Cochin Shipyard Limited Tender

Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Cochin Shipyard Limited - CSL Tender

Services
Eprocure
Opening Date23 Dec 2024
Closing Date6 Jan 2025
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
3.6.1 Replace the following 3.6.1.1 Thermo-couple 3.6.1.2 Electrical temperature indicator. 3.6.1.3 Tacho-meter transmitter. 3.6.1.4 Ball and roller bearing of pump motor.

4

-

-

... More
DG ROUTINES (SERVICE COST)

-

-

-

... More
3.6.5 Calibration and Repair/ Refurbishment of defective DG sensors 3.6.5.1 PSZ201 Very low inlet Lub-oil Pressure M/s Amote 3.6.5.2 TSZ201 Lub-oil Temperature M/s Amote 3.6.5.3 PSZ311 Low Safety Pressure M/s Amote 3.6.5.4 TSZ402 HT Water Temp, Engine Outlet M/s Amote 3.6.5.5. PSZ101 Low Lub-oil Pressure M/s Amote 3.6.5.6 PT401 HT Water Pressure, Engine Inlet M/s Den Force 3.6.5.7 Overspeed Sensor M/s Amote 3.6.5.8. PT50 Winding Temp Sensor M/s Amote

4

-

-

... More
DG ROUTINES (SERVICE COST)

-

-

-

... More
3.6.6 Calibration and Repair/ Refurbishment of defective DG harness 3.6.6.1 3-Way valve - 30 mtrs (3X1.5 sq mm) 3.6.6.2. Propotional valve - 30 mtrs (3X1.5 sq mm) 3.6.6.3 Lub Oil flow meter - 30 mtrs (3X1.5 sq mm) 3.6.6.4. Buffer tank level sensor - 30 mtrs (3X1.5 sq mm) 3.6.6.5. 3Way Solenoid Valve - 30 mtrs (2X1.5 sq mm) 3.6.6.6. MPD - 30 mtrs (3X1.5 sq mm) 3.6.6.7. Filter - 30 mtrs (3X1.5 sq mm) 3.6.6.8. RTD PT 50 (winding temp) - 30 mtrs (3X1.5 sq mm) 3.6.6.9. RTD PT 50 (bearing temp) - 30 mtrs (3X1.5 sq mm)

4

-

-

... More
DG CONTROL PANEL (SERVICE COST)

-

-

-

... More
3.194.1 Check setting value of voltage and phase order of LCP voltage relays (KV741 and KV742) as per Maintenance manual 02961928 para 8.4.1 3.194.2 Make calibration of all transducer and meters of LCP, RCP, and CCP 3.194.3 Carry out repair/calibration of defective sensors/gauges at shop floor. (SS to land the sensosr/gauges. 3.194.4 Serviceability checks of UPS batteries. 3.194.5. Replace PLC fans of LCP 3.194.6 Change Hour counters of LCPs 3.194.7 Clean PLC fans for any dust, sand, and impurities. 3.194.8 Test the grounding(bonding straps) continuity replace if necessary 3.194.9 Check all fuses and relays, replace if necessary. 3.194.10 Check the operation of wire break supervision module (SIMOS WBM-21) as per maintenance manual 02961928 para 8.5.1 3.194.11.Check all shutdown/protection relays for:- 3.194.12. check soldered connections in LCP. 3.194.13. Simulate the shutdown for each relay. 3.194.14. check is to be carried as per OI/maintenance manual of system 3.194.15 Check insulation resistance of LCP, RCP, and CCP for 24 V DC/380V AC as per Maintenance manual 02961928 para 8.3 to 8.3.2 with safety precaution para 5.1 to 5.3

4

-

-

... More
DG AIR INLET (MATERIAL COST)

-

-

-

... More
1.8.18 Repairs to DG Air inlet restriction and exhaust back pressure with replacement of sensors for DGs Renewal of pressure sensors (04). Digital display to be provided. Renewal of DG expansion tank level sensor alongwith high & low level indication (12)

1

-

-

... More
DG ROUTINES (MATERIAL COST )

-

-

-

... More
3.6.1 Replace the following 3.6.1.1 Thermo-couple 3.6.1.2 Electrical temperature indicator. 3.6.1.3 Tacho-meter transmitter. 3.6.1.4 Ball and roller bearing of pump motor.

4

-

-

... More
DG ROUTINES (MATERIAL COST )

-

-

-

... More
3.6.5 Calibration and Repair/ Refurbishment of defective DG sensors 3.6.5.1 PSZ201 Very low inlet Lub-oil Pressure M/s Amote 3.6.5.2 TSZ201 Lub-oil Temperature M/s Amote 3.6.5.3 PSZ311 Low Safety Pressure M/s Amote 3.6.5.4 TSZ402 HT Water Temp, Engine Outlet M/s Amote 3.6.5.5. PSZ101 Low Lub-oil Pressure M/s Amote 3.6.5.6 PT401 HT Water Pressure, Engine Inlet M/s Den Force 3.6.5.7 Overspeed Sensor M/s Amote 3.6.5.8. PT50 Winding Temp Sensor M/s Amote

4

-

-

... More
DG ROUTINES (MATERIAL COST )

-

-

-

... More
3.6.6 Calibration and Repair/ Refurbishment of defective DG harness 3.6.6.1 3-Way valve - 30 mtrs (3X1.5 sq mm) 3.6.6.2. Propotional valve - 30 mtrs (3X1.5 sq mm) 3.6.6.3 Lub Oil flow meter - 30 mtrs (3X1.5 sq mm) 3.6.6.4. Buffer tank level sensor - 30 mtrs (3X1.5 sq mm) 3.6.6.5. 3Way Solenoid Valve - 30 mtrs (2X1.5 sq mm) 3.6.6.6. MPD - 30 mtrs (3X1.5 sq mm) 3.6.6.7. Filter - 30 mtrs (3X1.5 sq mm) 3.6.6.8. RTD PT 50 (winding temp) - 30 mtrs (3X1.5 sq mm) 3.6.6.9. RTD PT 50 (bearing temp) - 30 mtrs (3X1.5 sq mm)

4

-

-

... More
DG CONTROL PANEL (MATERIAL COST)

-

-

-

... More
3.194.1 Check setting value of voltage and phase order of LCP voltage relays (KV741 and KV742) as per Maintenance manual 02961928 para 8.4.1 3.194.2 Make calibration of all transducer and meters of LCP, RCP, and CCP 3.194.3 Carry out repair/calibration of defective sensors/gauges at shop floor. (SS to land the sensosr/gauges. 3.194.4 Serviceability checks of UPS batteries. 3.194.5. Replace PLC fans of LCP 3.194.6 Change Hour counters of LCPs 3.194.7 Clean PLC fans for any dust, sand, and impurities. 3.194.8 Test the grounding(bonding straps) continuity replace if necessary 3.194.9 Check all fuses and relays, replace if necessary. 3.194.10 Check the operation of wire break supervision module (SIMOS WBM-21) as per maintenance manual 02961928 para 8.5.1 3.194.11.Check all shutdown/protection relays for:- 3.194.12. check soldered connections in LCP. 3.194.13. Simulate the shutdown for each relay. 3.194.14. check is to be carried as per OI/maintenance manual of system 3.194.15 Check insulation resistance of LCP, RCP, and CCP for 24 V DC/380V AC as per Maintenance manual 02961928 para 8.3 to 8.3.2 with safety precaution para 5.1 to 5.3

4

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.