Cochin Shipyard Limited Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_CSL_104576_1Bid Award Id
ViewTender No
SR5/KAVARATTI/GePNIC/RW.0276Tender Authority
Cochin Shipyard Limited ViewPurchaser Address
-Website
http://etenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
M/E CONTROL SYSTEM: Stbd main engine local power control, control panel for CPP and engine with related field cables fully damaged, same to be supplied , installed and system to be tried out. All Damaged cables to be renewed . ECR ME/ GB / CPP control system to be checked for operation to the satisfaction of SS , Surveyor and during sea trials . MAKER : MAN B&W. Local control panel will be supplied by yard . All other materials required to be supplied
-
-
-
MATERIAL
1
-
-
SERVICE
1
-
-
SME SENSORS & CABLES : All pressure and temperature sensors, cables etc for stbd ME / Gear Box / CPP fully damaged, same to be supplied , installed and system tried out to the satisfaction of SS and Surveyor .MAKER : MAN B&W.
-
-
-
MATERIAL
1
-
-
SERVICE
1
-
-
SME CONTROL VALVES & SOLENOIDS : Both direction control valves and solenoids for pitch and clutch with cables operations are fully damaged , same to be supplied , installed and system to be tried out satisfactorily. MAKER : MAN B&W alpha.
-
-
-
MATERIAL
1
-
-
SERVICE
1
-
-
OIL MIST DETECTOR : Oil mist detector to be overhauled and tested for operation. All lines to supplied and installed . Cables to be supplied and renewed for the system .All required spares to be supplied . System to be proved to SS / Surveyor .MAKE: SCHALLER AUTOMATION, TYPE: VISATRON VN 115/87 plus. ( For SME/PME)
-
-
-
MATERIAL
2
-
-
SERVICE
2
-
-
ALARM COLUMN: Alarm column Audio and visual fully damaged along with fields cables to be supplied and installed and proved.(MAKE-AEB nv BELGIUM) TYPE 595-24V DC, BULB H1-24 V-70 W. All required material to be supplied .(Location -Engine room)
-
-
-
MATERIAL
3
-
-
SERVICE
3
-
-
CO2 ALARM SYSTEM : CO2 alarm system and cables to be supplied and renewed in main engine room compartment. Audible alarm and light to made operational. (MAKE-UNITOR). .All required material to be supplied .
-
-
-
MATERIAL
4
-
-
SERVICE
4
-
-
W/T SLIDING DOOR: No.2 ,3 & 8 water tight sliding door's indication lamps, buzzers and cables to supply and renew and to make it operational. System to be proved to SS and Surveyor . All required material to be supplied . (Engine room)
-
-
-
MATERIAL
3
-
-
SERVICE
3
-
-
SHAFT EARTHING : Both main engine shaft earthing device to be supplied and renewed. System to be proved to SS .(MAKE - BAC CORROSION CONTROL).All required material to be supplied .
-
-
-
MATERIAL
1
-
-
SERVICE
1
-
-
ALARM MONITORING SYSTEM : Both Main engine alarm monitoring system to be made operational. All required material to be supplied .(MAKE - ARISTA).
-
-
-
MATERIAL
1
-
-
SERVICE
1
-
-
ENGINE CALL SYSTEM: Engine call ( patrol call) system to be supplied renewed and to be made operational. All required material to be supplied .
-
-
-
MATERIAL
1
-
-
SERVICE
1
-
-
BILGE PNEUMATIC VALVE : Bilge pneumatic valve operation cabinet damaged same to repair /renew and to be made operational. MAKE: Berg Armaturen Steuerungen, Type: PLA 80/S- RC DN 65 .All required material to be supplied .
-
-
-
MATERIAL
2
-
-
SERVICE
2
-
-
SME LO TANK VALVES/CABLES: Quick closing valve, solenoid valve and cables of Main engine lube oil storage tank stbd side to be supplied and renewed and to be made operational. All required material to be supplied .
-
-
-
MATERIAL
1
-
-
SERVICE
1
-
-
HYPER MIST: Hyper mist auto start to be made operational and panel to be modified, lines to be inspected. MAKE :TYCO .All required material to be supplied .
-
-
-
MATERIAL
1
-
-
SERVICE
1
-
-
Both main engine's instrument panel in ECR to be supplied and renewed .Analog pyrometers, pressure gauges, speedometer, temperature gauges etc. and proved to ship staff / surveyor
1
-
-
STBD/PORT ENGINE TERMINAL BOX-1: All contents / items in Stbd /Port engine terminal box 1 to be supplied and fitted with new Box . Connection , disconnection of cable with proper marking to be done . Damaged cables to be renewed .
-
-
-
MATERIAL
2
-
-
SERVICE
2
-
-
STBD/PORT ENGINE TERMINAL BOX-3: All contents / items in Stbd/Port engine terminal box 3 to be supplied and fitted with new box . Connection , disconnection of cable with proper marking to be done . Damaged cables to be renewed .
-
-
-
MATERIAL
2
-
-
SERVICE
2
-
-
WATER MIST P/P BASE/PANEL: Operating panel to be renewed and raised as per instruction of SS. System to be proved to SS and Surveyor .WATER MIST SYTEM:TYCO ,PUMP MAKE: GODWIN PUMPS. (Reefer Room)
-
-
-
MATERIAL
1
-
-
SERVICE
1
-
-
M/E BILGE ALARM FLOAT SWITCH: All M/E Room bilge alarm float switches to be supplied and renewed with cables and accessories. Satisfactory trial to be presented to SS and Surveyor .(M/E Room)
-
-
-
MATERIAL
1
-
-
SERVICE
1
-
-
Evaluation Notes How It Works ?