Cochin Shipyard Limited Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
0Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CSL_202554_1Bid Award Id
ViewTender No
CSL/SRM3/ADV075-076_1Tender Authority
Cochin Shipyard Limited ViewPurchaser Address
-Website
http://etenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
RENEW HOSE REEL AS PER SAMPLE VIEW DETERIORATED MATERIAL CONDITION - (MATERIAL COST)
2
-
-
OVERHAUL AND CARRY OUT HYDRAULIC PRESSURE TEST (15 BAR) OF FOAM COMPOUND TANK. PT CERTIFICATE OF BOTTLES FROM PESO APPROVED FIRMS ONLY-(SERVICE COST) .
1
-
-
OVERHAUL AND CARRY OUT HYDRAULIC PRESSURE TEST (15 BAR) OF FOAM COMPOUND TANK. PT CERTIFICATE OF BOTTLES FROM PESO APPROVED FIRMS ONLY - (MATERIAL COST).
1
-
-
OVERHAUL, PAINT AND PRESSURE TEST H.P. AIR BOTTLE. PT CERTIFICATE OF BOTTLES FROM PESO APPROVED FIRMS ONLY -(SERVICE COST) .
2
-
-
OVERHAUL, PAINT AND PRESSURE TEST H.P. AIR BOTTLE. PT CERTIFICATE OF BOTTLES FROM PESO APPROVED FIRMS ONLY - (MATERIAL COST).
2
-
-
REPLACE FOAM GENERATOR AND ITS WIREMESH VIEW DETERIORATION -(SERVICE COST) .
2
-
-
REPLACE FOAM GENERATOR AND ITS WIREMESH VIEW DETERIORATION - (MATERIAL COST).
2
-
-
OVERHAUL HP AIR REDUCER. LAP WORKING SURFACES AND RENEW WORN PARTS AS NECESSARY -(SERVICE COST) .
2
-
-
OVERHAUL HP AIR REDUCER. LAP WORKING SURFACES AND RENEW WORN PARTS AS NECESSARY - (MATERIAL COST).
2
-
-
OVERHAUL, REFIT AND RESET RELIEF VALVE -(SERVICE COST) .
4
-
-
OVERHAUL, REFIT AND RESET RELIEF VALVE - (MATERIAL COST).
4
-
-
DISCAHRGE FOAM COMPOND FROM TANK AND WASH WITH CLEAN HOT WATER. AND BLOW THROUGH THE SIPHON PIPE -(SERVICE COST) .
2
-
-
DISCAHRGE FOAM COMPOND FROM TANK AND WASH WITH CLEAN HOT WATER. AND BLOW THROUGH THE SIPHON PIPE - (MATERIAL COST).
2
-
-
OVERHAUL AND REFIT SYSTEM VALVES. REPLACE ALL DEFECTIVE -(SERVICE COST)
8
-
-
OVERHAUL AND REFIT SYSTEM VALVES. REPLACE ALL DEFECTIVE - (MATERIAL COST)
8
-
-
REPLACE AND CALIBRATE PRESSURE GAUGES -(SERVICE COST) .
6
-
-
REPLACE AND CALIBRATE PRESSURE GAUGES - (MATERIAL COST).
6
-
-
CARRY OUT FUNCTIONAL CHECK OF FOAM COMPOUND TANK SAFETY VALVE -(SERVICE COST) .
2
-
-
CARRY OUT FUNCTIONAL CHECK OF FOAM COMPOUND TANK SAFETY VALVE - (MATERIAL COST).
2
-
-
OFFER SYSTEM TRIALS AS PER IN NORMS -(SERVICE COST) .
1
-
-
GT FIRE FIGHTING SYS. (DRY CHEMICAL) - AER/FER
CARRY OUT OVERHAUL/ ROUTINES OF GT FIRE SMOOTHERING SYSTEMS IN BOTH ENGINE ROOMS AS FOLLOWS: -
-
-
-
DRAIN EXTINGUISHANT LIQUID FROM THE TANKS. CLEAN AND EXAMINE TANKS INTERNALLY FOR CORROSION. RENEW IF REQUIRED -(SERVICE COST)
2
-
-
DRAIN EXTINGUISHANT LIQUID FROM THE TANKS. CLEAN AND EXAMINE TANKS INTERNALLY FOR CORROSION. RENEW IF REQUIRED - (MATERIAL COST)
2
-
-
OVERHAUL PRESSURE REDUCERS. LAP THE WORKING SURFACES AND ELIMINATE AIR LEAKS. RENEW PARTS AS NECESSARY -(SERVICE COST) .
4
-
-
OVERHAUL PRESSURE REDUCERS. LAP THE WORKING SURFACES AND ELIMINATE AIR LEAKS. RENEW PARTS AS NECESSARY - (MATERIAL COST).
4
-
-
PRESURISE THE SYSTEM WITH AIR AND CHECK FOR LEAKS. RECTIFY DEFECTS IF ANY -(SERVICE COST) .
2
-
-
PRESURISE THE SYSTEM WITH AIR AND CHECK FOR LEAKS. RECTIFY DEFECTS IF ANY - (MATERIAL COST).
2
-
-
REPLACE AND RESET RELIEF VALVES -(SERVICE COST)
6
-
-
REPLACE AND RESET RELIEF VALVES - (MATERIAL COST)
6
-
-
CARRY OUT HYDRAULIC PRESSURE TEST OF CONTAINERS AT 150 KG/SQ CM PRESSURE -(SERVICE COST) .
2
-
-
CARRY OUT HYDRAULIC PRESSURE TEST OF CONTAINERS AT 150 KG/SQ CM PRESSURE - (MATERIAL COST).
2
-
-
REPLACE AND CARRY OUT FUNCTIONAL CHECKS OF SAFETY VALVES. RESET THE VALVE FOR REQUIRED SETTINGS -(SERVICE COST) .
4
-
-
REPLACE AND CARRY OUT FUNCTIONAL CHECKS OF SAFETY VALVES. RESET THE VALVE FOR REQUIRED SETTINGS - (MATERIAL COST).
4
-
-
DRAIN AIR BOTTLES. REMOVE THE CYLINDER HEAD CAPS AND EXAMINE BOTTLES INTERNALLY AND EXTERNALLY -(SERVICE COST) .
4
-
-
DRAIN AIR BOTTLES. REMOVE THE CYLINDER HEAD CAPS AND EXAMINE BOTTLES INTERNALLY AND EXTERNALLY - (MATERIAL COST).
4
-
-
REFILL TANKS WITH NEW EXTINGUISHANT -(SERVICE COST)
2
-
-
REFILL TANKS WITH NEW EXTINGUISHANT - (MATERIAL COST)
2
-
-
CALIBRATE PRESSURE GAUGES -(SERVICE COST) .
5
-
-
CALIBRATE PRESSURE GAUGES - (MATERIAL COST).
5
-
-
REPLACE AND PRESSURE TEST CONTAINER AND HP AIR BOTTLES AS PER SAMPLE AND REINSTALL. (QTY - 04 NO) -(SERVICE COST)
4
-
-
REPLACE AND PRESSURE TEST CONTAINER AND HP AIR BOTTLES AS PER SAMPLE AND REINSTALL. (QTY - 04 NO) - (MATERIAL COST)
4
-
-
PORTABLE FIRE FIGHTING EXTINGUISHERS - VARIOUS PLACES
-
-
-
CARRY OUT HYDRAULIC PRESSURE TESTING OF THE EXTINGUISHERS (EXCEPT CO2 EXTINGUISHERS) AT A PRESSURE OF 35 KG/CM2. THE PRESSURE OF 35 KG/CM2 IS TO BE BUILT-UP SLOWLY IN 1 MIN. AND MAINTAINED FOR 2.5 MINS. STAGGER THIS TEST SUCH THAT ATLEAST ONE-THIRD (1/3 RD) OF THE TOTAL EXTINGUISHERS ARE TESTED EVERY YEAR. RECHARGE/REFILL THE EXTINGUISHERS THEREAFTER. NOTE:- EXTINGUISHERS SHOULD BE HYDRAULICALLY TESTED WITH THE CAP FITTED. THERE SHALL NOT BE ANY LEAKAGE OR VISIBLE DISTORTION IN THE TEST AND EXTINGUISHERS WHICH FAIL THIS REQUIREMENT SHALL BE REPLACED -(SERVICE COST)
1
-
-
CARRY OUT HYDRAULIC PRESSURE TESTING OF THE EXTINGUISHERS (EXCEPT CO2 EXTINGUISHERS) AT A PRESSURE OF 35 KG/CM2. THE PRESSURE OF 35 KG/CM2 IS TO BE BUILT-UP SLOWLY IN 1 MIN. AND MAINTAINED FOR 2.5 MINS. STAGGER THIS TEST SUCH THAT ATLEAST ONE-THIRD (1/3 RD) OF THE TOTAL EXTINGUISHERS ARE TESTED EVERY YEAR. RECHARGE/REFILL THE EXTINGUISHERS THEREAFTER. NOTE:- EXTINGUISHERS SHOULD BE HYDRAULICALLY TESTED WITH THE CAP FITTED. THERE SHALL NOT BE ANY LEAKAGE OR VISIBLE DISTORTION IN THE TEST AND EXTINGUISHERS WHICH FAIL THIS REQUIREMENT SHALL BE REPLACED - (MATERIAL COST).
1
-
-
Scope 2 - TURNKEY JOB OF FIRE FIGHTING FOR Navy Vessel 2 (RM.0789)
-
-
-
FOAM FIRE SMOOTHERING SYSTEM (CO 500) MAIN ALLEWAY
CARRY OUT OVERHAUL/ ROUTINES OF FOAM SMOOTHERINGTEMS AS FOLLOWS: -
-
-
-
RENEW HOSE REEL AS PER SAMPLE VIEW DETERIORATED MATERIAL CONDITION -(SERVICE COST)
2
-
-
RENEW HOSE REEL AS PER SAMPLE VIEW DETERIORATED MATERIAL CONDITION - (MATERIAL COST)
2
-
-
OVERHAUL AND CARRY OUT HYDRAULIC PRESSURE TEST OF FOAM COMPOUND TANK AT 15 BAR. PT CERTIFICATE OF BOTTLES FROM PESO APPROVED FIRMS ONLY-(SERVICE COST)
1
-
-
OVERHAUL AND CARRY OUT HYDRAULIC PRESSURE TEST OF FOAM COMPOUND TANK AT 15 BAR. PT CERTIFICATE OF BOTTLES FROM PESO APPROVED FIRMS ONLY - (MATERIAL COST).
1
-
-
OVERHAUL, PAINT AND PRESSURE TEST H.P. AIR BOTTLE. PT CERTIFICATE OF BOTTLES FROM PESO APPROVED FIRMS ONLY-(SERVICE COST)
2
-
-
OVERHAUL, PAINT AND PRESSURE TEST H.P. AIR BOTTLE. PT CERTIFICATE OF BOTTLES FROM PESO APPROVED FIRMS ONLY - (MATERIAL COST).
2
-
-
REPLACE FOAM GENERATOR AND ITS WIREMESH VIEW DETERIORATION-(SERVICE COST)
2
-
-
REPLACE FOAM GENERATOR AND ITS WIREMESH VIEW DETERIORATION - (MATERIAL COST).
2
-
-
OVERHAUL HP AIR REDUCER. LAP WORKING SURFACES AND RENEW WORN PARTS AS NECESSARY-(SERVICE COST)
2
-
-
OVERHAUL HP AIR REDUCER. LAP WORKING SURFACES AND RENEW WORN PARTS AS NECESSARY - (MATERIAL COST).
2
-
-
OVERHAUL, REFIT AND RESET RELIEF VALVE-(SERVICE COST)
4
-
-
OVERHAUL, REFIT AND RESET RELIEF VALVE - (MATERIAL COST).
4
-
-
DISCAHRGE FOAM COMPOND FROM TANK AND WASH WITH CLEAN HOT WATER. AND BLOW THROUGH THE SIPHON PIPE-(SERVICE COST)
2
-
-
DISCAHRGE FOAM COMPOND FROM TANK AND WASH WITH CLEAN HOT WATER. AND BLOW THROUGH THE SIPHON PIPE - (MATERIAL COST).
2
-
-
OVERHAUL AND REFIT SYSTEM VALVES. REPLACE ALL DEFECTIVE-(SERVICE COST)
8
-
-
OVERHAUL AND REFIT SYSTEM VALVES. REPLACE ALL DEFECTIVE - (MATERIAL COST)
8
-
-
REPLACE AND CALIBRATE PRESSURE GAUGES -(SERVICE COST)
6
-
-
REPLACE AND CALIBRATE PRESSURE GAUGES - (MATERIAL COST).
6
-
-
CARRY OUT FUNCTIONAL CHECK OF FOAM COMPOUND TANK SAFETY VALVE-(SERVICE COST)
2
-
-
CARRY OUT FUNCTIONAL CHECK OF FOAM COMPOUND TANK SAFETY VALVE - (MATERIAL COST).
2
-
-
OFFER SYSTEM TRIALS AS PER IN NORMS -(SERVICE COST)
1
-
-
CARRY OUT OVERHAUL/ ROUTINES OF GT FIRE SMOOTHERING SYSTEMS IN BOTH ENGINE ROOMS AS FOLLOWS: -
-
-
-
DRAIN EXTINGUISHANT LIQUID FROM THE TANKS. CLEAN AND EXAMINE TANKS INTERNALLY FOR CORROSION. RENEW IF REQUIRED-(SERVICE COST)
2
-
-
DRAIN EXTINGUISHANT LIQUID FROM THE TANKS. CLEAN AND EXAMINE TANKS INTERNALLY FOR CORROSION. RENEW IF REQUIRED - (MATERIAL COST)
2
-
-
OVERHAUL PRESSURE REDUCERS. LAP THE WORKING SURFACES AND ELIMINATE AIR LEAKS. RENEW PARTS AS NECESSARY-(SERVICE COST)
4
-
-
OVERHAUL PRESSURE REDUCERS. LAP THE WORKING SURFACES AND ELIMINATE AIR LEAKS. RENEW PARTS AS NECESSARY - (MATERIAL COST)
4
-
-
PRESURISE THE SYSTEM WITH AIR AND CHECK FOR LEAKS. RECTIFY DEFECTS IF ANY-(SERVICE COST)
2
-
-
PRESURISE THE SYSTEM WITH AIR AND CHECK FOR LEAKS. RECTIFY DEFECTS IF ANY - (MATERIAL COST).
2
-
-
REPLACE AND RESET RELIEF VALVES -(SERVICE COST)
6
-
-
REPLACE AND RESET RELIEF VALVES - (MATERIAL COST)
6
-
-
CARRY OUT HYDRAULIC PRESSURE TEST OF CONTAINERS AT 150 KG/SQ CM PRESSURE-(SERVICE COST)
2
-
-
CARRY OUT HYDRAULIC PRESSURE TEST OF CONTAINERS AT 150 KG/SQ CM PRESSURE - (MATERIAL COST).
2
-
-
REPLACE AND CARRY OUT FUNCTIONAL CHECKS OF SAFETY VALVES. RESET THE VALVE FOR REQUIRED SETTINGS-(SERVICE COST)
4
-
-
REPLACE AND CARRY OUT FUNCTIONAL CHECKS OF SAFETY VALVES. RESET THE VALVE FOR REQUIRED SETTINGS - (MATERIAL COST).
4
-
-
DRAIN AIR BOTTLES. REMOVE THE CYLINDER HEAD CAPS AND EXAMINE BOTTLES INTERNALLY AND EXTERNALLY-(SERVICE COST)
4
-
-
DRAIN AIR BOTTLES. REMOVE THE CYLINDER HEAD CAPS AND EXAMINE BOTTLES INTERNALLY AND EXTERNALLY - (MATERIAL COST).
4
-
-
REFILL TANKS WITH NEW EXTINGUISHANT-(SERVICE COST)
2
-
-
REFILL TANKS WITH NEW EXTINGUISHANT - (MATERIAL COST)
2
-
-
CALIBRATE PRESSURE GAUGES-(SERVICE COST)
5
-
-
CALIBRATE PRESSURE GAUGES - (MATERIAL COST).
5
-
-
REPLACE AND PRESSURE TEST CONTAINER AND HP AIR BOTTLES AS PER SAMPLE AND REINSTALL. (QTY - 04 NO)-(SERVICE COST)
4
-
-
REPLACE AND PRESSURE TEST CONTAINER AND HP AIR BOTTLES AS PER SAMPLE AND REINSTALL. (QTY - 04 NO) - (MATERIAL COST)
4
-
-
PORTABLE FIRE FIGHTING EXTINGUISHERS - VARIOUS PLACES
-
-
-
CARRY OUT HYDRAULIC PRESSURE TESTING OF THE EXTINGUISHERS (EXCEPT CO2 EXTINGUISHERS) AT A PRESSURE OF 35 KG/CM2. THE PRESSURE OF 35 KG/CM2 IS TO BE BUILT-UP SLOWLY IN 1 MIN. AND MAINTAINED FOR 2.5 MINS. STAGGER THIS TEST SUCH THAT ATLEAST ONE-THIRD (1/3 RD) OF THE TOTAL EXTINGUISHERS ARE TESTED EVERY YEAR. RECHARGE/REFILL THE EXTINGUISHERS THEREAFTER. NOTE:- EXTINGUISHERS SHOULD BE HYDRAULICALLY TESTED WITH THE CAP FITTED. THERE SHALL NOT BE ANY LEAKAGE OR VISIBLE DISTORTION IN THE TEST AND EXTINGUISHERS WHICH FAIL THIS REQUIREMENT SHALL BE REPLACED. -(SERVICE COST) AFFF(9kg)- 28 nos,
CO2(2kg)- 30 nos,
DCO(10kg) - 05 nos.
1
-
-
CARRY OUT HYDRAULIC PRESSURE TESTING OF THE EXTINGUISHERS (EXCEPT CO2 EXTINGUISHERS) AT A PRESSURE OF 35 KG/CM2. THE PRESSURE OF 35 KG/CM2 IS TO BE BUILT-UP SLOWLY IN 1 MIN. AND MAINTAINED FOR 2.5 MINS. STAGGER THIS TEST SUCH THAT ATLEAST ONE-THIRD (1/3 RD) OF THE TOTAL EXTINGUISHERS ARE TESTED EVERY YEAR. RECHARGE/REFILL THE EXTINGUISHERS THEREAFTER. NOTE:- EXTINGUISHERS SHOULD BE HYDRAULICALLY TESTED WITH THE CAP FITTED. THERE SHALL NOT BE ANY LEAKAGE OR VISIBLE DISTORTION IN THE TEST AND EXTINGUISHERS WHICH FAIL THIS REQUIREMENT SHALL BE REPLACED - (MATERIAL COST). AFFF(9kg)- 28 nos,
CO2(2kg)- 30 nos,
DCO(10kg) - 05 nos.
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements