Cochin Shipyard Limited Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
0Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CSL_214262_1Bid Award Id
ViewTender No
SR1/0807/GePNIC/ADV/TurboTender Authority
Cochin Shipyard Limited ViewPurchaser Address
-Website
http://https://cochinshipyard.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
1.5.1.Disassemble pipelines to assemblies and parts; overhaul the regulation and protection assemblies. Clean, wash, inspect, and measure parts. Extract the pump rotor and inspect the internal surfaces of the case. Replace sealing parts. Examine condition of the rotor wheel. Measure clearances of the pump bearing. Check the rotors of turbine, reduction gear and pump for wear and tear. To be undertaken as part of 5 Annual routine: 1.5.2. Turbine and gearbox assembly along with control and protection system components. Qty - 4 Nos 1.5.3. Carry out repair of valves and filters. 1.5.4. Test the pump hydraulically. 1.5.5. Align the turbo-drive to the pump. 1.5.6. Check the operation of the pump. 1.5.7. Renewal of bellows of TD circulator inlet duct.
4
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements