
-
... More
8" NB/ 6.4 MM (0.252")/ API 5L GR. B (ERW)
12700
-
62
... More
4" NB/ 6.4 MM (0.252")/ API 5L GR. B (ERW)
3100
-
63
... More
PERMANENT MARKERS
Permanent Markers supply, fabrication and installation of all types of permanent markers along the route including all associated civil works such as excavation in all types of soil, construction in all types of soil, construction of pedestals and grouting with concrete, clearing, supply and application of approved colour and quality of primer and paint (powder coated), stencil letter cutting for numbers, direction, chainage etc., restoration of area to original condition and performing all works as per drawing, specification and instruction of Owner/Owner’s Representative
-
-
-
... More
SV MARKER/DIRECTION MARKER
-
-
-
... More
WARNING SIGN WITH POST
110
-
66
... More
WARNING SIGN WITHOUT POST
-
-
-
... More
BOUNDARY PILLARS
330
-
68
... More
PIPING WORKS FOR SECTIONALISING VALVE STATION/ VALVE-CUM-TAP-OFF POINT INSTALLATION
All works for fabrication and installation of all piping above ground at all elevations and below ground at all depth for Sectionalising Valve Station along with preparation of construction drawings duly approved by EIC, in all type of terrains and soils including transportation and handling of all Owner supplied materials i.e. Ball valve, other types of valves, line pipes for mainline, 4" NB pipe for all branch line from Owner’s designated place(s) of issue to work site.
Contractor shall supply all required size & type of piping material like pipes, fittings & flanges etc. along with 2" NB pipe for all branch line & vent line (wherever required) including supply of all consumables, manpower, machineries, materials etc. and carrying out all mechanical works of underground and above ground piping including fabrication, welding, non-destructive testing of welds, weld repairs/ retesting, cleaning/ flushing, pre-hydro testing & hydrostatic testing, dewatering, functional testing, cutting of mainline and bevelling (if required).
Assembly, including radiography of tie-in joints, corrosion, coating and external painting as required, installation of instruments like pressure/ temperature instruments/ gauges along with complete SS Tubing works including supply of SS Tube and their accessories etc., as required, obtaining all statutory clearances, approvals and permissions for the works (wherever required), making of valve pit (for detail refer relevant drawings) for SV Stations cum- tap-off points enclosed with tender filled with sand, excavation and filling in all types of soils including soft/ hard rock for installation of piping/ pipe supports providing pipe supports, area fencing and gate including all associated civil and structural works; painting, finishing, clean-up and restoration of site; preparation of as-built drawings, documents and project records and performing all works as per drawings, specifications, other provisions of Contract document and instructions of Engineer-in-charge.
All civil/ structural works including area fencing and gate, valve pits, piping support etc. is covered in this item. All coupling, nipples etc. as required shall be supplied by contractor but no separate payments shall be made as it is covered under this item rate.
Work under this item is exclusive of all works associated with main pipeline covered under SOR Item No. 1.0 above.
-
-
-
... More
TYPE - I, 8"SV INSTALLATION WITH BYE-PASS & VENT FACILITY
2
-
70
... More
TYPE - II, 8"SV INSTALLATION WITH BYE-PASS, VENT FACILITY & 4" FUTURE TAP-OFF
6
-
71
... More
TYPE - III, 8"SV INSTALLATION WITHOUT BYE-PASS & VENT FACILITY BUT WITH 4" FUTURE TAP-OFF
-
-
-
... More
TYPE - IV, INSTALLATION OF 4" FUTURE TAP-OFF
-
-
-
... More
CONSTRUCTION OF RCC VALVE CHAMBER
SCOPE - All civil works including supply of all material, excavation of pit, piping & valve supports including all PCC and RCC/ Brick works for valves pit, pedestals with insert plates as required sealing of pipe at valve pits, providing cover etc and finishing, clean up and restoration of site, filling and grading of area around the valve station to avoid any local flooding of area, as per specification enclosed and instruction of Engineer-in-Charge. Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials, shuttering in all conditions etc. with all bye works and sundry works.
EXCAVATION - Earth work in excavation in all kinds of soil, mixed strata, hard rock upto any depth including trimming of sides of the trenches/ valve pits, dressing, ramming and levelling the bottom of the trenches correct to level, grade etc. including bailing out of water, if any, filling in sides of foundation trenches, plinth etc. with the excavated earth available and/ or depositing the excess earth within station area limits, in layers not exceeding 20 cms. thick, consolidating each deposited layer by ramming, watering, dressing to level and grade, complete in all respects inclusive of cost of all labour, materials, tools, tackles etc. as per drawings, specifications and direction of Site Engineer.
PLAIN CEMENT CONCRETE - Supplying and laying plain cement concrete of grade M 20 with stone aggregate 20mm down grade (including shuttering if required) in all types of concrete works including levelling courses below foundations, columns, pedestals, pedestal bases, pipe supports, floors, chambers, cable trench, under floors and any other locations, at all levels and locations as per drawings, specifications and directions of the Engineer-in charge.
SAND - Supplying and filling coarse sand under floors, in foundations, floor, trenches, plinth etc. including cost-of sand, royalty, transportation, loading, unloading, spreading in layers not exceeding 20 cm., watering, ramming, compacting, dressing and levelling etc. complete in all respects inclusive of cost of all labour, materials, tools, tackles etc. as per drawings, specifications and direction of Site Engineer.
REINFORCED CEMENT CONCRETE - Providing and laying RCC (reinforced cement concrete) of grade M-25 with 20mm and down grade crushed stone aggregate in all types of sub-structures like Beams, foundations, walls, columns, pedestals, pedestal bases, pipe supports, sleepers, cable trench, RCC retaining wall foundation for boundary wall including construction joints, bitumen painting on surfaces in contact with soil, shuttering, supplying and fixing MS inserts, finishes etc. at all depths and levels complete as per drawings, specifications and directions of the Engineer-incharge.
REINFORCEMENT - Supplying and providing reinforcement (for reinforced cement concrete works) Thermo-mechanically treated Fe-415 bars conforming to IS:1786 including initial straightening of coiled/uncoiled bars, removal of loose rust, cutting, bending to correct size & shape, binding with 18 gauge G.I. wire at each intersection and placing at any position, at any height and depth complete in all respects inclusive of cost of all labour, materials, tools, tackles etc. as per drawings, specifications and direction of Site Engineer.
Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials such as minimum 43 grade OPC cement including sulphate resistant cement for sub-structures, inserts, bolts, conduits, bitumen, excavation, PCC M-10 in mud mat, other minor construction materials, shuttering , staging, testing of concrete, curing etc. except reinforcement steel with all bye works and sundry works complete BRICK WORK - Providing brick work with brick class designation M-7.5 of IS:1077 in cm1:4 (1 cement : 4 sand) in steps, walls, retaining walls and load bearing structures drains, or any shape with all lead, depths & height including curing, scaffolding, etc., as per specifications and drawings with all bye-works and direction of the Engineer-in-charge. (Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials such as minimum 43 grade cement bricks, finishes, bitumen, other minor construction materials, shuttering, staging, masonry work, plastering, painting etc. with all bye-works and sundry works).
STRUCTURAL WORK - Supplying, fabricating and fixing M.S. structural steel work made of joists, tubes, pipes, channels, angles, plates, flats, bars etc. for struts, chain link fencing posts as per drawing including gate, ladders, safety grills, walkways, collapsible gate, signboards, supports for cable trench, making slots for barbed line, wire hoisting, placing in position, embedding in concrete, applying two coats of epoxy paint "EPILUX 155 High Build Enamel over a coat of EPILUX 610 Primer of M/s Berger or any other approved equivalent make as per manufacturer’s recommendation, complete in all respect including cutting to required size welding of joints, fixing anchor plates, bolts, threading, nuts, washers, sleeves etc. and necessary lettering of approved pattern on main gate, signboards etc. complete in all respects inclusive of cost of all labour, materials, tools, tackles etc. as per drawings, specifications and direction of Site Engineer. (excluding the cost of concrete work).
-
-
-
... More
VALVE PIT TYPE -I OF SIZE 2700 X 2500 X 1600 MM (APPROX.)
7
-
75
... More
VALVE PIT TYPE -II OF SIZE 2000 X 2500 X 1600 MM (APPROX.)
9
-
76
... More
VALVE PIT TYPE -III OF SIZE 2000 X 1250 X 1600 MM (APPROX.)
3
-
77
... More
PLANT PIPING (ABOVEGROUND)
Transportation of all piping items from Owner's and/ or Contractor's storage point to work at site/ workshop as applicable, complete work of fabrication, erection, painting, testing of pipes, flanges and fittings and making ready for further Commissioning/ Start-up of carbon steel piping of all sizes and ratings including supply of all consumables, equipment, manpower and other resources and execution of, but not limited to, the following works in accordance with relevant specifications indicated in PJS & scope of work indicated in SCC, drawings, specification and instructions of Engineer-in-charge and as per all provisions of the CONTRACT DOCUMENT.
Preparation of isometric and fabrication drawings. Preparation of final bill of material based on piping GADs. Fabrication including cutting, edge preparation, inclusive of grinding the edges of pipes, fittings, flanges etc. to match with the matching edges of uneven/different thickness wherever required, welding, attachment of all pipe fittings like elbows, tees, reducers. Supply of all O-lets less than 2" NB size, all sizes of nipples and coupling etc. as required for completion of job. Weldolets, sockolets, flanges, vent and drain point connection etc., including providing stubbing connections, fabricated fittings and reinforcement pads etc., as required.
Erection including prior cleaning, lifting, placing on pipe sleepers and supports, overhead on racks, skids and at all elevations including installation and carrying out connected activities for all types of valves including supply and fixing of gaskets, studs/ bolts, nuts wherever required for all sizes, levelling, aligning, joining of flanges, blind flanges, connecting with equipment, nozzles, strainers, tie-in with existing piping/facilities, etc. tapping for inline instruments like pressure gauges, thermo wells, sample connection, etc. Carrying out Non-destructive testing as required. All butt welded fittings & flanges end shall generally match with connecting pipe wall thickness. However, in case of misalignment, Contractor shall have to do end preparation without any extra cost. Surface preparation before application of primer by means of sand blasting including supply of approved quality of sand, manpower, machineries, tools & tackles to achieve required roughness as per specification and as per instruction of Engineer-in-charge.
Painting of entire system (including aboveground all pipes fittings, flanges and accessories) as per specifications suitable for highly corrosive area environment including supply of approved paints and primers, application of primer and paints, identification lettering/ numbering, colour coding, etc. as specified including rub down & touch up of shop primer or scrapping of shop primer wherever required by COMPANY and providing scaffolding for all heights etc.
Cleaning and flushing by water/ compressed air, testing of the systems including hydrostatic, pneumatic and any other type of testing as specified, draining, drying by compressed air/other methods approved by COMPANY.
Precommissioning & making operational all piping system and equipments. Commissioning Contractor scope shall provide all necessary assistance in term of supply of man-power, equipment, tools and tackles required amount of nitrogen for purging of entire terminal piping system including equipments etc. to the company during commissioning activities.
Completion of all such work in all respects as per scope of work and as per drawings, specifications and instructions of the COMPANY and keeping the system ready in all respects for further commissioning and start up.
Complete Carbon Steel aboveground Piping Work with painting including all fittings, flanges and supply of all required gaskets, studs bolts & nuts etc. as described under item 16.0 above
Pipe Specification and thickness may vary depending upon availability of pipe. No extra payment shall be made for this.
All O-lets less than 2" NB size, all sizes of coupling and nipples etc. as required shall be supplied by contractor but no separate payments shall be made as it is covered under erection rate.
Supply of all pipes, fittings, O-lets, flanges etc less than 4" size is in contractors scope.
-
-
-
... More
PIPING 8", API 5LX42
100
-
79
... More
PIPING 4", SCH 40, ASTM A 106 GR. B
300
-
80
... More
PIPING 2", SCH XS, ASTM A 106 GR. B
150
-
81
... More
INSTALLATION OF IJ 8”, 300# (ASTM A 694 GR.F42) - PUP PIECE- API 5L GR.B
5
-
82
... More
INSTALLATION OF IJ 4”, 300# (ASTM A 694 GR.F42) - PUP PIECE- API 5L GR.B
14
-
83
... More
INSTALLATION OF BALL VALVE 8",300#, BW
5
-
84
... More
INSTALLATION OF BALL VALVE 4",300#, BW
14
-
85
... More
INSTALLATION OF BALL VALVE 2”, 300# ,FLANGED (BODY ASTM A 216 GR.WCB)
40
-
86
... More
INSTALLATION OF GLOBE VALVE 2”, 300# ,FLANGED (BODY ASTM A 216 GR.WCB)
14
-
87
... More
SUPPLY OF FOLLOWING ITEMS AS PER SPECIFICATION GIVEN IN TENDER
-
-
-
... More
PIPE 4", SCH 40, ASTM A 106 GR. B
-
-
-
... More
PIPE 2", SCH XS, ASTM A 106 GR. B
-
-
-
... More
WNRF FLANGE 3/4”, 150 #, (ASTM A 105)
-
-
-
... More
CONCENTRIC REDUCER 4”X2”, (ASTM A 234 GR.WPB)
-
-
-
... More
CONCENTRIC REDUCER 2”X3/4”, SCH.XS X SCH.160 (ASTM A 234 GR.WPB)
-
-
-
... More
90 DEG ELBOW 1.5D- 4”, SCH.40 (ASTM A 234 GR.WPB)
-
-
-
... More
90 DEG ELBOW 1.5D- 2”, SCH.XS (ASTM A 234 GR.WPB)
-
-
-
... More
BALL VALVE 3/4”, 800#, SW (BODY ASTM A 105 )
-
-
-
... More
BALL VALVE 3/4”, 800#, FLANGED (BODY ASTM A 105 )
-
-
-
... More
PLUG VALVE 2”, 300#, FLANGED (BODY ASTM A 216 GR.WCB)
-
-
-
... More
GASKET 8", 300 #, SPIRAL WOUND SS 316
2
-
99
... More
GASKET 4", 300 #, SPIRAL WOUND SS 316
14
-
100
... More
GASKET 2", 300 #, SPIRAL WOUND SS 316
50
-
101
... More
GASKET 3/4", 300 #, SPIRAL WOUND SS 316
-
-
-
... More
2" VENT FLAPPER
-
-
-
... More
STUD + 2 NUT - 8", BOLT: A193 B7, NUT: A194 GR.2H
24
-
104
... More
STUD + 2 NUT - 4", BOLT: A193 B7, NUT: A194 GR.2H
70
-
105
... More
STUD + 2 NUT - 2", BOLT: A193 B7, NUT: A194 GR.2H
350
-
106
... More
STUD + 2 NUT - 3/4", BOLT: A193 B7, NUT: A194 GR.2H
-
-
-
... More
SOCKOLET 2"
-
-
-
... More
SURGE DIVERTER
16
-
109
... More
SUPPLY & LAYING OF NEOPRENE SHEET OF SUITABLE WIDTH AS PER DRAWINGS, SPECIFICATIONS AND DIRECTION OF SITE ENGINEER.
250
-
110
... More
Earthwork in excavation (Depth upto 2 Mtrs from original ground level)
Earth work in excavation in all kinds of soil except hard rock requiring blasting for foundation trenches, upto any depth including trimming of sides of the trenches, dressing, ramming and levelling the bottom of the trenches correct to level, grade etc. including bailing out of water, if any, filling in sides of foundation trenches, plinth etc. with the excavated earth available and/or depositing the excess earth within station area limits, in layers not exceeding 20 cms. thick, consolidating each deposited layer by ramming, watering, dressing to level and grade , complete in all respects inclusive of cost of all labour, materials, tools, tackles etc. as per drawings, specifications and direction of Site Engineer.
Depth upto 2 m (measured from original ground level)
14
-
111
... More
PLAIN CEMENT CONCRETE
Supplying and laying plain cement concrete of grade M 20 with stone aggregate 20mm down grade (including shuttering if required) in all types of concrete works including levelling courses below foundations, columns, pedestals, pedestal bases, pipe supports,floors, chambers, cable trench, under floors and any other locations (which are not covered as part of composite items) , at all levels and locations as per drawings, specifications and directions of the Engineer-incharge.
Note: (Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials, shuttering in all conditions etc. with all bye works and sundry works.)
4
-
112
... More
REINFORCED CEMENT CONCRETE IN SUB STRUCTURE WORKS
Providing and laying RCC (reinforced cement concrete) of grade M-25 with 20mm and down grade crushed stone aggregate in all types of sub-structures like Beams, foundations, walls, columns, pedestals, pedestal bases, pipe supports, sleepers, cable trench, RCC retaining wall foundation for boundary wall including construction joints, bitumen painting on surfaces in contact with soil, shuttering, supplying and fixing MS inserts, finishes etc. at all depths and levels complete as per drawings, specifications and directions of the Engineer-incharge.
10
-
113
... More
Supplying and providing reinforcement (for reinforced cement concrete works) Thermo-mechanically treated Fe-415 bars conforming to IS:1786 including initial straightening of coiled/uncoiled bars, removal of loose rust, cutting, bending to correct size & shape, binding with 18 gauge G.I. wire at each intersection and placing at any position, at any height and depth complete in all respects inclusive of cost of all labour, materials, tools, tackles etc. as per drawings, specifications and direction of Site Engineer.
Note: Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials such as minimum 43 grade OPC cement including sulphate resistant cement for sub-structures, inserts, bolts, conduits, bitumen, excavation, PCC M-10 in mud mat, other minor construction materials, shuttering , staging, testing of concrete, curing etc. except reinforcement steel with all bye works and sundry works complete).
1
-
114
... More
BRICK WORK
Providing brick work with brick class designation M-7.5 of IS:1077 in cm1:4 (1 cement : 4 sand) in steps, walls, retaining walls and load bearing structures drains, or any shape with all lead, depths & height including curring, scaffolding, etc., as per specifications and drawings with all bye-works and direction of the Enfineer-in-charge. (Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials such as minimum 43 grade cement bricks, finishes, bitumen, other minor constrcution materials, shuttering, staging, masnory work, plastering, painting etc. with all bye-works and sundry works).
3
-
115
... More
STRUCTURAL WORKS
Supplying, fabricating and fixing M.S. structural steel work made of joists, tubes, pipes, channels, angles, plates, flats, bars etc. for struts, chain link fencing posts as per drawing including gate, ladders, safety grills, walkways, collapsible gate, signboards, supports for cable trench, making slots for barbed line, wire hoisting, placing in position, embedding in concrete, applying two coats of epoxy paint "EPILUX 155 High Build Enamel over a coat of EPILUX 610 Primer of M/s Berger or any other approved equivalent make as per manufacturer’s recommendation, complete in all respect including cutting to required size welding of joints, fixing anchor plates,bolts, theading, nuts, washers, sleeves etc. and necessary lettering of approved pattern on main gate, signboards etc.complete in all respects inclusive of cost of all labour, materials, tools, tackles etc. as per drawings, specifications and direction of Site Engineer. (excluding the cost of concrete work).
60
-
116
... More
TEMPORARY CATHODIC PROTECTION Design, detailed engineering, supply, installation, testing and commissioning of the temporary Cathodic protection system using Mg/ Zn galvanic anodes to protect the external surface of 3 LPE coated entire length steel pipeline network against corrosion for design life of minimum 1 year or till commissioning of PCP system whichever is later as per standard specification for temporary cathodic protection system. Scope shall also include but not limited to the following for completion of jobs:
Measurement of soil resistivity along the right of way of the main pipeline route as per specification for design & installation of anodes. Collection of additional data related to cathodic protection along the right of way of pipeline as per specifications.
Supply, installation, testing & commissioning of one set of spark gap arrestor with 2 plate Zinc grounding cell of 20 kg net weight each across each insulating joint as per specification. Supply & installation of Zinc Ribbon Anodes at 4-8 O'clock position in the interval of 2 metre (max.) on carrier pipes at all cased crossings i.e. railways/ roads etc.
Supply, installation, testing & commissioning one set of polarisation cell with zinc anode at all high tension (66KV or higher) electrical power transmission line/Equipment crossing or running parallel to the pipeline for grounding purpose as per specification. The rating shall depend upon anticipated fault current & ground bed resistance at the location of installation. However, the rating of polarisation cell (krick) shall not be less than 5 KA & number of 20 kg net weight zinc anode shall not be less than two.
Monitoring of the protection system for 6 months.
All civil/ structural works related to TCP system including supply of bricks, cement & steel etc. required for completion of the system.
The quantities mentioned above are tentative and quantities for above including supply items shall be finalised & procured by Contractor only after due approval of EIC. Contractor supplied any surplus item during reconciliation shall not be accepted / taken by the Owner.
For all the supply items mentioned above, procurement shall be made as per specification & Data Sheets, after due approval of Engineer-incharge.
-
-
-
... More
8" NB/ 6.4 MM (0.252")/ API 5L GR. B (ERW)
12700
-
118
... More
4" NB/ 6.4 MM (0.252")/ API 5L GR. B (ERW)
3100
-
119
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements