Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Harbour Engineering Department - HED Tender
Civil And Construction
Eprocure
Opening Date24 Feb 2024
Closing Date18 Mar 2024
Tender Amount₹ 6,57,79,827
Costs
EMD
₹ 2,00,000Document Cost
₹ 11,025Tender Fee
Refer Documents
Summary
General-kmb -extension Of 50 M Wharf Of Existing Seaward Wharf At Vizhinjam Port-general Civil Work
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_HED_663352_1Tender No
HED/CEHED/TR/298/2023_5_1_1/1Tender Authority
Harbour Engineering Department ViewPurchaser Address
-Website
http://etenders.kerala.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
OD3629/2023-2024:Bored cast-in-situ M40 grade R.C.C. Pile of 1000mm diameter in sea using pile driving platform and accessories mounted on floating pontoon of suitable size through hard rock excluding Reinforcement complete as per Drawing and Technical Specifications and removal of bored material with all lifts and lead upto 1000 m. including retaining of sides and cleaning the holes, labour charges including shifting plants, equipment's etc., complete as per drawings, detailed specifications and directions of Engineer-in-charge (Based on 12.11.B.9 AND 55.18.2)
54
-
-
OD3920/2022-2023:Supply, Fitting and Placing in position reinforcement in cages using HCR bar Reinforcement including cost of materials, labour charges, conveyance and placing the cages in bore holes providing precast cover blocks etc, complete as per Drawing and Technical Specifications and as directed by Engineer in charge excluding cost of welding charges. Unit = 1 MT Taking output = 1 MT) (Based on 12.40)
199.61
-
-
OD3958/2022-2023:Furnishing and Placing Pre cast Grade M40 using 20 mm broken stones for beams and slab panels using Batching Plant, Transit Mixer and Concrete Pump in super-structure as per drawing and Technical Specification including cost of all materials , conveyance, labour charges, formwork, watering, curing, launching of beams and slab panels in positions as per the direction of engineer in charge etc complete but excluding cost of reinforcement. (Based on 14.1.E.2 AND 14.E2.2A)
182.52
-
-
OD3012/2023-2024: Cement Concrete for Reinforced Concrete for cast in situ (Joint concrete)complete as per Drawing and Technical Specification R C C Grade M40 - Using Batching plant, Transit Mixer and Concrete pump (based on 12.38.D.2,12.11.B.9)
83.41
-
-
OD5994/2023-2024:Cement Concrete for Reinforced Concrete for cast in situ for pile muff, beams, slabs etc. complete as per Drawing and Technical Specification R C C Grade M40 - Using Batching plant, Transit Mixer and Concrete pump (based on 13.5.G.P.2, 12.11.B.9)
432.3
-
-
OD3922/2022-2023:Supplying, fitting and placing reinforcement using HCR for the RCC works for super structure including conveying, straightening, cutting, bending and tying in position etc. complete as per & drawing and technical specifications and the direction of engineer in charge Based on 14.2 Taking output = 1 MT
111.24
-
-
OD5682/2023-2024: Supplying, providing and fixing IRM 'DIPTI' OR equivalent Twin Horn Cast Steel Bollard of 70 TON capacity as per drawing including all cost of materials, fixtures, labour charges, conveyance etc. complete.
5
-
-
OD3050/2023-2024: Supplying, providing and fixing DRM “DIPTI” or equivalent D-Fenders Model - DDB 150 x 150 x 1000 MM Long as per drawing enclosed including all cost of materials, fixtures labour charges etc. complete.
5
-
-
Deepening
-
-
-
OD5690/2023-2024:Deepening the harbour basin and mouth by using dredger having a flow rate of 700 to 1000m3 slurry per hour with a solid output of not less than 127.5 m3/hour and dumping the spoil at location already pointed out by the departmental officers with a lead up to a radial distance of 500m, including hire charges of dredger, all tools and plants and accesories , fuel charges, idling and mobilisation charges, providing and shifting the pipe lines including all labour charges, incidental charges etc. and drtvice taxes complete for a depth upto (-) 9m bedlevel with a tolerance of +/- 20cm. (Based on 65.82)
9000
-
-
Reclamation Bund
-
-
-
60.7.6:Supplying and stacking granite stone 20 to 45 dm3 for dumping works- Supplying at site of work granite stone 20 to 45 dm3 in size (60% 45m3,30%30 to 40dm3 and 10% 20 to 30dm3 stones) for measurement ( deducting not less than 15% for voids as fixed by the departmental officer at site) including all cost, conveyance, loading and unloading charges all other incidental charges all leads and lifts etc. complete as per the direction of the departmental officers at site.
1359
-
-
60.7.7:Conveyance and dumping of departmental granite stones-Conveyance of departmental granite stone 20 to 45 dm3 in size from stack at site and dumping in position (60% 45m3,30%30 to 40dm3 and 10% 20 to 30dm3 stones) to lines and levels to from the core of the sea wall as per approved design including all leads and lifts etc. complete as per the direction of the departmental officers at site.
1359
-
-
OD5784/2023-2024:Laying of a Geo textile 120 gram per sq. meter (best quality) filter between rubble and embankment on which is laid to prevent escape of the embankment material through the voids of the stone pitching/cement concrete blocks as well as to allow free movement of water without creating any uplift head on the pitching
462
-
-