Department Of Ports Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 50,000Document Cost
₹ 2,975Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_DoP_322471_1Bid Award Id
ViewTender No
PD/POB/C1-1269/17/10/2019-20Tender Authority
Department Of Ports ViewPurchaser Address
-Website
http://etenders.kerala.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
od98/2017_2018 : Removing the thickly formed oyster coating and other vegetable growth from the underwater portion of the vessel including cleaning the surface etc. complete as per the direction and satisfaction of department officers <br>
135
-
-
od99/2017_2018 : Chipping scrapping and cleaning the complete surface of the vessel body, machineries pipelines and other accessories of the vessel body as per the direction of dept officers<br>
1000
-
-
od100/2017_2018 : Gauging the thickness of the plates, beam, frame etc. at different portion of the vessel using, ultrasonic thickness gauge after chipping, scrapping and filing the surface to about 50 mm dia and pasting grease/ oil over it as per the direction of department officers.<br>
300
-
-
Plate Work and Anode fixing work
-
-
-
od103/2017_2018 : Cutting and removing the old damaged, weakened, severely damaged various thickness ms plate/ms flat/ms angles/ms rods/ beams/ girders etc. marked by dept officers in various places of the vessel without damaging any other portion/ structures/ member on the vessel as per the direction of department officers. <br>
200
-
-
od104/2017_2018 : Supplying and welding with new various thickness maine quality ms plate/ ms angle/ ms flat/ ms rod/ beam/ gazette of existing size and shape to the various portions on the vessel's already removed damaged portion of the after heating and bending into shape, V cut on the matting edge of the plate and welding three layer on both sides together. The rate including the cost of materials, welding charges, tools, plants, scaffolding, other incidental expenses etc. complete as per the direction of department officers.<br>
30
-
-
od105/2017_2018 : Supplying and fitting by welding zinc anode weighting 2.5 kg (excluding the weight of bracket) with bracket on the underwater portion of the hull if damaged/distorted the existing anodes complete as per the direction of department officers.<br>
20
-
-
Painting and Varnishing work
-
-
-
od192/2017_2018 : Supplying and painting with approved (quality of entire quantity of primer supply should be get inspected and approved by engineer, who is in-charge of work/ department authority before starting/ continuation of the painting work) best quality (marine) yellow high rich zincromate metal primer 2 coats over all chipped surface after cleaning the surface etc. complete as per the direction of department officers.<br>
1000
-
-
od193/2017_2018 : Supplying and painting with approved (quality of entire quantity of poly urethane paint supply should be get inspected and approved by engineer, who is in-charge of work/ dept. authority before starting/ continuation of the painting work) poly urethane paint white or other approved colour 2 coats over the primer coat already done on vessel body, machinery, pipelines with colour code and other accessories etc. as per the direction and satisfaction of dept. officers.<br>
565
-
-
od194/2017_2018 : Supplying and painting with approved (quality of entire quantity of paint supply should be get inspected and approved by engineer, who is in-charge of work/ Department authority before starting/ continuation of the painting work) best quality Apoxy Coal Tar/ Vinyl guard paint (marine quality) over the primer applied surface after cleaning the surface as per the direction of department officers.<br>
300
-
-
od195/2017_2018 : For under water area copper slag /sand blasting to resist of corrosion as per the direction of departmental officers. <br>
135
-
-
od196/2017_2018 : Supplying and painting 2 coats to the underwater portion with anti fouling paint of reputed make (quality of entire quantity of anti fouling paint supply should be get inspected and approved by engineer, who is in-charge of work/ department authority before starting/ continuation of the painting work) over black paint already done etc. complete as per the direction of department officers.<br>
135
-
-
od197/2017_2018 : Supplying and varnishing with approved best quality Copal Varnish 2 coats over wheel house wooden paneling surface after cleaning the surface etc. complete as per the direction of department officers.<br>
13
-
-
Mast light work
-
-
-
od106/2017_2018 : Install a new ladder having length of 3meter and width of 0.3 meter width with ISF 16 X 6 mm thickfor the maintenance of navigational light, painting etc on the light mast over the wheel house of the vessel, as per the direction of department officials. <br>
1
-
-
od107/2017_2018 : Fix all the cables in the mast using aluminium u-clamb of suitable size on the wheel house such as navigational light, rudder, AS, GPS, VHF, etc, as per the direction of department officials. <br>
20
-
-
Water line work
-
-
-
od108/2017_2018 : Replace the existing damaged water tank installed over the wheel house with existing shape and capacity of reputed make and interconnect the same and repair the stand and install the same with additional ribs, as per the direction of department officials. <br>
2
-
-
od109/2017_2018 : Repair the existing water line connection to the wash basin installed over the outside of wheel house and refit the same with additional ribs, as per the direction of department officials. <br>
1
-
-
Curtain Work
-
-
-
od110/2017_2018 : Install new cotton curtain of good quality inside the wheel house by 3/4 " dia aluminium pipe for the protection of electronic equipments, as per the direction of department officials. <br>
10
-
-
od111/2017_2018 : Arrest the leaking of water entry to the wheel house through the glass joint, as per the direction of department officials. <br>
10
-
-
Mica and rubber beading work
-
-
-
od112/2017_2018 : Install the barometer supplied by the Department in the wheel house in a suitable position, as per the direction of the department officials. <br>
1
-
-
od113/2017_2018 : Replace all the damaged mica in the wheel hose, galley, crew room, officers room etc, in existing shape and colour as per the direction of department officlas. <br>
5
-
-
od114/2017_2018 : Renew all the damaged door rubber beading in the wheel house with existing size after leveling the door and make them watertight all as directed by the department officers.<br>
40
-
-
od116/2017_2018 : Renew the broken glass in the fire hose box with existing size and shape as directed by the department officers.<br>
1
-
-
Electrical wiring
-
-
-
od115/2017_2018 : Check all the electrical wiring in the tug, replace the defected holders, starters, bulbs, tubes, navigational lights, search lights, panel board, bells, motors, blowers etc. by new arrange all the DC and AC wiring properly etc. complete all as directed by department officers (The contractor should procure the defected items from the authorized dealer and submit the original dealer bill along with the contractor bill for its reimbursement. 15% of the cost of spares will be paid to the contractor as overhead charges for arranging these items. These procured as well as the replaced items should get inspected by the Engineer who is the in-charge of the work and the un serviceable/ old items should be returned to dept for realization of payment)<br>
1
-
-
Fender Work
-
-
-
od117/2017_2018 : Dismantle the existing rubber fender from position, replace the fender in existing shape and size and dimension, as per the direction of department officers. <br>
10
-
-
od118/2017_2018 : Replace the damaged Tyre fender in the existing position, shape, size and fix he same with proper fastening, as per the direction of Department officials. <br>
20
-
-
Portable fire pump work
-
-
-
od119/2017_2018 : Made the portable fire pump operational by providing new foot valve made of PVC and provide flexible hose of 2 inch diameter with 5 meter length and all the accessories, (The contractor should procure the defected items from the authorised dealer and submit the original dealer bill along with the contractor bill for its reimbursement. 15% of the cost of spares will be paid to the contractor as overhead charges for arranging these items. These procured as well as the replaced items should get inspected by the Engineer who is the in-charge of the work and the unserviceable/ old items should be returned to dept for realisation of payment) as per the direction of department officials.<br>
1
-
-
Fire extinguisher work
-
-
-
od120/2017_2018 : Renew two number 4.5 Kg CO2 type, eleven number 5 Kg ABC type and one number form type fire extinguishers on the vessel and mark the validity period on the extinguishers, all as per the direction of Department officers. <br>
1
-
-
Life raft and light smoke signal
-
-
-
od121/2017_2018 : Servicing of life raft and replace damaged accessories if any like Floating anchor, Pump, Thermal protective blanket, Paddles, Floating knife, Rescue quoit with line, Bailer, Sponge, Repair kit, Checkbook and life raft instructions manual, Survival instructions and signal card - Rain catching gutter on canopy, Rainwater collecting pouch, Water (quantity per person), Graduated cup, Food rations (quantity per person), Fishing kit, First aid kit, Seasickness pills person), Seasickness pouch (1/personS. Hand flares, SOLAS, Parachute rockets, SOLAS - Floating smoke, SOLAS, Chemical light sticks, Signalling mirror, Light on top of canopy, Retro-reflective tapes on canopy,Retro-reflective tapes on bottom (to spot capsized raft),Radar-reflecting tapes, Waterproof torch, Spare batteries and bulb for torch, Whistle etc are, and provide approval of IRS certificate, as per the direction of department officials. <br>
1
-
-
od122/2017_2018 : Replace the existing branded Light and smoke signal with makers all asnaderd fitting and accessories in the vessel with necessory certifcates as per the direction of department officials.<br>
2
-
-
od123/2017_2018 : Replace the Parachute Rocket in the vessel of reputed make with necessary certificate, as per the direction of department officials. <br>
6
-
-
od124/2017_2018 : Replace the Red hand flares in the vessel of reputed make with necessary certificate, as per the direction of department officials. <br>
4
-
-
od125/2017_2018 : Supply a new reflector light sticker to the existing life buoy of the vessel, as per the direction of department officials. <br>
2
-
-
Main engine work
-
-
-
od155/2017_2018 : Remove the main engine valve cover of CUMINS main engine and check the cause for the leaking of oil and arrest the same for the smooth operation of the engine. replacing all the damaged parts if any (The contractor should procure the spare parts required to make functional the engine from the authorized dealer and submit the original dealer bill along with the contractor bill for its reimbursement. 15% of the cost of spares will be paid to the contractor as overhead charges for arranging and supplying the spares. These procured spares as well as the replaced un serviceable/ old parts except consumable like O rings, rubber parts etc. should get inspected by the Engineer who is the in-charge of the work and these un serviceable/ old spares should be returned to dept for realization of payment If the spares are not available in market produce these items himself or its production should be arranged by the contractor. Cost of these items assessed by the Engineer is to be reimbursed with overhead of 15% as contractor's profit) Check the valve seat and check the valve tappet clearance, adjust the same if necessary for the smooth operation, Replace the gasket with original spare of CUMINS Engine, refill the engine oil of original grade as per the direction of Department Officers.and taken 10 hrs trial run, all are as per the direction and satisfaction of dept. officers.<br>
2
-
-
od156/2017_2018 : Dismantling the Main Engine fuel pump for overhauling, calibration, and fitting back in position after overhauling and calibration as per the direction of departmental officers (Overhauling & Calibration to be done in a reputed diesel service center with minimum 9 months service warranty. Cost of spares will be reimbursed against original bill of service center. The replacing spares as well as the replaced parts except consumable like O rings, rubber parts etc. should get inspected by the Engineer who is the in-charge of the work and these un serviceable/old spares should be returned to dept for realization of payment)<br>
2
-
-
od157/2017_2018 : Main engine fuel injectors to be overhauled pressure tested and fitted back as per the direction of the departmental officers. The rate includes only the labour charge.<br>
2
-
-
od184/2017_2018 : Dismantle the Heat exchanger, Clean and provide Provide flanged connection for the maintenance of the heat exchanger lines of both Port & Starboard side main engines, without damaging the other portions, as per the direction and satisfaction of the departmental officials. Replace the damaged spares if any (The contractor should procure the spare parts required to make functional the heat engine from the authorized dealer and submit the original dealer bill along with the contractor bill for its reimbursement. 15% of the cost of spares will be paid to the contractor as overhead charges for arranging and supplying the spares. These procured spares as well as the replaced un serviceable/ old parts except consumable like O rings, rubber parts etc. should get inspected by the Engineer who is the in-charge of the work and these un serviceable/ old spares should be returned to dept for realization of payment If the spares are not available in market produce these items himself or its production should be arranged by the contractor. Cost of these items assessed by the Engineer is to be reimbursed with overhead of 15% as contractor's profit) <br>
2
-
-
Chimney work
-
-
-
od159/2017_2018 : Provide a manhole on the Chimney for the maintenance purpose with cover and hinges, locking arrangement by nut and bolt of M12 with thermal insulation gasket on the chimney of the vessel and provide the ceramic fiber blanket insulation on the all the surface of the exhaust pipe lines inside both the chimney, as performed in the engine room by arresting the leakage of exhaust gas from the silencer of main engine through the inner side portion of chimney, as per the direction and satisfaction of the department officials. <br>
1
-
-
Hydraulic rudder system
-
-
-
od160/2017_2018 : Check the hydraulic rudder System of the vessel for arresting any leakages from the tank to the rudder compartment, check the quantity and quality of the hydraulic oil and replace any parts/oil if damaged and make the system efficient and operational,(The contractor should procure the spare parts required to make functional the rudder system from the authorized dealer and submit the original dealer bill along with the contractor bill for its reimbursement. 15% of the cost of spares will be paid to the contractor as overhead charges for arranging and supplying the spares. These procured spares as well as the replaced un serviceable/ old parts except consumable like O rings, rubber parts etc. should get inspected by the Engineer who is the in-charge of the work and these un serviceable/ old spares should be returned to dept for realization of payment If the spares are not available in market produce these items himself or its production should be arranged by the contractor. Cost of these items assessed by the Engineer is to be reimbursed with overhead of 15% as contractor's profit) as per the direction and satisfaction of department officials. <br>
1
-
-
Bilge connection and water leakage
-
-
-
od161/2017_2018 : Arrest the leaking of water entry to the engine room through the cable tray to the top cover of port side transformer installed, as per the direction and satisfaction of department officials. <br>
1
-
-
od162/2017_2018 : Provide a new bilge outlet connection from the deck for flushing the bilge water from the tank to out side to avoid bilge water enter to the deck by providing a flexible hose with suitable size and good quality for a length of 2 meter with hose end connections and hose clips, as per the direction and satisfaction of department officers. <br>
1
-
-
Cargo Winch and anchor
-
-
-
od163/2017_2018 : Repair the Cargo winch installed on the vessel and made the winch operational, (The contractor should procure the defected items from the authorized dealer and submit the original dealer bill along with the contractor bill for its reimbursement. 15% of the cost of spares will be paid to the contractor as overhead charges for arranging these items. These procured as well as the replaced items should get inspected by the Engineer who is the in-charge of the work and the un serviceable/ old items should be returned to dept for realization of payment)as per the direction and satisfaction f the department officials. <br>
1
-
-
od164/2017_2018 : Dismantling the anchor winch glow catch installed on the vessel, after resetting the same position, replace the spares if needed, make a trial run and make the same operational, as per the direction and satisfaction of department officials (The contractor should procure the defected items from the authorized dealer and submit the original dealer bill along with the contractor bill for its reimbursement. 15% of the cost of spares will be paid to the contractor as overhead charges for arranging these items. These procured as well as the replaced items should get inspected by the Engineer who is the in-charge of the work and the un serviceable/ old items should be returned to dept for realization of payment)<br>
1
-
-
od178/2017_2018 : Supply and provide a new anchor wench cover made of good quality of rexine made to a suitable shape by stitching and necessary fastenings with good quality thread, as per the direction ans satisfaction of department officials. <br>
1
-
-
Bilge repair
-
-
-
od165/2017_2018 : Repair the bilge suction line on the vessel and made the bilge pump operational, as per the direction and satisfaction of dept officials.(The contractor should procure the defected items from the authorized dealer and submit the original dealer bill along with the contractor bill for its reimbursement. 15% of the cost of spares will be paid to the contractor as overhead charges for arranging these items. These procured as well as the replaced items should get inspected by the Engineer who is the in-charge of the work and the un serviceable/ old items should be returned to dept for realization of payment)<br>
1
-
-
od166/2017_2018 : Repair the emergency bilge pump of GREAVES model installed at Engine Room and made the pump operational, as per the direction and satisfaction of department officials (The contractor should procure the defected items from the authorized dealer and submit the original dealer bill along with the contractor bill for its reimbursement. 15% of the cost of spares will be paid to the contractor as overhead charges for arranging these items. These procured as well as the replaced items should get inspected by the Engineer who is the in-charge of the work and the un serviceable/ old items should be returned to dept for realization of payment)<br>
1
-
-
Generator repair
-
-
-
od167/2017_2018 : Remove the engine valve cover of Diesel Generator No:1 of Ashok Lyland Make ALMG370/I, 68BHP, 50KVA Power engine and Check the valve seat and seat assembly and drain the sump of the engine fully by removing the drain plug and refill the engine oil of original grade and necessory bleeding have to be done and replace the oil filter with original spare included the cost of HSD oil and Engine oils (The contractor should procure the spare parts required to make functional the engine from the authorised dealer and submit the original dealer bill along with the contractor bill for its reimbursement. 15% of the cost of spares will be paid to the contractor as overhead charges for arranging and supplying the spares. These procured spares as well as the replaced unserviceable/ old parts except consumable like O rings, rubber parts etc. should get inspected by the Engineer who is the in-charge of the work and these un serviceable/ old spares should be returned to dept for realization of payment If the spares are not available in market produce these items himself or its production should be arranged by the contractor. Cost of these items assessed by the Engineer is to be reimbursed with overhead of 15% as contractor's profit) Replace the gasket with original spare of engine, as per the direction of Department Officers.and taken 10 hrs trial run, all are as per the direction and satisfaction of dept. officers.<br>
1
-
-
od168/2017_2018 : Remove the engine valve cover of Diesel Generator No:2 of Ashok Lyland Make ALMG370/I, 68BHP, 50KVA Power engine and Check the valve seat and seat assembly and drain the sump of the engine fully by removing the drain plug and refill the engine oil of original grade and necessory bleeding have to be done and replace the oil filter with original spare included the cost of HSD oil and Engine oils (The contractor should procure the spare parts required to make functional the engine from the authorised dealer and submit the original dealer bill along with the contractor bill for its reimbursement. 15% of the cost of spares will be paid to the contractor as overhead charges for arranging and supplying the spares. These procured spares as well as the replaced unserviceable/ old parts except consumable like O rings, rubber parts etc. should get inspected by the Engineer who is the in-charge of the work and these un serviceable/ old spares should be returned to dept for realization of payment If the spares are not available in market produce these items himself or its production should be arranged by the contractor. Cost of these items assessed by the Engineer is to be reimbursed with overhead of 15% as contractor's profit) Replace the gasket with original spare of engine, as per the direction of Department Officers.and taken 10 hrs trial run, all are as per the direction and satisfaction of dept. officers.<br>
1
-
-
od169/2017_2018 : Remove the engine valve cover of Diesel Generator No:3 of SIPSON Make S433 , 49BHP, 30KVA Power engine and Check the valve seat and seat assembly and drain the sump of the engine fully by removing the drain plug and refill the engine oil of original grade and necessary bleeding have to be done and replace the oil filter with original spare included the cost of HSD oil and Engine oils (The contractor should procure the spare parts required to make functional the engine from the authorised dealer and submit the original dealer bill along with the contractor bill for its reimbursement. 15% of the cost of spares will be paid to the contractor as overhead charges for arranging and supplying the spares. These procured spares as well as the replaced unserviceable/ old parts except consumable like O rings, rubber parts etc. should get inspected by the Engineer who is the in-charge of the work and these un serviceable/ old spares should be returned to dept for realization of payment If the spares are not available in market produce these items himself or its production should be arranged by the contractor. Cost of these items assessed by the Engineer is to be reimbursed with overhead of 15% as contractor's profit) Replace the gasket with original spare of engine, as per the direction of Department Officers.and taken 10 hrs trial run, all are as per the direction and satisfaction of dept. officers.<br>
1
-
-
Propeller Shaft
-
-
-
od170/2017_2018 : Removing the propeller with shaft and cutlass bushes from the vessel and dismantling the propeller from the propeller shaft etc. and renew the bushes and gland packing, bend checking and straightening the shaft, balancing and pitch correcting the propeller etc. all as per the direction of departmental officers.(The contractor should procure the spare parts required to make functional the shaft from the authorized dealer and submit the original dealer bill along with the contractor bill for its reimbursement. 15% of the cost of spares will be paid to the contractor as overhead charges for arranging and supplying the spares. These procured spares as well as the replaced un serviceable/ old parts except consumable like O rings, rubber parts etc. should get inspected by the Engineer who is the in-charge of the work and these un serviceable/ old spares should be returned to dept for realization of payment If the spares are not available in market produce these items himself or its production should be arranged by the contractor. Cost of these items assessed by the Engineer is to be reimbursed with overhead of 15% as contractor's profit)<br>
2
-
-
Sea chest and pipe lines
-
-
-
od171/2017_2018 : All the sea chests, sea chest strainers sea water box and sea chest valve is to be removed,cleaned and fitted back after replacing the damaged nuts and bolts and filters as per the direction of departmental officers. (The contractor should procure the spare parts required to make functional the valve from the authorized dealer and submit the original dealer bill along with the contractor bill for its reimbursement. 15% of the cost of spares will be paid to the contractor as overhead charges for arranging and supplying the spares. These procured spares as well as the replaced un serviceable/ old parts except consumable like O rings, rubber parts etc. should get inspected by the Engineer who is the in-charge of the work and these un serviceable/ old spares should be returned to dept for realization of payment If the spares are not available in market produce these items himself or its production should be arranged by the contractor. Cost of these items assessed by the Engineer is to be reimbursed with overhead of 15% as contractor's profit), this include cost of MS/Brass bolt and nut, cost of Brass Net, <br>
2
-
-
od172/2017_2018 : Check all the pipelines in the engine room of size such as 25 mm, including the waterline, fuel and oil line, replace the damaged pipe line if any with new B class GI pipe of existing size and good quality make the pipelines free from air for the smooth flow of sea water, bilging etc. also conduct a pressure test for the pipes, complete as directed by the Department officers.<br>
20
-
-
od173/2017_2018 : Check all the pipelines in the engine room of size such as 32 mm, including the waterline, fuel and oil line, replace the damaged pipe line if any with new B class GI pipe of existing size and good quality make the pipelines free from air for the smooth flow of sea water, bilging etc. also conduct a pressure test for the pipes, complete as directed by the Department officers.<br>
20
-
-
od174/2017_2018 : Check all the pipelines in the engine room of size such as 40 mm, including the waterline, fuel and oil line, replace the damaged pipe line if any with new B class GI pipe of existing size and good quality make the pipelines free from air for the smooth flow of sea water, bilging etc. also conduct a pressure test for the pipes, complete as directed by the Department officers.<br>
15
-
-
od175/2017_2018 : Check all the pipelines in the engine room of size such as 50 mm, including the waterline, fuel and oil line, replace the damaged pipe line if any with new B class GI pipe of existing size and good quality make the pipelines free from air for the smooth flow of sea water, bilging etc. also conduct a pressure test for the pipes, complete as directed by the Department officers.<br>
12
-
-
od176/2017_2018 : Check all the pipelines in the engine room of size such as 65 mm, including the waterline, fuel and oil line, replace the damaged pipe line if any with new B class GI pipe of existing size and good quality make the pipelines free from air for the smooth flow of sea water, bilging etc. also conduct a pressure test for the pipes, complete as directed by the Department officers.<br>
8
-
-
od177/2017_2018 : Check all the pipelines in the engine room of size such as 80/100 mm, including the waterline, fuel and oil line, replace the damaged pipe line if any with new B class GI pipe of existing size and good quality make the pipelines free from air for the smooth flow of sea water, bilging etc. also conduct a pressure test for the pipes, complete as directed by the Department officers.<br>
5
-
-
Gauges, tools & Oily water pump
-
-
-
od185/2017_2018 : Replace the damaged meters such as RPM, Temp gauges..etc both installed in the engine room and wheel house, as per the direction and satisfaction of department officials. (The contractor should procure the spare parts required to make functional the engine from the authorized dealer and submit the original dealer bill along with the contractor bill for its reimbursement. 15% of the cost of spares will be paid to the contractor as overhead charges for arranging and supplying the spares. These procured spares as well as the replaced un serviceable/ old parts except consumable like O rings, rubber parts etc. should get inspected by the Engineer who is the in-charge of the work and these un serviceable/ old spares should be returned to dept for realization of payment If the spares are not available in market produce these items himself or its production should be arranged by the contractor. Cost of these items assessed by the Engineer is to be reimbursed with overhead of 15% as contractor's profit) rate is only for the labour charges<br>
4
-
-
od186/2017_2018 : Install and provide a new mechanical vice 6 inch and a work bench of 0.5X0.5 meter square size of 6 mm plate in a suitable position for 1 meter height from chequed plate frame made by ISA 50x50x6, without making any interruption to the operation of the other machinery inside the engine room, as per the direction of department officials. <br>
1
-
-
od187/2017_2018 : Dismantling the oily water pump for repair and fitting back in position after overhauling the pump assembly and made the same operational as per the direction of dept. officers (The contractor should procure the spare parts required to make functional the pump set from the authorized dealer and submit the original dealer bill along with the contractor bill for its reimbursement. 15% of the cost of spares will be paid to the contractor as overhead charges for arranging and supplying the spares. These procured spares as well as the replaced un serviceable/ old parts except consumable like O rings, rubber parts etc. should get inspected by the Engineer who is the in-charge of the work and these un serviceable/ old spares should be returned to dept for realization of payment If the spares are not available in market produce these items himself or its production should be arranged by the contractor. Cost of these items assessed by the Engineer is to be reimbursed with overhead of 15% as contractor's profit) <br>
2
-
-
Ply wood replacement
-
-
-
od188/2017_2018 : Supply and provide the damaged/removed ply wood of existing thickness and mica of existing dimension near the toilet with necessary woolen packing as in the existing original format for the protection of heet from chimney, as per the direction and satisfaction of department officials. <br>
5
-
-
AC
-
-
-
od189/2017_2018 : Provide and install a 0.5 Ton, a 0.5 Ton, and a 2.5 Ton Capacity of Split Air Conditioner of reputed make with energy 5 star on the Cabin of 2nd Officer/2nd Engineer, on both the cabin of Master and Chief Engineer and Crew cabin respectively with suitable stabilizer and accessories. Necessary power taking arrangements and change over switches have to be installed for working the Air Conditioner on shore connection, complete as per the direction and satisfaction of Department officials. <br>
1
-
-
First Aid
-
-
-
od190/2017_2018 : Provide and supply a First Aid Kit (Regulation Marine First Aid Kit) of Box having dimention W360 X H460 X D170 for the use of the vessel, (ISO7010)as per the direction ans satisfaction of the department officials. <br>
1
-
-
Marking the name
-
-
-
od191/2017_2018 : Painting the name of the vessel (MT KERALAM, PORT DEPARTMENT, GOVERNMENT OF KERALA) on the tug by fabricating the letters in 6 mm MS plate and ISF 60X6, in 300X300 mm size letters as per the directions of the departmental officers.<br>
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements