Cochin Shipyard Limited Tender

Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Cochin Shipyard Limited - CSL Tender

Services
Eprocure
Opening Date25 Nov 2024
Closing Date3 Dec 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
1. 10. 3    Check operation of QCV (Quick Closing Valve). Overhaul the assembly, carryout checks as per OEM manual. Repair/ renew parts/ sub-assemblies as required.

2

-

-

... More
1. 10. 4    Check operation of GSR (Gland Steam Regulator). Overhaul the assembly, carryout checks as per OEM manual. Repair/ renew parts/ sub-assemblies as required.

2

-

-

... More
1. 10. 5    Carryout inspection of steam chest nozzle control valve and nozzles for clogging/ clear from obstruction. Overhaul/ repair and renew as per OEM manual, as necessary.

2

-

-

... More
1. 10. 6    Undertake chemical/ mechanical cleaning of condenser, lub oil cooler and air ejector. Carryout inspection/ thickness gauging of body. Undertake renewal of doors/ end covers. Repalce zinc anodes.

2

-

-

... More
1. 10. 7    Overhaul complete assembly of feed controller and undertake tuning, as per OEM manual. Repair/ renew as necessary.

2

-

-

... More
TDAC - SERVICE COST

-

-

-

... More
Undertake 5000 hourly routines on turbine. Repair/ renew spares and sub-assemblies as necessary. 1.11.1 Check the conditions of the protectors of the condenser, oil cooler and ejector. replace protectors in case the wear of their working section is 50%. (total 4 plants).

2

-

-

... More
1.11.2 Open and clean the oil filters.

2

-

-

... More
1.11.3. Dismantle and inspect the differential pressure governor of the starting oil pump. in case of great amount of sludge in the governor, open the cut-off pilot. if necessary, open and clean sludge from all components of the governor unit and those of the protector unit.

2

-

-

... More
1.11.4. Check the rotor wear down in the thrust bearing.

2

-

-

... More
1.11.5. When the service life (10000 to 12000 hours) is over, replace the following components:- 1.11.5.1 Pressure relay, type д21k1, Qty - 24 each 1.11.5.2. Electric motors, type aдh-100 and дm160mb4 , Qty -04 1.11.5.3 Electric magnet, type эm33-71311 , Qty - 12 each 1.11.5.4. Voltmeter, type m1618t, Qty -10 each 1.11.5.5. Micro switch, type д-311 , Qty - 12 each

2

-

-

... More
1.11.6 Carry out calibration of feed regulator and complete flushing through of the system.

2

-

-

... More
1.11.8. Carryout mechanical cleaning of water path in compressor oil cooler and MAK30C compressor condenser.

4

-

-

... More
1.11.9. Application of Belzona 1392 coating on tube sheet of all TDAC condenser.

4

-

-

... More
TDAC - SERVICE COST

-

-

-

... More
Undertake 3000 hourly/ Annual routines on turbine. Repair/ renew spares and sub-assemblies as necessary. 1.11.10. Carry out rotor wear down in the thrust bearing on 04 TDAC plants

2

-

-

... More
1.11.12. Carry out maintenance works on compressor oil pumps in accordance with service and maintenance manual in case of abnormality during last operation.

2

-

-

... More
1.11.13. Carry out inspection of compressor gland sealing in accordance with description 1.521.001 to. [measure the protrusion of the metal bushes and compare with the last reading. in case reducing by 2 mm, proceed further for inspection of graphite ring thickness. check seal (graphite ring) thickness, if less than 8 mm then replace it].

2

-

-

... More
1.11.14. Carry out checking and calibration tests of the safety valves.

2

-

-

... More
1.11.15. Carry out maintenance works on compressor oil pumps in accordance with service and maintenance manual.

2

-

-

... More
1.11.16. Carry out maintenance routine on electric starter, bypass valve electric drive and electric drive on evaporator gate valve in accordance with its service and maintenance documents.

2

-

-

... More
1.11.17. Disassemble the compressor in accordance with description 1.521.001to. routine incase of running hours close to 10000 on all 04 TDAC plants.

2

-

-

... More
1.11.18. Replace the thrust pads, thrust bearing shell, radial bearing shell in the compressor.

2

-

-

... More
1.11.19. carry out calibration checks on all pressure and vacuum gauges, safety valve on MAK 30C unit.

2

-

-

... More
1.11.20. Carryout in-situ cleaning of condenser adn evaporator.

2

-

-

... More
Heat Exchangers / Coolers - SERVICE COST Insitu Mechanical cleaning of HEs/ Coolers (Lub oil coolers/ Condenser/ Fresh water coolers/ Chillers) Job involves:- 1.40.1 Degutting and regutting of system pipes and associated system pipes. 1.40.2 Chemical cleaning of coolers 1.40.3 Pressure testing of HEs. 1.40.4 Repairs to leaking tubes 1.40.5 Replacement of drain plug/cock where fitted (as per sample Mat-SS High Tensile) 1.40.6 Replacement of instrumentation adaptor/cocks where fitted (as per sample Mat-High Tensile SS) 1.40.7 Renewal of Fastners: Mat : Al Bronze 1.40.8 Renewal of gaskets Mat : Rubber Nitrile S/W resistant

-

-

-

... More
1.40.10 TDAC chiller; Shell and Tube type, Size- 7m X 1.5 m X 1.5 m

3

-

-

... More
1.40.12 TDAC plant turbine condensor insitu cleaning . Shell and Tube type, Size- 3m X 1.5m X 1.5m

3

-

-

... More
1.40.13.TDAC plant referigerant condensor insitu cleaning. Shell and Tube type, Size- 5m X 0.5m X 0.5m

3

-

-

... More
Pumps - SERVICE COST Overhauling of Pump. Job involves :- 1.45.1 Removal of pumps and degutting of associated system. 1.45.2 Overhauling of Pump, priming unit and motor (for monoblock pump), replacement of worn out components as per opening up inspection. Pressure testing of casing and metal build up if required 1.45.3 Renewal of Mechanical seal 1.45.4 Pressure/ leak test of pump post boxing up. Painting of pump body and foundation with anti corrosive paint primer and top coat. 1.45.5 Fitment of Pump, reftitting associated systems. Renewal of all fasteners (Mat-Al Bronze) and gaskets to be undertaken. 1.46.6 Decoupling and couping with motor/engine and final alignment. 1.46.7 Inspection, renewal of damaged pump stool / foundation. 1.46.8 Inspection, renewal of damaged shock mounts (mounts supplied by yard/Navy). 1.46.9 Carry out performance trial of the pump including parameter checks (suction/ discharge pressure), vibration trials, insulation / SPM checks on motor, motor starting running current checks etc assess for satisfactory performance and defects if any to be rectified.

-

-

-

... More
1.45.6.Condensate pump, HUB-25/40, Centrifugal , monoblock

4

-

-

... More
1.45.7.TDAC plant sea water pump, HUB-630/15, Centrifugal , monoblcok

6

-

-

... More
1.45.8 TDAC chilled water pump, HUB-630/30, Centrifugal , monoblock

3

-

-

... More
1.45.12. Overhauling of TDAC turbine priming lub oil pump. Type - Gear pump

4

-

-

... More
1.45.13. Overhauling of TDAC compressor main oil pump. Type - Screw pump

4

-

-

... More
1.45.14. Overhauling of TDAC compressor emergency oil pump. Type - Screw pump

4

-

-

... More
Cladding - SERVICE COST

-

-

-

... More
1.42.5 Cladding over Steam auxiliary machineries 1.42.5.1TDAC (Total 4 Nos)

400

-

-

... More
TDAC - SERVICE COST

-

-

-

... More
Turbine oil filling line to be modified and new strainer / filter body to be inserted in line to avoid oil contamination. BoM will be supplied by vendor.SoW are as follows:- 1.107.1 Manufacturing of flanged pipes 1.107.2 Fitment of isolating Valves Remarks;- BoM (a) Isolating Valves (SD Straight Way, 32 mm), (b) Lub oil filter housing & filter element

4

-

-

... More
Boilers and TD Auxilaries - SERVICE COST

-

-

-

... More
Renewal /Repair of Outer Insulation materials and Cement lagging TD Auxilliaries (TDAC)

1

-

-

... More
TDAC (Russian) - MATERIAL COST

-

-

-

... More
Undertake the following: - 1. 10. 1    Check the rotor run out in the thrust bearing.

2

-

-

... More
1. 10. 2    Open all units of governing and protection units and remove the sludge. Undertake overhauling/ tuning of all hydraulic and electric control components (local/ remote). Undertake trials as per OEM manual, carryout tuning. Rerpair and renew as necessary.

2

-

-

... More
1. 10. 3    Check operation of QCV (Quick Closing Valve). Overhaul the assembly, carryout checks as per OEM manual. Repair/ renew parts/ sub-assemblies as required.

2

-

-

... More
1. 10. 4    Check operation of GSR (Gland Steam Regulator). Overhaul the assembly, carryout checks as per OEM manual. Repair/ renew parts/ sub-assemblies as required.

2

-

-

... More
1. 10. 5    Carryout inspection of steam chest nozzle control valve and nozzles for clogging/ clear from obstruction. Overhaul/ repair and renew as per OEM manual, as necessary.

2

-

-

... More
1. 10. 6    Undertake chemical/ mechanical cleaning of condenser, lub oil cooler and air ejector. Carryout inspection/ thickness gauging of body. Undertake renewal of doors/ end covers. Repalce zinc anodes.

2

-

-

... More
1. 10. 7    Overhaul complete assembly of feed controller and undertake tuning, as per OEM manual. Repair/ renew as necessary.

2

-

-

... More
TDAC - MATERIAL COST

-

-

-

... More
Undertake 5000 hourly routines on turbine. Repair/ renew spares and sub-assemblies as necessary. 1.11.1 Check the conditions of the protectors of the condenser, oil cooler and ejector. replace protectors in case the wear of their working section is 50%. (total 4 plants).

2

-

-

... More
1.11.2 Open and clean the oil filters.

2

-

-

... More
1.11.3. Dismantle and inspect the differential pressure governor of the starting oil pump. in case of great amount of sludge in the governor, open the cut-off pilot. if necessary, open and clean sludge from all components of the governor unit and those of the protector unit.

2

-

-

... More
1.11.4. Check the rotor wear down in the thrust bearing.

2

-

-

... More
1.11.5. When the service life (10000 to 12000 hours) is over, replace the following components:- 1.11.5.1 Pressure relay, type д21k1, Qty - 24 each 1.11.5.2. Electric motors, type aдh-100 and дm160mb4 , Qty -04 1.11.5.3 Electric magnet, type эm33-71311 , Qty - 12 each 1.11.5.4. Voltmeter, type m1618t, Qty -10 each 1.11.5.5. Micro switch, type д-311 , Qty - 12 each

2

-

-

... More
1.11.6 Carry out calibration of feed regulator and complete flushing through of the system.

2

-

-

... More
1.11.8. Carryout mechanical cleaning of water path in compressor oil cooler and MAK30C compressor condenser.

4

-

-

... More
1.11.9. Application of Belzona 1392 coating on tube sheet of all TDAC condenser.

4

-

-

... More
TDAC - MATERIAL COST

-

-

-

... More
Undertake 3000 hourly/ Annual routines on turbine. Repair/ renew spares and sub-assemblies as necessary. 1.11.10. Carry out rotor wear down in the thrust bearing on 04 TDAC plants

2

-

-

... More
1.11.12. Carry out maintenance works on compressor oil pumps in accordance with service and maintenance manual in case of abnormality during last operation.

2

-

-

... More
1.11.13. Carry out inspection of compressor gland sealing in accordance with description 1.521.001 to. [measure the protrusion of the metal bushes and compare with the last reading. in case reducing by 2 mm, proceed further for inspection of graphite ring thickness. check seal (graphite ring) thickness, if less than 8 mm then replace it].

2

-

-

... More
1.11.14. Carry out checking and calibration tests of the safety valves.

2

-

-

... More
1.11.15. Carry out maintenance works on compressor oil pumps in accordance with service and maintenance manual.

2

-

-

... More
1.11.16. Carry out maintenance routine on electric starter, bypass valve electric drive and electric drive on evaporator gate valve in accordance with its service and maintenance documents.

2

-

-

... More
1.11.17. Disassemble the compressor in accordance with description 1.521.001to. routine incase of running hours close to 10000 on all 04 TDAC plants.

2

-

-

... More
1.11.18. Replace the thrust pads, thrust bearing shell, radial bearing shell in the compressor.

2

-

-

... More
1.11.19. carry out calibration checks on all pressure and vacuum gauges, safety valve on MAK 30C unit.

2

-

-

... More
1.11.20. Carryout in-situ cleaning of condenser adn evaporator.

2

-

-

... More
Heat Exchangers / Coolers - MATERIAL COST Insitu Mechanical cleaning of HEs/ Coolers (Lub oil coolers/ Condenser/ Fresh water coolers/ Chillers) Job involves:- 1.40.1 Degutting and regutting of system pipes and associated system pipes. 1.40.2 Chemical cleaning of coolers 1.40.3 Pressure testing of HEs. 1.40.4 Repairs to leaking tubes 1.40.5 Replacement of drain plug/cock where fitted (as per sample Mat-SS High Tensile) 1.40.6 Replacement of instrumentation adaptor/cocks where fitted (as per sample Mat-High Tensile SS) 1.40.7 Renewal of Fastners: Mat : Al Bronze 1.40.8 Renewal of gaskets Mat : Rubber Nitrile S/W resistant

-

-

-

... More
1.40.10 TDAC chiller; Shell and Tube type, Size- 7m X 1.5 m X 1.5 m

3

-

-

... More
1.40.12 TDAC plant turbine condensor insitu cleaning . Shell and Tube type, Size- 3m X 1.5m X 1.5m

3

-

-

... More
1.40.13.TDAC plant referigerant condensor insitu cleaning. Shell and Tube type, Size- 5m X 0.5m X 0.5m

3

-

-

... More
Pumps - MATERIAL COST Overhauling of Pump. Job involves :- 1.45.1 Removal of pumps and degutting of associated system. 1.45.2 Overhauling of Pump, priming unit and motor (for monoblock pump), replacement of worn out components as per opening up inspection. Pressure testing of casing and metal build up if required 1.45.3 Renewal of Mechanical seal 1.45.4 Pressure/ leak test of pump post boxing up. Painting of pump body and foundation with anti corrosive paint primer and top coat. 1.45.5 Fitment of Pump, reftitting associated systems. Renewal of all fasteners (Mat-Al Bronze) and gaskets to be undertaken. 1.46.6 Decoupling and couping with motor/engine and final alignment. 1.46.7 Inspection, renewal of damaged pump stool / foundation. 1.46.8 Inspection, renewal of damaged shock mounts (mounts supplied by yard/Navy). 1.46.9 Carry out performance trial of the pump including parameter checks (suction/ discharge pressure), vibration trials, insulation / SPM checks on motor, motor starting running current checks etc assess for satisfactory performance and defects if any to be rectified.

-

-

-

... More
1.45.6.Condensate pump, HUB-25/40, Centrifugal , monoblock

4

-

-

... More
1.45.7.TDAC plant sea water pump, HUB-630/15, Centrifugal , monoblcok

6

-

-

... More
1.45.8 TDAC chilled water pump, HUB-630/30, Centrifugal , monoblock

3

-

-

... More
1.45.12. Overhauling of TDAC turbine priming lub oil pump. Type - Gear pump

4

-

-

... More
1.45.13. Overhauling of TDAC compressor main oil pump. Type - Screw pump

4

-

-

... More
1.45.14. Overhauling of TDAC compressor emergency oil pump. Type - Screw pump

4

-

-

... More
Cladding - MATERIAL COST

-

-

-

... More
1.42.5 Cladding over Steam auxiliary machineries 1.42.5.1TDAC (Total 4 Nos)

400

-

-

... More
TDAC - MATERIAL COST

-

-

-

... More
Turbine oil filling line to be modified and new strainer / filter body to be inserted in line to avoid oil contamination. BoM will be supplied by vendor.SoW are as follows:- 1.107.1 Manufacturing of flanged pipes 1.107.2 Fitment of isolating Valves Remarks;- BoM (a) Isolating Valves (SD Straight Way, 32 mm), (b) Lub oil filter housing & filter element

4

-

-

... More
Boilers and TD Auxilaries - MATERIAL COST

-

-

-

... More
Renewal /Repair of Outer Insulation materials and Cement lagging TD Auxilliaries (TDAC)

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.