Harbour Engineering Department Tender

Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Harbour Engineering Department - HED Tender

Works
Civil And Construction
Irrigation Work
Eprocure
Opening Date8 Aug 2023
Closing Date4 Sep 2023
Tender Amount₹ 2,05,33,829 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Dry rubble masonary for retaining walls under water (below mean water level)including all costs, labour charges, conveyance charges etc. complete

391.13

-

-

... More
Dry rubble masonary for retaining walls above mean water level including all costs, labour charges, conveyance charges etc. complete

190.84

-

-

... More
Cement concrete 1:4:8 using 40mm (nominal size) broken stones for fixing guard stones including all costs, labour charges, conveyance charges etc. complete

3.4

-

-

... More
Reinforced Cement concrete 1:11/2:3 using 20mm (nominal size) broken stones for belt concrete including all costs, labour charges, watering, curing,form work, conveyance charges but excluding cost of reinforcement

31225

-

-

... More
Reinforcement for RCC work , bent, tied and placed in position using TMT (ISI) steel including all cost, labour charges,conveyance etc.complete

20.4

-

-

... More
Reclaiming the area behind the newly formed bund using excavated soil from Kayal within a distance of 500m by dredging or any other method including hire and operational charges of dredgers, earth moving equipments, pontoons, labour charges, incidental charges,mobilisation charges etc.complete

11754.77

-

-

... More
Sectioning upto 150mm for fixing new roads

2113.82

-

-

... More
Forming embankment with contractor's own gravelly earth spreading in horizontal layers of uniform thickness including all costs, labour charges and consolidated with power roller etc. complete

1377.39

-

-

... More
APPENDIX B- Construction of Twin Box Culvert

-

-

-

... More
Supplying and stacking best quality coconut piles 200 to 300mm dia for measurements

8622.8

-

-

... More
Driving down best quality coconut piles 200mm to 300mm dia to approved lines and levels through various strata including all hire and labour for fixing staging platform etc. complete as directed by the Engineer incharge.

8643.75

-

-

... More
APENDIX C-CONSTRUCTION OF BRIDGES

-

-

-

... More
Fabricating and supplying M.S liner[steining] for piles using 5mm thick M.S plates including all costs fabrication charges etc complete

43.15

-

-

... More
Driving down MS liner to lines & levels through various strata from bed level till the pile get water tight by using the monkey weighing weight with less than 2 t with the aid of pile driving plant winge barge and accessaries wire rope etc. including labour and higher charge of all machineries, cost of lubricant, oil pay of staff etc. complete. all the works are to be carried out as per the direction of Engineer in charge

29.82

-

-

... More
Providing and installing reinforcement fabricated in cages inside boreholes including cost of all materials and cost of labour required ,fabricating in to cages by welding installing the cages inside the bore holes ,providing cover blocks as required etc complete as per the directions of dept. officers but excluding the cost of welding

339.09

-

-

... More
Spot welding using 8g approved quality electrode for a welding length not less than 6mm stirrups to the main bars after cleaning the surface with brush etc.complete as per the direction of deptl. Officers at site.

30305

-

-

... More
Chipping and removing top of R.C.C. piles to lines and levels carefully, without damaging the remaining portion and removing the debris upto a distance of 150m.

3465

-

-

... More
Earth work excavation in ordinary soil in or under water or liquid mud, and depositing with lead upto 50m and lift upto 1.5m including neat banking.

57.91

-

-

... More
Cement concrete 1:4:8 using 40mm (nominal size) broken stones for bed of box culvert including all costs, labour charges etc complete

39.88

-

-

... More
Vibrated R.C.C mix M30 using 20 mm metal with cement content 405kg/m3 of concrete for pile cap including all charges of materials, labours, form work , watering, curing etc. complete but excluding cost of reinforcement and admixtures

92160

-

-

... More
Reinforcement for RCC works, bent, tied and placed in position using TMT bars including all costs, labour charges etc complete

484.92

-

-

... More
Wearing coat on deck slab using cement concrete 1:11/2:3 using 20mm (nominal size) broken stone for a thickness of 75 mm including finishing with abrasion resistant approved quality hard flooring to IS1237 1980 @ 5kg /m2 of flooring including floated hard and trowelled smooth in two layers inclusive of labour charges including provision for making wire brush impressions and necessary grooves for expansion joint but excluding cost of joint filler and labour charges for filling etc complete.

270

-

-

... More
Plastering in cm 1:4, 12 mm thick one coat trowelled smooth for parapet and inside of culvert including all costs, labour charges etc complete

140

-

-

... More
Providing and applying protective cum decorative coating using DECKGUARD STD as per the approval of the engineer in charge after cleaning the surface thoroughly to get rid of fungus ,fungi,dirt,oil,etc. and apply one coat of primer with penetrating silence/silexane based DECKGUARD primer whose approximate consumption should be 8m2/litre per coat and over this two coats of aliphatic acrylate coating of chosen colour of DECKGUARD STD with approximate coverage of 8m2/litre/coat including all cost of materials ,labour, scaffolding charges etc.complete as per the direction of Engineer-in-charge.

1690

-

-

... More
Extra item

-

-

-

... More
Providing coir geotextile on the bed of the reclamation bund to lines and levels including all charges etc. complete as per the direction of Engineer.

1860.75

-

-

... More
Providing plastic sheet of approved make along the inner side of masonry between LWL and HWL (above bund height) to lines and levels including all fixing charges etc. complete as per the direction of Engineer.

1106.17

-

-

... More
Random rubble masonry in cement mortar 1:6 for retaining wall including all cost,labour charges, curing etc.complete

90.39

-

-

... More
Putting up islands at north and south side for construction of pile and substructure works for an average height of 3.0m, inside the kayal to retain dredged soil for making the working platform using 200 to 300 mm dia coconut poles of average length5.0m along outer periphery of the island @ 50cm c/c driving to 2.0 m below bed level, tied together with Casurina poles @50 centimeter C/C horizontaly,racker poles at 1m c/c with GI wire ,forming sand bag ring bund along the inner perifery of the island for 1.5m width to protect sandy bed scouring due to tidal variation, filling the inner space with stiff clay/soil taken from kayal including all conveyance of clay by boat, hire charges,labour charges,etc.complete ,mainntaining the bund till completion of the work and demolishing the bund after completion of work as per the direction of departmental officers at site.

253

-

-

... More
Boring vertical holes of suitable diameter to cast 1200mm. dia piles through any strata except chiselling through hard rock using direct mud circulation method (DMC) including cost of bentonite clay,hire of boring plant,Pontoons and changadom, slurry pump, fuel, operational charges and mobilisation of machinery for piling etc.complete as per direction of departmental officers at site including removal of all obstructions met with, removal of bored material and dumping the same at suitable places as directed by the Engineer in charge upto a lead of 250 m, making the boreholes suitable for concreting etc complete ( 5 mm thick m.s lining should be provided to ensure verticality of the boreholes and to be paid seperately) including removal of excess length of lining from the top etc. complete but excluding cost and driving charges of lining

263.36

-

-

... More
R.C.C 1:11/2:3 using 20mm (nominal size) broken stones for hand rails, post including all cost of materials,labour charges and admixtures etc complete but excluding cost of reinforcement

3896

-

-

... More
Providing reflection light on either side of guardpost &guide post as per specification

1320

-

-

... More
Providing and constructing RCC cast in situ vertical bored piles of 1200mm dia using cement concrete mix 1:1.467:2.787 with cement content 450kg/m3 of concrete using 20mm broken stone and M sand, water cement ratio not exceeding 0.42 and 290ml admixture per 50kg cement including all cost of materials,labour charges,hire charges, conveyance and admixture etc complete but excluding cost of reinforecement

297784

-

-

... More
Vibrated R.C.C mix M30 using 20 mm metal Cement concrete 1:1.701:3.233 with cement content 405.17kg/m3. of concrete for pile cap using 20mm (nominal size) broken stones and M sand, water cement ratio not exceeding 0.42 and 345.26ml admixture per 50kg cement including all charges of materials, labours, form work , watering, curing,admixture etc. complete but excluding cost of reinforcement for pile cap

92200

-

-

... More
Vibrated R.C.C mix M30 using 20 mm metal Cement concrete 1:1.701:3.233 with cement content 405.17kg/m3. of concrete using 20mm (nominal size) broken stones and M sand, water cement ratio not exceeding 0.42 and 345.26ml admixture per 50kg cement including all charges of materials, labours, form work , watering, admixtures,curing etc. complete but excluding cost of reinforcement for abutment cap

89376

-

-

... More
Vibrated R.C.C mix M30 using 20 mm metal Cement concrete 1:1.701:3.233 with cement content 405.17kg/m3. of concrete using 20mm (nominal size) broken stones and M sand, water cement ratio not exceeding 0.42 and 345.26ml admixture per 50kg cement including all charges of materials, labours, form work , watering, admixture, curing etc. complete but excluding cost of reinforcement for bed block

2925

-

-

... More
Vibrated R.C.C mix M30 using 20 mm metal Cement concrete 1:1.701:3.233 by weight with cement content 405.17kg/m3. of concrete using 20mm (nominal size) broken stones and M sand, water cement ratio of 0.42 and 345.26ml admixture per 50kg cement including all charges of materials, labours, form work , watering, curing etc. complete but excluding cost of reinforcement and inclusive of admixtures for beams

37105

-

-

... More
Vibrated R.C.C mix M30 using 20 mm metal Cement concrete 1:1.701:3.233 by weight with cement content 405.17kg/m3. of concrete using 20mm (nominal size) broken stones and M sand, water cement ratio of 0.42 and 345.26ml admixture per 50kg cement including all charges of materials, labours, form work , watering, curing etc. complete but excluding cost of reinforcement and inclusive of admixtures for deck slab

43515

-

-

... More
Vibrated R.C.C mix M30 using 20 mm metal Cement concrete 1:1.701:3.233 by weight with cement content 405.17kg/m3. of concrete using 20mm (nominal size) broken stones and M sand, water cement ratio not exceeding 0.42 and 345.26ml admixture per 50kg cement including all charges of materials, labours, form work , watering, curing etc. complete but excluding cost of reinforcement and inclusive of admixtures for kerb

3600

-

-

... More
Supplying and providing in position true to lines and levels Elastomeric bearing of size 300x350x60 mm confirming to IRC-83( Part II) section IV and clause 2005 of MORTH specification complete including all accessories as per drawing and technical specifications etc complete

42

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.