Cochin Shipyard Limited Tender

Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Cochin Shipyard Limited - CSL Tender

Services
Aerospace and Defence
Eprocure
Opening Date2 Jul 2024
Closing DateCancelled
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
SHAFTING (1241RE) AER PORT& STBD SHAFT RPM INDICATOR IS DEFECTIVE AND NOT SHOWING SPRM READINGS ON CCC. REPLACE OF SHAFT RPM INDICATOR. (Material Cost)

4

-

-

... More
A/C CONDENSATE SYSTEM VARIOUS PLACES

-

-

-

... More
A/C CONDENSATE SYSTEM REPLACE AND CALIBRATE PRESSURE GAUGES (SUCTION AND DISCHARGE QTY 07) VIEW GAUGE MALFUNCTIONING. (Service Cost)

1

-

-

... More
A/C CONDENSATE SYSTEM REPLACE AND CALIBRATE PRESSURE GAUGES (SUCTION AND DISCHARGE QTY 07) VIEW GAUGE MALFUNCTIONING. (Material Cost)

1

-

-

... More
A/C CONDENSATE SYSTEM AUTO CUT IN / CUT OUT DFECTIVE. TO BE REFURBISHED BY REPLACING LEVEL SENSORS, CABLING ETC. OFFER TRIALS OF SYSTEM (Service Cost)

1

-

-

... More
A/C CONDENSATE SYSTEM AUTO CUT IN / CUT OUT DFECTIVE. TO BE REFURBISHED BY REPLACING LEVEL SENSORS, CABLING ETC. OFFER TRIALS OF SYSTEM (Material Cost)

1

-

-

... More
DIESEL GENERATOR 1& 2 (NTA 855 MG) - FER & AER

-

-

-

... More
REMOVE AND CHECK THE OVER SPEED TRIP (PROTECTION DEVICE/ SENSOR) FOR CORRECT SETTING/FUNCTIONING, CALIBRATE IF NECESSARY. (Service Cost)

1

-

-

... More
REMOVE AND CHECK THE OVER SPEED TRIP (PROTECTION DEVICE/ SENSOR) FOR CORRECT SETTING/FUNCTIONING, CALIBRATE IF NECESSARY. (Material Cost)

1

-

-

... More
MANUFACTURING OF FOLLOWING COVER AS PER DIMENSIONS (A) DA CONTROL PANEL, MAT-GI SHEET. (B) DA CONTROL PANEL MAT-GI SHEET. (C) DA JUNCTION BOX, MAT- GI SHEET. (Service Cost)

9

-

-

... More
MANUFACTURING OF FOLLOWING COVER AS PER DIMENSIONS (A) DA CONTROL PANEL, MAT-GI SHEET. (B) DA CONTROL PANEL MAT-GI SHEET. (C) DA JUNCTION BOX, MAT- GI SHEET. (Material Cost)

9

-

-

... More
PROVIDE & FITMENT OF MANOMETERS ON DA NO. 1,2 AND 3 TURBOCHARGER (Service Cost)

3

-

-

... More
PROVIDE & FITMENT OF MANOMETERS ON DA NO. 1,2 AND 3 TURBOCHARGER (Material Cost)

3

-

-

... More
3 ELECTRICAL CONTROL SYSTEM: UNDERTAKE CHECKS OF ALL CONTROL SYSTEM AND SAFETY DEVICES. . (B) CHECK PNEUMATIC/ ELECTRICAL STARTER WHERE FITTED. (C) CLEAN MAGNETIC PICKUP UNIT. (Service Cost)

1

-

-

... More
3 ELECTRICAL CONTROL SYSTEM: UNDERTAKE CHECKS OF ALL CONTROL SYSTEM AND SAFETY DEVICES. . (B) CHECK PNEUMATIC/ ELECTRICAL STARTER WHERE FITTED. (C) CLEAN MAGNETIC PICKUP UNIT. (Material Cost)

1

-

-

... More
UNDERTAKE RENEWAL OF ALL THREE DA CONTROL WIRING FROM CONTROL PANEL/ BUPS PANEL TO LOCAL CONTROL PANEL IN VIEW OF WIRE PERISHED. (Service Cost)

3

-

-

... More
UNDERTAKE RENEWAL OF ALL THREE DA CONTROL WIRING FROM CONTROL PANEL/ BUPS PANEL TO LOCAL CONTROL PANEL IN VIEW OF WIRE PERISHED. (Material Cost)

3

-

-

... More
UNDERTAKE MANUFACURING OF CABLE TRAY AND CLAMPS FOR PROPER SECURING ARRANGEMENT OF CABLES OF ALL THREE DAS. (Service Cost)

20

-

-

... More
UNDERTAKE MANUFACURING OF CABLE TRAY AND CLAMPS FOR PROPER SECURING ARRANGEMENT OF CABLES OF ALL THREE DAS. (Material Cost)

20

-

-

... More
UNDERTAKE SERVICEABILITY CHECK OF DA LOCAL JUNCTION BOXES (Service Cost)

3

-

-

... More
UNDERTAKE SERVICEABILITY CHECK OF DA LOCAL JUNCTION BOXES (Material Cost)

3

-

-

... More
REWIRING OF DA CONTROL WIRES BETWEEN LOCAL CONTROL AND REMOTE CONTROL IN VIEW OF EXCESSIVE PERISHED. LENGTH- 40 MTRS. (Service Cost)

1

-

-

... More
REWIRING OF DA CONTROL WIRES BETWEEN LOCAL CONTROL AND REMOTE CONTROL IN VIEW OF EXCESSIVE PERISHED. LENGTH- 40 MTRS. (Material Cost)

1

-

-

... More
REWIRING OF DA INSTRUMENTATION SENSOR WIRES IN VIEW OF EXCESSIVE PERISHED. LENGTH- 30 MTRS. (Service Cost)

1

-

-

... More
REWIRING OF DA INSTRUMENTATION SENSOR WIRES IN VIEW OF EXCESSIVE PERISHED. LENGTH- 30 MTRS. (Material Cost)

1

-

-

... More
UNDERTAKE RENEWAL OF ALL THREE DA METALLIC CONDUIT FOR WIRING FROM CONTROL PANEL TO LOCAL CONTROL PANEL AND LOCAL CONTROL PANEL TO DA IN VIEW OF CORRODED. (Service Cost)

3

-

-

... More
UNDERTAKE RENEWAL OF ALL THREE DA METALLIC CONDUIT FOR WIRING FROM CONTROL PANEL TO LOCAL CONTROL PANEL AND LOCAL CONTROL PANEL TO DA IN VIEW OF CORRODED. (Material Cost)

3

-

-

... More
UNDERTAKE COMPLETE REFURBISHENT OF ALL THREE DA LOCAL CONTROL PANEL AND FITMENT. (MAKE - M/S SYMPTRONICS)(Service Cost)

3

-

-

... More
UNDERTAKE COMPLETE REFURBISHENT OF ALL THREE DA LOCAL CONTROL PANEL AND FITMENT. (MAKE - M/S SYMPTRONICS) (Material Cost)

3

-

-

... More
UNDERTAKE RENEWAL OF ALL THREE DA SENSOR/ INSTRUMENTATION WIRING IN VIEW OF WIRE PERISHED. (Service Cost)

1

-

-

... More
UNDERTAKE RENEWAL OF ALL THREE DA SENSOR/ INSTRUMENTATION WIRING IN VIEW OF WIRE PERISHED. (Material Cost)

1

-

-

... More
UNDERTAKE COMPLETE REFURBISHMENT OF REMOTE CONTROL PANEL OF ALL THREE DAs IN MCR IN VIEW OF FAULTY ALARM AND INDICATION LAMP NOT GLOWING PROPERLY. (Service Cost)

1

-

-

... More
UNDERTAKE COMPLETE REFURBISHMENT OF REMOTE CONTROL PANEL OF ALL THREE DAs IN MCR IN VIEW OF FAULTY ALARM AND INDICATION LAMP NOT GLOWING PROPERLY. (Material Cost)

1

-

-

... More
AC DIESEL ALTERNATOR (MCK 103-4) AFT ENGINE ROOM/FWD ENGINE ROOM REPLACE (A) THERMO-COUPLE (B) ELECTRICAL TEMPERATURE INDICATOR. (C) TACHO-METER TRANSMITTER. (Service Cost)

5

-

-

... More
AC DIESEL ALTERNATOR (MCK 103-4) AFT ENGINE ROOM/FWD ENGINE ROOM REPLACE (A) THERMO-COUPLE (B) ELECTRICAL TEMPERATURE INDICATOR. (C) TACHO-METER TRANSMITTER. (Material Cost)

5

-

-

... More
AC DIESEL ALTERNATOR (MCK 92-4) NO.3 DA UNDERTAKE OVERHAUL OF ALTERNATERS AS FOLLOWS: - REPLACE (A) THERMO-COUPLE (B) ELECTRICAL TEMPERATURE INDICATOR. (C) TACHO-METER TRANSMITTER. (Service Cost)

5

-

-

... More
AC DIESEL ALTERNATOR (MCK 92-4) NO.3 DA UNDERTAKE OVERHAUL OF ALTERNATERS AS FOLLOWS: - REPLACE (A) THERMO-COUPLE (B) ELECTRICAL TEMPERATURE INDICATOR. (C) TACHO-METER TRANSMITTER. (Material Cost)

5

-

-

... More
DIESEL GENERATOR CONTROL ENGINE ROOMS AND MCR CARRY OUT REFUBISHMENT OF BOTH MAIN AND REMOTE PANELS. (MAKE - M/S SYMPTRONICS) REPLACE INSTRUMENTS (METERS) (Service Cost)

3

-

-

... More
DIESEL GENERATOR CONTROL ENGINE ROOMS AND MCR CARRY OUT REFUBISHMENT OF BOTH MAIN AND REMOTE PANELS. (MAKE - M/S SYMPTRONICS) REPLACE INSTRUMENTS (METERS) (Material Cost)

3

-

-

... More
DIESEL GENERATOR CONTROL ENGINE ROOMS AND MCR REPLACE INSTRUMENTS (METERS) (Service Cost)

18

-

-

... More
DIESEL GENERATOR CONTROL ENGINE ROOMS AND MCR REPLACE INSTRUMENTS (METERS) (Material Cost)

18

-

-

... More
DIESEL GENERATOR CONTROL (PAYMENT IN ACTUALS) ENGINE ROOMS AND MCR RENEWAL OF LUGS AND REWIRING OF CABLE (TYPE - SCREENED, 3 CORE, CORE DIA 2.5 SQ MM, COPPER) FROM ALL ALTERNATORS TO SWITCHBOARD VIEW CABLE PERISHED/ CUT/ SHOWING LOW INSULATION(Service Cost)

100

-

-

... More
DIESEL GENERATOR CONTROL (PAYMENT IN ACTUALS) ENGINE ROOMS AND MCR RENEWAL OF LUGS AND REWIRING OF CABLE (TYPE - SCREENED, 3 CORE, CORE DIA 2.5 SQ MM, COPPER) FROM ALL ALTERNATORS TO SWITCHBOARD VIEW CABLE PERISHED/ CUT/ SHOWING LOW INSULATION (Material Cost)

100

-

-

... More
DIESEL GENERATOR CONTROL ENGINE ROOMS AND MCR REWIRING FROM DA CONTROL PANEL TO LOCAL CONTROL PANEL AND JUNCTION BOX OF ALL THREE DAs IN VIEW OF CABLE PERISHED/DEGUTTED FOR HULL SURVEY(APPROX LENGTH 80 MTRS, SCREENED, 3 CORE, DIA 1.5 SQ MM, COPER) (Service Cost)

80

-

-

... More
DIESEL GENERATOR CONTROL ENGINE ROOMS AND MCR REWIRING FROM DA CONTROL PANEL TO LOCAL CONTROL PANEL AND JUNCTION BOX OF ALL THREE DAs IN VIEW OF CABLE PERISHED/DEGUTTED FOR HULL SURVEY(APPROX LENGTH 80 MTRS, SCREENED, 3 CORE, DIA 1.5 SQ MM, COPER) (Material Cost)

80

-

-

... More
DIESEL GENERATOR CONTROL ENGINE ROOMS AND MCR DA NO.1,2,3 IS NOT STARTING FROM MCR REMOTE PANEL(CCC). DEFECT IDENTIFICATION AND RECTIFICATION FOR THE SAME(Service Cost)

1

-

-

... More
DIESEL GENERATOR CONTROL ENGINE ROOMS AND MCR DA NO.1,2,3 IS NOT STARTING FROM MCR REMOTE PANEL(CCC). DEFECT IDENTIFICATION AND RECTIFICATION FOR THE SAME (Material Cost)

1

-

-

... More
ELECTRICAL GENERAL LIGHTING AND CABLING VARRIOUS PLACE

-

-

-

... More
ELECTRICAL GENERAL LIGHTING AND CABLING VARRIOUS PLACE REPLACE CABLING JS SYSTEM AUDIO VISUAL ALARM IN VARIOUS COMPARTMENT IN VIEW OF WIRE PERISHED/FAULTY ALARM (APPROX 02 CORE CABLE 2.5 SQMM 300 MTRS REQD)(Service Cost)

100

-

-

... More
ELECTRICAL GENERAL LIGHTING AND CABLING VARRIOUS PLACE REPLACE CABLING JS SYSTEM AUDIO VISUAL ALARM IN VARIOUS COMPARTMENT IN VIEW OF WIRE PERISHED/FAULTY ALARM (APPROX 02 CORE CABLE 2.5 SQMM 300 MTRS REQD) (Material Cost)

100

-

-

... More
DOOR SWITCH REPLACE DOOR SWITCHES (9 NO) WITH CABLE (SCREENED, 2 CORE, 1 SQ MM, 100 MTR)(Service Cost)

1

-

-

... More
DOOR SWITCH REPLACE DOOR SWITCHES (9 NO) WITH CABLE (SCREENED, 2 CORE, 1 SQ MM, 100 MTR) (Material Cost)

1

-

-

... More
FIREMAIN PUMP - (MAKE - M/S JOHNSON, CAPACITY - 60 TPH) - FER / AER

-

-

-

... More
REPLACE AND CALIBRATE ALL INSTRUMENTATION (PRESSURE GAUGE ETC). (Service Cost)

8

-

-

... More
REPLACE AND CALIBRATE ALL INSTRUMENTATION (PRESSURE GAUGE ETC). (Material Cost)

8

-

-

... More
CALIBRATE/ RENEW PRESSURE SWITCHES. REPLACE IF DEFECTIVE (Service Cost)

12

-

-

... More
CALIBRATE/ RENEW PRESSURE SWITCHES. REPLACE IF DEFECTIVE (Material Cost)

12

-

-

... More
FIREMAIN SYSTEM SCATTERED CARRY OUT ROUTINES OF FIREMAIN SYSTEMS AS FOLLOWS: - REPLACE AND REFIT PRESSURE GAUGE VALVES. (Service Cost)

4

-

-

... More
FIREMAIN SYSTEM SCATTERED CARRY OUT ROUTINES OF FIREMAIN SYSTEMS AS FOLLOWS: - REPLACE AND REFIT PRESSURE GAUGE VALVES. (Material Cost)

4

-

-

... More
FIREMAIN SYSTEM SCATTERED CARRY OUT ROUTINES OF FIREMAIN SYSTEMS AS FOLLOWS: - REPLACE AND CALIBRATE ALL PRESSURE GAUGES. {(A) SUCTION GAUGE - 1 TO 2 KGF/CM2 (QTY- 05) (B) DISCHARGE GAUGE - 0 TO 20 KGF/CM2 (QTY- 15), (C) 0 TO 10 KGF/CM2, QTY- 03}(Service Cost)

23

-

-

... More
FIREMAIN SYSTEMSCATTERED CARRY OUT ROUTINES OF FIREMAIN SYSTEMS AS FOLLOWS: - REPLACE AND CALIBRATE ALL PRESSURE GAUGES. {(A) SUCTION GAUGE - 1 TO 2 KGF/CM2 (QTY- 05) (B) DISCHARGE GAUGE - 0 TO 20 KGF/CM2 (QTY- 15), (C) 0 TO 10 KGF/CM2, QTY- 03} (Material Cost)

23

-

-

... More
FOAM FIRE SMOOTHERING SYSTEM (CO 500) MAIN ALLEWAY CARRY OUT OVERHAUL/ ROUTINES OF FOAM SMOOTHERINGTEMS AS FOLLOWS: - REPLACE AND CALIBRATE PRESSURE GAUGES. (Service Cost)

6

-

-

... More
FOAM FIRE SMOOTHERING SYSTEM (CO 500) MAIN ALLEWAY CARRY OUT OVERHAUL/ ROUTINES OF FOAM SMOOTHERINGTEMS AS FOLLOWS: - REPLACE AND CALIBRATE PRESSURE GAUGES. (Material Cost)

6

-

-

... More
GT FIRE FIGHTING SYS. (DRY CHEMICAL) AER/FER CARRY OUT OVERHAUL/ ROUTINES OF GT FIRE SMOOTHERING SYSTEMS IN BOTH ENGINE ROOMS AS FOLLOWS: - CALIBRATE PRESSURE GAUGES. (Service Cost)

5

-

-

... More
GT FIRE FIGHTING SYS. (DRY CHEMICAL) AER/FER CARRY OUT OVERHAUL/ ROUTINES OF GT FIRE SMOOTHERING SYSTEMS IN BOTH ENGINE ROOMS AS FOLLOWS: - CALIBRATE PRESSURE GAUGES. (Material Cost)

5

-

-

... More
GT/RG LUB OIL SYSTEM FER UNDERTAKE OVERHAUL OF GT & RG LUB OIL SYSTEM AS FOLLOWS: - REPLACE AND CALIBRATE PRESSURE GAUGES. (Service Cost)

10

-

-

... More
GT/RG LUB OIL SYSTEM FER UNDERTAKE OVERHAUL OF GT & RG LUB OIL SYSTEM AS FOLLOWS: - REPLACE AND CALIBRATE PRESSURE GAUGES. (Material Cost)

10

-

-

... More
HOLD PUMP FER UNDERTAKE REPLACEMENT OF HOLD PUMP WITH MOTOR AND DO THE FOLLOWING: - REPLACE AND CALIBRATE ALL INSTRUMENTATION.SUCTION AND DISCHARGE PRESSURE GAUGES. (Service Cost)

2

-

-

... More
HOLD PUMP FER UNDERTAKE REPLACEMENT OF HOLD PUMP WITH MOTOR AND DO THE FOLLOWING: - REPLACE AND CALIBRATE ALL INSTRUMENTATION.SUCTION AND DISCHARGE PRESSURE GAUGES. (Material Cost)

2

-

-

... More
FRESH WATER PUMP FER (PORT / STBD) UNDERTAKE OVERHAUL OF FRESH WATER PUMP AS FOLLOWS: - REPLACE AND CALIBRATE ALL TEMPERATURE AND PRESSURE GAUGES VIEW DEFECTIVE. (Service Cost)

4

-

-

... More
FRESH WATER PUMP FER (PORT / STBD) UNDERTAKE OVERHAUL OF FRESH WATER PUMP AS FOLLOWS: - REPLACE AND CALIBRATE ALL TEMPERATURE AND PRESSURE GAUGES VIEW DEFECTIVE. (Material Cost)

4

-

-

... More
DOMESTIC FW SYSTEM THROUGHOUT SHIP CARRY OUT ROUTINES OF FW SYSTEMS AS FOLLOWS: - REPLACE AND CALIBRATE PRESSURE GAUGES. (Service Cost)

6

-

-

... More
DOMESTIC FW SYSTEM THROUGHOUT SHIP CARRY OUT ROUTINES OF FW SYSTEMS AS FOLLOWS: - REPLACE AND CALIBRATE PRESSURE GAUGES. (Material Cost)

6

-

-

... More
JS FIRE FIGHTING SYSTEM NEAR CO CABIN/ QUERTER DECK UNDERTAKE OVERHAUL OF THE JS(HALON) FIRE FIGHTING SYSTEMS (FWD AND AFT) AS FOLLOWS: - REPLACE AND CALIBRATE PRESSURE GAUGES. (Service Cost)

10

-

-

... More
JS FIRE FIGHTING SYSTEM NEAR CO CABIN/ QUERTER DECK UNDERTAKE OVERHAUL OF THE JS(HALON) FIRE FIGHTING SYSTEMS (FWD AND AFT) AS FOLLOWS: - REPLACE AND CALIBRATE PRESSURE GAUGES. (Material Cost)

10

-

-

... More
MGT STARTING & TURNING SYSTEM (CRUISE/ BOOST-1241RE) AER/ FER CALIBRATE ALL PRESSURE GAUGES. REPLACE DEFECTIVE (Service Cost)

50

-

-

... More
MGT STARTING & TURNING SYSTEM (CRUISE/ BOOST-1241RE) AER/ FER CALIBRATE ALL PRESSURE GAUGES. REPLACE DEFECTIVE (Material Cost)

50

-

-

... More
MGT FUEL OIL SYSTEM (GT CRUISE/ BOOST) AER/FER CARRY OUT FUNCTIONAL CHECKS OF CONTROL INSTRUMENTATION. REPLACE IF REQUIRED. (Service Cost)

2

-

-

... More
MGT FUEL OIL SYSTEM (GT CRUISE/ BOOST) AER/FER CARRY OUT FUNCTIONAL CHECKS OF CONTROL INSTRUMENTATION. REPLACE IF REQUIRED. (Material Cost)

2

-

-

... More
REFRIGERATION PLANT (700 KCAL/HR) REFRIGERATION PLANT (700 KCAL/HR) ASP PORT STORE/ ASP STBD CANTEEN/ SHIPS GALLEY RENEW & CALIBRATE ALL INSTRUMENTATION (Service Cost)

4

-

-

... More
REFRIGERATION PLANT (700 KCAL/HR) REFRIGERATION PLANT (700 KCAL/HR) ASP PORT STORE/ ASP STBD CANTEEN/ SHIPS GALLEY RENEW & CALIBRATE ALL INSTRUMENTATION (Material Cost)

4

-

-

... More
SANITARY PUMP AER PORT UNDERTAKE FOLLOWING ON SANITARY PUMP: - REPLACE AND CALIBRATE ALL INSTRUMENTATION. (Service Cost)

4

-

-

... More
SANITARY PUMP AER PORT UNDERTAKE FOLLOWING ON SANITARY PUMP: - REPLACE AND CALIBRATE ALL INSTRUMENTATION. (Material Cost)

4

-

-

... More
STEERING GEAR (SERVESTAL 124PE/RE) ASP CARRY OUT MAJOR OVERHAUL OF STEERING GEAR SYSTEM WITH ASSOCIATED PUMP, MOTORS, CONTROLS, REPEATERS AS FOLLOWS:- REPLACE AND CALIBRATE ALL PRESSURE GAUGES. (Service Cost)

6

-

-

... More
STEERING GEAR (SERVESTAL 124PE/RE) ASP CARRY OUT MAJOR OVERHAUL OF STEERING GEAR SYSTEM WITH ASSOCIATED PUMP, MOTORS, CONTROLS, REPEATERS AS FOLLOWS:- REPLACE AND CALIBRATE ALL PRESSURE GAUGES. (Material Cost)

6

-

-

... More
STEERING GEAR (SERVESTAL 124PE/RE) ASP CARRY OUT MAJOR OVERHAUL OF STEERING GEAR SYSTEM WITH ASSOCIATED PUMP, MOTORS, CONTROLS, REPEATERS AS FOLLOWS:- UNDERTAKE CALIBRATION AND REPLACEMENT OF STEERING GEAR SYSTEM PRESSURE GAUGES. RANGE: 0-100 KGF/CM2, (Service Cost)

6

-

-

... More
STEERING GEAR (SERVESTAL 124PE/RE) ASP CARRY OUT MAJOR OVERHAUL OF STEERING GEAR SYSTEM WITH ASSOCIATED PUMP, MOTORS, CONTROLS, REPEATERS AS FOLLOWS:- UNDERTAKE CALIBRATION AND REPLACEMENT OF STEERING GEAR SYSTEM PRESSURE GAUGES. RANGE: 0-100 KGF/CM2, (Material Cost)

6

-

-

... More
STEERING GEAR (SERVESTAL 124PE/RE) ASP CARRY OUT MAJOR OVERHAUL OF STEERING GEAR SYSTEM WITH ASSOCIATED PUMP, MOTORS, CONTROLS, REPEATERS AS FOLLOWS:- UNDERTAKE CALIBRATION OF HYDRAULIC SYSTEM PRESSURE GAUGES. RANGE: 0-250 KGF/CM2, (Service Cost)

4

-

-

... More
STEERING GEAR (SERVESTAL 124PE/RE) ASP CARRY OUT MAJOR OVERHAUL OF STEERING GEAR SYSTEM WITH ASSOCIATED PUMP, MOTORS, CONTROLS, REPEATERS AS FOLLOWS:- UNDERTAKE CALIBRATION OF HYDRAULIC SYSTEM PRESSURE GAUGES. RANGE: 0-250 KGF/CM2, (Material Cost)

4

-

-

... More
STEERING GEAR (SERVESTAL 124PE/RE) ASP CARRY OUT MAJOR OVERHAUL OF STEERING GEAR SYSTEM WITH ASSOCIATED PUMP, MOTORS, CONTROLS, REPEATERS AS FOLLOWS:- ORION LEAKAGE OBSERVED INI THE THE 4/3 VALVE LEADING TO INADVERT OPERATIONAL. UNDERTAKE REPAIR AND OVERHAULING OF 4/3 WAY VV OF STEERING GEAR SYSTEM SYSTEM. (Service Cost)

4

-

-

... More
STEERING GEAR (SERVESTAL 124PE/RE) ASP CARRY OUT MAJOR OVERHAUL OF STEERING GEAR SYSTEM WITH ASSOCIATED PUMP, MOTORS, CONTROLS, REPEATERS AS FOLLOWS:- ORION LEAKAGE OBSERVED INI THE THE 4/3 VALVE LEADING TO INADVERT OPERATIONAL. UNDERTAKE REPAIR AND OVERHAULING OF 4/3 WAY VV OF STEERING GEAR SYSTEM SYSTEM. (Material Cost)

4

-

-

... More
STEERING SYSTEM (AIST-12-10) TILLER FLAT UNDERTAKE FOLLOWING ROUTINES OVERHAUL OF STEERING SYSTEM: - REPLACE AND CALIBRATE PRESSURE GAUGES VIEW ERRATIC READING(Service Cost)

4

-

-

... More
STEERING SYSTEM (AIST-12-10) TILLER FLAT UNDERTAKE FOLLOWING ROUTINES OVERHAUL OF STEERING SYSTEM: - REPLACE AND CALIBRATE PRESSURE GAUGES VIEW ERRATIC READING(Material Cost)

4

-

-

... More
HP AIR COMPRESSOR (ELGI EKPA 2/150) - AER/FER UNDERTAKE FOLLOWING ON BOTH HPAC COMPRESSORS :-

-

-

-

... More
HP AIR COMPRESSOR (ELGI EKPA 2/150) AER/FER UNDERTAKE FOLLOWING ON BOTH HPAC COMPRESSORS :- REPLACEMENT OF HPAC NO 1 CONTROL PANEL. (EQUIPMENT SUPPLLIED BY NAVY) (Service Cost)

1

-

-

... More
HP AIR COMPRESSOR (ELGI EKPA 2/150) AER/FER UNDERTAKE FOLLOWING ON BOTH HPAC COMPRESSORS :- REPLACEMENT OF HPAC NO 1 CONTROL PANEL. (EQUIPMENT SUPPLLIED BY NAVY) (Material Cost)

1

-

-

... More
HP AIR COMPRESSOR (ELGI EKPA 2/150) AER/FER UNDERTAKE FOLLOWING ON BOTH HPAC COMPRESSORS :- REPLACEMENT OF HPAC NO 2 CONTROL PANEL. (EQUIPMENT SUPPLIED BY NAVY) (Service Cost)

1

-

-

... More
HP AIR COMPRESSOR (ELGI EKPA 2/150) AER/FER UNDERTAKE FOLLOWING ON BOTH HPAC COMPRESSORS :- REPLACEMENT OF HPAC NO 2 CONTROL PANEL. (EQUIPMENT SUPPLIED BY NAVY) (Material Cost)

1

-

-

... More
HP AIR COMPRESSOR (ELGI EKPA 2/150) AER/FER UNDERTAKE FOLLOWING ON BOTH HPAC COMPRESSORS :- REPLACE AUTO CUT IN AND CUT OFF SYSTEM AND STW FOR CORRECT OPERATION (Service Cost)

2

-

-

... More
HP AIR COMPRESSOR (ELGI EKPA 2/150) AER/FER UNDERTAKE FOLLOWING ON BOTH HPAC COMPRESSORS :- REPLACE AUTO CUT IN AND CUT OFF SYSTEM AND STW FOR CORRECT OPERATION (Material Cost)

2

-

-

... More
HP AIR COMPRESSOR (ELGI EKPA 2/150) AER/FER UNDERTAKE FOLLOWING ON BOTH HPAC COMPRESSORS :- UNDERTAKE REFURBISHMENT OF REMOTE OPERATION PANEL IN MCR (QTY 1). REPLACE CABLING, INERNAL WIRING, SWITCHES, RELAYS, INDICATORS, KNOBs ETC VIEW WORN OUT DUE TO PROLONED USAGE. (Service Cost)

1

-

-

... More
HP AIR COMPRESSOR (ELGI EKPA 2/150) AER/FER UNDERTAKE FOLLOWING ON BOTH HPAC COMPRESSORS :- UNDERTAKE REFURBISHMENT OF REMOTE OPERATION PANEL IN MCR (QTY 1). REPLACE CABLING, INERNAL WIRING, SWITCHES, RELAYS, INDICATORS, KNOBs ETC VIEW WORN OUT DUE TO PROLONED USAGE. (Material Cost)

1

-

-

... More
HP AIR SYSTEM SCATTERED UNDERTAKE FOLLOWING ON HP AIR SYSTEM COMPRESSORS :- FOLLOWING GAUGES DEFECTIVE. REPLACE THE AIR SYSTEM PRESSURE GAUGES. (A) RANGE: 0-250 KGF/CM2, QTY- 10. (B) RANGE: 0-100 KGF/CM2, QTY- 05. (C) RANGE:0-40 KGF/CM2, QTY-05. (Service Cost)

20

-

-

... More
HP AIR SYSTEM SCATTERED UNDERTAKE FOLLOWING ON HP AIR SYSTEM COMPRESSORS :- FOLLOWING GAUGES DEFECTIVE. REPLACE THE AIR SYSTEM PRESSURE GAUGES. (A) RANGE: 0-250 KGF/CM2, QTY- 10. (B) RANGE: 0-100 KGF/CM2, QTY- 05. (C) RANGE:0-40 KGF/CM2, QTY-05. (Material Cost)

20

-

-

... More
REFRIGERATION PLANT (700 KCAL/HR) ASP PORT STORE/ ASP STBD CANTEEN/ SHIPS GALLEY

-

-

-

... More
REFRIGERATION PLANT (700 KCAL/HR) ASP PORT STORE/ ASP STBD CANTEEN/ SHIPS GALLEY CARRY OUT MAJOR OVERHAUL OF REFRIGERATION PLANTS WITH ASSOCIATED CONTROLS AND CUTOUTS (Service Cost)

3

-

-

... More
REFRIGERATION PLANT (700 KCAL/HR) ASP PORT STORE/ ASP STBD CANTEEN/ SHIPS GALLEY CARRY OUT MAJOR OVERHAUL OF REFRIGERATION PLANTS WITH ASSOCIATED CONTROLS AND CUTOUTS (Material Cost)

3

-

-

... More
SHIPS FUEL SYSTEM (1241RE/PE) SCATTERED UNDERTAKE OVERHAUL OF TANK LEVEL SYSTEM

-

-

-

... More
UNDERTAKE OVERHAUL OF TANK LEVEL SYSTEM. REPLACE SENSORS AND CABLING. PROVE SYSTEM IN LOCAL AND REMOTE OPERATION . SENSORS - 07NOS (Service Cost)

1

-

-

... More
SHIPS FUEL SYSTEM (1241RE/PE) SCATTERED UNDERTAKE OVERHAUL OF TANK LEVEL SYSTEM. REPLACE SENSORS AND CABLING. PROVE SYSTEM IN LOCAL AND REMOTE OPERATION . SENSORS - 07NOS (Material Cost)

1

-

-

... More
SHIPS FUEL SYSTEM (1241RE/PE) SCATTERED ELECTROMAGNETIC VALVES OF SHIP FUEL SYSTEM NOT HOLDING. UNDERTAKE OF ELECTROMAGNETIC VALVE MOTOR, AND OF VALVE SEATING VIEW SEEAPAGE IN CLOSED POSITION. (Service Cost)

12

-

-

... More
SHIPS FUEL SYSTEM (1241RE/PE) SCATTERED ELECTROMAGNETIC VALVES OF SHIP FUEL SYSTEM NOT HOLDING. UNDERTAKE OF ELECTROMAGNETIC VALVE MOTOR, AND OF VALVE SEATING VIEW SEEAPAGE IN CLOSED POSITION. (Material Cost)

12

-

-

... More
SHIPS FUEL SYSTEM (1241RE/PE) SCATTERED EM VALVES AND EMERGENCY DRAIN VALVES NOT OPERATING FROM MCR. UNDERTAKE REPAIRS AND OVERHAULING CONTROL CIRCUIT FROM CCC PANEL TO EACH VALVE AND PROVE REMOTE OPERATIONS (TOTAL CKTS - 12 NO) (Service Cost)

1

-

-

... More
SHIPS FUEL SYSTEM (1241RE/PE) SCATTERED EM VALVES AND EMERGENCY DRAIN VALVES NOT OPERATING FROM MCR. UNDERTAKE REPAIRS AND OVERHAULING CONTROL CIRCUIT FROM CCC PANEL TO EACH VALVE AND PROVE REMOTE OPERATIONS (TOTAL CKTS - 12 NO) (Material Cost)

1

-

-

... More
SHIPS FUEL SYSTEM (1241RE/PE) SCATTERED REPLACE LOW/HIGH LEVEL SENSORS OF ALL SEVEN FUEL TANKS AND PROVE FUNCTIONALITY FROM CCC PANEL. (QTY - 18 NO) (Service Cost)

1

-

-

... More
SHIPS FUEL SYSTEM (1241RE/PE) SCATTERED REPLACE LOW/HIGH LEVEL SENSORS OF ALL SEVEN FUEL TANKS AND PROVE FUNCTIONALITY FROM CCC PANEL. (QTY - 18 NO) (Material Cost)

1

-

-

... More
SHIPS FUEL SYSTEM (1241RE/PE) SCATTERED FOLLOWING GAUGES READING ERRATIC AND MALFUNCTIONING. UNDEERTAKE CALIBRATION/ SERVICABLITY CHECKS OF FOLLOWING PRESSURE GAUGES.(A) -1 TO 1.5 KGF/CM2,(B) 0 TO 16 KGF/CM2,QTY- 03 (C) 02TO 10 KGF/CM2,QTY- 02(D) 0 TO 9 KGF/CM2,QTY- 01(E) 0 TO 150 KGF/CM2,QTY-01(F) 0 TO 4 KGF/CM2, " REPLACE IF REQUIRED. (Service Cost)

20

-

-

... More
SHIPS FUEL SYSTEM (1241RE/PE) SCATTERED FOLLOWING GAUGES READING ERRATIC AND MALFUNCTIONING. UNDEERTAKE CALIBRATION/ SERVICABLITY CHECKS OF FOLLOWING PRESSURE GAUGES.(A) -1 TO 1.5 KGF/CM2,(B) 0 TO 16 KGF/CM2,QTY- 03 (C) 02TO 10 KGF/CM2,QTY- 02(D) 0 TO 9 KGF/CM2,QTY- 01(E) 0 TO 150 KGF/CM2,QTY-01(F) 0 TO 4 KGF/CM2, " REPLACE IF REQUIRED. (Material Cost)

20

-

-

... More
PENUMATIC SIREN (TYPHOON) SUPER STRUCTURE

-

-

-

... More
PENUMATIC SIREN (TYPHOON) SUPER STRUCTURE CALIBRATE CONTROL INSTRUMENTS. (Service Cost)

1

-

-

... More
PENUMATIC SIREN (TYPHOON) SUPER STRUCTURE CALIBRATE CONTROL INSTRUMENTS. (Material Cost)

1

-

-

... More
PENUMATIC SIREN (TYPHOON) SUPER STRUCTURE RENEW TYPHOON ASSEMBLY. (Service Cost)

1

-

-

... More
PENUMATIC SIREN (TYPHOON) SUPER STRUCTURE RENEW TYPHOON ASSEMBLY. (Material Cost)

1

-

-

... More
PENUMATIC SIREN (TYPHOON) SUPER STRUCTURE REPLACE SOLENOID VALVE/MANUAL VALVE. (Service Cost)

2

-

-

... More
PENUMATIC SIREN (TYPHOON) SUPER STRUCTURE REPLACE SOLENOID VALVE/MANUAL VALVE. (Material Cost)

2

-

-

... More
PENUMATIC SIREN (TYPHOON) SUPER STRUCTURE OFFER SYSTEM TRIALS AS PER IN STANDARDS INCLUDING SEA TRIALS AND PROVE SYSTEM (Service Cost)

1

-

-

... More
SHIP'S SIREN (EQUIPMENT WILL BE PROVIDED BY IN) WHEEL HOUSE UNDERTAKE INSTALLATION OF SHIPS SIREN AS FOLLOWS: - (A) REMOVE OLD GT SIREN INCLUDING MOUNTS, CABLING, FOUNDATIONS ETC. (B) INSTALLATION, CABLING & CONNECTORISATION OF SIREN, CONTROL PANEL AND ASSOCIATED COMPONENTS AS PER IN APPROVED BPs AND DRAWINGS. (C) CARRY OUT STW, PROVE FUNCTIONING OF SYSTEM AS PER APPROVED BPs. (D) OFFER SYSTEM HATs TO ETMA/ SS (Service Cost)

1

-

-

... More
SHIP'S SIREN (EQUIPMENT WILL BE PROVIDED BY IN) WHEEL HOUSE UNDERTAKE INSTALLATION OF SHIPS SIREN AS FOLLOWS: - (A) REMOVE OLD GT SIREN INCLUDING MOUNTS, CABLING, FOUNDATIONS ETC. (B) INSTALLATION, CABLING & CONNECTORISATION OF SIREN, CONTROL PANEL AND ASSOCIATED COMPONENTS AS PER IN APPROVED BPs AND DRAWINGS. (C) CARRY OUT STW, PROVE FUNCTIONING OF SYSTEM AS PER APPROVED BPs. (D) OFFER SYSTEM HATs TO ETMA/ SS (Material Cost)

1

-

-

... More
SIRS 4012 A WHEEL HOUSE

-

-

-

... More
UNDERTAKE THE FOLLOWING ON SIRS SYSTEM CALIBRATION/ SERVIABILITY CHECKS OF RADIOACTIVE SOURCE OF SIRS. CALIBRATION/ SERVICEABILITY CHECK OF FOLLOWINGS:-(A)SIRS SYSTEM WITH SENSORS. (B)RADIATION SURVEY METER. (C) POCKET DOZIMETER. (D) CONTAMINATION MONITOR. RENEWAL OF ALL BASE MOUNT PLATES OF SIRS SENSORS IN VIEW OF CORRODED/DAMAGED(QTY-05). REPAIR OF POCKET DOZY METER 04 IN NO, RADIATION SURVEY METER 01 IN NO, DE-CONTAMINATION METER 01 IN NO REPAIR OF 05 IN NO OFF SIRS SENSORS (Service Cost)

1

-

-

... More
UNDERTAKE THE FOLLOWING ON SIRS SYSTEM CALIBRATION/ SERVIABILITY CHECKS OF RADIOACTIVE SOURCE OF SIRS. CALIBRATION/ SERVICEABILITY CHECK OF FOLLOWINGS:-(A)SIRS SYSTEM WITH SENSORS. (B)RADIATION SURVEY METER. (C) POCKET DOZIMETER. (D) CONTAMINATION MONITOR. RENEWAL OF ALL BASE MOUNT PLATES OF SIRS SENSORS IN VIEW OF CORRODED/DAMAGED(QTY-05). REPAIR OF POCKET DOZY METER 04 IN NO, RADIATION SURVEY METER 01 IN NO, DE-CONTAMINATION METER 01 IN NO REPAIR OF 05 IN NO OFF SIRS SENSORS (Material Cost)

1

-

-

... More
MISC CATTERED

-

-

-

... More
NAGMAN LP CALIBERATOR DEFUCNTIONAL. UNDERTAKE SERVICEBILITY CHECKS AND CALIBERATION AND REPAIR OF NAGMAN LP CALIBERATOR (Service Cost)

1

-

-

... More
NAGMAN LP CALIBERATOR DEFUCNTIONAL. UNDERTAKE SERVICEBILITY CHECKS AND CALIBERATION AND REPAIR OF NAGMAN LP CALIBERATOR (Material Cost)

1

-

-

... More
NAGMAN HP CALIBERATOR NOT OPERATIONAL. UNDERTAKE SERVICEBILITY CHECKS AND CALIBERATION AND REPAIR OF NAGMAN HP CALIBERATOR (Service Cost)

1

-

-

... More
NAGMAN HP CALIBERATOR NOT OPERATIONAL. UNDERTAKE SERVICEBILITY CHECKS AND CALIBERATION AND REPAIR OF NAGMAN HP CALIBERATOR (Material Cost)

1

-

-

... More
KITTIWAKE LUB OIL TEST KIT READING ERRATIC VALUES/ DEFUNC. UNDERTAKE REPAIRS AND PROVE SERVICEBILITY CHECKS AND CALIBERATION OF KITIWAKE TEST KIT (Service Cost)

1

-

-

... More
KITTIWAKE LUB OIL TEST KIT READING ERRATIC VALUES/ DEFUNC. UNDERTAKE REPAIRS AND PROVE SERVICEBILITY CHECKS AND CALIBERATION OF KITIWAKE TEST KIT (Material Cost)

1

-

-

... More
ELECTRICAL AND WEAPONS WORK PACKAGE

-

-

-

... More
ADDRESSABLE FLOOD ALARM SYSTEM (AFAS) (Make M/s L&T, India) (EQUIPMENT WILL BE SUPPLIED BY IN) VARIOUS "UNDERTAKE ROUTINES OF AFAS AS FOLLOWS:-" (A) REMOVE(AS PART OF DEGUTTING), REPLACE DEFECTIVE SYSTEM COMPONENTS INCLUDING SENSORS, FOUNDATIONS, CABLES, DBs, PANELS ETC. (B) REGUTTING/ INSTALLATION, CABLING & CONNECTORISATION OF AFAS SENSORS, FOUNDATIONS, CONTROL UNITS AND ASSOCIATED COMPONENTS AS PER IN APPROVED BPs AND DRAWINGS. (C) CARRY OUT AUGMENTATION (ADDITION) OF SENSORS, I.A.W.AMMENDED IN POLICY (D) CARRY OUT STW, PROVE FUNCTIONING OF SYSTEM AS PER APPROVED BPs. (E) OFFER SYSTEM CHECKS TO ETMA (Service Cost)

1

-

-

... More
ADDRESSABLE FLOOD ALARM SYSTEM (AFAS) (Make M/s L&T, India) (EQUIPMENT WILL BE SUPPLIED BY IN) VARIOUS "UNDERTAKE ROUTINES OF AFAS AS FOLLOWS:-" (A) REMOVE(AS PART OF DEGUTTING), REPLACE DEFECTIVE SYSTEM COMPONENTS INCLUDING SENSORS, FOUNDATIONS, CABLES, DBs, PANELS ETC. (B) REGUTTING/ INSTALLATION, CABLING & CONNECTORISATION OF AFAS SENSORS, FOUNDATIONS, CONTROL UNITS AND ASSOCIATED COMPONENTS AS PER IN APPROVED BPs AND DRAWINGS. (C) CARRY OUT AUGMENTATION (ADDITION) OF SENSORS, I.A.W.AMMENDED IN POLICY (D) CARRY OUT STW, PROVE FUNCTIONING OF SYSTEM AS PER APPROVED BPs. (E) OFFER SYSTEM CHECKS TO ETMA (Material Cost)

1

-

-

... More
Scope 2 - Instrumentation Jobs of Various Systems - (RM.0789)

-

-

-

... More
HULL WORK PACKAGE

-

-

-

... More
UNDERTAKE MAJOR OVERHAUL OF FWD CAPSTAN AS FOLLOWS: - (IV) REPLACE THE PRESSURE GAUGE (04 NO) (IX) REPLACE SOLENOID VALVES (04 NO) (Service Cost)

1

-

-

... More
UNDERTAKE MAJOR OVERHAUL OF FWD CAPSTAN AS FOLLOWS: - (IV) REPLACE THE PRESSURE GAUGE (04 NO) (IX) REPLACE SOLENOID VALVES (04 NO) (Material Cost)

1

-

-

... More
ENGINEERING WORK PACKAGE

-

-

-

... More
SHAFT RPM INDICATOR IS DEFECTIVE AND NOT SHOWING SPRM READINGS ON CCC. REPLACE OF SHAFT RPM INDICATOR. (Service Cost)

4

-

-

... More
SHAFT RPM INDICATOR IS DEFECTIVE AND NOT SHOWING SPRM READINGS ON CCC. REPLACE OF SHAFT RPM INDICATOR. (Material Cost)

4

-

-

... More
A/C CONDENSATE SYSTEM - VARIOUS PLACES UNDERTAKE ROUTINES OF AC CONDENSATE SYSTEM AS FOLLOWS: -

-

-

-

... More
UNDERTAKE ROUTINES OF AC CONDENSATE SYSTEM AS FOLLOWS: - REPLACE AND CALIBRATE PRESSURE GAUGES (SUCTION AND DISCHARGE QTY 07) VIEW GAUGE MALFUNCTIONING. (Service Cost)

1

-

-

... More
UNDERTAKE ROUTINES OF AC CONDENSATE SYSTEM AS FOLLOWS: - REPLACE AND CALIBRATE PRESSURE GAUGES (SUCTION AND DISCHARGE QTY 07) VIEW GAUGE MALFUNCTIONING. (Material Cost)

1

-

-

... More
UNDERTAKE ROUTINES OF AC CONDENSATE SYSTEM AS FOLLOWS: - AUTO CUT IN / CUT OUT DFECTIVE. TO BE REFURBISHED BY REPLACING LEVEL SENSORS, CABLING ETC. OFFER TRIALS OF SYSTEM (Service Cost)

1

-

-

... More
UNDERTAKE ROUTINES OF AC CONDENSATE SYSTEM AS FOLLOWS: - AUTO CUT IN / CUT OUT DFECTIVE. TO BE REFURBISHED BY REPLACING LEVEL SENSORS, CABLING ETC. OFFER TRIALS OF SYSTEM (Material Cost)

1

-

-

... More
UNDERTAKE OVERHAUL/ ROUTINES ON ALL 07 PACKAGE Acs AS FOLLOWS (MAKE VOLTAS, CAPACITY - 4 TR) : - REPLACE AND CALIBRATE ALL PRESSURE AND TEMPERATURE GAUGES.(QTY-07 EACH) VIEW MALFUNCTIONING. (Service Cost)

1

-

-

... More
UNDERTAKE OVERHAUL/ ROUTINES ON ALL 07 PACKAGE Acs AS FOLLOWS (MAKE VOLTAS, CAPACITY - 4 TR) : - REPLACE AND CALIBRATE ALL PRESSURE AND TEMPERATURE GAUGES.(QTY-07 EACH) VIEW MALFUNCTIONING. (Material Cost)

1

-

-

... More
UNDERTAKE OVERHAUL/ ROUTINES ON ALL 07 PACKAGE Acs AS FOLLOWS (MAKE VOLTAS, CAPACITY - 4 TR) : - AC PLANT NOT TRIPPING DURING PROTECTION CHECKS. REPLACE AND UNDERTAKE CALIBRATION CHECKS OF CUTOUTS (A) LP CUT OUT (B) TEMP CUTOUT (C) HP CUTOUT, RANGE 270 PSI. (Service Cost)

21

-

-

... More
UNDERTAKE OVERHAUL/ ROUTINES ON ALL 07 PACKAGE Acs AS FOLLOWS (MAKE VOLTAS, CAPACITY - 4 TR) : - AC PLANT NOT TRIPPING DURING PROTECTION CHECKS. REPLACE AND UNDERTAKE CALIBRATION CHECKS OF CUTOUTS (A) LP CUT OUT (B) TEMP CUTOUT (C) HP CUTOUT, RANGE 270 PSI. (Material Cost)

21

-

-

... More
FER & AER UNDERTAKE 12K ROUTINES OF DA 1, 2 & 3 USING OEM SUPPLIED MOH SPARES KIT (REF MAINTOP NO. 410002) AS FOLLOWS

-

-

-

... More
REMOVE AND CHECK THE OVER SPEED TRIP (PROTECTION DEVICE/ SENSOR) FOR CORRECT SETTING/FUNCTIONING, CALIBRATE IF NECESSARY. (Service Cost)

1

-

-

... More
REMOVE AND CHECK THE OVER SPEED TRIP (PROTECTION DEVICE/ SENSOR) FOR CORRECT SETTING/FUNCTIONING, CALIBRATE IF NECESSARY. (Material Cost)

1

-

-

... More
MANUFACTURING OF FOLLOWING COVER AS PER DIMENSIONS (A) DA CONTROL PANEL, MAT-GI SHEET. (B) DA CONTROL PANEL MAT-GI SHEET. (C) DA JUNCTION BOX, MAT- GI SHEET. OEM:- M/S Cummins India(Service Cost)

9

-

-

... More
MANUFACTURING OF FOLLOWING COVER AS PER DIMENSIONS (A) DA CONTROL PANEL, MAT-GI SHEET. (B) DA CONTROL PANEL MAT-GI SHEET. (C) DA JUNCTION BOX, MAT- GI SHEET. OEM:- M/S Cummins India (Material Cost)

9

-

-

... More
PROVIDE & FITMENT OF MANOMETERS ON DA NO. 1,2 AND 3 TURBOCHARGER OEM:- M/S Cummins India(Service Cost)

3

-

-

... More
PROVIDE & FITMENT OF MANOMETERS ON DA NO. 1,2 AND 3 TURBOCHARGER OEM:- M/S Cummins India (Material Cost)

3

-

-

... More
ENGINE ROOM UNDERTAKE RENEWAL OF ALL THREE DA CONTROL WIRING FROM CONTROL PANEL/ BUPS PANEL TO LOCAL CONTROL PANEL IN VIEW OF WIRE PERISHED. (Service Cost)

3

-

-

... More
ENGINE ROOM UNDERTAKE RENEWAL OF ALL THREE DA CONTROL WIRING FROM CONTROL PANEL/ BUPS PANEL TO LOCAL CONTROL PANEL IN VIEW OF WIRE PERISHED. (Material Cost)

3

-

-

... More
ENGINE ROOM UNDERTAKE MANUFACURING OF CABLE TRAY/ CLAMPS FOR PROPER SECURING ARRANGEMENT OF CABLES OF ALL THREE DAS. LCP to engine 10mtr each DA, total 30mtrs (Service Cost)

20

-

-

... More
ENGINE ROOM UNDERTAKE MANUFACURING OF CABLE TRAY/ CLAMPS FOR PROPER SECURING ARRANGEMENT OF CABLES OF ALL THREE DAS. LCP to engine 10mtr each DA, total 30mtrs (Material Cost)

20

-

-

... More
ENGINE ROOM UNDERTAKE SERVICEABILITY CHECK OF DA LOCAL JUNCTION BOXES. (Service Cost)

3

-

-

... More
ENGINE ROOM UNDERTAKE SERVICEABILITY CHECK OF DA LOCAL JUNCTION BOXES. (Material Cost)

3

-

-

... More
ENGINE ROOM REWIRING OF DA CONTROL WIRES BETWEEN LOCAL CONTROL AND REMOTE CONTROL IN VIEW OF EXCESSIVE PERISHED. LENGTH- 40 MTRS. (Service Cost)

1

-

-

... More
ENGINE ROOM REWIRING OF DA CONTROL WIRES BETWEEN LOCAL CONTROL AND REMOTE CONTROL IN VIEW OF EXCESSIVE PERISHED. LENGTH- 40 MTRS. (Material Cost)

1

-

-

... More
D/A GOVERNING SYSTEM ENGINE ROOM REWIRING OF DA INSTRUMENTATION SENSOR WIRES IN VIEW OF EXCESSIVE PERISHED. LENGTH- 30 MTRS. (Service Cost)

1

-

-

... More
D/A GOVERNING SYSTEM ENGINE ROOM REWIRING OF DA INSTRUMENTATION SENSOR WIRES IN VIEW OF EXCESSIVE PERISHED. LENGTH- 30 MTRS. (Material Cost)

1

-

-

... More
ENGINE ROOM UNDERTAKE RENEWAL OF ALL THREE DA METALLIC CONDUCT FOR WIRING FROM CONTROL PANEL TO LOCAL CONTROL PANEL AND LOCAL CONTROL PANEL TO DA IN VIEW OF CORRODED. (Service Cost)

3

-

-

... More
ENGINE ROOM UNDERTAKE RENEWAL OF ALL THREE DA METALLIC CONDUCT FOR WIRING FROM CONTROL PANEL TO LOCAL CONTROL PANEL AND LOCAL CONTROL PANEL TO DA IN VIEW OF CORRODED. (Material Cost)

3

-

-

... More
D/A GOVERNING SYSTEM ENGINE ROOM UNDERTAKE COMPLETE REFURBISHENT OF ALL THREE DA LOCAL CONTROL PANEL AND FITMENT. (MAKE - M/S SYMPTRONICS)(Service Cost)

3

-

-

... More
D/A GOVERNING SYSTEM ENGINE ROOM UNDERTAKE COMPLETE REFURBISHENT OF ALL THREE DA LOCAL CONTROL PANEL AND FITMENT. (MAKE - M/S SYMPTRONICS)(Material Cost)

3

-

-

... More
ENGINE ROOM UNDERTAKE RENEWAL OF ALL THREE DA SENSOR/ INSTRUMENTATION WING IN VIEW OF WIRE PERISHED. (Service Cost)

1

-

-

... More
ENGINE ROOM UNDERTAKE RENEWAL OF ALL THREE DA SENSOR/ INSTRUMENTATION WING IN VIEW OF WIRE PERISHED. (Material Cost)

1

-

-

... More
ENGINE ROOM UNDERTAKE COMPLETE REFURBISHMENT OF REMOTE CONTROL PANEL OF ALL THREE DAS IN MCR IN VIEW OF FAULTY ALARM AND INDICATION LAMP NOT GLOWING PROPERLY. (Service Cost)

1

-

-

... More
ENGINE ROOM UNDERTAKE COMPLETE REFURBISHMENT OF REMOTE CONTROL PANEL OF ALL THREE DAS IN MCR IN VIEW OF FAULTY ALARM AND INDICATION LAMP NOT GLOWING PROPERLY. (Material Cost)

1

-

-

... More
AC DIESEL ALTERNATOR (MCK 103-4) AFT ENGINE ROOM/FWD ENGINE ROOM REPLACE (A) THERMO-COUPLE (B) ELECTRICAL TEMPERATURE INDICATOR. (C) TACHO-METER TRANSMITTER. (Service Cost)

5

-

-

... More
AC DIESEL ALTERNATOR (MCK 103-4) AFT ENGINE ROOM/FWD ENGINE ROOM REPLACE (A) THERMO-COUPLE (B) ELECTRICAL TEMPERATURE INDICATOR. (C) TACHO-METER TRANSMITTER. (Material Cost)

5

-

-

... More
AC DIESEL ALTERNATOR (MCK 92-4) NO.3 DA UNDERTAKE OVERHAUL OF ALTERNATERS AS FOLLOWS: - REPLACE (A) THERMO-COUPLE (B) ELECTRICAL TEMPERATURE INDICATOR. (C) TACHO-METER TRANSMITTER. (Service Cost)

5

-

-

... More
AC DIESEL ALTERNATOR (MCK 92-4) NO.3 DA UNDERTAKE OVERHAUL OF ALTERNATERS AS FOLLOWS: - REPLACE (A) THERMO-COUPLE (B) ELECTRICAL TEMPERATURE INDICATOR. (C) TACHO-METER TRANSMITTER. (Material Cost)

5

-

-

... More
DIESEL GENERATOR CONTROL ENGINE ROOMS AND MCR CARRY OUT REFUBISHMENT OF BOTH MAIN AND REMOTE PANELS. (MAKE - M/S SYMPTRONICS) REPLACE INSTRUMENTS (METERS) (Service Cost)

3

-

-

... More
DIESEL GENERATOR CONTROL ENGINE ROOMS AND MCR CARRY OUT REFUBISHMENT OF BOTH MAIN AND REMOTE PANELS. (MAKE - M/S SYMPTRONICS) REPLACE INSTRUMENTS (METERS) (Material Cost)

3

-

-

... More
DIESEL GENERATOR CONTROL ENGINE ROOMS AND MCR REPLACE INSTRUMENTS (METERS) (Service Cost)

18

-

-

... More
DIESEL GENERATOR CONTROL ENGINE ROOMS AND MCR REPLACE INSTRUMENTS (METERS) (Material Cost)

18

-

-

... More
DIESEL GENERATOR CONTROL (PAYMENT IN ACTUALS) ENGINE ROOMS AND MCR RENEWAL OF LUGS AND REWIRING OF CABLE (TYPE - SCREENED, 3 CORE, CORE DIA 2.5 SQ MM, COPPER) FROM ALL ALTERNATORS TO SWITCHBOARD VIEW CABLE PERISHED/ CUT/ SHOWING LOW INSULATION (Service Cost)

100

-

-

... More
DIESEL GENERATOR CONTROL (PAYMENT IN ACTUALS) ENGINE ROOMS AND MCR RENEWAL OF LUGS AND REWIRING OF CABLE (TYPE - SCREENED, 3 CORE, CORE DIA 2.5 SQ MM, COPPER) FROM ALL ALTERNATORS TO SWITCHBOARD VIEW CABLE PERISHED/ CUT/ SHOWING LOW INSULATION(Material Cost)

100

-

-

... More
DIESEL GENERATOR CONTROL ENGINE ROOMS AND MCR REWIRING FROM DA CONTROL PANEL TO LOCAL CONTROL PANEL AND JUNCTION BOX OF ALL THREE DAs IN VIEW OF CABLE PERISHED/DEGUTTED FOR HULL SURVEY(APPROX LENGTH 80 MTRS, SCREENED, 3 CORE, DIA 1.5 SQ MM, COPER) (Service Cost)

80

-

-

... More
DIESEL GENERATOR CONTROL ENGINE ROOMS AND MCR REWIRING FROM DA CONTROL PANEL TO LOCAL CONTROL PANEL AND JUNCTION BOX OF ALL THREE DAs IN VIEW OF CABLE PERISHED/DEGUTTED FOR HULL SURVEY(APPROX LENGTH 80 MTRS, SCREENED, 3 CORE, DIA 1.5 SQ MM, COPER) (Material Cost)

80

-

-

... More
DIESEL GENERATOR CONTROL ENGINE ROOMS AND MCR DA NO.1,2,3 IS NOT STARTING FROM MCR REMOTE PANEL(CCC). DEFECT IDENTIFICATION AND RECTIFICATION FOR THE SAME(Service Cost)

1

-

-

... More
DIESEL GENERATOR CONTROL ENGINE ROOMS AND MCR DA NO.1,2,3 IS NOT STARTING FROM MCR REMOTE PANEL(CCC). DEFECT IDENTIFICATION AND RECTIFICATION FOR THE SAME(Material Cost)

1

-

-

... More
UNDERTAKE OVERHAUL OF FIREMAIN PUMPS AS FOLLOWS (QTY - 02 NO, MAKE - M/S JOHNSON, CAPACITY - 60 TPH):-

-

-

-

... More
UNDERTAKE OVERHAUL OF FIREMAIN PUMPS AS FOLLOWS(QTY - 02 NO, MAKE - M/S JOHNSON, CAPACITY - 60 TPH):- REPLACE AND CALIBRATE ALL INSTRUMENTATION(PRESSURE GAUGE ETC). (Service Cost)

8

-

-

... More
UNDERTAKE OVERHAUL OF FIREMAIN PUMPS AS FOLLOWS(QTY - 02 NO, MAKE - M/S JOHNSON, CAPACITY - 60 TPH):- REPLACE AND CALIBRATE ALL INSTRUMENTATION(PRESSURE GAUGE ETC). (Material Cost)

8

-

-

... More
CARRY OUT ROUTINES OF AK 176/ AK 630 SPRINKLING SYSTEMS (QTY 02) AS FOLLOWS: - CALIBRATE/RENEW PRESSURE SWITCHES. REPLACE IF DEFECTIVE (Service Cost)

12

-

-

... More
CARRY OUT ROUTINES OF AK 176/ AK 630 SPRINKLING SYSTEMS (QTY 02) AS FOLLOWS: - CALIBRATE/RENEW PRESSURE SWITCHES. REPLACE IF DEFECTIVE (Material Cost)

12

-

-

... More
CARRY OUT ROUTINES OF FIREMAIN SYSTEMS AS FOLLOWS: - REPLACE AND REFIT PRESSURE GAUGE VALVES. (Service Cost)

4

-

-

... More
CARRY OUT ROUTINES OF FIREMAIN SYSTEMS AS FOLLOWS: - REPLACE AND REFIT PRESSURE GAUGE VALVES. (Material Cost)

4

-

-

... More
CARRY OUT ROUTINES OF FIREMAIN SYSTEMS AS FOLLOWS: - REPLACE AND CALIBRATE ALL PRESSURE GAUGES. {(A) SUCTION GAUGE - 1 TO 2 KGF/CM2 (QTY- 05) (B) DISCHARGE GAUGE - 0 TO 20 KGF/CM2 (QTY- 15), (C) 0 TO 10 KGF/CM2, QTY- 03} (Service Cost)

23

-

-

... More
CARRY OUT ROUTINES OF FIREMAIN SYSTEMS AS FOLLOWS: - REPLACE AND CALIBRATE ALL PRESSURE GAUGES. {(A) SUCTION GAUGE - 1 TO 2 KGF/CM2 (QTY- 05) (B) DISCHARGE GAUGE - 0 TO 20 KGF/CM2 (QTY- 15), (C) 0 TO 10 KGF/CM2, QTY- 03} (Material Cost)

23

-

-

... More
CARRY OUT OVERHAUL/ ROUTINES OF FOAM SMOOTHERINGTEMS AS FOLLOWS: - REPLACE AND CALIBRATE PRESSURE GAUGES. (Service Cost)

6

-

-

... More
CARRY OUT OVERHAUL/ ROUTINES OF FOAM SMOOTHERINGTEMS AS FOLLOWS: - REPLACE AND CALIBRATE PRESSURE GAUGES. (Material Cost)

6

-

-

... More
CARRY OUT OVERHAUL/ ROUTINES OF GT FIRE SMOOTHERING SYSTEMS IN BOTH ENGINE ROOMS AS FOLLOWS: - CALIBRATE PRESSURE GAUGES. (Service Cost)

5

-

-

... More
CARRY OUT OVERHAUL/ ROUTINES OF GT FIRE SMOOTHERING SYSTEMS IN BOTH ENGINE ROOMS AS FOLLOWS: - CALIBRATE PRESSURE GAUGES. (Material Cost)

5

-

-

... More
UNDERTAKE OVERHAUL OF FRESH WATER PUMP AS FOLLOWS: - REPLACE AND CALIBRATE ALL TEMPERATURE AND PRESSURE GAUGES VIEW DEFECTIVE. (Service Cost)

4

-

-

... More
UNDERTAKE OVERHAUL OF FRESH WATER PUMP AS FOLLOWS: - REPLACE AND CALIBRATE ALL TEMPERATURE AND PRESSURE GAUGES VIEW DEFECTIVE. (Material Cost)

4

-

-

... More
CARRY OUT ROUTINES OF FW SYSTEMS AS FOLLOWS: - REPLACE AND CALIBRATE PRESSURE GAUGES. (Service Cost)

6

-

-

... More
CARRY OUT ROUTINES OF FW SYSTEMS AS FOLLOWS: - REPLACE AND CALIBRATE PRESSURE GAUGES. (Material Cost)

6

-

-

... More
UNDERTAKE OVERHAUL OF THE JS(HALON) FIRE FIGHTING SYSTEMS (FWD AND AFT) AS FOLLOWS: - REPLACE AND CALIBRATE PRESSURE GAUGES. (Service Cost)

10

-

-

... More
UNDERTAKE OVERHAUL OF THE JS(HALON) FIRE FIGHTING SYSTEMS (FWD AND AFT) AS FOLLOWS: - REPLACE AND CALIBRATE PRESSURE GAUGES. (Material Cost)

10

-

-

... More
REFRIGERATION PLANT (700 KCAL/HR) ASP PORT STORE/ ASP STBD CANTEEN/ SHIPS GALLEY RENEW & CALIBRATE ALL INSTRUMENTATION . (Service Cost)

4

-

-

... More
REFRIGERATION PLANT (700 KCAL/HR) ASP PORT STORE/ ASP STBD CANTEEN/ SHIPS GALLEY RENEW & CALIBRATE ALL INSTRUMENTATION . (Material Cost)

4

-

-

... More
UNDERTAKE FOLLOWING ON SANITARY PUMP: - REPLACE AND CALIBRATE ALL INSTRUMENTATION. (Service Cost)

4

-

-

... More
UNDERTAKE FOLLOWING ON SANITARY PUMP: - REPLACE AND CALIBRATE ALL INSTRUMENTATION. (Material Cost)

4

-

-

... More
BRACKETS / CLAMPS Scattered UNDERTAKE FITMENT OF SUPPORTING BRACKETS FOR THE FOLLOWING:-(d) PRESSURE GAUGES, QTY- 100. (Service Cost)

100

-

-

... More
BRACKETS / CLAMPS Scattered UNDERTAKE FITMENT OF SUPPORTING BRACKETS FOR THE FOLLOWING:-(d) PRESSURE GAUGES, QTY- 100. (Material Cost)

100

-

-

... More
HP AIR COMPRESSOR (ELGI EKPA 2/150) - AER/FER UNDERTAKE FOLLOWING ON BOTH HPAC COMPRESSORS:-

-

-

-

... More
UNDERTAKE FOLLOWING ON BOTH HPAC COMPRESSORS :- REPLACEMENT OF HPAC NO 1 CONTROL PANEL. (EQUIPMENT BY NAVY) (Service Cost)

1

-

-

... More
UNDERTAKE FOLLOWING ON BOTH HPAC COMPRESSORS :- REPLACEMENT OF HPAC NO 1 CONTROL PANEL. (EQUIPMENT BY NAVY) (Material Cost)

1

-

-

... More
UNDERTAKE FOLLOWING ON BOTH HPAC COMPRESSORS :- REPLACEMENT OF HPAC NO 2 CONTROL PANEL. (EQUIPMENT BY NAVY) (Service Cost)

1

-

-

... More
UNDERTAKE FOLLOWING ON BOTH HPAC COMPRESSORS :- REPLACEMENT OF HPAC NO 2 CONTROL PANEL. (EQUIPMENT BY NAVY) (Material Cost)

1

-

-

... More
UNDERTAKE FOLLOWING ON BOTH HPAC COMPRESSORS :- REPLACE AUTO CUT IN AND CUT OFF SYSTEM AND STW FOR CORRECT OPERATION (Service Cost)

2

-

-

... More
UNDERTAKE FOLLOWING ON BOTH HPAC COMPRESSORS :- REPLACE AUTO CUT IN AND CUT OFF SYSTEM AND STW FOR CORRECT OPERATION (Material Cost)

2

-

-

... More
UNDERTAKE FOLLOWING ON BOTH HPAC COMPRESSORS :- UNDERTAKE REFURBISHMENT OF REMOTE OPERATION PANEL IN MCR (QTY 1). REPLACE CABLING, INERNAL WIRING, SWITCHES, RELAYS, INDICATORS, KNOBs ETC VIEW WORN OUT DUE TO PROLONED USAGE. (Service Cost)

1

-

-

... More
UNDERTAKE FOLLOWING ON BOTH HPAC COMPRESSORS :- UNDERTAKE REFURBISHMENT OF REMOTE OPERATION PANEL IN MCR (QTY 1). REPLACE CABLING, INERNAL WIRING, SWITCHES, RELAYS, INDICATORS, KNOBs ETC VIEW WORN OUT DUE TO PROLONED USAGE. (Material Cost)

1

-

-

... More
UNDERTAKE FOLLOWING ON HP AIR SYSTEM COMPRESSORS :- FOLLOWING GAUGES DEFECTIVE. REPLACE THE AIR SYSTEM PRESSURE GAUGES. (A) RANGE: 0-250 KGF/CM2, QTY- 10. (B) RANGE: 0-100 KGF/CM2, QTY- 05. (C) RANGE:0-40 KGF/CM2, QTY-05. (Service Cost)

20

-

-

... More
UNDERTAKE FOLLOWING ON HP AIR SYSTEM COMPRESSORS :- FOLLOWING GAUGES DEFECTIVE. REPLACE THE AIR SYSTEM PRESSURE GAUGES. (A) RANGE: 0-250 KGF/CM2, QTY- 10. (B) RANGE: 0-100 KGF/CM2, QTY- 05. (C) RANGE:0-40 KGF/CM2, QTY-05. (Material Cost)

20

-

-

... More
SHIPS FUEL SYSTEM (1241RE/PE) SCATTERED

-

-

-

... More
UNDERTAKE OVERHAUL OF TANK LEVEL SYSTEM. REPLACE 50% SENSORS AND CABLING. PROVE SYSTEM IN LOCAL AND REMOTE OPERATION . SENSOR- 07NOS (Service Cost)

1

-

-

... More
UNDERTAKE OVERHAUL OF TANK LEVEL SYSTEM. REPLACE 50% SENSORS AND CABLING. PROVE SYSTEM IN LOCAL AND REMOTE OPERATION . SENSOR- 07NOS (Material Cost)

1

-

-

... More
ELECTROMAGNETIC VALVES OF SHIP FUEL SYSTEM NOT HOLDING. UNDERTAKE OF ELECTROMAGNETIC VALVE MOTOR, AND OF VALVE SEATING VIEW SEEAPAGE IN CLOSED POSITION. (Service Cost)

12

-

-

... More
ELECTROMAGNETIC VALVES OF SHIP FUEL SYSTEM NOT HOLDING. UNDERTAKE OF ELECTROMAGNETIC VALVE MOTOR, AND OF VALVE SEATING VIEW SEEAPAGE IN CLOSED POSITION. (Material Cost)

12

-

-

... More
EM VALVES AND EMERGENCY DRAIN VALVES NOT OPERATING FROM MCR. UNDERTAKE REPAIRS AND OVERHAULING CONTROL CIRCUIT FROM CCC PANEL TO EACH VALVE AND PROVE REMOTE OPERATIONS (TOTAL CKTS - 12 NO) (Service Cost)

1

-

-

... More
EM VALVES AND EMERGENCY DRAIN VALVES NOT OPERATING FROM MCR. UNDERTAKE REPAIRS AND OVERHAULING CONTROL CIRCUIT FROM CCC PANEL TO EACH VALVE AND PROVE REMOTE OPERATIONS (TOTAL CKTS - 12 NO) (Material Cost)

1

-

-

... More
REPLACE LOW/HIGH LEVEL SENSORS OF ALL SEVEN FUEL TANKS AND PROVE FUNCTIONALITY FROM CCC PANEL. (QTY - 18 NO) (Service Cost)

1

-

-

... More
REPLACE LOW/HIGH LEVEL SENSORS OF ALL SEVEN FUEL TANKS AND PROVE FUNCTIONALITY FROM CCC PANEL. (QTY - 18 NO) (Material Cost)

1

-

-

... More
FOLLOWING GAUGES READING ERRATIC AND MALFUNCTIONING. UNDEERTAKE CALIBRATION/ SERVICABLITY CHECKS OF FOLLOWING PRESSURE GAUGES.(A) -1 TO 1.5 KGF/CM2,(B) 0 TO 16 KGF/CM2,QTY- 03 (C) 02TO 10 KGF/CM2,QTY- 02(D) 0 TO 9 KGF/CM2,QTY- 01(E) 0 TO 150 KGF/CM2,QTY-01(F) 0 TO 4 KGF/CM2, " REPLACE IF REQUIRED. (Service Cost)

20

-

-

... More
FOLLOWING GAUGES READING ERRATIC AND MALFUNCTIONING. UNDEERTAKE CALIBRATION/ SERVICABLITY CHECKS OF FOLLOWING PRESSURE GAUGES.(A) -1 TO 1.5 KGF/CM2,(B) 0 TO 16 KGF/CM2,QTY- 03 (C) 02TO 10 KGF/CM2,QTY- 02(D) 0 TO 9 KGF/CM2,QTY- 01(E) 0 TO 150 KGF/CM2,QTY-01(F) 0 TO 4 KGF/CM2, " REPLACE IF REQUIRED. (Material Cost)

20

-

-

... More
PENUMATIC SIREN (TYPHOON) SUPER STRUCTURE

-

-

-

... More
CALIBRATE CONTROL INSTRUMENTS. (Service Cost)

1

-

-

... More
CALIBRATE CONTROL INSTRUMENTS. (Material Cost)

1

-

-

... More
RENEW TYPHOON ASSEMBLY. (Service Cost)

1

-

-

... More
RENEW TYPHOON ASSEMBLY. (Material Cost)

1

-

-

... More
REPLACE SOLENOID VALVE/MANUAL VALVE. (Service Cost)

2

-

-

... More
REPLACE SOLENOID VALVE/MANUAL VALVE. (Material Cost)

2

-

-

... More
OFFER SYSTEM TRIALS AS PER IN STANDARDS INCLUDING SEA TRIALS AND PROVE SYSTEM (Service Cost)

1

-

-

... More
SHIP'S SIREN (EQUIPMENT WILL BE PROVIDED BY IN) WHEEL HOUSE UNDERTAKE INSTALLATION OF SHIPS SIREN AS FOLLOWS: - (A) REMOVE OLD GT SIREN INCLUDING MOUNTS, CABLING, FOUNDATIONS ETC. (B) INSTALLATION, CABLING & CONNECTORISATION OF SIREN, CONTROL PANEL AND ASSOCIATED COMPONENTS AS PER IN APPROVED BPs AND DRAWINGS. (C) CARRY OUT STW, PROVE FUNCTIONING OF SYSTEM AS PER APPROVED BPs. (D) OFFER SYSTEM HATs TO ETMA/ SS (Service Cost)

1

-

-

... More
SHIP'S SIREN (EQUIPMENT WILL BE PROVIDED BY IN) WHEEL HOUSE UNDERTAKE INSTALLATION OF SHIPS SIREN AS FOLLOWS: - (A) REMOVE OLD GT SIREN INCLUDING MOUNTS, CABLING, FOUNDATIONS ETC. (B) INSTALLATION, CABLING & CONNECTORISATION OF SIREN, CONTROL PANEL AND ASSOCIATED COMPONENTS AS PER IN APPROVED BPs AND DRAWINGS. (C) CARRY OUT STW, PROVE FUNCTIONING OF SYSTEM AS PER APPROVED BPs. (D) OFFER SYSTEM HATs TO ETMA/ SS (Material Cost)

1

-

-

... More
STEERING GEAR (SERVESTAL 124PE/RE) ASP

-

-

-

... More
CARRY OUT MAJOR OVERHAUL OF STEERING GEAR SYSTEM WITH ASSOCIATED PUMP, MOTORS, CONTROLS, REPEATERS AS FOLLOWS:- REPLACE AND CALIBRATE ALL PRESSURE GAUGES. (Service Cost)

6

-

-

... More
CARRY OUT MAJOR OVERHAUL OF STEERING GEAR SYSTEM WITH ASSOCIATED PUMP, MOTORS, CONTROLS, REPEATERS AS FOLLOWS:- REPLACE AND CALIBRATE ALL PRESSURE GAUGES. (Material Cost)

6

-

-

... More
CARRY OUT MAJOR OVERHAUL OF STEERING GEAR SYSTEM WITH ASSOCIATED PUMP, MOTORS, CONTROLS, REPEATERS AS FOLLOWS:- UNDERTAKE CALIBRATION/ REPLACEMENT OF STEERING GEAR SYSTEM PRESSURE GAUGES. RANGE: 0-100 KGF/CM2, (Service Cost)

6

-

-

... More
CARRY OUT MAJOR OVERHAUL OF STEERING GEAR SYSTEM WITH ASSOCIATED PUMP, MOTORS, CONTROLS, REPEATERS AS FOLLOWS:- UNDERTAKE CALIBRATION/ REPLACEMENT OF STEERING GEAR SYSTEM PRESSURE GAUGES. RANGE: 0-100 KGF/CM2, (Material Cost)

6

-

-

... More
CARRY OUT MAJOR OVERHAUL OF STEERING GEAR SYSTEM WITH ASSOCIATED PUMP, MOTORS, CONTROLS, REPEATERS AS FOLLOWS:- UNDERTAKE CALIBRATION OF HYDRAULIC SYSTEM PRESSURE GAUGES. RANGE: 0-250 KGF/CM2, (Service Cost)

4

-

-

... More
CARRY OUT MAJOR OVERHAUL OF STEERING GEAR SYSTEM WITH ASSOCIATED PUMP, MOTORS, CONTROLS, REPEATERS AS FOLLOWS:- UNDERTAKE CALIBRATION OF HYDRAULIC SYSTEM PRESSURE GAUGES. RANGE: 0-250 KGF/CM2, (Material Cost)

4

-

-

... More
CARRY OUT MAJOR OVERHAUL OF STEERING GEAR SYSTEM WITH ASSOCIATED PUMP, MOTORS, CONTROLS, REPEATERS AS FOLLOWS:- ORION LEAKAGE OBSERVED INI THE THE 4/3 VALVE LEADING TO INADVERT OPERATIONAL. UNDERTAKE REPAIR AND OVERHAULING OF 4/3 WAY VV OF STEERING GEAR SYSTEM SYSTEM. (Service Cost)

4

-

-

... More
CARRY OUT MAJOR OVERHAUL OF STEERING GEAR SYSTEM WITH ASSOCIATED PUMP, MOTORS, CONTROLS, REPEATERS AS FOLLOWS:- ORION LEAKAGE OBSERVED INI THE THE 4/3 VALVE LEADING TO INADVERT OPERATIONAL. UNDERTAKE REPAIR AND OVERHAULING OF 4/3 WAY VV OF STEERING GEAR SYSTEM SYSTEM. (Material Cost)

4

-

-

... More
STEERING SYSTEM (AIST-12-10) TILLER FLAT UNDERTAKE FOLLOWING ROUTINES OVERHAUL OF STEERING SYSTEM: - REPLACE AND CALIBRATE PRESSURE GAUGES VIEW ERRATIC READING (Service Cost)

4

-

-

... More
STEERING SYSTEM (AIST-12-10) TILLER FLAT UNDERTAKE FOLLOWING ROUTINES OVERHAUL OF STEERING SYSTEM: - REPLACE AND CALIBRATE PRESSURE GAUGES VIEW ERRATIC READING (Material Cost)

4

-

-

... More
MISC SCATTERED

-

-

-

... More
NAGMAN LP CALIBERATOR DEFUCNTIONAL. UNDERTAKE SERVICEBILITY CHECKS/CALIBERATION AND REPAIR OF NAGMAN LP CALIBERATOR (Service Cost)

1

-

-

... More
NAGMAN LP CALIBERATOR DEFUCNTIONAL. UNDERTAKE SERVICEBILITY CHECKS/CALIBERATION AND REPAIR OF NAGMAN LP CALIBERATOR (Material Cost)

1

-

-

... More
NAGMAN HP CALIBERATOR NOT OPERATIONAL. UNDERTAKE SERVICEBILITY CHECKS/CALIBRATION AND REPAIR OF NAGMAN HP CALIBERATOR (Service Cost)

1

-

-

... More
NAGMAN HP CALIBERATOR NOT OPERATIONAL. UNDERTAKE SERVICEBILITY CHECKS/CALIBRATION AND REPAIR OF NAGMAN HP CALIBERATOR (Material Cost)

1

-

-

... More
KITTIWAKE LUB OIL TEST KIT READING ERRATIC VALUES/ DEFUNC. UNDERTAKE REPAIRS AND PROVE SERVICEABILITY CHECKS/CALIBERATION OF KITIWAKE TEST KIT (Service Cost)

1

-

-

... More
KITTIWAKE LUB OIL TEST KIT READING ERRATIC VALUES/ DEFUNC. UNDERTAKE REPAIRS AND PROVE SERVICEABILITY CHECKS/CALIBERATION OF KITIWAKE TEST KIT (Material Cost)

1

-

-

... More
ELECTRICAL GENERAL LIGHTING AND CABLING VARIOUS PLACE

-

-

-

... More
ELECTRICAL GENERAL LIGHTING AND CABLING VARIOUS PLACE REPAIR OF QOV PRESSURE DOM SWITCHES IN VIEW OF MALFUNCTIONING.(QTY-08)(Service Cost)

8

-

-

... More
ELECTRICAL GENERAL LIGHTING AND CABLING VARIOUS PLACE REPAIR OF QOV PRESSURE DOM SWITCHES IN VIEW OF MALFUNCTIONING.(QTY-08)(Material Cost)

8

-

-

... More
ELECTRICAL GENERAL LIGHTING AND CABLING VARRIOUS PLACE REPLACE CABLING JS SYSTEM AUDIO VISUAL ALARM IN VARIOUS COMPARTMENT IN VIEW OF WIRE PERISHED/FAULTY ALARM (APPROX 02 CORE CABLE 2.5 SQMM 300 MTRS REQD)(Service Cost)

100

-

-

... More
ELECTRICAL GENERAL LIGHTING AND CABLING VARRIOUS PLACE REPLACE CABLING JS SYSTEM AUDIO VISUAL ALARM IN VARIOUS COMPARTMENT IN VIEW OF WIRE PERISHED/FAULTY ALARM (APPROX 02 CORE CABLE 2.5 SQMM 300 MTRS REQD) (Material Cost)

100

-

-

... More
DOOR SWITCH REPLACE DOOR SWITCHES (9 NO) WITH CABLE (SCREENED, 2 CORE, 1 SQ MM, 100 MTR)(Service Cost)

1

-

-

... More
DOOR SWITCH REPLACE DOOR SWITCHES (9 NO) WITH CABLE (SCREENED, 2 CORE, 1 SQ MM, 100 MTR) (Material Cost)

1

-

-

... More
ELECTRICAL AND WEAPONS WORK PACKAGE

-

-

-

... More
ADDRESSABLE FLOOD ALARM SYSTEM (AFAS) (Make M/s L&T, India) (EQUIPMENT WILL BE SUPPLIED BY IN) VARIOUS "UNDERTAKE ROUTINES OF AFAS AS FOLLOWS:-" (A) REMOVE(AS PART OF DEGUTTING), REPLACE DEFECTIVE SYSTEM COMPONENTS INCLUDING SENSORS, FOUNDATIONS, CABLES, DBs, PANELS ETC. (B) REGUTTING/ INSTALLATION, CABLING & CONNECTORISATION OF AFAS SENSORS, FOUNDATIONS, CONTROL UNITS AND ASSOCIATED COMPONENTS AS PER IN APPROVED BPs AND DRAWINGS. (C) CARRY OUT AUGMENTATION (ADDITION) OF SENSORS, I.A.W.AMMENDED IN POLICY (D) CARRY OUT STW, PROVE FUNCTIONING OF SYSTEM AS PER APPROVED BPs. (E) OFFER SYSTEM CHECKS TO ETMA (Service Cost)

1

-

-

... More
ADDRESSABLE FLOOD ALARM SYSTEM (AFAS) (Make M/s L&T, India) (EQUIPMENT WILL BE SUPPLIED BY IN) VARIOUS "UNDERTAKE ROUTINES OF AFAS AS FOLLOWS:-" (A) REMOVE(AS PART OF DEGUTTING), REPLACE DEFECTIVE SYSTEM COMPONENTS INCLUDING SENSORS, FOUNDATIONS, CABLES, DBs, PANELS ETC. (B) REGUTTING/ INSTALLATION, CABLING & CONNECTORISATION OF AFAS SENSORS, FOUNDATIONS, CONTROL UNITS AND ASSOCIATED COMPONENTS AS PER IN APPROVED BPs AND DRAWINGS. (C) CARRY OUT AUGMENTATION (ADDITION) OF SENSORS, I.A.W.AMMENDED IN POLICY (D) CARRY OUT STW, PROVE FUNCTIONING OF SYSTEM AS PER APPROVED BPs. (E) OFFER SYSTEM CHECKS TO ETMA (Material Cost)

1

-

-

... More
SIRS 4012 A WHEEL HOUSE

-

-

-

... More
SIRS 4012 A WHEEL HOUSE UNDERTAKE THE FOLLOWING ON SIRS SYSTEM CALIBRATION/ SERVIABILITY CHECKS OF RADIOACTIVE SOURCE OF SIRS. CALIBRATION/ SERVICEABILITY CHECK OF FOLLOWINGS:-(A)SIRS SYSTEM WITH SENSORS. (B)RADIATION SURVEY METER. (C) POCKET DOZIMETER. (D) CONTAMINATION MONITOR. RENEWAL OF ALL BASE MOUNT PLATES OF SIRS SENSORS IN VIEW OF CORRODED/DAMAGED(QTY-05). REPAIR OF POCKET DOZY METER 04 IN NO, RADIATION SURVEY METER 01 IN NO, DE-CONTAMINATION METER 01 IN NO REPAIR OF 05 IN NO OFF SIRS SENSORS (Service Cost)

1

-

-

... More
SIRS 4012 A WHEEL HOUSE UNDERTAKE THE FOLLOWING ON SIRS SYSTEM CALIBRATION/ SERVIABILITY CHECKS OF RADIOACTIVE SOURCE OF SIRS. CALIBRATION/ SERVICEABILITY CHECK OF FOLLOWINGS:-(A)SIRS SYSTEM WITH SENSORS. (B)RADIATION SURVEY METER. (C) POCKET DOZIMETER. (D) CONTAMINATION MONITOR. RENEWAL OF ALL BASE MOUNT PLATES OF SIRS SENSORS IN VIEW OF CORRODED/DAMAGED(QTY-05). REPAIR OF POCKET DOZY METER 04 IN NO, RADIATION SURVEY METER 01 IN NO, DE-CONTAMINATION METER 01 IN NO REPAIR OF 05 IN NO OFF SIRS SENSORS (Material Cost)

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.