Department Of Ports Tender

Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Department Of Ports Tender

Works
Civil And Construction
Eprocure
Opening Date22 Jan 2021
Closing Date2 Feb 2021
Tender Amount₹ 63,29,093 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Removing the thickly formed oyster coating and other vegetable growth from the underwater portion of the vessel including cleaning the surface etc. complete as per the direction and satisfaction of department officers

175.18

-

-

... More
Chipping scrapping and cleaning the complete surface of the vessel body, machineries pipelines and other accessories of the vessel body as per the direction of dept officers

1200

-

-

... More
Gauging the thickness of the plates, beam, frame etc. at different portion of the vessel using, ultrasonic thickness gauge after chipping, scrapping and filing the surface to about 50 mm dia and pasting grease/ oil over it as per the direction of department officers.

300

-

-

... More
Plate and Anode fixing Work

-

-

-

... More
Cutting and removing the old damaged, weakened, severely damaged various thickness ms plate/ms flat/ms angles/ms rods/ beams/ girders etc. marked by dept officers in various places of the vessel without damaging any other portion/ structures/ member on the vessel as per the direction of department officers

225

-

-

... More
Supplying and welding with new various thickness maine quality IRS grade A/ 2062 Gr B ms plate/ ms angle/ ms flat/ ms rod/ beam/ gazette of existing size and shape to the various portions on the vessel's already removed damaged portion of the after heating and bending into shape, V cut on the matting edge of the plate and welding three layer on both sides together. The rate including the cost of materials, welding charges, tools, plants, scaffolding, other incidental expenses etc. complete as per the direction of department officers.

75

-

-

... More
Supplying and fitting by welding zinc anode weighting 2.5 kg (excluding the weight of bracket) with bracket on the underwater portion of the hull if damaged/distorted the existing anodes complete as per the direction of department officers.

34

-

-

... More
Painting and Varnishing work

-

-

-

... More
Copper slag /sand blasting at the standards of SA 2.5 for the resistance of corrosion on outer portion of the vessel, as per the direction of departmental officers

600

-

-

... More
Supplying and painting with approved (quality of entire quantity of primer supply should be get inspected and approved by engineer, who is in-charge of work/ department authority before starting/ continuation of the painting work) best quality (marine) epoxy metal primer 2 coats over all chipped and blasted surface after cleaning the surface etc. complete as per the direction of department officers.

1200

-

-

... More
Supplying and painting with approved (quality of entire quantity of paint supply should be get inspected and approved by engineer, who is in-charge of work/ Department authority before starting/ continuation of the painting work) best quality epoxy Coal Tar/ Vinyl guard/ Tie coat paint (marine quality) over the primer applied surface after cleaning the surface as per the direction of department officers.

575

-

-

... More
Supplying and painting with approved (quality of entire quantity of paint supply should be get inspected and approved by engineer, who is in-charge of work/ dept. authority before starting/ continuation of the painting work) epoxy (marine quality) paint white or other approved colour 2 coats over the primer coat already done on vessel body, machinery, pipelines with colour code and other accessories etc. as per the direction and satisfaction of dept. officers.

625

-

-

... More
Supplying and painting 2 coats to the underwater portion with anti fouling paint of reputed make (quality of entire quantity of anti fouling paint supply should be get inspected and approved by engineer, who is in-charge of work/ department authority before starting/ continuation of the painting work) over black paint already done etc. complete as per the direction of department officers.

175

-

-

... More
Supplying and varnishing with approved best quality Copal Varnish 2 coats over wheel house wooden paneling surface after cleaning the surface etc. complete as per the direction of department officers.

13

-

-

... More
Mast Light Work

-

-

-

... More
Fix all the cables in the mast using aluminium u-clamp of suitable size on the top of the wheel house for navigational light, rudder, AS, GPS, VHF, etc, as per the direction of department officials.

20

-

-

... More
Fresh water

-

-

-

... More
Replace the existing damaged water tank installed over the wheel house with existing shape and capacity of reputed make and interconnect the same and repair the stand and install the same with additional ribs, as per the direction of department officials.

