Indian Oil Adani Gas Private Limited Tender

Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Indian Oil Adani Gas Private Limited - IOAGPL Tender

Services
Civil And Construction
Pipe Line Project
Eprocure
Opening Date6 Jan 2022
Closing Date17 Jan 2022
Tender AmountRefer Documents 
Notes
Download

Summary

Annual Rate Contract For Mdpe Pipe Network Laying Lmc Installation And Associated

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Laying using any method (Open trench, Moling and HDD) with or without casing; it includes survey of the under ground utilities, submission of HDD profile for approval, execution of the work as per specification, including excavation of pits, moling with hole size not exceeding 20% of the the carrier / casing pipe dia. jointing and insertion of the carrier pipe in casing pipe (on case to case basis) and subsequent padding with soft soil, laying of warning mat in open trench only, backfilling, compaction, submission of as built drawing, as graphs as per attached specification and instruction of ElC / Site Engineer of Owner. Includes laying of pipeline in all type of surface including Kutcha, metal, concrete (PCC/RCC), bituminous, tiled, brick lined etc. after raking up of hard surface of any type; Roads, Pavement, Footpaths etc. shall be made motorable once the pipeline is laid.. Includes minimum 300 mm (150mm below the pipeline & 150 mm above the pipeline) sand bedding & padding in all kind of soil (normal/ hard/ rocky).Trench shall be filled by normal/ soft soil and no sharp rock/ boulders to be used for backfilling.

-

-

-

... More
Installation of Gl sleeves, 2.5" NB x 300 mm length pipe sleeve/ half round concrete sleeves/HDPE Guard for domestic connections, 3" NB x 300 mm length Gl sleeve for commercial and industrial installations, excavation, breaking through any obstructions, insertion of pipe, sealing the annulus, fixing of the sleeves/RCC Half Round Guard with concrete mix, preparation of pedestal & restoration of excavated pits within the size of pedestal & the same pit with the laying of 20/32 mm dia MDPE pipe as defined in scope of work, technical specification and instruction of ElC/ SIC.

-

-

-

... More
Flushing, cleaning, pneumatic testing, purging with nitrogen and commissioning as per scope of work, specification and approved procedures providing all tools and tackles, nitrogen, instruments, manpower and other related accessories and as per instructions of the EIC/ SIC. Maintaining the completed pipelines/ installation for any defect, failures during defect liability period.

-

-

-

... More
Handing over the completed works to owner for their operation/ use, returning of all surplus material to owner stores, reconciliation of free issue material area wise and obtaining no objection certificate.

-

-

-

... More
On completion of gas charging of pipelines, preparation and submission of as-built drawings, crossings details, termination, utility graphs and deviation statements. Submission of all documents required for contract closure in numbers as mentioned in contract.

-

-

-

... More
In case more than 1 MDPE pipelines are laid in a common trench, SOR rate of higher dia plus 1/3rd SOR rate of lower dia will be paid.

-

-

-

... More
MDPE pipeline laying in all kind of terrain in normal soil with all type of surface by open trench methodology

-

-

-

... More
MDPE pipeline laying in all kind of terrain in normal soil with all type of surface by open trench methodology of laying by maintaining minimum clear cover of minimum 1.0 m from the top of lowest datum available in the vicinity of the pipeline.

-

-

-

... More
20 mm Dia

121500

-

-

... More
32 mm Dia

62000

-

-

... More
63 mm Dia

4500

-

-

... More
90 mm Dia

7800

-

-

... More
125 mm Dia

-

-

-

... More
MDPE pipeline laying in all kind of terrain in normal soil with all type of surface by moling methodology without HDPE casing pipe

-

-

-

... More
MDPE pipeline laying in all kind of terrain in normal soil with all type of surface by moling methodology without HDPE casing pipe by maintaining minimum depth of 1.00 m from the top of lowest datum available in the vicinity of the pipeline.

