Cochin Shipyard Limited Tender

Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Cochin Shipyard Limited - CSL Tender

Services
Security and Emergency Services
Eprocure
Opening Date25 Jul 2024
Closing Date8 Aug 2024
Tender Amount₹ 14,95,722 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
RENEW HOSE REEL AS PER SAMPLE VIEW DETERIORATED MATERIAL CONDITION - (MATERIAL COST)

2

-

-

... More
OVERHAUL AND CARRY OUT HYDRAULIC PRESSURE TEST (15 BAR) OF FOAM COMPOUND TANK. PT CERTIFICATE OF BOTTLES FROM PESO APPROVED FIRMS ONLY-(SERVICE COST) .

1

-

-

... More
OVERHAUL AND CARRY OUT HYDRAULIC PRESSURE TEST (15 BAR) OF FOAM COMPOUND TANK. PT CERTIFICATE OF BOTTLES FROM PESO APPROVED FIRMS ONLY - (MATERIAL COST).

1

-

-

... More
OVERHAUL, PAINT AND PRESSURE TEST H.P. AIR BOTTLE. PT CERTIFICATE OF BOTTLES FROM PESO APPROVED FIRMS ONLY -(SERVICE COST) .

2

-

-

... More
OVERHAUL, PAINT AND PRESSURE TEST H.P. AIR BOTTLE. PT CERTIFICATE OF BOTTLES FROM PESO APPROVED FIRMS ONLY - (MATERIAL COST).

2

-

-

... More
REPLACE FOAM GENERATOR AND ITS WIREMESH VIEW DETERIORATION -(SERVICE COST) .

2

-

-

... More
REPLACE FOAM GENERATOR AND ITS WIREMESH VIEW DETERIORATION - (MATERIAL COST).

2

-

-

... More
OVERHAUL HP AIR REDUCER. LAP WORKING SURFACES AND RENEW WORN PARTS AS NECESSARY -(SERVICE COST) .

2

-

-

... More
OVERHAUL HP AIR REDUCER. LAP WORKING SURFACES AND RENEW WORN PARTS AS NECESSARY - (MATERIAL COST).

2

-

-

... More
OVERHAUL, REFIT AND RESET RELIEF VALVE -(SERVICE COST) .

4

-

-

... More
OVERHAUL, REFIT AND RESET RELIEF VALVE - (MATERIAL COST).

4

-

-

... More
DISCAHRGE FOAM COMPOND FROM TANK AND WASH WITH CLEAN HOT WATER. AND BLOW THROUGH THE SIPHON PIPE -(SERVICE COST) .

2

-

-

... More
DISCAHRGE FOAM COMPOND FROM TANK AND WASH WITH CLEAN HOT WATER. AND BLOW THROUGH THE SIPHON PIPE - (MATERIAL COST).

2

-

-

... More
OVERHAUL AND REFIT SYSTEM VALVES. REPLACE ALL DEFECTIVE -(SERVICE COST)

8

-

-

... More
OVERHAUL AND REFIT SYSTEM VALVES. REPLACE ALL DEFECTIVE - (MATERIAL COST)

8

-

-

... More
REPLACE AND CALIBRATE PRESSURE GAUGES -(SERVICE COST) .

6

-

-

... More
REPLACE AND CALIBRATE PRESSURE GAUGES - (MATERIAL COST).

6

-

-

... More
CARRY OUT FUNCTIONAL CHECK OF FOAM COMPOUND TANK SAFETY VALVE -(SERVICE COST) .

2

-

-

... More
CARRY OUT FUNCTIONAL CHECK OF FOAM COMPOUND TANK SAFETY VALVE - (MATERIAL COST).

2

-

-

... More
OFFER SYSTEM TRIALS AS PER IN NORMS -(SERVICE COST) .

1

-

-

... More
GT FIRE FIGHTING SYS. (DRY CHEMICAL) - AER/FER CARRY OUT OVERHAUL/ ROUTINES OF GT FIRE SMOOTHERING SYSTEMS IN BOTH ENGINE ROOMS AS FOLLOWS: -

-

-

-

... More
DRAIN EXTINGUISHANT LIQUID FROM THE TANKS. CLEAN AND EXAMINE TANKS INTERNALLY FOR CORROSION. RENEW IF REQUIRED -(SERVICE COST)

2

-

-

... More
DRAIN EXTINGUISHANT LIQUID FROM THE TANKS. CLEAN AND EXAMINE TANKS INTERNALLY FOR CORROSION. RENEW IF REQUIRED - (MATERIAL COST)

2

-

-

... More
OVERHAUL PRESSURE REDUCERS. LAP THE WORKING SURFACES AND ELIMINATE AIR LEAKS. RENEW PARTS AS NECESSARY -(SERVICE COST) .

4

-

-

... More
OVERHAUL PRESSURE REDUCERS. LAP THE WORKING SURFACES AND ELIMINATE AIR LEAKS. RENEW PARTS AS NECESSARY - (MATERIAL COST).

4

-

-

... More
PRESURISE THE SYSTEM WITH AIR AND CHECK FOR LEAKS. RECTIFY DEFECTS IF ANY -(SERVICE COST) .

2

-

-

... More
PRESURISE THE SYSTEM WITH AIR AND CHECK FOR LEAKS. RECTIFY DEFECTS IF ANY - (MATERIAL COST).

2

-

-

... More
REPLACE AND RESET RELIEF VALVES -(SERVICE COST)

6

-

-

... More
REPLACE AND RESET RELIEF VALVES - (MATERIAL COST)

6

-

-

... More
CARRY OUT HYDRAULIC PRESSURE TEST OF CONTAINERS AT 150 KG/SQ CM PRESSURE -(SERVICE COST) .

2

-

-

... More
CARRY OUT HYDRAULIC PRESSURE TEST OF CONTAINERS AT 150 KG/SQ CM PRESSURE - (MATERIAL COST).

2

-

-

... More
REPLACE AND CARRY OUT FUNCTIONAL CHECKS OF SAFETY VALVES. RESET THE VALVE FOR REQUIRED SETTINGS -(SERVICE COST) .

4

-

-

... More
REPLACE AND CARRY OUT FUNCTIONAL CHECKS OF SAFETY VALVES. RESET THE VALVE FOR REQUIRED SETTINGS - (MATERIAL COST).

4

-

-

... More
DRAIN AIR BOTTLES. REMOVE THE CYLINDER HEAD CAPS AND EXAMINE BOTTLES INTERNALLY AND EXTERNALLY -(SERVICE COST) .

4

-

-

... More
DRAIN AIR BOTTLES. REMOVE THE CYLINDER HEAD CAPS AND EXAMINE BOTTLES INTERNALLY AND EXTERNALLY - (MATERIAL COST).

4

-

-

... More
REFILL TANKS WITH NEW EXTINGUISHANT -(SERVICE COST)

2

-

-

... More
REFILL TANKS WITH NEW EXTINGUISHANT - (MATERIAL COST)

2

-

-

... More
CALIBRATE PRESSURE GAUGES -(SERVICE COST) .

5

-

-

... More
CALIBRATE PRESSURE GAUGES - (MATERIAL COST).

5

-

-

... More
REPLACE AND PRESSURE TEST CONTAINER AND HP AIR BOTTLES AS PER SAMPLE AND REINSTALL. (QTY - 04 NO) -(SERVICE COST)

4

-

-

... More
REPLACE AND PRESSURE TEST CONTAINER AND HP AIR BOTTLES AS PER SAMPLE AND REINSTALL. (QTY - 04 NO) - (MATERIAL COST)

4

-

-

... More
PORTABLE FIRE FIGHTING EXTINGUISHERS - VARIOUS PLACES

-

-

-

... More
CARRY OUT HYDRAULIC PRESSURE TESTING OF THE EXTINGUISHERS (EXCEPT CO2 EXTINGUISHERS) AT A PRESSURE OF 35 KG/CM2. THE PRESSURE OF 35 KG/CM2 IS TO BE BUILT-UP SLOWLY IN 1 MIN. AND MAINTAINED FOR 2.5 MINS. STAGGER THIS TEST SUCH THAT ATLEAST ONE-THIRD (1/3 RD) OF THE TOTAL EXTINGUISHERS ARE TESTED EVERY YEAR. RECHARGE/REFILL THE EXTINGUISHERS THEREAFTER. NOTE:- EXTINGUISHERS SHOULD BE HYDRAULICALLY TESTED WITH THE CAP FITTED. THERE SHALL NOT BE ANY LEAKAGE OR VISIBLE DISTORTION IN THE TEST AND EXTINGUISHERS WHICH FAIL THIS REQUIREMENT SHALL BE REPLACED -(SERVICE COST)

1

-

-

... More
CARRY OUT HYDRAULIC PRESSURE TESTING OF THE EXTINGUISHERS (EXCEPT CO2 EXTINGUISHERS) AT A PRESSURE OF 35 KG/CM2. THE PRESSURE OF 35 KG/CM2 IS TO BE BUILT-UP SLOWLY IN 1 MIN. AND MAINTAINED FOR 2.5 MINS. STAGGER THIS TEST SUCH THAT ATLEAST ONE-THIRD (1/3 RD) OF THE TOTAL EXTINGUISHERS ARE TESTED EVERY YEAR. RECHARGE/REFILL THE EXTINGUISHERS THEREAFTER. NOTE:- EXTINGUISHERS SHOULD BE HYDRAULICALLY TESTED WITH THE CAP FITTED. THERE SHALL NOT BE ANY LEAKAGE OR VISIBLE DISTORTION IN THE TEST AND EXTINGUISHERS WHICH FAIL THIS REQUIREMENT SHALL BE REPLACED - (MATERIAL COST).

1

-

-

... More
Scope 2 - TURNKEY JOB OF FIRE FIGHTING FOR Navy Vessel 2 (RM.0789)

-

-

-

... More
FOAM FIRE SMOOTHERING SYSTEM (CO 500) MAIN ALLEWAY CARRY OUT OVERHAUL/ ROUTINES OF FOAM SMOOTHERINGTEMS AS FOLLOWS: -

-

-

-

... More
RENEW HOSE REEL AS PER SAMPLE VIEW DETERIORATED MATERIAL CONDITION -(SERVICE COST)

2

-

-

... More
RENEW HOSE REEL AS PER SAMPLE VIEW DETERIORATED MATERIAL CONDITION - (MATERIAL COST)

2

-

-

... More
OVERHAUL AND CARRY OUT HYDRAULIC PRESSURE TEST OF FOAM COMPOUND TANK AT 15 BAR. PT CERTIFICATE OF BOTTLES FROM PESO APPROVED FIRMS ONLY-(SERVICE COST)

1

-

-

... More
OVERHAUL AND CARRY OUT HYDRAULIC PRESSURE TEST OF FOAM COMPOUND TANK AT 15 BAR. PT CERTIFICATE OF BOTTLES FROM PESO APPROVED FIRMS ONLY - (MATERIAL COST).

1

-

-

... More
OVERHAUL, PAINT AND PRESSURE TEST H.P. AIR BOTTLE. PT CERTIFICATE OF BOTTLES FROM PESO APPROVED FIRMS ONLY-(SERVICE COST)

2

-

-

... More
OVERHAUL, PAINT AND PRESSURE TEST H.P. AIR BOTTLE. PT CERTIFICATE OF BOTTLES FROM PESO APPROVED FIRMS ONLY - (MATERIAL COST).

2

-

-

... More
REPLACE FOAM GENERATOR AND ITS WIREMESH VIEW DETERIORATION-(SERVICE COST)

2

-

-

... More
REPLACE FOAM GENERATOR AND ITS WIREMESH VIEW DETERIORATION - (MATERIAL COST).

2

-

-

... More
OVERHAUL HP AIR REDUCER. LAP WORKING SURFACES AND RENEW WORN PARTS AS NECESSARY-(SERVICE COST)

2

-

-

... More
OVERHAUL HP AIR REDUCER. LAP WORKING SURFACES AND RENEW WORN PARTS AS NECESSARY - (MATERIAL COST).

2

-

-

... More
OVERHAUL, REFIT AND RESET RELIEF VALVE-(SERVICE COST)

4

-

-

... More
OVERHAUL, REFIT AND RESET RELIEF VALVE - (MATERIAL COST).

4

-

-

... More
DISCAHRGE FOAM COMPOND FROM TANK AND WASH WITH CLEAN HOT WATER. AND BLOW THROUGH THE SIPHON PIPE-(SERVICE COST)

2

-

-

... More
DISCAHRGE FOAM COMPOND FROM TANK AND WASH WITH CLEAN HOT WATER. AND BLOW THROUGH THE SIPHON PIPE - (MATERIAL COST).

2

-

-

... More
OVERHAUL AND REFIT SYSTEM VALVES. REPLACE ALL DEFECTIVE-(SERVICE COST)

8

-

-

... More
OVERHAUL AND REFIT SYSTEM VALVES. REPLACE ALL DEFECTIVE - (MATERIAL COST)

8

-

-

... More
REPLACE AND CALIBRATE PRESSURE GAUGES -(SERVICE COST)

6

-

-

... More
REPLACE AND CALIBRATE PRESSURE GAUGES - (MATERIAL COST).

6

-

-

... More
CARRY OUT FUNCTIONAL CHECK OF FOAM COMPOUND TANK SAFETY VALVE-(SERVICE COST)

2

-

-

... More
CARRY OUT FUNCTIONAL CHECK OF FOAM COMPOUND TANK SAFETY VALVE - (MATERIAL COST).

2

-

-

... More
OFFER SYSTEM TRIALS AS PER IN NORMS -(SERVICE COST)

1

-

-

... More
CARRY OUT OVERHAUL/ ROUTINES OF GT FIRE SMOOTHERING SYSTEMS IN BOTH ENGINE ROOMS AS FOLLOWS: -

-

-

-

... More
DRAIN EXTINGUISHANT LIQUID FROM THE TANKS. CLEAN AND EXAMINE TANKS INTERNALLY FOR CORROSION. RENEW IF REQUIRED-(SERVICE COST)

2

-

-

... More
DRAIN EXTINGUISHANT LIQUID FROM THE TANKS. CLEAN AND EXAMINE TANKS INTERNALLY FOR CORROSION. RENEW IF REQUIRED - (MATERIAL COST)

2

-

-

... More
OVERHAUL PRESSURE REDUCERS. LAP THE WORKING SURFACES AND ELIMINATE AIR LEAKS. RENEW PARTS AS NECESSARY-(SERVICE COST)

4

-

-

... More
OVERHAUL PRESSURE REDUCERS. LAP THE WORKING SURFACES AND ELIMINATE AIR LEAKS. RENEW PARTS AS NECESSARY - (MATERIAL COST)

4

-

-

... More
PRESURISE THE SYSTEM WITH AIR AND CHECK FOR LEAKS. RECTIFY DEFECTS IF ANY-(SERVICE COST)

2

-

-

... More
PRESURISE THE SYSTEM WITH AIR AND CHECK FOR LEAKS. RECTIFY DEFECTS IF ANY - (MATERIAL COST).

2

-

-

... More
REPLACE AND RESET RELIEF VALVES -(SERVICE COST)

6

-

-

... More
REPLACE AND RESET RELIEF VALVES - (MATERIAL COST)

6

-

-

... More
CARRY OUT HYDRAULIC PRESSURE TEST OF CONTAINERS AT 150 KG/SQ CM PRESSURE-(SERVICE COST)

2

-

-

... More
CARRY OUT HYDRAULIC PRESSURE TEST OF CONTAINERS AT 150 KG/SQ CM PRESSURE - (MATERIAL COST).

2

-

-

... More
REPLACE AND CARRY OUT FUNCTIONAL CHECKS OF SAFETY VALVES. RESET THE VALVE FOR REQUIRED SETTINGS-(SERVICE COST)

4

-

-

... More
REPLACE AND CARRY OUT FUNCTIONAL CHECKS OF SAFETY VALVES. RESET THE VALVE FOR REQUIRED SETTINGS - (MATERIAL COST).

4

-

-

... More
DRAIN AIR BOTTLES. REMOVE THE CYLINDER HEAD CAPS AND EXAMINE BOTTLES INTERNALLY AND EXTERNALLY-(SERVICE COST)

4

-

-

... More
DRAIN AIR BOTTLES. REMOVE THE CYLINDER HEAD CAPS AND EXAMINE BOTTLES INTERNALLY AND EXTERNALLY - (MATERIAL COST).

4

-

-

... More
REFILL TANKS WITH NEW EXTINGUISHANT-(SERVICE COST)

2

-

-

... More
REFILL TANKS WITH NEW EXTINGUISHANT - (MATERIAL COST)

2

-

-

... More
CALIBRATE PRESSURE GAUGES-(SERVICE COST)

5

-

-

... More
CALIBRATE PRESSURE GAUGES - (MATERIAL COST).

5

-

-

... More
REPLACE AND PRESSURE TEST CONTAINER AND HP AIR BOTTLES AS PER SAMPLE AND REINSTALL. (QTY - 04 NO)-(SERVICE COST)

4

-

-

... More
REPLACE AND PRESSURE TEST CONTAINER AND HP AIR BOTTLES AS PER SAMPLE AND REINSTALL. (QTY - 04 NO) - (MATERIAL COST)

4

-

-

... More
PORTABLE FIRE FIGHTING EXTINGUISHERS - VARIOUS PLACES

-

-

-

... More
CARRY OUT HYDRAULIC PRESSURE TESTING OF THE EXTINGUISHERS (EXCEPT CO2 EXTINGUISHERS) AT A PRESSURE OF 35 KG/CM2. THE PRESSURE OF 35 KG/CM2 IS TO BE BUILT-UP SLOWLY IN 1 MIN. AND MAINTAINED FOR 2.5 MINS. STAGGER THIS TEST SUCH THAT ATLEAST ONE-THIRD (1/3 RD) OF THE TOTAL EXTINGUISHERS ARE TESTED EVERY YEAR. RECHARGE/REFILL THE EXTINGUISHERS THEREAFTER. NOTE:- EXTINGUISHERS SHOULD BE HYDRAULICALLY TESTED WITH THE CAP FITTED. THERE SHALL NOT BE ANY LEAKAGE OR VISIBLE DISTORTION IN THE TEST AND EXTINGUISHERS WHICH FAIL THIS REQUIREMENT SHALL BE REPLACED. -(SERVICE COST) AFFF(9kg)- 28 nos, CO2(2kg)- 30 nos, DCO(10kg) - 05 nos.

1

-

-

... More
CARRY OUT HYDRAULIC PRESSURE TESTING OF THE EXTINGUISHERS (EXCEPT CO2 EXTINGUISHERS) AT A PRESSURE OF 35 KG/CM2. THE PRESSURE OF 35 KG/CM2 IS TO BE BUILT-UP SLOWLY IN 1 MIN. AND MAINTAINED FOR 2.5 MINS. STAGGER THIS TEST SUCH THAT ATLEAST ONE-THIRD (1/3 RD) OF THE TOTAL EXTINGUISHERS ARE TESTED EVERY YEAR. RECHARGE/REFILL THE EXTINGUISHERS THEREAFTER. NOTE:- EXTINGUISHERS SHOULD BE HYDRAULICALLY TESTED WITH THE CAP FITTED. THERE SHALL NOT BE ANY LEAKAGE OR VISIBLE DISTORTION IN THE TEST AND EXTINGUISHERS WHICH FAIL THIS REQUIREMENT SHALL BE REPLACED - (MATERIAL COST). AFFF(9kg)- 28 nos, CO2(2kg)- 30 nos, DCO(10kg) - 05 nos.

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.