Directorate Of Archaeology Tender

Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Directorate Of Archaeology Tender

Works
Civil And Construction
Eprocure
Opening Date31 Dec 2022
Closing Date16 Jan 2023
Tender Amount₹ 16,61,908 
Notes
Download

Costs

Summary

Repair Works To Bamboo Huts, Bamboo Bridges And Ancillary Structures In The Premises Of The Protected Monument, Rock Cut Temple, Madavoorpara, Thiruvananthapuram, 2022-23

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Dismantling thatching carefully without damages and stacking the same to a convenient place for reuse as directed by the departmental officer at site.

463.22

-

48.6

... More
Dismantling decayed / damaged reeper of thatching and stacking them in a convenient place as directed by the departmental officer at site.

1200

-

4.85

... More
Dismantling and removing hand rails made by bamboo in the bridge; including cutting and removing bolts and nuts, screws and stacking serviceable materials and disposing un serviceable materials within a lead of 100 m as per the direction of the departmental officer at site etc complete.

30

-

75.45

... More
Dismantling existing split bamboos fixed over the path way of bridge as floor; including removing screws and stacking serviceable materials and disposing unserviceable materials within a distance of 100 m as per the direction of the departmental officer at site, etc. complete.

11.25

-

226.3

... More
Dismantling damaged/decayed bamboo post of pathways and huts; including cuting & removing bolt & nuts, demolishing cement concrete base without damages to the existing structure as per the direction of the departmental officer at site etc. complete.

12

-

245.35

... More
Dismantling hard bamboo hand rails and combined trellies provided in huts; including cutting and removing bolts and nuts etc. and stacking the serviceable materials and disposing unserviceable material within a distance of 100 m as directed by the departmental officer at site etc. complete.

231

-

64.95

... More
Dismantling damaged/decayed bamboo benches, seats, back rests etc. including cutting and removing bolts & nuts, screws etc. and removing all members in piece by piece for reuse and stacking serviceable materials and disposal of unserviceable material within a distance of 100 m as directed by the departmental officer at site etc. complete.

25.2

-

389.65

... More
Chemical seasoning the bamboo poles prior to fixing in positions, after making temporary pit and covering it with tarpaulin over PVC sheet; filling it with potable water and with 4.40 gm borax powder / litre of water and 4.00 gm boric acid / litre of water; immersing the poles in to the solution after drilling necessary holes between all the joints of bamboos to make the solution enter inside,keeping the same for two weeks for proper treating, including all cost of materials and labour charges etc. complete as directed by the departmental officer at site.

1000

-

85

... More
Providing and fixing hand rails at bamboo hut with 30 % new hard bamboo and 70 % departmental bamboo; filling joints with saw dust and synthetic resin adhesive and making good the floor and wall including all cost of materials and labour charges etc. complete as directed by the departmental officer at site.

24

-

1319.75

... More
Providing and fixing posts to hold the structure; with hard bamboo covered in the bottom with virgin PVC sheet to prevent decay; embedded in cement concrete 1:2:4 (1 cement Coarse sand : 4 graded stone aggregate of size 20 mm nominal size) filling joints with saw dust and synthetic resin adhesive including all costs of materials, transportation labour charges etc. complete as directed by the departmental officer at site

43.2

-

651.3

... More
Providing and fixing wall plates, rafters etc. on huts using hard bamboo; fixing with threaded bolts, nuts and washers as per the direction of the departmental officer at site including all cost and labour charges etc. complete.

46

-

542.7

... More
Reepering with 1/6 th vertically splited normal bamboo reeper for fixing coconut pealed cadjans with 75 mm self threaded screws including all cost of materials and labour charges etc. complete as per the direction of the departmental officer at site.

1200

-

72.45

... More
Thatching roof with 50 % new and 50 % old departmental pealed coconut cadjans including cost of materials and labour charges, conveyance etc. complete as per the direction of the departmental officer at site

463.22

-

168.55

... More
Providing and fixing tarpaulin, 50 % departmental and 50 % new over thatched roof as water proofing media; tying to roofmembers with 14 gauge copper wire wherever necessary,as per the direction of the departmental officer at site.

463.22

-

206.55

... More
Trellising over the roof with 1/6th vertically splited normal bamboo reepers 50 cm c/c on both ways; fixing with wire nails including cost and conveyance of all materials and labour charges etc. complete as per the direction of the departmental officer at site.

487.48

-

232.15

... More
Trellising over the roof with 1/6th vertically splited departmental normal bamboo reepers 50 cm c/c on both ways; fixing with wire nails including cost and conveyance of all materials and labour charges etc. complete as per the direction of the departmental officer at site.

926.43

-

51

... More
Covering the roof with dry grass in bundles with a minimum thickness of 7.5 cm after laying; tying the bundles to roof members with 14 gage copper wire at appropriate places including all cost of materials and labour charges etc complete as per the direction of the departmental officer at site.

487.48

-

592.75

... More
Providing and fixing bridge platform with 1/3rd of vertically splited normal bamboo at necessary areas; fixing the same with 75mm self threaded bolt nut and washer including all cost of materials and labour charges etc complete as per the direction of the departmental officer at site.

60

-

167.3

... More
Protecting the edges of bamboo pathway using 1/3rd vertically split bamboo placed along the direction of pathway; with 75mm self thread screw including all cost and conveyance of materials and labour charges etc complete as per the direction of the departmental officer at site.

60

-

157.95

... More
Providing and fixing handrails using 8 cm dia (avg) normal bamboo, verticals @ 75 cm c/c 77 cm long and 5 nos intermediate diagonals, 5 cm dia (avg) alternately in various lengths; fixing the same with self thread bolt and nuts and finishing the joints with saw dust and synthetic resin adhesive including all costs of materials, transportation labour charges etc. complete as directed by the departmental officer at site.

30

-

1706

... More
Providing and fixing seating and its supports at huts with 60 % departmental and 40 % new hard bamboos, 4 nos horizontals at top, bottom and intermediate; and legs at front and rear with 60 cm height, inclined legs supported with post of 50 cm long and cross of 1m long for fixing seat and the back with 1/4th vertically splited bamboo; fixing all the same with threaded bolts and nuts, 63mm self threaded screw etc, finishing joints with saw dust and resin including cost and conveyance of all materials and labour charges etc. complete as directed by the departmental officer at site.

25.2

-

2850.7

... More
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade. Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture.

619.65

-

208.55

... More
Dismantling barbed wire or flexible wire rope in fencing including making rolls and stacking within 50 meters lead.

74.52

-

30.9

... More
Dismantling G.I and PVC coated chain link fencing of protected area where it had fallen off and stacking the same within 100 meters lead as directed by the departmental officer at site.

39

-

30.15

... More
Fencing with barbed wire 9.38 kg / 100 m (minimum) between the post fixed with G.I staples , turn buckles etc. complete.

820

-

22.45

... More
Providing and fixing G.I chain link fabric fencing made of G.I wire 4 mm in mesh size 50 x 50 mm including strengthening with 2 mm dia wire or nuts, bolts, band washers as required in place of damaged PVC chain link and G.I chain link etc. complete as per the direction of Engineer-in-charge.

87.5

-

938.4

... More
Providing and fixing 32 mm dia PVC waste pipe for sink or wash basin including PVC waste pipe fittings etc. complete.

4

-

103.25

... More
Supplying and fixing CP Health faucet good quality including cost of materials and labour charges etc. complete.

4

-

1026.8

... More
Finishing walls with Premium Acrylic smooth exterior paint with silicon additives of required shade old work (one or more coats applied @ 0.83 /tr / 10 sqm).

261.6

-

78.85

... More
Documentation of the monument in the form of photos before, during and after the conservation work for future references.

1

-

10000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.