Cochin Shipyard Limited Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
0Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CSL_221695_1Bid Award Id
ViewTender No
CSL/SR1/VKD366Tender Authority
Cochin Shipyard Limited ViewPurchaser Address
-Website
http://https://cochinshipyard.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
(c) Overhauling of regulating wheel along with auto/ manual change over mechanism.
1
-
-
... More
(d) Repair/ renewal of sentinel valve followed by setting and hot trials.
1
-
-
... More
(e) High vibration observed on condensate pump top, inspection of bearing and overhauling of pump if required.
1
-
-
... More
(f) Renewal of working water filter body, change over filter mechanism and elements. QTY- 04.
1
-
-
... More
(g) Overhauling of HP drain 3-way valve view not holding.
1
-
-
... More
(h) Tuning and setting to work of PDR to achieve automatic and remote operation.
1
-
-
... More
(i) Gland packing renewal and tightening of feed pump and condensate pump.
1
-
-
... More
(j) Overhauling of manipulators inclusive of electrical backplane and securing cover.
1
-
-
... More
(k) Operationalization of axial float mechanism of turbine.
1
-
-
... More
(l) Renewal of cooling manifold including diamond flange followed by application of putty.
1
-
-
... More
(m) Overhauling of mechanical control elements inclusive of PDR unit, booster relay, Protection and regulation block, lock up relay.
1
-
-
... More
(n) Operationalization of FCBT RPM indicator.
1
-
-
... More
(o) Hot SDCs of the FCBT pump to be proved.
1
-
-
... More
(p) Ultrasonic thickness gauging of Turbine Casing.
1
-
-
... More
FCBT (Feed Condensate and Booster Pump) - FCBT 2 & 3 (SERVICE COST)
-
-
-
... More
(a) Inspection of Feed pump and condensate pump PTFE bearing along with pencil fitters, renew if required.
2
-
-
... More
(b) Overhauling of regulating wheel along with auto/ manual change over mechanism.
2
-
-
... More
(c) Repair/ renewal of sentinel valve followed by setting and hot trials.
2
-
-
... More
(d) Renewal of working water filter body, change over filter mechanism and elements. QTY –04.
2
-
-
... More
(e) Overhauling of HP drain 3-way valve view not holding.
2
-
-
... More
(f) Tuning and setting to work of PDR to achieve automatic and remote operation.
2
-
-
... More
(g) Gland packing renewal and tightening of feed pump and condensate pump.
2
-
-
... More
(h) Overhauling of manipulators inclusive of electrical backplane and securing cover.
2
-
-
... More
(i) Renewal of cooling manifold including diamond flange followed by application of putty.
2
-
-
... More
(j) Overhauling of mechanical control elements inclusive of PDR unit, booster relay. Protection and regulation block, lock up relay.
2
-
-
... More
(k) Operationalization of FCBT RPM indicator.
2
-
-
... More
(l) Hot SDCs of the FCBT pump to be proved.
2
-
-
... More
FCBT (Feed Condensate and Booster Pump) - FCBT 4 & 6 (SERVICE COST)
-
-
-
... More
(a) High vibrations observed during operation . Under inspection FCBT pumps and Box assembly, overhauling/ renew as necessary.
2
-
-
... More
(b) Overhauling of regulating wheel along with auto/ manual change over mechanism.
2
-
-
... More
(c) Repair/ renewal of sentinel valve followed by setting and hot trials.
2
-
-
... More
(d) Renewal of working water filter body, change over filter mechanism and elements. QTY- 04.
2
-
-
... More
(e) Overhauling of HP drain 3-way valve view not holding.
2
-
-
... More
(f) Tuning and setting to work of PDR to achieve automatic and remote operation.
2
-
-
... More
(g) Gland packing renewal and tightening of feed pump and condensate pump.
2
-
-
... More
(h) Overhauling of manipulators inclusive of electrical backplane and securing cover.
2
-
-
... More
(i) Renewal of cooling manifold including diamond flange followed by application of putty.
2
-
-
... More
(j) Overhauling of mechanical control elements inclusive of PDR unit, booster relay, Protection and regulation block, lock up relay.
2
-
-
... More
(k) Operationalization of FCBT RPM indicator.
2
-
-
... More
(l) Hot SDCs of the FCBT pump to be proved.
2
-
-
... More
FCBT (Feed Condensate and Booster Pump) - FCBT 5 (SERVICE COST)
-
-
-
... More
(a) Inspection of Feed pump and condensate pump PTFE being along with pencil filters Renew if required.
1
-
-
... More
(b) Overhauling of regulating wheel along with auto/ manual change over mechanism.
1
-
-
... More
(c) Repair renewal of sentinel valve followed by setting and hot trials.
1
-
-
... More
(d) Renewal of working water filter body, change over filter mechanism and elements. QTY-04.
1
-
-
... More
(e) Overhauling of HP drain 3-way valve view not holding.
1
-
-
... More
(f) Tuning and setting to work of PDR to achieve automatic and remote operation.
1
-
-
... More
(g) Gland packing renewal and tightening of feed pump and condensate pump.
1
-
-
... More
(h) Overhauling of manipulators inclusive of electrical backplane and securing cover.
1
-
-
... More
(i) Renewal of cooling manifold including diamond flange followed by application of putty.
1
-
-
... More
(j) Overhauling of mechanical control elements inclusive of PDR unit, booster relay. Protection and regulation block, lock up relay.
1
-
-
... More
(k) Operationalization of FCBT RPM indicator.
1
-
-
... More
(l) Hot SDCs of the FCBT pump to be proved.
1
-
-
... More
FCBT (Feed Condensate and Booster Pump) - FCBT 7 & 8 (SERVICE COST)
-
-
-
... More
(a)Inspection of Feed pump and condensate pump PTFE bearing along with pencil filters, renew if required.
2
-
-
... More
(b) Misalignment in FCBT hand turning tool slot observed, adjustment of FC8T casing / Manufacturing of FCBT turning tool as per casing.
2
-
-
... More
(c) Overhauling of regulating wheel along with auto/ manual change over mechanism.
2
-
-
... More
(d) Repair/ renewal of sentinel valve followed by setting and hot trials.
2
-
-
... More
(e) High vibration observed on condensate pump top, inspection of bearing and overhauling of pump if required.
2
-
-
... More
(f) Renewal of working water filter body, change over fitter mechanism and elements. QTY – 04.
2
-
-
... More
(g) Overhauling of HP drain 3-way valve view not holding.
2
-
-
... More
(h) Tuning and setting to work of PDR to achieve automatic and remote operation.
2
-
-
... More
(i) Gland packing renewal and tightening of feed pump and condensate pump.
2
-
-
... More
(j) Overhauling of manipulators inclusive of electrical backplane and securing cover.
2
-
-
... More
(k) Operationalization of axial float mechanism of turbine.
2
-
-
... More
(l) Renewal of cooling manifold including diamond flange followed by application of putty.
2
-
-
... More
(m) Overhauling of mechanical control elements inclusive of PDR unit, booster relay, Protection and regulation block, lock up relay.
2
-
-
... More
(n) Operationalization of FCBT RPM indicator.
2
-
-
... More
(o) Hot SDCs of the FCBT pump to be proved.
2
-
-
... More
(p) Ultrasonic thickness gauging of Turbine Casing.
2
-
-
... More
Hot Lagging & Cladding (SERVICE COST)
-
-
-
... More
1. 42. 5 Cladding over Steam auxiliary machineries
1.42.5.3 FCBT
300
-
-
... More
Boilers and TD Auxiliaries (SERVICE COST)
-
-
-
... More
1.102 Repair of Outer Insulation materials and Cement lagging TD Auxilliaries (FCBTs)
1
-
-
... More
FCBT (Feed Condensate and Booster Pump) - FCBT 1 (MATERIAL COST)
-
-
-
... More
(a) Inspection of Feed pump and condensate pump PTFE bearing along with pencil filters, renew if required.
1
-
-
... More
(b) Misalignment in FCBT hand turning tool slot observed, adjustment of FCBT casing/ Manufacturing of FCBT turning tool as per casing.
1
-
-
... More
(c) Overhauling of regulating wheel along with auto/ manual change over mechanism.
1
-
-
... More
(d) Repair/ renewal of sentinel valve followed by setting and hot trials.
1
-
-
... More
(e) High vibration observed on condensate pump top, inspection of bearing and overhauling of pump if required.
1
-
-
... More
(f) Renewal of working water filter body, change over filter mechanism and elements. QTY- 04.
1
-
-
... More
(g) Overhauling of HP drain 3-way valve view not holding.
1
-
-
... More
(h) Tuning and setting to work of PDR to achieve automatic and remote operation.
1
-
-
... More
(i) Gland packing renewal and tightening of feed pump and condensate pump.
1
-
-
... More
(j) Overhauling of manipulators inclusive of electrical backplane and securing cover.
1
-
-
... More
(k) Operationalization of axial float mechanism of turbine.
1
-
-
... More
(l) Renewal of cooling manifold including diamond flange followed by application of putty.
1
-
-
... More
(m) Overhauling of mechanical control elements inclusive of PDR unit, booster relay, Protection and regulation block, lock up relay.
1
-
-
... More
(n) Operationalization of FCBT RPM indicator.
1
-
-
... More
(o) Hot SDCs of the FCBT pump to be proved.
1
-
-
... More
(p) Ultrasonic thickness gauging of Turbine Casing.
1
-
-
... More
FCBT (Feed Condensate and Booster Pump) - FCBT 2 & 3 (MATERIAL COST)
-
-
-
... More
(a) Inspection of Feed pump and condensate pump PTFE bearing along with pencil fitters, renew if required.
2
-
-
... More
(b) Overhauling of regulating wheel along with auto/ manual change over mechanism.
2
-
-
... More
(c) Repair/ renewal of sentinel valve followed by setting and hot trials.
2
-
-
... More
(d) Renewal of working water filter body, change over filter mechanism and elements. QTY –04.
2
-
-
... More
(e) Overhauling of HP drain 3-way valve view not holding.
2
-
-
... More
(f) Tuning and setting to work of PDR to achieve automatic and remote operation.
2
-
-
... More
(g) Gland packing renewal and tightening of feed pump and condensate pump.
2
-
-
... More
(h) Overhauling of manipulators inclusive of electrical backplane and securing cover.
2
-
-
... More
(i) Renewal of cooling manifold including diamond flange followed by application of putty.
2
-
-
... More
(j) Overhauling of mechanical control elements inclusive of PDR unit, booster relay. Protection and regulation block, lock up relay.
2
-
-
... More
(k) Operationalization of FCBT RPM indicator.
2
-
-
... More
(l) Hot SDCs of the FCBT pump to be proved.
2
-
-
... More
FCBT (Feed Condensate and Booster Pump) - FCBT 4 & 6 (MATERIAL COST)
-
-
-
... More
(a) High vibrations observed during operation . Under inspection FCBT pumps and Box assembly, overhauling/ renew as necessary.
2
-
-
... More
(b) Overhauling of regulating wheel along with auto/ manual change over mechanism.
2
-
-
... More
(c) Repair/ renewal of sentinel valve followed by setting and hot trials.
2
-
-
... More
(d) Renewal of working water filter body, change over filter mechanism and elements. QTY- 04.
2
-
-
... More
(e) Overhauling of HP drain 3-way valve view not holding.
2
-
-
... More
(f) Tuning and setting to work of PDR to achieve automatic and remote operation.
2
-
-
... More
(g) Gland packing renewal and tightening of feed pump and condensate pump.
2
-
-
... More
(h) Overhauling of manipulators inclusive of electrical backplane and securing cover.
2
-
-
... More
(i) Renewal of cooling manifold including diamond flange followed by application of putty.
2
-
-
... More
(j) Overhauling of mechanical control elements inclusive of PDR unit, booster relay, Protection and regulation block, lock up relay.
2
-
-
... More
(k) Operationalization of FCBT RPM indicator.
2
-
-
... More
(l) Hot SDCs of the FCBT pump to be proved.
2
-
-
... More
FCBT (Feed Condensate and Booster Pump) - FCBT 5 (MATERIAL COST)
-
-
-
... More
(a) Inspection of Feed pump and condensate pump PTFE being along with pencil filters Renew if required.
1
-
-
... More
(b) Overhauling of regulating wheel along with auto/ manual change over mechanism.
1
-
-
... More
(c) Repair renewal of sentinel valve followed by setting and hot trials.
1
-
-
... More
(d) Renewal of working water filter body, change over filter mechanism and elements. QTY-04.
1
-
-
... More
(e) Overhauling of HP drain 3-way valve view not holding.
1
-
-
... More
(f) Tuning and setting to work of PDR to achieve automatic and remote operation.
1
-
-
... More
(g) Gland packing renewal and tightening of feed pump and condensate pump.
1
-
-
... More
(h) Overhauling of manipulators inclusive of electrical backplane and securing cover.
1
-
-
... More
(i) Renewal of cooling manifold including diamond flange followed by application of putty.
1
-
-
... More
(j) Overhauling of mechanical control elements inclusive of PDR unit, booster relay. Protection and regulation block, lock up relay.
1
-
-
... More
(k) Operationalization of FCBT RPM indicator.
1
-
-
... More
(l) Hot SDCs of the FCBT pump to be proved.
1
-
-
... More
FCBT (Feed Condensate and Booster Pump) - FCBT 7 & 8 (MATERIAL COST)
-
-
-
... More
(a)Inspection of Feed pump and condensate pump PTFE bearing along with pencil filters, renew if required.
2
-
-
... More
(b) Misalignment in FCBT hand turning tool slot observed, adjustment of FC8T casing / Manufacturing of FCBT turning tool as per casing.
2
-
-
... More
(c) Overhauling of regulating wheel along with auto/ manual change over mechanism.
2
-
-
... More
(d) Repair/ renewal of sentinel valve followed by setting and hot trials.
2
-
-
... More
(e) High vibration observed on condensate pump top, inspection of bearing and overhauling of pump if required.
2
-
-
... More
(f) Renewal of working water filter body, change over fitter mechanism and elements. QTY – 04.
2
-
-
... More
(g) Overhauling of HP drain 3-way valve view not holding.
2
-
-
... More
(h) Tuning and setting to work of PDR to achieve automatic and remote operation.
2
-
-
... More
(i) Gland packing renewal and tightening of feed pump and condensate pump.
2
-
-
... More
(j) Overhauling of manipulators inclusive of electrical backplane and securing cover.
2
-
-
... More
(k) Operationalization of axial float mechanism of turbine.
2
-
-
... More
(l) Renewal of cooling manifold including diamond flange followed by application of putty.
2
-
-
... More
(m) Overhauling of mechanical control elements inclusive of PDR unit, booster relay, Protection and regulation block, lock up relay.
2
-
-
... More
(n) Operationalization of FCBT RPM indicator.
2
-
-
... More
(o) Hot SDCs of the FCBT pump to be proved.
2
-
-
... More
(p) Ultrasonic thickness gauging of Turbine Casing.
2
-
-
... More
Hot Lagging & Cladding (MATERIAL COST)
-
-
-
... More
1. 42. 5 Cladding over Steam auxiliary machineries
1.42.5.3 FCBT
300
-
-
... More
Boilers and TD Auxiliaries (MATERIAL COST)
-
-
-
... More
1.102 Repair of Outer Insulation materials and Cement lagging TD Auxilliaries (FCBTs)
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements