The Fertilisers And Chemicals Travancore Limited Tender

Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

The Fertilisers And Chemicals Travancore Limited - FACT Tender

Services
Machinery and Tools
Eprocure
Opening Date29 Jan 2020
Closing Date17 Feb 2020
Tender Amount₹ 2,99,500 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Rectification of overflow in CI trays inside IAT. Work involves:- The overflow of acid from all 07 numbers of CI trays inside IAT shall be rectified by fabricating and fixing Alloy20 / 316L plates, as per the instruction of the site engineer in charge. The plates shall be cut to size, after taking necessary measurements to fix upon CI trays in order to completely avoid overflow of acid from the trays. At least 5 Number of plates shall be fixed / required in each tray. Totally, minimum 35 Nos. of plates shall be fixed / required.

1

-

-

... More
Dismantling and refixing of relief valves and steam valves. a) Dismantling relief / safety valves of various vessels from position, transport the valves to work shop for reconditioning / testing and transport back, fixing in position with new gaskets, bolts nuts / studs etc. The number of valves dismantled will be as per the request from process department duly forwarded through mechanical maintenance department. List of valves : HP:- W4 outlet-2, W6 outlet-2, Steam drum-2, Rv-6 Ph-1 Header- 1, super heater outlet- 2 MP:- RV1 8ATA header-1, RV3 8ATA melter –1, RV2 NPK 5 ATA-1, LP:- De-aerator –1, MAB exhaust –2, BFW turbine exhaust –1, 4ATA melter-1.

17

-

-

... More
Inspection and repair of IAT & FAT dilution water lines. Inspection / removal, repair / replacement of dilution water assembly in IAT and FAT including line modification if required.(1 No is 1 vessel)

2

-

-

... More
Dismantling and Refixing of Valves I. Dismantling of the following valves from position, transport the valves to the workshop, fixing back in the system with new gasket, bolt-nuts etc.The number of valves dismantled will be as per the request from process department duly forwarded through mechanical maintenance department. 1. Startup steam NRV(1) 200 NB 2. Super heater NRV(1) 3. Steam vent line Isolation valve 200 NB - 2 Nos. 4. Start up I/V 200 NB (1 No.) (Temporary blinds shall be provided wherever necessary)

5

-

-

... More
Dismantling and Refixing of Valves II. Dismantling of the following valves from position, transport the valves to the workshop, fixing back in the system with new gasket, bolt-nuts etc.The number of valves dismantled will be as per the request from process department duly forwarded through mechanical maintenance department. 1. Boiler feed water NRV and Isolation valve1 each) 80 NB (Temporary blinds shall be provided wherever necessary).

2

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.