Cochin Shipyard Limited Tender

Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Cochin Shipyard Limited - CSL Tender

Works
Eprocure
Opening Date26 Dec 2024
Closing Date2 Jan 2025
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Jobs On Oxygen Plant For Navy Vessel

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
1.25.3 Removal of absorber 1 inlet valve (3-16) of purification unit view not holing.Job entails removal of welded valve and fitment of new valve, welding cutting assistance required for the same.

1

-

-

... More
1.25.4 Removal and renewal of zeolite (grade- NAX, gty-400 kg) of both absorbers. Job entails removal of system pipelines and re-fitment post charging of new zeolite.

1

-

-

... More
1.25.5 DI / DR on heater view frequent tripping.

1

-

-

... More
1.25.6 Inspection of both absorbers cylinder (in-situ ultra-sonic thickness gauging to be undertaken).

1

-

-

... More
1.25.7 Boxing up of both absorbers and pressure testing in bath tub at the pressure of 200 bar.

1

-

-

... More
1.25.8 Fitment of both absorbers and carry out system leak test using HP air up to pressure 200 bar.

1

-

-

... More
1.25.9 Charging of new pearlite (QTY - 100 kg) and fitment of cladings

1

-

-

... More
1.25.10 Post boxing up undertake trials of air purification unit.

1

-

-

... More
1.25.11 Overhauling of n-2 drain valve view leaking from gland and not holding.

1

-

-

... More
1.25.12 Renewal of level gauge (y-2) of air liquefying unit view broken.

1

-

-

... More
Jobs on Oxygen Plant - Material COST

-

-

-

... More
1.25.1 Removal of cladding and pearlite from air purification unit.

1

-

-

... More
1.25.2 Replacement of filtering cloth of air purification unit.

1

-

-

... More
1.25.3 Removal of absorber 1 inlet valve (3-16) of purification unit view not holing.Job entails removal of welded valve and fitment of new valve, welding cutting assistance required for the same.

1

-

-

... More
1.25.4 Removal and renewal of zeolite (grade- NAX, gty-400 kg) of both absorbers. Job entails removal of system pipelines and re-fitment post charging of new zeolite.

1

-

-

... More
1.25.5 DI / DR on heater view frequent tripping.

1

-

-

... More
1.25.6 Inspection of both absorbers cylinder (in-situ ultra-sonic thickness gauging to be undertaken).

1

-

-

... More
1.25.7 Boxing up of both absorbers and pressure testing in bath tub at the pressure of 200 bar.

1

-

-

... More
1.25.8 Fitment of both absorbers and carry out system leak test using HP air up to pressure 200 bar.

1

-

-

... More
1.25.9 Charging of new pearlite (QTY - 100 kg) and fitment of cladings

1

-

-

... More
1.25.10 Post boxing up undertake trials of air purification unit.

1

-

-

... More
1.25.11 Overhauling of n-2 drain valve view leaking from gland and not holding.

1

-

-

... More
1.25.12 Renewal of level gauge (y-2) of air liquefying unit view broken.

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.