-

-

-

... More
20 mm Dia

13450

-

-

... More
32 mm Dia

10200

-

-

... More
63 mm Dia

300

-

-

... More
90 mm Dia

250

-

-

... More
125 mm Dia

-

-

-

... More
MDPE pipeline laying in all kind of terrain in normal soil with all type of surface by moling methodology with HDPE casing pipe

-

-

-

... More
20 mm Dia (in 50 mm HDPE casing pipe)

1050

-

-

... More
32 mm Dia (in 50 mm HDPE casing pipe)

1050

-

-

... More
63 mm Dia (in 125 mm HDPE casing pipe)

450

-

-

... More
90 mm Dia (in 200 mm HDPE casing pipe)

250

-

-

... More
125 mm Dia (in 250 mm HDPE casing pipe)

-

-

-

... More
MDPE pipeline laying by HDD method without casing pipe in Normal Soil

-

-

-

... More
MDPE pipeline laying by HDD method without casing pipe in Normal terrian & soil condition including survey of the underground utilities, intimation to all other utility agencies through owner, submission of HDD profile for approval, execution of the work as per the scope of work, standard procedure, specifications & PNGRB T4S, including excavation of the pits, jointing and insertion of carrier pipe, subsequent backfilling, compaction, restoration, submission of as-built drawings/ graphs as per specification and the instructions of EIC/ SIC of owner.

-

-

-

... More
32 mm Dia

580

-

-

... More
63 mm Dia

1750

-

-

... More
90 mm Dia

5800

-

-

... More
125 mm Dia

-

-

-

... More
MDPE pipeline laying by HDD method without casing pipe in Rocky terrain

-

-

-

... More
MDPE pipeline laying by HDD method without casing pipe in Rocky terrian & soil condition including survey of the underground utilities, intimation to all other utility agencies through owner, submission of HDD profile for approval, execution of the work as per the scope of work, standard procedure, specifications & PNGRB T4S, including excavation of the pits, jointing and insertion of carrier pipe, subsequent backfilling, compaction, restoration, submission of as-built drawings/ graphs as per specification and the instructions of EIC/ SIC of owner.

-

-

-

... More
32 mm Dia

170

-

-

... More
63 mm Dia

250

-

-

... More
90 mm Dia

700

-

-

... More
125 mm Dia

-

-

-

... More
MDPE pipeline laying by HDD method with HDPE casing pipe

-

-

-

... More
MDPE pipeline laying by HDD method with casing pipe in all kind of terrian & soil condition including survey of the underground utilities, intimation to all other utility agencies through owner, submission of HDD profile for approval, execution of the work as per the scope of work, standard procedure, specifications & PNGRB T4S, including supply & installation of PE6N HDPE Casing pipe & HDPE coupler. Excavation of the pits, jointing, pulling of casing pipe & insertion of carrier pipe, subsequent backfilling, compaction, restoration, submission of as-built drawings/ graphs as per specification and the instructions of EIC/ SIC of owner.

-

-

-

... More
32 mm Dia (in 50 mm HDPE casing pipe)

1080

-

-

... More
63 mm Dia (in 125 mm HDPE casing pipe)

630

-

-

... More
90 mm Dia (in 200 mm HDPE casing pipe)

430

-

-

... More
125 mm Dia (in 250 mm HDPE casing pipe)

-

-

-

... More
MDPE Pipeline laid in common trench

-

-

-

... More
63mm MDPE Pipeline laid with 32 MM MDPE Pipeline

15000

-

-

... More
90mm MDPE Pipeline laid with 32 MM MDPE Pipeline

6300

-

-

... More
Hard rock excavation for MDPE pipeline laying in hard rock/ Laterite

-

-

-

... More
Removal of hard rock strata/ large boulder encountered during excavation exceeding 1.0 m in any direction of the trench and removable only by chisel/ pneumatic chisel/ drill and backfillinig with soft/ normal soil after sand bedding & padding as per the scope of work, specifications and after prior intimation/ approval of EIC/ SIC. Scope of this item includes minimum 300 mm (150mm below the pipeline & 150 mm above the pipeline) sand bedding & padding in hard rock, supply & laying of warning mat above pipeline. Trench shall be filled by normal/ soft soil and no sharp rock/ boulders to be used for backfilling. In case of less cover PCC (1:3:6) of 150 mm thickness is covered under this item only. MDPE pipeline laying rates shall be payable as per SOR Item No. 1 above.

-

-

-

... More
Excavation of hard rock/ Laterite

8500

-

-

... More
Restoration of trenches

-

-

-

... More
Restoration to original conditions surface like bituminous/ asphalted road, concrete pavement, RCC pavements, tiles/ slabs/ blocks/ curb stones/ Agra/ Kota stones (chequered/ interlocking etc.), brick lining/ channels pavement as per the scope of work, technical specifications after laying of pipeline in built-up surface, as per the directions of EIC/SIC. Scope includes providing of the approved quality material, testing of materials by third party agencies as per scope of work, technical specification/ CPWD/ IRC standards, submission of the restoration reports, obtaining no objection certificates from the concern local authorities/ statutory authorities/ land owners/ third party inspection agencies designated by land owing agencies and owner.

-

-

-

2500

-

-

... More
Chipping Carpet

30000

-

-

... More
Interlocking Tiles

-

-

-

... More
Concrete Surface

23500

-

-

... More
GSB laying

600

-

-

... More
Restoration of pits for laying by HDD Method

-

-

-

... More
BM/BC (2 Mtr x 2 Mtr)

-

-

-

... More
BM/BC (1.5 Mtr x 1.5 Mtr)

60

-

-

... More
Concrete Road (2 Mtr x 2 Mtr)

-

-

-

... More
Concrete Road (1.5 Mtr x 1.5 Mtr)

75

-

-

... More
Interlocking Tiles Road (2 Mtr x 2 Mtr)

-

-

-

... More
Interlocking Tiles Road (1.5 Mtr x 1.5 Mtr)

-

-

-

... More
Chipping Carpet (2 Mtr x 2 Mtr)

-

-

-

... More
Chipping Carpet (1.5 Mtr x 1.5 Mtr)

90

-

-

... More
Fabrication & installation of pipeline markers

-

-

-

... More
Fabrication and installation of pipeline RCC route markers/ steel pole markers/ steel plate markers as per the scope of work, specification & PNGRB T4S along the route/ boundary wall, lamp posts including all associated civil works such as excavation and construction in all types of soils, construction of pedestals and grouting with concrete, cleaning, application of approved color and quality of primer and paint, stencil letter cutting of numbers, direction, chainage etc., restoration of area to original condition and performing all works as per scope of work, specification, PNGRB T4S and instructions of EIC/ SIC.

-

-

-

... More
RCC route markers

1560

-

-

... More
Steel pole markers with foundation

50

-

-

... More
Ground Penetrating RADAR

-

-

-

... More
Carrying out subsurface utility survey along the proposed pipeline route and/ or as specified by Engineer-In-Charge for 5 m corridor using Ground Penetrating Radar (GPR) for depth upto 5m below the existing ground level to locate and identify all existing underground utilities/buried objects including but not limited to pipelines, sewers, conduits, cables, drains, manholes, appurtenances etc in the proposed corridor along with location, DGPS coordinates, depth, shape and dimensional details of utilities. Four (4) Copies of Report and Drawings incorporating all collected datas shall be submitted as per scope of work and direction of the Engineer-in-charge. Scale of Drawing shall be Planimetry (X Axis 1:1000, Y Axis 1:100), Longitudinal Section (Z Axis 1:100) and Transverse Section at critical location. Note: 1.Survey Agency for execution of GPR Survey Work to be engaged by the Contractor shall be submitted for approval of Owner prior to start of work. 2. GPR Work shall be carried in presence of Contractor Representative, TPI & Owner.

-

-

-

... More
GI SECTION

-

-

-

... More
Installation of GI service pipe & fittings

-

-

-

... More
Survey of designated area and survey drawings of societies / colonies/ localities shall be provided by the contractor. installation of GI fittings like elbows, tees, unions, sockets, reducers, GI plugs,any other GI fittings, adopter for appliance valves & Anaconda, Domestic Adoptor, GI Sleeves, RCC Crimping Guard, Meter clamp & Pipe clamps etc. as required to complete the job including supply of all consumables like Teflon tape, soldering consumables, flux application and all other required material to complete the job. Excluding only Supply of GI pipes of all dia.,GI fittings, Isolation valve, appliance valve,brass adopter Anaconda, Meters,Regulators,Suraksha hose pipe with clamps,GI sleeves,HDPE guard & GI fittings which shall be issued by Owner as FIM.

-

-

-

... More
Receiving and taking-over as defined in the scope of work & specifications, handling, loading, transportation and unloading of owner supplied GI pipes of all dia.,GI fittings, Isolation valve, appliance valve,brass adopter Anaconda, Meters,Regulators,Suraksha hose pipe with clamps,GI sleeves,HDPE guard , GI fittings and other free issue items from owner's designated place(s) of issue to contractor's own stock-yard(s)/ Work Shop(s)/ work-site(s) including proper storing, stacking, identification, providing security & insurance cover, including installation of GI line (alongwith installation of required accessories as mentioned above) of following sizes, including fabrication, consumables, labour and other incidental works and handing over the same after return of the surplus pipes, fittings, valves & other accessories to the owner's designated store; carrying out all temporary, ancillary, auxiliary works required to make the GI line ready for commissioning as per drawings, specifications, scope of work and other provisions of contract document and instructions of EIC/ SIC, including but not limited to carrying out the following:

-

-

-

... More
Preparation and approval of schedules, execution procedures, sketches

-

-

-

... More
Finalization of optimum route with consent of customer, from transition fitting to cooking oven/ appliance. A tentative sketch shall be prepared and shall be signed by customer, contractor & SIC/ TPIA

-

-

-

... More
Making temporary but stable platforms/ scaffolding / rope ladders and all other safety devices

-

-

-

... More
Installation of Powder Coated GI Pipes & Fittings, Isolation & Appliance Valves including NPT/BSPT threading, Anaconda, Suraksha Hose etc.. painting as specified including installation of regulators and meters.

-

-

-

... More
Supply & Fixing of approved clamps, Dowell Plugs with screws, grout material, suitable thread sealant i.e. Teflon Tape/ lock tight, drilling of holes through wall /tiles / wood/ marble/ Granite etc jointing of PE to aboveground service GI pipes, testing, purging and commissioning of the complete installation.

-

-

-

... More
Touchup/ Painting of entire length of pipe along with fittings after proper surface finish by one coat of approved primer paint and two coats of approved synthetic enamel paint complete as per specification & direction of EIC. Restoring the wall surface to original by cleaning/ touching of corresponding paint to original as per instructions & to satisfaction of the owner. Preparation of laying records, meter reading etc. Reconciliation of free issue material.

-

-

-

... More
Drilling of holes through walls with proper heavy duty hammer drill Machine, tools & tackles, using proper sealant/ grout material & colours to match original, replacement of damages during drilling, restoring the area to original condition to the satisfaction of Owner/ EIC & as per specification for 1/2" & 1" NB in brick wall and RCC wall. PVC sleeve with proper sealant to be provided in the drilled section to protect GI pipe.

-

-

-

... More
All above activities to be carried out as per scope of work, specifications and to the complete satisfaction of consumer & EIC/ SIC.

-

-

-

... More
Handing over the completed works to owner for their operation/ use, returning of all free issue surplus material to owner stores, reconciliation of free issue material area wise and obtaining "no objection certificate" from owner/ EIC/ SIC/ TPIA

-

-

-

... More
Any other activity not mentioned/ covered, explicitly above, but otherwise required for satisfactory completion/ safety/ statutory/ maintenance of works shall also be covered under scope of work and has to be completed by contractor within specified schedule at no extra cost to owner

-

-

-

... More
Arrangement of all tools, tackles and consumables required to execute the work in an efficient manner.

-

-

-

... More
NON LMC

-

-

-

... More
Installation of powder coated GI riser of 1” & ½” from TF to Riser Isolation Valve, from Riser Isolation Valve upto lateral Isolation Valve by providing plug at all levels upto all floors including supply and fixing of all type of pipe supports/ clamps/ brackets.

-

-

-

... More
Installation of Welded powder coated GI/ MS riser at all length in buidlings above 8 floors and confined spaces like basements by using forged fittings confirming to IS 1239 - Part 2, duly polyester powder coated with 70 micron thickness. GI pipe & required fittings shall be first coupled with threaded joint. Teflon/PTFE tape should not be used in threaded joint for welded riser. Alternatively, plain ended pipes and fittings can also be used for welding in welded riser.The entire riser shall be constructed with SOCKET weld only, threaded joints are permitted only on the laterals on account of workability & for future maintenance only. The electrodes (Welding Rods) used for welding on risers shall be of E 6013 grade & 2.5mm thickness of reputed make used for industrial application. The Vendor is required to provide the Batch Test Certificate (TC) for the electrodes. The Weld joint shall be thoroughly cleaned with wire brush and examined visually for its quality. Welding shall be free from defects like porosity, crack, undercut, incomplete fusion etc. Spatter, slag must be removed from pipe.

-

-

-

... More
Installation of Common Ring/ Header of Powder coated GI Pipe/MS Pipe in Basement/ Terrace of the High Rise Building.

-

-

-

... More
Installation of powder coated GI pipe/MS Pipe (Horizontal/ Vertical) in Flats & Bulidings.

-

-

-

... More
Installation of 1/2" powder coated GI pipe ;All levels upto G+6 floor

11550

-

-

... More
Installation of 1/2" powder coated GI pipe;All levels above G+6 floor

1050

-

-

... More
Installation of 1" powder coated Gl pipe (Threaded/Welded); All levels upto G+6 Floor

850

-

-

... More
Installation of 1" powder coated Gl pipe(Threaded/Welded) ; All levels above G+6 Floor

1900

-

-

... More
Inst. of 1" Horizontal/ Vertical GI/ MS pipe-Welded common Ring (Basement/ Terrace)

1100

-

-

... More
Installation/Fixing of Commercial/Non-Commercial meter and regulator with associated inlet & outlet connections fittings,anaconda,valves. Using approved meters & regulator brackets and other supports by proper scaffolding/grouting. Restoring the area/walls to original condition as per specification and to complete satisfaction of consumer and EIC.

480

-

-

-

-

-

... More
Installation of 1/2" Powder Coated GI pipe & Fittings with Installation of lateral isolation valve (included) at all length after lateral isolation valve along with installation of regulator, meter with associated inlet & outlet connections/ fittings/ anaconda, supply and fixing of approved meter brackets and other supports upto Appliance Valve (excluded). Installation of Appliance Valve is covered in Conversion of Domestic Appliances.

-

-

-

... More
Installation of 1/2" Powder Coated GI pipe & Fittings at all length up to appliance valve/gas tap at domestic household for connecting PNG connection with GI Riser network with end cap/ plug (included).

87000

-

-

... More
Connection ready for commissioning (RFC) by installation of lateral isolation valve (included) at all length after lateral isolation valve along with installation of regulator, meter with associated inlet & outlet connections/ fittings/ anaconda, supply and fixing of approved meter brackets and other supports upto appliance valve (excluded).

7750

-

-

... More
Conversion of Domestic Appliance

-

-

-

... More
Conversion of all types of LPG kitchen appliances to NG based appliances by installing appliance valve, suraksha hose of 1 meter, changing/ converting nozzles, jets and associated controls for domestic & imported appliances with proper tools & tackles.

-

-

-

... More
Cleaning and performing minor maintenance, greasing etc of appliance, testing/ showing performance to the customer, signing of joint meter records (JMR) and instructing customer on use & safety norms, complete as per scope of work, specifications & to the satisfaction of owner/ EIC/ SIC.

-

-

-

... More
2 Burner Stove

7550

-

-

... More
3/4 Burner Stove

200

-

-

... More
Cooking Range

10

-

-

... More
Geyser

15

-

-

... More
Other Applicances

-

-

-

... More
INSTALLATION WORKS

-

-

-

... More
Construction of Foundation & Installation of DRS/ MRS/ Metering Skid/ Service Regulator

-

-

-

... More
Receiving and taking over, handling, loading, transportation and unloading of DRS/ Service Regulator/MRS/ Metering Skid from owner's designated stockyards to site, installation and hooking up with Steel & MDPE pipe.

-

-

-

... More
Installation of DRS with RCC pedestal, foundation and Structural Works. Providing and laying reinforced cement concrete of grade M-20 with 20 mm and down grade crushed stone aggregate in all types of structures like foundations, pedestals, pedestal bases, pipe supports, sleepers, columns, equipment, foundation, etc. including providing fencing with gate wherever required.

-

-

-

... More
Hook up from the existing steel tapping to DRS inlet and installation of all the items like pipe, fittings, valves, etc. supplied as FIM by owner as per the directions of the EIC/ SIC.

-

-

-

... More
Supply of all materials, fabrication and erection of chain link fencing 2.5 m high with mesh upto 2 m height providing proper bracing & supprots at safe intervals and barbed wire fencing complete in all respect including painting as per technical specification on all steel items, all works as per specification including foundations and RCC beams.

-

-

-

... More
Supply fabrication and erection of all types of pipe supports like clamps, saddle, guide, stops, cradles, neoprene sheet, turn buckles, anchors, T-posts, stockade/ trestle and pipe bridge for overhead piping, frames for canopy, approach ladders and platforms, crossover, cable tray supports etc, including painting suitable for highly corrosive area as per specification, labour and supervision & complete work as per drawing, specifications and instructions of EIC/ SIC.

-

-

-

... More
All handling and transport charges of raw materials and fabricated structures including double handling, as required, for completion of work in accordance with time schedule, are deemed to be included in the quoted rates.

-

-

-

... More
The DRS/ MRS shall be suitably earthed as per the IS 3043.The Earthing pit also to be constructed as per the required specification.

-

-

-

... More
Bolts, nuts, washer, U-clamps, gaskets etc. if required during installation shall be procured and supplied by the contractor within the rate quoted.

-

-

-

... More
Rate quoted in SOR shall include cost of all labour, tools, tackles, equipment, hire charged etc. This is a lump sum item rate and shall not be measured & paid separately

-

-

-

... More
DRS 5000/ 2000 SCMH installation, Foundation Size approx. (4500 mm x 2000 mm x 750 mm)

2

-

-

... More
Service Regulator installation, Foundation Size approx. (800 mm x 500 mm x 600 mm)

138

-

-

... More
MRS / Metering Skid installation, Foundation Size as per Skid

-

-

-

... More
Transportation of MRS from owner designated stock yard to Site

-

-

-

... More
CIVIL & STRUCTURAL WORKS

-

-

-

... More
Installation of brick/ RCC valve chambers/ pits

-

-

-

... More
All civil works including excavation of pit, piping supports including best grade bricks used for all walls, PCC and RCC works required for valves pit base & top cover, internal surface plaster, primer & paint coatings on walls, cat ladders & pedestals with insert plates as required sealing of pipe at valve pits, providing metal cover with locking arrangement etc and finishing, clean up and restoration of site, filling and grading of area around the valve station to avoid any local water/ sewage flooding of that area, with provision of separate metal handle to operate valves from above ground as per the approved for construction drawings and specifications as per instruction of EIC/ SIC.

-

-

-

... More
Earth work in excavation and filling to the grades and levels shown in the approved drawings in all kinds of soil including for road embankments, using approved quality good earth from designated borrow area, for all heights and depths including clearing and stripping (Min. 150 mm) of the area marked for filling, taking spot levels, consolidating the exposed natural soil surface, excavating the earth from borrow area loading, transporting & unloading, spreading in layers not exceeding 150 mm thickness, breaking clods, watering (if reqd.), ramming and compacting by manual/ mechanical means to give minimum 95% of modified Proctor's density of earth, testing & dressing including disposal of all unserviceable material all complete as per specifications and directions of EIC/ SIC. Rate to include cost of labour, tools, tackles, equipment, hire charges, cost of borrow earth by way of realities, right of way, cess etc., as applicable with all by works and sundry works.

-

-

-

... More
Supplying and laying plain cement concrete (including shuttering of required) in all types of concrete works including levelling courses below foundation, substructure, superstructure, chambers, cable trench, under floors and any other locations, at all levels as per drawings, specifications and directions of EIC/ SIC.

-

-

-

... More
Providing and laying reinforced cement concrete of grade M-20 with 20 mm and down grade crushed stone aggregate in all types of structures like foundations, pedestals, pedestal bases, pipe supports, sleepers cable trench including construction joints, bitumen painting on surface in contact with soil, providing and fixing reinforcing steel, shuttering, inserts, finishes etc. at all depths and heights complete as per drawings, specifications and direction of the EIC/ SIC.

-

-

-

... More
Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials, such as minimum 43 grade cement including sulphate resistant cement for sub structures, R/F steel, Inserts, bolts, conduits, bitumen, other minor construction materials, shuttering tanging, earth work in excavation and backfilling using serviceable earth in all conditions shorting bailing and pumping out water, testing of concrete, curing etc. will all bye works and sundry works.

-

-

-

... More
Providing and laying reinforced cement concrete (M20 Grade) with 20 mm and down grade crushed stone aggregate in pavement, including preparation of base (i.e. compacted sub grade, 200 thk sand and 50 thk PCC M-10 grade), leaving pockets if necessary, making recess, projections fixing inserts conduit pipes (GI, PVC, HDPE etc.) laying in alternate panels, filling the gaps between the panels with bitumen etc., making slopes, finishing edge, leaving bars for pedestals & sleepers, including providing sand fill isolation, shuttering providing and fixing reinforcing steel, curing, chipping and modification works etc. as specified in any shape, thickness, position and finishing the top surface smooth as per requirement etc. all complete as per drawings, specifications and directions of the EIC/ SIC.

-

-

-

... More
Providing brick work with brick class designation M 5.0 of IS:1077 in cm 1:5 (1 cement 5 sand) in steps, walls, retaining walls and load bearing structures drains, or any shape with all lead, depths & height including curing scaffolding etc., as per specifications and drawings with all bye-woks and direction of the EIC/ SIC.

-

-

-

... More
Brick valve chamber - Size (L x W) - 2 m x 1m

-

-

-

... More
RCC valve chamber - Size (L x W) - 2m x 1m

-

-

-

... More
Brick valve chamber - Size (L x W) - 1m x 1m

-

-

-

... More
RCC valve chamber - Size (L x W) - 1m x 1m

38

-

-

... More
Brick valve chamber - Size (L x W) - 2m x 1m

-

-

-

... More
Civil & Structural Works

-

-

-

... More
This item is for miscellaneous jobs including supply of Brick, Cement, Sand, Aggregate, Steel etc.

-

-

-

... More
Brick Works

-

-

-

... More
PCC Works (M20)

11

-

-

... More
RCC Works (M20)

-

-

-

... More
Reinforced Steel

-

-

-

... More
Structural Steel

-

-

-

... More
Supply and installation of half-round RCC crimp guard as per approved drawing

9000

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.