2

-

-

... More
Replace the defected accessories like water tap, flexible nylon pipe, angle cock .. etc of reputed make with ISI mark on the wash basin of the existing water line connection installed over the outside of wheel house and refit the same with additional ribs from the protection of vibration during the operation of the vessel, as per the direction of department officials.

1

-

-

... More
Curtain Work

-

-

-

... More
Install new cotton curtain of good quality inside the wheel house neatly by 3/4 " diameter of aluminium pipe and proper locking arrangement for the protection of electronic equipment, as per the direction of department officials.

10

-

-

... More
Arrest the leaking of water entry to the wheel house through the glass joint by applying good quality gum clearly and neatly, as per the direction of department officials.

10

-

-

... More
Mica and rubber beading work

-

-

-

... More
Install the barometer supplied by the Department in the wheel house in a suitable position, as per the direction of the department officials.

1

-

-

... More
Replace all the damaged mica in the wheel hose, galley, crew room, officers room etc, in existing shape, thickness and colour as per the direction of department officials.

20

-

-

... More
Renew all the damaged door rubber beading in the wheel house with existing size after leveling the door and make them watertight all as directed by the department officers.

40

-

-

... More
Replace the damaged ply wood to be renewed on wheel house, galley, crew room, officers room etc with best quality marine plywood of IS:710 specification (water resistant) 12 mm thick with provision for opening for the repairs of the cable lines and other lines passed through it as per the direction of departmental officers.

20

-

-

... More
Electrical wiring

-

-

-

... More
Check all the electrical wiring in the tug, replace the defected holders, starters, bulbs, tubes, navigational lights, search lights, panel board, bells, motors, blowers etc. by new arrange all the DC and AC wiring properly etc. complete all as directed by department officers (The contractor should procure the defected items from the authorized dealer and submit the original dealer bill along with the contractor bill for its reimbursement. 15% of the cost of spares will be paid to the contractor as overhead charges for arranging these items. These procured as well as the replaced items should get inspected by the Engineer who is the in-charge of the work and the un serviceable/ old items should be returned to dept for realization of payment)

1

-

-

... More
Fender Work

-

-

-

... More
Dismantle the existing hard rolled rubber fender from position, replace the fender in existing shape and size and dimension, as per the direction of department officers.

11.5

-

-

... More
Replace the damaged Tyre fender in the existing position, shape, size and fix he same with proper fastening, as per the direction of Department officials.

20

-

-

... More
Replace the damaged rubber fender having dimension 200 mm X 150 mm inserted by Anjily wooden size of 100 mm X 100 mm of good quality, complete as per the direction of department officials.

20

-

-

... More
Portable fire pump work

-

-

-

... More
Made the portable fire pump operational by providing new foot valve made of PVC and provide flexible fire hose of 2 inch diameter of length not less than 10 meter and all the accessories, service the single cylinder engine replace the spares if any (The contractor should procure the defected items from the authorized dealer and submit the original dealer bill along with the contractor bill for its reimbursement. 15% of the cost of spares will be paid to the contractor as overhead charges for arranging these items. These procured as well as the replaced items should get inspected by the Engineer who is the in-charge of the work and the unserviceable/ old items should be returned to dept for realisation of payment) as per the direction of department officials.

1

-

-

... More
Fire Exttingusher and Hydrant Work

-

-

-

... More
Renew two number 4.5 Kg CO2 type, eleven number 5 Kg ABC type and one number form type fire extinguishers on the vessel and mark the validity period on the extinguishers, all as per the direction of Department officers.

1

-

-

... More
Replace all the fire hose boxes completely with new boxes, gun metal nozzle, fire hose and fire hydrant connection completely and function the same operational, complete as the direction of the department officials.

3

-

-

... More
Life raft and light smoke signal

-

-

-

... More
Servicing the existing life raft, mark the name of the vessel with good quality epoxy paint and provide the approval of IRS certificate, as per the direction of department officials.

1

-

-

... More
Replace the existing branded Light and smoke signal fitting and accessories in the vessel with necessary certificate as per the direction of department officials.

2

-

-

... More
Replace the Parachute Rocket in the vessel of reputed make with necessary certificate, as per the direction of department officials.

6

-

-

... More
Replace the Red hand flares in the vessel of reputed make with necessary certificate, as per the direction of department officials.

4

-

-

... More
Supply a new reflector light sticker to the existing life buoy of the vessel, as per the direction of department officials.

2

-

-

... More
Main Engine Work

-

-

-

... More
Dismantling engine (NTA 855 M Cumins make 325 HP at 1800 rpm) heads and other accessories from the engine, cleaning and de-carbonizing the cylinder, piston, head etc. Cleaning the crank case oil sump, valve and all internal parts, valve seat grinding and suiting, replace the damaged wiring and make operational the engine control panel, overhaul the engine, replacing all the damaged parts if any (The contractor should procure the spare parts required to make functional the engine from the authorized dealer and submit the original dealer bill along with the contractor bill for its reimbursement. 15% of the cost of spares will be paid to the contractor as overhead charges for arranging and supplying the spares. These procured spares asPwuelbl alsictheWrepolarckedsunDseerpvicaeratbmle/ eolnd tparts except consumable like O rings serviceable/ old spaPres shouldRbe returnedIto depCt for realizaEtion of payment If the spares are not rubber parts etc. should get inspected by the Engineer who is the in-charge of the work and these un available in market produce these items himself or its production should be arranged by the contractor. Cost of these items assessed by the Engineer is to be reimbursed with overhead of 15% as contractor's profit) Box up the engine, after supplying the required engine oil (40 Ltr)l, HSD (400 Ltr) and de- carbonization kit contains gaskets, O rings etc. and taken 10 hrs trial run, all are as per the direction and satisfaction of dept. officers. The contractor should provide 12 months guarantee for smooth working of the engine.

2

-

-

... More
Dismantling the Main Engine fuel pump for overhauling, calibration, and fitting back in position after overhauling and calibration as per the direction of departmental officers (Overhauling & Calibration to be done in a reputed diesel service center with minimum 9 months service warranty. Cost of spares will be reimbursed against original bill of service center. The replacing spares as well as the replaced parts except consumable like O rings, rubber parts etc. should get inspected by the Engineer who is the in- charge of the work and these un serviceable/old spares should be returned to dept for realization of payment)

2

-

-

... More
Main engine fuel injectors to be overhauled pressure tested and fitted back as per the direction of the departmental officers. The rate includes only the labour charge.

2

-

-

... More
Remove and dismantle the multi stage sea water pump from the engine, inspect the same, replace the damaged spares if any, (The contractor should procure the spare parts required from the authorized dealer and submit the original dealer bill along with their bill for its reimbursement. 15% of the cost of spares will be paid to the contractor as overhead charges for arranging and supplying the spares. These procured spares as well as the replaced un serviceable/old parts except consumable like O rings, rubber parts etc. should get inspected by the Engineer who is the in-charge of the work and these un serviceable/ old spares should be returned to dept for realization of payment) assemble the sea water pump, assemble with the engine and, and taken trial run all as per the direction and satisfaction of departmental officers.

2

-

-

... More
Chimney work

-

-

-

... More
Design and provide a manhole with gratings on the Chimney for reducing the over heating and for the maintenance purpose by circulating the atmospheric air to the chimney and avoid the entry of rain water in to the chimney during operation with cover and hinges,locking arrangement by nut and bolt of M12 with thermal insulation gasket on the chimIney of the vessel and provide the ceramic fiber blanket insulation on the all the surface of the exhaust pipe lines inside both the chimney, as performed in the engine room byarresting the leakage of exhaust gas from the silencer of main engine through the inner side portion of chimney, as per the direction and satisfaction of the department officials

2

-

-

... More
Hydraulic Rudder System

-

-

-

... More
Check the hydraulic rudder System of the vessel for arresting any leakages from the tank to the rudder compartment, check the quantity and quality of the hydraulic oil and replace any parts/oil if damaged and make the system efficient and operational,(The contractor should procure the spare parts required to make functional the rudder system from the authorized dealer and submit the original dealer bill along with the contractor bill for its reimbursement. 15% of the cost of spares will be paid to the contractor as overhead charges for arranging and supplying the spares. These procured spares as well as the replaced un serviceable/ old parts except consumable like O rings, rubber parts etc. should get inspected by the Engineer who is the in-charge of the work and these un serviceable/ old spares should be returned to dept for realization of payment If the spares are not available in market produce these items himself or its production should be arranged by the contractor. Cost of these items assessed by the Engineer is to be reimbursed with overhead of 15% as contractor's profit) as per the direction and satisfaction of department officials.

1

-

-

... More
Water leakage to engine room

-

-

-

... More
Arrest the leaking of water entry to the engine room through the cable tray to the top cover of port side transformer installed, as per the direction and satisfaction of department officials.

1

-

-

... More
Windlass and anchor

-

-

-

... More
Repair the windlass installed on the vessel and made the winch operational, (The contractor should procure the defected items from the authorized dealer and submit the original dealer bill along with the contractor bill for its reimbursement. 15% of the cost of spares will be paid to the contractor as overhead charges for arranging these items. These procured as well as the replaced items should get inspected by the Engineer who is the in-charge of the work and the un serviceable/ old items should be returned to dept for realization of payment)as per the direction and satisfaction of the department officials.

1

-

-

... More
Dismantling the anchor winch glow catch installed on the vessel, after resetting the same position, replace the spares if needed, make a trial run and make the same operational, as per the direction and satisfaction of department officials (The contractor should procure the defected items from the authorized dealer and submit the original dealer bill along with the contractor bill for its reimbursement. 15% of the cost of spares will be paid to the contractor as overhead charges for arranging these items. These procured as well as the replaced items should get inspected by the Engineer who is the in-charge of the work and the un serviceable/ old items should be returned to dept for realization of payment)

1

-

-

... More
Supply and provide a new anchor winch cover made of good quality of rexine made to a suitable shape by stitching and necessary fastenings with good quality thread, as per the direction ans satisfaction of department officials.

1

-

-

... More
Emergency Bilge pump

-

-

-

... More
Repair the emergency bilge pump of GREAVES model installed at Engine Room and made the pump operational, service the engine, as per the direction and satisfaction of department officials (The contractor should procure the defected items from the authorized dealer and submit the original dealer bill along with the contractor bill for its reimbursement. 15% of the cost of spares will be paid to the contractor as overhead charges for arranging these items. These procured as well as the replaced items should get inspected by the Engineer who is the in-charge of the work and the un serviceable/ old items should be returned to dept for realization of payment)

1

-

-

... More
Gererator Repair

-

-

-

... More
Remove the engine valve cover of Diesel Generator No:1 and 2 of Ashok Lyland Make ALMG370/I,68BHP, 50KVA Power engine and check the valve seat and seat assembly and drain the sump of the have to be done and replace the oil filter withIoriginal spare, included the cost of HSD oil and Engine oils engine fully by removing the drain plug and refill the engine oil of original grade and necessory bleeding (The contractor should procure the spare parts required to make functional the engine from the authorised dealer and submit the original dealer bill along with the contractor bill for its reimbursement. 15% of the cost of spares will be paid to the contractor as overhead charges for arranging and supplying the spares. These procured spares as well as the replaced unserviceable/ old parts except consumable like O rings, rubber parts etc. should get inspected by the Engineer who is the in-charge of the work and these un serviceable/ old spares should be returned to dept for realization of payment If the spares are not available in market produce these items himself or its production should be arranged by the contractor. Cost of these items assessed by the Engineer is to be reimbursed with overhead of 15% as contractor's profit) Replace the gasket with original spare of engine, conduct the insulation test and load test, as per the direction of Department Officers.and taken 10 hrs trial run, all are as per the direction and satisfaction of dept. officers.

2

-

-

... More
Remove the engine valve cover of Diesel Generator No:3 of SIPSON Make S433 , 49BHP, 30KVA Power engine and Check the valve seat and seat assembly and drain the sump of the engine fully by removing the drain plug and refill the engine oil of original grade and necessary bleeding have to be done and replace the oil filter with original spare, included the cost of HSD oil and Engine oils and make the electrical stopper switch operational (The contractor should procure the spare parts required to make functional the engine from the authorized dealer and submit the original dealer bill along with the contractor bill for its reimbursement. 15% of the cost of spares will be paid to the contractor as overhead charges for arranging and supplying the spares. These procured spares as well as the replaced un serviceable/ old parts except consumable like O rings, rubber parts etc. should get inspected by the Engineer who is the in-charge of the work and these un serviceable/ old spares should be returned to dept for realization of payment If the spares are not available in market produce these items himself or its production should be arranged by the contractor. Cost of these items assessed by the Engineer is to be reimbursed with overhead of 15% as contractor's profit) Replace the gasket with original spare of engine, conduct the insulation test and load test, as per the direction of Department Officers.and taken 10 hrs trial run, all are as per the direction and satisfaction of dept. officers.

1

-

-

... More
Propeller Shaft

-

-

-

... More
Removing the propeller with shaft and cutlass bushes from the vessel and dismantling the propeller from the propeller shaft etc. and renew the bushes and gland packing, bend checking and straightening the shaft, balancing and pitch correcting the propeller etc. all as per the direction of departmental officers.

2

-

-

... More
Sea chest and pipe lines

-

-

-

... More
All the sea chests, sea chest strainers sea water box and sea chest valve is to be removed,cleaned and fitted back after replacing the damaged nuts and bolts and filters as per the direction of departmental officers. this include cost of MS/Brass bolt and nut, cost of Brass Net, If any strainers are to be replaced, found during the repair it will consider as additional work.

1

-

-

... More
Check all the pipelines in the engine room of size such as up to 25 mm, including the waterline, fuel and oil line, replace the damaged pipe line if any with new std scheduled GI pipe of existing size and good quality make the pipelines free from air for the smooth flow of sea water, bilging etc. also conduct a pressure test for the pipes, complete as directed by the Department officers.

3

-

-

... More
Check all the pipelines in the engine room of size such as 32 mm, including the waterline, fuel and oil line, replace the damaged pipe line if any with new std scheduled GI pipe of existing size and good quality make the pipelines free from air for the smooth flow of sea water, bilging etc. also conduct a pressure test for the pipes, complete as directed by the Department officers.

40

-

-

... More
Check all the pipelines in the engine room of size such as 40 mm, including the waterline, fuel and oil line, replace the damaged pipe line if any with new std scheduled GI pipe of existing size and good quality make the pipelines free from air for the smooth flow of sea water, bilging etc. also conduct a pressure test for the pipes, complete as directed by the Department officers.

25

-

-

... More
Check all the pipelines in the engine room of size such as 50 mm, including the waterline, fuel and oil line, replace the damaged pipe line if any with new std scheduled GI pipe of existing size and good quality make the pipelines free from air for the smooth flow of sea water, bilging etc. also conduct a pressure test for the pipes, complete as directed by the Department officers.

25

-

-

... More
Check all the pipelines in the engine room of size such as 65 mm, including the waterline, fuel and oil line, replace the damaged pipe line if any with new std scheduled GI pipe of existing size and good quality make the pipelines free from air for the smooth flow of sea water, bilging etc. also conduct a pressure test for the pipes, complete as directed by the Department officers.

12

-

-

... More
Check all the pipelines in the engine room of size such as 80 mm, including the waterline, fuel and oil line, replace the damaged pipe line if any with new std scheduled GI pipe of existing size and good quality make the pipelines free from air for the smooth flow of sea water, bilging etc. also conduct a pressure test for the pipes, complete as directed by the Department officers.

10

-

-

... More
Check all the pipelines in the engine room of size such as 100 to 150 mm, including the waterline, fuel and oil line, replace the damaged pipe line if any with new std scheduled GI pipe of existing size and good quality make the pipelines free from air for the smooth flow of sea water, bilging etc. also conuct a pressure test for the pipes, complete as directed by the Department officers.

6

-

-

... More
Gauges and work bench

-

-

-

... More
Replace the defective meters if any such as RPM, Temp gauges, oil pressure..etc of reputed make both installed in the engine room and wheel house, as per the direction and satisfaction of department officials. rate is only for the labour charges (The contractor should procure the spare parts required from the authorised dealer and submit the original dealer bill along with their bill for its reimbursement. 15% of the cost of spares will be paid to the contractor as overhead charges for arranging and supplying the spares. These procured spares as well as the replaced unserviceable/old parts except consumable like O rings, rubber parts etc. should get inspected by the Engineer who is the in-charge of the work and these unserviceable/ old spares should be returned to dept for realisation of payment) and taken trial run all as per the direction and satisfaction of departmental officers.

5

-

-

... More
Install and provide a new mechanical vice 6 inch and a work bench of 0.4 X 0.4 meter square size of 6 mm plate in a suitable position for 1 meter height from chequed plate frame made by ISA 50x50x6, without making any interruption to the operation of the other machinery inside the engine room, as per the direction of department officials.

1

-

-

... More
Fire damaged Ply wood replacement

-

-

-

... More
Remove the damaged/removed portion near the toilet and provide new marine ply wood of 12 mm thickness and mica of existing dimension with necessary woolen packing as in the existing original format for the protection of heat from chimney, as per the direction and satisfaction of department officials.

6

-

-

-

-

-

... More
Provide and install a 2 Ton Capacity of Split Air Conditioner of reputed make with energy 5 star rating on the Crew room with suitable stabilizer and accessories. Necessary power taking arrangements and change over switches have to be installed for working the Air Conditioner on shore connection, complete as per the direction and satisfaction of Department officials.

1

-

-

... More
Check the working of the Air Conditioner installed on the vessel, clean the filter and internal components, check the working of PC Board, pressure testing, leak testing, gas charging... etc and make the Air Conditioner efficient, as per the direction of the department officials.

1

-

-

... More
First Aid Kit

-

-

-

... More
Provide and supply a First Aid Kit (Regulation Marine First Aid Kit) of Box having dimention W360 X H460 X D170 for the use of the vessel, (ISO7010)as per the direction ans satisfaction of the department officials.

1

-

-

... More
Marking the name

-

-

-

... More
Painting the name of the vessel (MT KERALAM, PORT DEPARTMENT, GOVERNMENT OF KERALA IMO number and place) on the tug by fabricating the letters in 6 mm MS plate in 300X300 mm size letters clearly and neatly by applying putty on both the forward and aft side of the vessel, as per the directions of the departmental officers.

1

-

-

... More
Air vent

-

-

-

... More
Supply, Fabricate and install air vents on the vessel in the existing positions with 8 mm pad 50 NB GIpipe 40 Schedule pipe in the existing shape and dimension with flanges fastening with M 12 Bolt & Nut arrangement for the maintenance purpose, complete as per the direction and satisfaction of department officers.

9

-

-

... More
Storage Tank cleaning

-

-

-

... More
Storage tanks manhole doors to be opened up, tanks to be cleaned with banyan waste. After cleaning, manhole doors to be boxed up with new allied packing of 3 mm thick. complete as per the direction of the department officials.

7

-

-

... More
Towing rope releasing mechanism

-

-

-

... More
Remove the towing hook releasing mechanism from the vessel, overhaul the plunger, cylinder mechanism, replace the damaged parts, oil seals.. etc apply necessary quantity grease for the smooth functioning box up the same for smooth operational from the upper deck, as per the direction and satisfaction of department officials.

1

-

-

... More
Battery covering box making

-

-

-

... More
Supply make and provide a new square cover box for the battery installed on the upper deck made of reinforced fiber in four layers with good finishing by using 6 mm marine good quality ply wood of reputed make in a dimension 1300 mm X 700 mm X 600 mm (LxBxH), from the protection of water and dust. Complete as per the direction and satisfaction of department officials.

3.31

-

-

... More
Valves repair and replacing

-

-

-

... More
Dismantle the Valves in the fuel line and Water line from the vessel overhaul the same by machining the seat of the valve filled by brazing or M I G welding, lapping and repair the damaged spindle and box up with new gland etc complete as per the direction and satisfaction of departmental officers.

18

-

-

... More
Supply and replace the following valves on the vessel, 80 mm one CI gate valve on the Bilge line, 32 mm 3 numbers of CI gate valve on DG suction and discharge line, 40 mm Brass valve 1 number valve, 32 mm brass valve 3 numbers, 50 mm brass valve sea wage out let non return valve 2 numbers, 12 mm CI propeller shaft cooling line 2 numbers, as per the direction of department officials.

1

-

-

... More
Electric Motor pump set repair

-

-

-

... More
Dismantle the parts of the Electric motor from the vessel, inspect the same, cleaning the winding, varnishing the stater and rotor coil winding and replace the bearing of both the ends box up the motor and take a trial rum for 15 minutes continuously, as per the direction and satisfaction of department officials.

9

-

-

... More
Dismantle the pump set from the motor and dismantle the pump, inspect the discharge connection out, inlet connection, operating liquid port, impeller, housing, inlet port, exhaust port...etc, replace the damaged spares and box up the pump and connect to the motor unit and take a trial run for at-least 15 minutes continuously, as per the direction and satisfaction of the department officials.

7

-

-

... More
Bollard

-

-

-

... More
Fabricating supplying and fixing by welding a new bollard 670 x 250 x 80 mm base dimension with 8 mm ms plate on deck having double post of overall height 250 mm and dia 170 mm with 6 mm thick ms pipe and provide top plate of diameter 200 mm having 8 mm thick to avoid slipping of rope at the end of post and stiffness with pipe and base. Fill the hollow pipe with 1:2:3 cement concrete all as per the direction of department

1

-

-

... More
Starting motor, Alternator, Heat exchanger, Oil cooler repair

-

-

-

... More
Removing the starting motor of the main engine from position and the same to be dismantled without causing damages to any part. Cleaning the parts in lead free petrol adjusting the spring tension, cleaning and leveling the contacts, varnishing, Growler testingtobedone for armature and field winding, lubricating the bushes, insulation testing and assembling, testing for correct speed, torque and spark less operation of conductors etc. andfitting back in position, testing for correct and proper engagement of the pinion to the fly wheel teeth etc. all as per the direction of the departmental officers

5

-

-

... More
Removing the alternator from the engines from position and the same to be dismantled without causing damages to any part. Cleaning the parts in lead free petrol, cleaning the brushes, rectifier and regulators, check the rotor and stater winding, belt driven pulley and cooling fan, varnishing, Growler testing to be done for armature and field winding, lubricating the bushes, insulation testing and assembling, testing for correct speed, torque and spark less operation of conductors etc. and fitting back in position, testing for correct and proper engagement for the belt pulley etc. all as per the direction of the departmental officers.

5

-

-

... More
Dismantle the Heat exchanger, Clean and provide Provide flanged connection for the maintenance of the heat exchanger lines of both Port & Starboard side main engines, No-1, 2 and 3 generators, without damaging the other portions, as per the direction and satisfaction of the departmental officials.

5

-

-

... More
Dismantling all the oil coolers and stripping off all the parts, acid washing to be done for removing scale inside and outside tubes then to be cleaned by using cane with cotton waste. Resetting all the parts in position and leak testing after supplying necessary packing, o-rings, bolt and nuts etc. completed as per the direction of the departmental officers.

5

-

-

... More
Transformer service

-

-

-

... More
Remove the top of the Step down air cooled Transformer, remove the off line tap changer, oil level indicator, high voltage bushing, low voltage bushing, low voltage connections, core clamp, yoke, tap connections, low voltage winding, high voltage winding, outer and central core limps. etc inspect the spares and replace if any and box up the same, make a trial run, complete as per the direction and satisfaction of the department officials.

2

-

-

... More
VHF and Compass Repair

-

-

-

... More
Check the defected VHF set on board of the vessel overhaul the same and make it functional, the rate includes for replacement of damaged code of good qualityreputed make spare also replace the defected spares if any all as per the direction by department officers

1

-

-

... More
Take the Magnetic compass form the vessel make error free by calibrating the same, as per the norms ISO 25862 : 2009 (E) and install the same beck in the vessel with necessary calibration certificate from the reputed firm, complete as per the direction and satisfaction of department officials.

1

-

-

... More
Eco Sounder, GPS, Water purifier

-

-

-

... More
Supply install and commission a new eco-sounder with necessary accessories on the vessel of reputed make with a frequency range 50 to 200 KHz with a display of 6 inch size of color LED of IPX5 Water protection type of English language with necessary certificate all as per the direction of department officials.

1

-

-

... More
Replace the GPS of original specification with necessary accessories on the vessel of reputed make with necessary certificate as per the direction of the department officials.

1

-

-

... More
Replace the old water purifier on the vessel with new hot and cold water purifier of reputed make with minimum 2 years of warranty with UV treated and stage filters with necessary fittings and connections, all as per the direction of department officials.

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.