Greater Cochin Development Authority Tender

Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Greater Cochin Development Authority - GCDA Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date9 May 2023
Closing Date20 May 2023
Tender Amount₹ 36,97,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
15.9.2 : Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar

34.97

-

-

... More
60.7.3 : DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m.

3.35

-

-

... More
15.7.4 : Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar

0.32

-

-

... More
od356149/2022_2023 : Dismantling stainless steel work in single sections including dismembering and stacking within 50 metes lead.<br>Ref ID-DAR 15.17.2

11.52

-

-

... More
15.13.1 : Taking out doors, windows and clerestory window shutters (steel or wood ) including stacking within 50 metres lead:Of area 3 sq. metes and below

12

-

-

... More
16.83 : Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge.

108.15

-

-

... More
50.2.33.5 : Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete.

15

-

-

... More
50.2.33.6 : Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete

15

-

-

... More
50.2.33.7 : Cutting branches of trees overhanging above any structures of girth between 90cm to 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete.

15

-

-

... More
50.2.33.8 : Cutting branches of trees overhanging above any structures of girth beyond 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete.

25

-

-

... More
15.60 : Disposal of building rubbish/ malba/ similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved

30

-

-

... More
50.2.26.1 : Filling with contractor own earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge.

448.75

-

-

... More
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)

1.76

-

-

... More
5.9.16.1 : Centering and shuttering including strutting, etc. and removal of form for:Edges of slabs and breaks in floors and wallsUnder 20 cm wide

78

-

-

... More
7.1.1 : Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)

10.53

-

-

... More
6.4.1 : Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in:Cement mortar 1:4 ( 1 cement : 4 coarse sand)

0.32

-

-

... More
13.1.1 : 12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)

6.4

-

-

... More
od356108/2022_2023 : Engaging the labour charge; fitter grade 1 for fixing fencing in compound wall in site.

2

-

-

... More
13.33.1 : Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing

200.4

-

-

... More
14.1.1 : Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground within 50 meters lead:With cement mortar 1:4 ( 1 cement : fine sand)

81.92

-

-

... More
od340682/2022_2023 : Cleaning the surface and removing dirt,dust,greese,oil,algae,fungus including washing the surface with the help of required srubbers and cleaning with machine operated water jet etc. Without causing any damage to the existing structure

256

-

-

... More
13.43.1 : Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer

6.4

-

-

... More
13.52.1 : Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work

83.24

-

-

... More
13.60.1 : Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade:Two or more coats on new work

6.4

-

-

... More
13.111.1 : Finishing walls with Acrylic Smooth exterior paint of required shade :Old work (Two or more coat applied @ 1.67 ltr/ 10 sqm) on existing cement paint surface

66.99

-

-

... More
TOILET BLOCK AND RENOVATION OF EXISTING BUILDING

-

-

-

... More
2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil

5.85

-

-

... More
60.7.8 : DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site

5.85

-

-

... More
7.1.1 : Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)

1.45

-

-

... More
2.25 : Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.

1.35

-

-

... More
15.13.2 : Taking out doors, windows and clerestory window shutters (steel or wood ) including stacking within 50 metres lead:Of area beyond 3 sq. metres

1

-

-

... More
15.13.1 : Taking out doors, windows and clerestory window shutters (steel or wood ) including stacking within 50 metres lead:Of area 3 sq. metes and below

8

-

-

... More
50.6.1.2 : Solid block masonry using pre cast solid blocks (Factory made) of size 40x20x20cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level thickness 20cm and above in: CM 1:6 ( 1 cement: 6 coarse sand) etc complete.

4.76

-

-

... More
50.6.1.8 : Solid block masonry using pre cast solid blocks (Factory made) of size 40x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in: CM 1:6 ( 1 cement : 6 coarse sand etc complete

3.86

-

-

... More
5.18.1 : Providing precast cement concrete jali 1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 6 mm nominal size) reinforced with 1.6 mm dia mild steel wire including centering and shuttering, roughening cleaning, fixing and finishing in cement mortar 1:3 (1 cement : 3 fine sand ) etc. complete excluding plastering of the jambs, sills and soffits.50 mm thick

12.68

-

-

... More
od355382/2022_2023 : Maintenance work of existing building roof

1

-

-

... More
5.3 : Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15sup0/sup landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size).

1.74

-

-

... More
5.9.3 : Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform

7.83

-

-

... More
5.9.5 : Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers

8.28

-

-

... More
5.9.16.1 : Centering and shuttering including strutting, etc. and removal of form for:Edges of slabs and breaks in floors and wallsUnder 20 cm wide

9.82

-

-

... More
5.22A.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more

156.33

-

-

... More
13.1.1 : 12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)

105.22

-

-

... More
13.16.1 : 6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand)

7.83

-

-

... More
11.39 : Providing and laying rectified Glazed Ceramic floor tiles of size 300x300 mm or more (thickness to be specified by the manufacturer), of 1st quality conforming to IS: 15622, of approved make in colours White, Ivory, Grey, fume Red Brown, laid on 20 mm thick cement mortar 1:4 (1 cement : 4 Coarse sand), including grouting the joints with white cement and matching pigments etc., complete.

6

-

-

... More
8.31 : Providing and fixing Ist quality ceramic glazed wall tiles conforming to IS: 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineerin-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg per sqm, including pointing in white cement mixed with pigment of matching shade complete.

9.03

-

-

... More
13.46.1 : Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)

81.45

-

-

... More
13.99.1 : Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :One or more coats on old work

50.7

-

-

... More
13.111.1 : Finishing walls with Acrylic Smooth exterior paint of required shade :Old work (Two or more coat applied @ 1.67 ltr/ 10 sqm) on existing cement paint surface

50.7

-

-

... More
9.117.1 : Providing and fixing factory made uPVC door frame made of uPVC extruded sections having an overall dimension as below (tolerance ±1 mm), with wall thickness 2.0mm (±0.2 mm), corners of the door frame to be jointed with galvanized brackets and stainless steel screws, joints mitred and plastic welded. The hinge side vertical of the frames reinforced by galvanized M.S. tube of size 19 x 19 mm and 1 mm (± 0.1 mm) wall thickness and 3 nos. stainless steel hinges fixed to the frame complete as per manufacturer's specification and direction of Engineer-in-chargeExtruded section profile size 48x40 mm

11.4

-

-

... More
9.118.1 : Providing and fixing to existing door frames24 mm thick factory made PVC door shutters made of styles and rails of a uPVC hollow section of size 59x24 mm and wall thickness 2 mm (± 0.2 mm) with inbuilt edging on both sides. The styles and rails mitred and joint at the corners by means of M.S. galvanised/plastic brackets of size 75x220 mm having wall thickness 1.0 mm and stainless steel screws. The styles of the shutter reinforced by inserting galvanised M.S. tube of size 20x20 mm and 1 mm (± 0.1 mm) wall thickness. The lock rail made up of 'H' section, a uPVC hollow section of size 100x24 mm and 2 mm (± 0.2 mm) wall thickness,fixed to the shutter styles by means of plastic/galvanised M.S. 'U' cleats. The shutter frame filled with a uPVC multi-chambered single panel of size not less than 620 mm, having over all thickness of 20 mm and 1 mm (± 0.1 mm) wall thickness. The panels filled vertically and tie bar at two places by inserting horizontally 6 mm galvanised M.S. rod and fastened with nuts and washers, complete as per manufacturer's specification and direction of Engineer-in-charge( For W.C. and bathroom door shutter).

4

-

-

... More
21.1.1.2 : Providing and fixing aluminium work for doors, windows, ventilators and partitions with extruded built up standard tubular sections/ appropriate Z sections and other sections of approved make conforming to IS : 733 and IS: 1285, fixing with dash fasteners of required dia and size, including necessary filling up the gaps at junctions, i.e. at top, bottom and sides with required EPDM rubber/ neoprene gasket etc. Aluminium sections shall be smooth, rust free, straight, mitred and jointed mechanically wherever required including cleat angle, Aluminnium snap beading for glazing /paneling, C.P. brass/ stainless steel screws, all complete as per architectural drawings and the directions of Engineer-in-charge.(Glazing, paneling and dash fasteners to be paid for separately):For fixed portionPowder coated aluminium (minimum thickness of powder coating 50 micron)

3.59

-

-

... More
21.1.2.2 : For shutters of doors, windows & ventilators including providing and fixing hinges / pivots and making provision for fixing of fittings wherever required including the cost of EPDM rubber/ neoprene gasket required (Fittings shall be paid for separately)Powder coated aluminium (minimum thickness of powder coating 50 micron)

3.59

-

-

... More
21.3.1 : Providing and fixing glazing in aluminium door, window, ventilator shutters and partitions etc. with EPDM rubber / neoprene gasket etc. complete as per the architectural drawings and the directions of Engineer - in -Charge. ( Cost of aluminium snap beading shall be paid in basic item):With float glass panes of 4.0 mm thickness

0.65

-

-

... More
STAGE

-

-

-

... More
2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil

10.32

-

-

... More
60.7.8 : DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site

10.32

-

-

... More
7.1.1 : Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)

10.21

-

-

... More
2.25 : Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.

15.36

-

-

... More
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)

3.7

-

-

... More
5.9.16.1 : Centering and shuttering including strutting, etc. and removal of form for:Edges of slabs and breaks in floors and wallsUnder 20 cm wide

24.8

-

-

... More
13.1.1 : 12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)

23.83

-

-

... More
11.3.1 : Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate)finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete.40 mm thick with 20 mm nominal size stone aggregate

37

-

-

... More
13.45.1 : Finishing walls with textured exterior pint of required shade:New work (Two or more coats applied @ 3.28 ltr/ 10 sqm ) over and including priming coat of exterior primer applied @ 2.20 kg/ 10 sqm

14.88

-

-

... More
PLANTER BOX

-

-

-

... More
2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil

10.31

-

-

... More
60.7.1 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site

7.42

-

-

... More
7.1.1 : Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)

7.15

-

-

... More
4.1.2 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1/2:3 (cement : 11/2 coarse sand : 3 graded stone aggregate 20 mm nominal size)

0.52

-

-

... More
5.9.16.1 : Centering and shuttering including strutting, etc. and removal of form for:Edges of slabs and breaks in floors and wallsUnder 20 cm wide

35.04

-

-

... More
13.1.1 : 12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)

28.59

-

-

... More
13.7.1 : 12 mm cement plaster finished with a floating coat of neat cement of mix:1:3 ( 1 cement : 3 fine sand)

9.61

-

-

... More
8.2.2.2 : Providing and fixing 18 mm thick gang saw cut, mirror, polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counters, window sills, facias and similar locations, of required size, approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 ( 1 cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch ups, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels.Area of slab over 0.50 sqm

10.31

-

-

... More
13.43.1 : Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer

3.2

-

-

... More
13.45.1 : Finishing walls with textured exterior pint of required shade:New work (Two or more coats applied @ 3.28 ltr/ 10 sqm ) over and including priming coat of exterior primer applied @ 2.20 kg/ 10 sqm

8.17

-

-

... More
13.60.1 : Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade:Two or more coats on new work

3.2

-

-

... More
LANDSCAPE DETAILS

-

-

-

... More
2.28.1 : Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.All kinds of soil

366.06

-

-

... More
4.6.1 : Providing and fixing at or near ground level precast cement concrete in kerbs, edgings etc. as per approved pattern and setting in position with cement mortar 1:3 (1 cement : 3 coarse sand), including the cost of required centering, shuttering complete.1:1.5:3 ( 1 cement : 1.5 coarse sand (Zone III): 3 graded stone aggregate 20 mm nominal size)

7.4

-

-

... More
16.91.1 : Providing and laying factory made chamfered edge Cement Concrete paver blocks in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colour & pattern over 50mm thick compacted bed of sand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand. complete all as per direction of Engineer-in-Charge.60mm thick cement concrete paver block of M-35 grade with approved colour, design & pattern.

265.1

-

-

... More
od353024/2022_2023 : Providing and laying Tandur stone in footpath, parks, lawns etc, of required strength, thickness & size/ shape, laid in required colour & pattern over 50mm thick compacted bed of sand, compacting and proper embedding/laying of Tandur stone into the sand bedding layer, filling the joints with sand and cutting of Tandur stone as per required size and pattern, finishing and sweeping extra sand. complete all as per direction of Engineer-in-Charge. (Modified DAR 16.91.1)

100.97

-

-

... More
od366323/2022_2023 : Sand Filling with river sand at children's play area with 22.5cm thick including supply of material, filling and preparing the surface.

2.25

-

-

... More
2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil

6.04

-

-

... More
60.7.1 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site

6.04

-

-

... More
7.1.1 : Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)

1.86

-

-

... More
50.6.1.1 : Solid block masonry using pre cast solid blocks ( factory made) of size 40x20x20cm or nearest available size confirming to IS 2185 part 1 of 1979 for foundation and plinth with thickness 20 cm and above in: CM 1:6 ( 1 cement : 6 coarse sand) etc complete

0.4

-

-

... More
50.6.1.2 : Solid block masonry using pre cast solid blocks (Factory made) of size 40x20x20cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level thickness 20cm and above in: CM 1:6 ( 1 cement: 6 coarse sand) etc complete.

1.23

-

-

... More
5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size

0.38

-

-

... More
5.9.16.1 : Centering and shuttering including strutting, etc. and removal of form for:Edges of slabs and breaks in floors and wallsUnder 20 cm wide

19.36

-

-

... More
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more

30.72

-

-

... More
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)

4.65

-

-

... More
od340682/2022_2023 : Cleaning the surface and removing dirt,dust,greese,oil,algae,fungus including washing the surface with the help of required srubbers and cleaning with machine operated water jet etc. Without causing any damage to the existing structure

31.18

-

-

... More
8.2.1.2 : Providing and fixing 18 mm thick gang saw cut, mirror, polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counters, window sills, facias and similar locations, of required size, approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 ( 1 cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch ups, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels.Area of slab over 0.50 sqm

21.64

-

-

... More
13.1.1 : 12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)

30.58

-

-

... More
13.16.1 : 6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand)

2.64

-

-

... More
13.45.1 : Finishing walls with textured exterior pint of required shade:New work (Two or more coats applied @ 3.28 ltr/ 10 sqm ) over and including priming coat of exterior primer applied @ 2.20 kg/ 10 sqm

10.1

-

-

... More
13.110.2 : Finishing walls with textured exterior paint of required shade :Old work (One or more coats) applied @ 1.82 ltr/10 sqm.

17.1

-

-

... More
13.43.1 : Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer

18.37

-

-

... More
13.60.1 : Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade:Two or more coats on new work

15.73

-

-

... More
od356191/2022_2023 : Maintenance work of existing electrical post.

7

-

-

... More
od356192/2022_2023 : Petty works at site, coolie

15

-

-

... More
13.52.2 : Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On concrete work

88.41

-

-

... More
od340343/2022_2023 : Supplying, Providing & placing of park seating benches with cast iron frame with wooden seating and of size 60" L, 16"W, 20" H at site with primer and required finishes of paint including loading, unloading, carriage etc.and as per direction of officer in charge.

9

-

-

... More
od366322/2022_2023 : Supplying and fixing ready made waste bins of 3 feet length and 22 inch width at<br>necessary location.

4

-

-

... More
GARDENING WORKS

-

-

-

... More
od338244/2022_2023 : Planting by excavating planting bed 45 cm deep at specified area shown in the planting plans and refilling the same with a thorough mix of good quality fertile soil, river sand, dried cow dung manure and leaf mould mixed in the ratio of 1:1:1:1, removal of rubbish and surplus earth if any, including lead, lift etc. as directed by the engineer in charge and supplying good healthy cuttings of groundcovers free of all pests and deceases from the source of availability including all conveyance, transported without any damage to the cuttings, covering, caring and protecting the groundcovers transported and unloaded at site. The Groundcovers have to be maintained for a period of 3 months after the entire planting is completed. The Rate shall include necessary labour, supply of materials, safe keep of GARDENEA ,40CM HEIGHT

10

-

-

... More
od338245/2022_2023 : Planting trees by Digging pit in all kinds of soil and refilling the same with a thorough mix of good quality fertile soil, river sand, dried cow dung manure and leaf mould mixed in the ratio of 1:1:1:1, removal of rubbish and surplus earth if any, including lead, lift etc. as directed by the engineer in charge and planting trees supplied with roots covered with appropriate natural containers from the source of availability including all conveyance, transported without any damage to the root pods, covering the stem with necessary hay etc., caring and protecting the plants transported and unloaded at site till planting in pits of size 120 cm diameter, and 120 cm deep, TERMINALIA VARIEGATED. Appropriate Length of softwood props shall be provided as supports for the plants as directed. The trees have to be maintained for a period of 3 months after the entire planting of trees is completed. The Rate shall include necessary labour, supply of materials, safe keep of plants, cost of conveyance, removal of rubbish and surplus earth etc. Complete.<br>TERMINALIA VARIEGATED 180CM

3

-

-

... More
od338246/2022_2023 : Planting HELICONIA PSITTACORUM by excavating planting bed 45 cm deep at specified area shown in the planting plans and refilling the same with a thorough mix of good quality fertile soil, river sand, dried cow dung manure and leaf mould mixed in the ratio of 1:1:1:1, removal of rubbish and surplus earth if any, including lead, lift etc. as directed by the engineer in charge and supplying good healthy cuttings free of all pests and deceases from the source of availability including all conveyance, transported without any damage to the cuttings, covering, caring and protecting the plants transported and unloaded at site. The plants have to be maintained for a period of 3 months after the entire planting is completed. The Rate shall include necessary labour, supply of materials, safe keep of plants, cost of conveyance, removal of rubbish and surplus earth etc. Complete.<br>45cm height

32

-

-

... More
od338247/2022_2023 : Planting trees by Digging pit in all kinds of soil and refilling the same with a thorough mix of good quality fertile soil, river sand, dried cow dung manure and leaf mould mixed in the ratio of 1:1:1:1, removal of rubbish and surplus earth if any, including lead, lift etc. as directed by the engineer in charge and planting trees supplied with roots covered with appropriate natural containers from the source of availability including all conveyance, transported without any damage to the root pods, covering the stem with necessary hay etc., caring and protecting the plants transported and unloaded at site till planting in pits of size 120 cm diameter, and 120 cm deep, FOX TAIL PALM . Appropriate Length of softwood props shall be provided as supports for the plants as directed. The trees have to be maintained for a period of 3 months after the entire planting of trees is completed. The Rate shall include necessary labour, supply of materials, safe keep of plants, cost of conveyance, removal of rubbish and surplus earth etc. Complete.<br>FOX TAIL PALM 3M

6

-

-

... More
od338248/2022_2023 : Planting FICUS PANDA PLANTS by excavating planting bed 45 cm deep at specified area shown in the planting plans and refilling the same with a thorough mix of good quality fertile soil, river sand, dried cow dung manure and leaf mould mixed in the ratio of 1:1:1:1, removal of rubbish and surplus earth if any, including lead, lift etc. as directed by the engineer in charge and supplying good healthy cuttings of groundcovers free of all pests and deceases from the source of availability including all conveyance, transported without any damage to the cuttings, covering, caring and protecting the groundcovers transported and unloaded at site. The Groundcovers have to be maintained for a period of 3 months after the entire planting is completed. The Rate shall include necessary labour, supply of materials, safe keep of Groundcovers, cost of conveyance, removal of rubbish and surplus earth etc. Complete.<br>90cm height

28

-

-

... More
od338249/2022_2023 : Planting ALPINIA PLANTS by excavating planting bed 45 cm deep at specified area shown in the planting plans and refilling the same with a thorough mix of good quality fertile soil, river sand, dried cow dung manure and leaf mould mixed in the ratio of 1:1:1:1, removal of rubbish and surplus earth if any, including lead, lift etc. as directed by the engineer in charge and supplying good healthy cuttings of groundcovers free of all pests and deceases from the source of availability including all conveyance, transported without any damage to the cuttings, covering, caring and protecting the groundcovers transported and unloaded at site. The Groundcovers have to be maintained for a period of 3 months after the entire planting is completed. The Rate shall include necessary labour, supply of materials, safe keep of Groundcovers, cost of conveyance, removal of rubbish and surplus earth etc. Complete.<br>30cm height

7

-

-

... More
od338250/2022_2023 : Planting trees by Digging pit in all kinds of soil and refilling the same with a thorough mix of good quality fertile soil, river sand, dried cow dung manure and leaf mould mixed in the ratio of 1:1:1:1, removal of rubbish and surplus earth if any, including lead, lift etc. as directed by the engineer in charge and planting trees supplied with roots covered with appropriate natural containers from the source of availability including all conveyance, transported without any damage to the root pods, covering the stem with necessary hay etc., caring and protecting the plants transported and unloaded at site till planting in pits of size 120 cm diameter, and 120 cm deep, ARECA PALM 1.80 M HEIGHT . Appropriate Length of softwood props shall be provided as supports for the plants as directed. The trees have to be maintained for a period of 3 months after the entire planting of trees is completed. The Rate shall include necessary labour, supply of materials, safe keep of plants, cost of conveyance, removal of rubbish and surplus earth etc. Complete.<br>ARECA PALM 1.80 M HEIGHT

11

-

-

... More
od338251/2022_2023 : Planting Buffalo grass by excavating planting bed 30 cm deep at specified area shown in the planting plans and preparing the same with thorough mix of good quality fertile soil, river sand, dried cow dung manure and leaf mould mixed in the ratio of 1:1:1:1, removal of rubbish and surplus earth if any, including lead, lift etc. as directed by the engineer in charge and supplying and planting Grass Buffalo grass sod, machine cut at a uniform soil thickness of 15 mm, plus or minus 6 mm, at the time of cutting, measurement for thickness shall exclude top growth and thatch. Individual pieces of Buffalo grass sod shall<br>be cut to the supplier’s standard width and length. Maximum allowable deviation from standard widths and lengths shall be plus or minus 15 mm on width and plus or minus five percent on length. Broken pads and torn or uneven ends will not be acceptable. Standard size sections of Buffalo grass sod shall be strong enough that it can be picked up and handled without damage. Buffalo grass sod shall not be harvested or transplanted when its moisture content (excessively dry or wet) may adversely affect its survival. Before<br>harvesting, the turfgrass shall be mowed uniformly at a height of 25 to 60 mm on winter season grasses and 20 to 40 mm on summer season. Grass turfgrass sod should be transported unloaded at site with care and protection and without any damage. The planted Grass turf grass have to be maintained for a period of 3 months after the entire planting is completed. The Rate shall include necessary labour, supply of materials, safe keep of Grass , cost of conveyance, removal of rubbish and surplus earth etc. Complete.<br>Details of cost for 10 sqm.

893.74

-

-

... More
od338252/2022_2023 : Planting EUGINIA PLANTS by excavating planting bed 45 cm deep at specified area shown in the planting plans and refilling the same with a thorough mix of good quality fertile soil, river sand, dried cow dung manure and leaf mould mixed in the ratio of 1:1:1:1, removal of rubbish and surplus earth if any, including lead, lift etc. as directed by the engineer in charge and supplying good healthy cuttings free of all pests and deceases from the source of availability including all conveyance, transported without any damage to the cuttings, covering, caring and protecting the plants transported and unloaded at site. The plants have to be maintained for a period of 3 months after the entire planting is completed. The Rate shall include necessary labour, supply of materials, safe keep of plants, cost of conveyance, removal of rubbish and surplus earth etc. Complete.<br>EUGINIA PLANTS 90 cm

15

-

-

... More
od338253/2022_2023 : Planting BROAD LEAF LADY PALM by excavating planting bed 45 cm deep at specified area shown in the planting plans and refilling the same with a thorough mix of good quality fertile soil, river sand, dried cow dung manure and leaf mould mixed in the ratio of 1:1:1:1, removal of rubbish and surplus earth if any, including lead, lift etc. as directed by the engineer in charge and supplying good healthy cuttings of ground covers free of all pests and deceases from the source of availability including all conveyance, transported without any damage to the cuttings, covering, caring and protecting the ground covers transported and unloaded at site. The Ground covers have to be maintained for a period of 3 months after the entire planting is completed. The Rate shall include necessary labour, supply of materials, safe keep of Ground covers, cost of conveyance, removal of rubbish and surplus earth etc. Complete.<br>45cm height

21

-

-

... More
od338254/2022_2023 : Planting PHILODENDRON SELLOUM by excavating planting bed 45 cm deep at specified area shown in the planting plans and refilling the same with a thorough mix of good quality fertile soil, river sand, dried cow dung manure and leaf mould mixed in the ratio of 1:1:1:1, removal of rubbish and surplus earth if any, including lead, lift etc. as directed by the engineer in charge and supplying good healthy cuttings free of all pests and deceases from the source of availability including all conveyance, transported without any damage to the cuttings, covering, caring and protecting the plants transported and unloaded at site. The plants have to be maintained for a period of 3 months after the entire planting is completed. The Rate shall include necessary labour, supply of materials, safe keep of plants, cost of conveyance, removal of rubbish and surplus earth etc. Complete.<br>40cm height

41

-

-

... More
od338255/2022_2023 : Planting trees by Digging pit in all kinds of soil and refilling the same with a thorough mix of good quality fertile soil, river sand, dried cow dung manure and leaf mould mixed in the ratio of 1:1:1:1, removal of rubbish and surplus earth if any, including lead, lift etc. as directed by the engineer in charge and planting trees supplied with roots covered with appropriate natural containers from the source of availability including all conveyance, transported without any damage to the root pods, covering the stem with necessary hay etc., caring and protecting the plants transported and unloaded at site till planting in pits of size 120 cm diameter, and 120 cm deep, PLUMARIA OBTUSA - 2.5 M . Appropriate Length of softwood props shall be provided as supports for the plants as directed. The trees have to be maintained for a period of 3 months after the entire planting of trees is completed. The Rate shall include necessary labour, supply of materials, safe keep of plants, cost of conveyance, removal of rubbish and surplus earth etc. Complete.<br>PLUMARIA OBTUSA - 2.5 M

5

-

-

... More
od338256/2022_2023 : Planting CANNA INDICA PLANTS by excavating planting bed 45 cm deep at specified area shown in the planting plans and refilling the same with a thorough mix of good quality fertile soil, river sand, dried cow dung manure and leaf mould mixed in the ratio of 1:1:1:1, removal of rubbish and surplus earth if any, including lead, lift etc. as directed by the engineer in charge and supplying good healthy cuttings free of all pests and deceases from the source of availability including all conveyance, transported without any damage to the cuttings, covering, caring and protecting the plants transported and unloaded at site. The plants have to be maintained for a period of 3 months after the entire planting is completed. The Rate shall include necessary labour, supply of materials, safe keep of plants, cost of conveyance, removal of rubbish and surplus earth etc. Complete.<br>30cm height

22

-

-

... More
PLUMBING WORKS

-

-

-

... More
18.51.1 : Providing and fixing C.P. brass long body bib cock of approved quality conforming to IS standards and weighing not less than 690 gms.15 mm nominal bore

3

-

-

... More
50.17.1.1 : Supplying and fixing Stainless steel soap dish including cost of materials and labour charges etc complete as per the direction of site Engineer-in-charge.

1

-

-

... More
50.17.1.2 : Supplying and fixing CP Towel rod 45cm or nearest available length including cost of materials and labour charges etc complete as per the direction of site Engineer-in-charge.

1

-

-

... More
50.17.1.4 : Supplying and fixing CP Health faucet good quality including cost of materials and labour charges etc. complete as per the direction of site engineer-in-charge.

2

-

-

... More
od352744/2022_2023 : Supply, installation and commisiioining charges for Floor Drain Outlets including, accessories, bolts/screws, washers, etc. as applicable, complete including making good the wall as per Architectural drawings and as relevant standards.<br>125X125 1.2mm thick SS 304 grade lockable type floor drain

2

-

-

... More
17.3.1 : Providing and fixing white vitreous china pedestal type water closet (European type) with seat and lid, 10 litre low level white vitreous china flushing cistern & C.P. flush bend with fittings & C.I. brackets, 40 mm flush bend, overflow arrangement with specials of standard make and mosquito proof coupling of approved municipal design complete, including painting of fittings and brackets, cutting and making good the walls and floors wherever required :W.C. pan with ISI marked white solid plastic seat and lid

2

-

-

... More
17.7.1 : Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar taps, 32 mm C.P. brass waste of standard pattern, including painting of fittings and brackets, cutting and making good the walls wherever require:White Vitreous China Wash basin size 630x450 mm with a pair of 15 mm C.P. brass pillar taps

1

-

-

... More
18.52.1 : Providing and fixing C.P brass stop cock ( concealed) of standard design and of approved make conforming to IS: 893115 mm nominal bore

1

-

-

... More
18.53.1 : Providing and fixing C.P. brass angle valve for basin mixer and geyser points of approved quality conforming to IS: 893115 mm nominal bore

1

-

-

... More
18.7.3 : Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer -in-Charge. Internal work - Exposed on wall25 mm nominal outer dia pipes

5

-

-

... More
18.7.4 : Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer -in-Charge. Internal work - Exposed on wall32 mm nominal outer dia pipes

5

-

-

... More
18.8.2 : Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes& fittings, with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer-in-Charge. Concealed work, including cutting chases and making good the wall etc.20 mm nominal outer dia pipes

5

-

-

... More
18.8.3 : Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes& fittings, with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer-in-Charge. Concealed work, including cutting chases and making good the wall etc.25 mm nominal outer dia pipes

1

-

-

... More
18.9.2 : Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings. This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching , refilling & testing of joints complete as per direction of Engineer- in-Charge. External work20 mm nominal outer dia pipes

80

-

-

... More
18.9.3 : Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings. This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching , refilling & testing of joints complete as per direction of Engineer- in-Charge. External work25 mm nominal outer dia pipes

25

-

-

... More
18.9.4 : Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings. This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching , refilling & testing of joints complete as per direction of Engineer- in-Charge. External work32 mm nominal outer dia pipes

35

-

-

... More
od351304/2022_2023 : Supply, installation, testing & commissioning of Water lifting pump, with pumps (2 nos on a 1duty + 1 standby basis) with control panel,automatic changeover switch, with all necessary valves, flexible connections, pressure gauges, strainers, supports, fixings and fittings electrical/ control panels, power and control cabling , cable trays, automatic level controller, etc. as specified and as shown on drawings and complying to relevant standards. <br>Duty conditions:- 90LPM @ 30 M Head (One Duty + One standby) (WTP-01)

1

-

-

... More
18.17.1A : Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) :20 mm nominal bore

2

-

-

... More
18.17.1 : Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) :25 mm nominal bore

2

-

-

... More
od351395/2022_2023 : Supply, installation, testing and commissioning of high pressure float valve with bronze construction, brass floats, with screwed end fittings with all supports and fixings all as specified and as shown on drawings and complying to relevant standards<br>32mm dia

1

-

-

... More
od351396/2022_2023 : Supply, installation, testing and commissioning of high pressure float valve with bronze construction, brass floats, with screwed end fittings with all supports and fixings all as specified and as shown on drawings and complying to relevant standards<br>20mm dia

1

-

-

... More
od351591/2022_2023 : Supply, installation, testing and commissioning of spring loaded, vertical mounted brass air release valve with forged brass body, forged brass chamber, with screwed end fittings with all supports and fixings all as specified and as shown on drawings and complying to relevant standards<br>20 mm automatic air release valve

1

-

-

... More
od338745/2022_2023 : Providing and placing a polyethylene water storage tank :ISI 12701 marked,in UG tank with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank. Ref . OD 18.48

3000

-

-

... More
18.61.4 : Providing and fixing C.I dirt box strainer for bulk type water meter with nuts, bolts, rubber insertions etc. complete conforming to IS : 2373 :20 mm dia

1

-

-

... More
18.37.1 : Constructing masonry chamber 60x45x50 cm inside, in brick work in cement mortar 1:4 ( 1 cement : 4 coarse sand) for water meter complete with C.I double flap surface box 400x200x200 mm ( inside ) with locking arrangement and RCC top slab 1:2:4 mix ( 1 cement : 2 coarse sand : 4 grades stone aggregate 20 nominal size), i/c necessary excavation, foundation concrete 1:5:10 ( 1 cement : 5fine sand : 10 graded stone aggregate 40 mm nominal size) and inside plastering with cement mortar 1:3 ( 1 cement : 3 coarse sand) 12 mm thick, finished with a floating coat of neat cement complete as per standard design:With common burnt clay F.P.S. ( non modular ) bricks of class designation 7.5

1

-

-

... More
18.48 : Providing and placing on terrace (at all floor levels) polyethylene water storage tank :ISI 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank.

500

-

-

... More
50.18.8.8.2 : Providing and fixing PVC pipes, fittings, including fixing the pipe with clamps at 1.00 m spacing. this includes jointing of pipes with one step PVC solvent cement and testing of joints complete as per the direction of Engineer-in-Charge. Concealed work, including cutting chases and making good the wall etc. 75 mm pipe 4 kgf/cm2

3

-

-

... More
50.18.9.6.2 : Providing and fixing PVC pipes includings jointing of pipes with one step PVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. 50 mm dia 6 Kgf/cm2

5

-

-

... More
50.18.9.8.1 : Providing and fixing PVC pipes includings jointing of pipes with one step PVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. 75 mm dia 6 Kgf/ cm2

5

-

-

... More
50.18.9.9.1 : Providing and fixing PVC pipes includings jointing of pipes with one step PVC solvent cement, trenching, refilling & testing of Joints complete as per direction of engineer in charge.110 mm dia 6Kgf/cm2

15

-

-

... More
od352714/2022_2023 : Supply, Installation, testing and commissioning of drainage fixtures and accessories including cutting and making good the wall/slab all in accordance with the drawings and relevant standards.<br>Floor trap 100 mm dia

2

-

-

... More
19.7.1.2 : Constructing brick masonry manhole in cement mortar 1:4 ( 1 cement : 4 coarse sand) with R.C.C. top with 1:2:4 mix (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size), foundation concrete 1:4:8 mix ( 1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size,) inside plastering 12 mm thick with cement mortar 1:3 ( 1 cement : 3 coarse sand) finished with floating coat of neat cement and making channels in cement concrete 1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size ) finished with a floating coat of neat cement complete as per standard design:Inside size 90x80 cm and 45 cm deep including C.I. cover with frame (light duty) 455x610 mm internal dimensions, total weight of cover and frame to be not less than 38 kg (weigh of cover 23 kg and weight of frame 15 kg):With Sewer bricks conforming to IS : 4885

2

-

-

... More
19.4.1.2 : Providing and fixing square-mouth S.W. gully trap class SP -1 complete with C.I. grating brick masonry chamber with water tight C.I. cover with frame of 300x300 mm size (inside) the weight of cover to be not less than 4.50 kg and frame to be not less than 2.70 kg as per standard design:100x100 mm size P typeWith Sewer bricks conforming to IS: 4885

1

-

-

... More
od338832/2022_2023 : Supply and fixing of CI manhole frame and cover of lockable type ( Double Sealed ) over openings of under ground sump, overhead tank,rain water Sump, soak pits.<br>600X600 Manhole cover with medium duty

5

-

-

... More
19.32.1 : Making soak pit 2.5 m diameter 3.0 metre deep with 45 x 45 cm dry brick honey comb shaft with bricks and S.W. drain pipe 100 mm diameter, 1.8 m long complete as per standard design.With common burnt clay F.P.S. (non modular) bricks of class designation 7.5

1

-

-

... More
51.19.ST3 : Supplying and installing ready made PVC Septic tank including the cost of carriage, trenching, placing at the level below ground level as specified as per the direction of engineer in charge (Provision for CC/RCC/Sand/06mm aggregate for the preparation of bed shall be paid separately)br 3. 25 to below 35 flush capacity

1

-

-

... More
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil

10.94

-

-

... More
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)

0.58

-

-

... More
6.1.1 : Brick work with common burnt clay F.P.S (non modular) bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:4 (1 cement : 4 coarse sand)

2.9

-

-

... More
5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size

0.86

-

-

... More
5.9.16.1 : Centering and shuttering including strutting, etc. and removal of form for:Edges of slabs and breaks in floors and wallsUnder 20 cm wide

9.6

-

-

... More
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more

69.12

-

-

... More
CHILDRENS PLAY EQUIPMENT

-

-

-

... More
od354630/2022_2023 : Supplying and fixing childrens play equipment circular climber TC04 at site as instructed by concerned Architect / Engineer including transportation, fixing etc. complete.

1

-

-

... More
od354642/2022_2023 : Supplying and fixing childrens play equipment Seesaw SE01 at site as instructed by concerned Architect / Engineer including transportation, fixing etc. complete.

1

-

-

... More
od354643/2022_2023 : Supplying and fixing childrens play equipment Climber TC01 at site as instructed by concerned Architect / Engineer including transportation, fixing etc. complete.

1

-

-

... More
od366202/2022_2023 : Supplying and fixing sliding equipment for children's at site as instructed byconcerned Architect / Engineer including transportation, fixing etc. complete.<br>SL01

1

-

-

... More
OPEN GYM EQUIPMENTS

-

-

-

... More
od339433/2022_2023 : Supplying, Providing & placing of Outdoor Surf board at site with primer and required finishes of paint including loading, unloading, carriage etc.and as per direction of officer in charge.

1

-

-

... More
od339434/2022_2023 : Supplying, Providing & placing of Outdoor Single cross trainer at site with primer and required finishes of paint including loading, unloading, carriage etc.and as per direction of officer in charge.

2

-

-

... More
od339435/2022_2023 : Supplying, Providing & placing of Outdoor Seat twister at site with primer and required finishes of paint including loading, unloading, carriage etc.and as per direction of officer in charge.

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.