Cochin Shipyard Limited Tender

Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Cochin Shipyard Limited - CSL Tender

Services
Hiring of Vehicles
Eprocure
Opening Date27 Dec 2024
Closing Date6 Jan 2025
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
(c) Overhauling of regulating wheel along with auto/ manual change over mechanism.

1

-

-

... More
(d) Repair/ renewal of sentinel valve followed by setting and hot trials.

1

-

-

... More
(e) High vibration observed on condensate pump top, inspection of bearing and overhauling of pump if required.

1

-

-

... More
(f) Renewal of working water filter body, change over filter mechanism and elements. QTY- 04.

1

-

-

... More
(g) Overhauling of HP drain 3-way valve view not holding.

1

-

-

... More
(h) Tuning and setting to work of PDR to achieve automatic and remote operation.

1

-

-

... More
(i) Gland packing renewal and tightening of feed pump and condensate pump.

1

-

-

... More
(j) Overhauling of manipulators inclusive of electrical backplane and securing cover.

1

-

-

... More
(k) Operationalization of axial float mechanism of turbine.

1

-

-

... More
(l) Renewal of cooling manifold including diamond flange followed by application of putty.

1

-

-

... More
(m) Overhauling of mechanical control elements inclusive of PDR unit, booster relay, Protection and regulation block, lock up relay.

1

-

-

... More
(n) Operationalization of FCBT RPM indicator.

1

-

-

... More
(o) Hot SDCs of the FCBT pump to be proved.

1

-

-

... More
(p) Ultrasonic thickness gauging of Turbine Casing.

1

-

-

... More
FCBT (Feed Condensate and Booster Pump) - FCBT 2 & 3 (SERVICE COST)

-

-

-

... More
(a) Inspection of Feed pump and condensate pump PTFE bearing along with pencil fitters, renew if required.

2

-

-

... More
(b) Overhauling of regulating wheel along with auto/ manual change over mechanism.

2

-

-

... More
(c) Repair/ renewal of sentinel valve followed by setting and hot trials.

2

-

-

... More
(d) Renewal of working water filter body, change over filter mechanism and elements. QTY –04.

2

-

-

... More
(e) Overhauling of HP drain 3-way valve view not holding.

2

-

-

... More
(f) Tuning and setting to work of PDR to achieve automatic and remote operation.

2

-

-

... More
(g) Gland packing renewal and tightening of feed pump and condensate pump.

2

-

-

... More
(h) Overhauling of manipulators inclusive of electrical backplane and securing cover.

2

-

-

... More
(i) Renewal of cooling manifold including diamond flange followed by application of putty.

2

-

-

... More
(j) Overhauling of mechanical control elements inclusive of PDR unit, booster relay. Protection and regulation block, lock up relay.

2

-

-

... More
(k) Operationalization of FCBT RPM indicator.

2

-

-

... More
(l) Hot SDCs of the FCBT pump to be proved.

2

-

-

... More
FCBT (Feed Condensate and Booster Pump) - FCBT 4 & 6 (SERVICE COST)

-

-

-

... More
(a) High vibrations observed during operation . Under inspection FCBT pumps and Box assembly, overhauling/ renew as necessary.

2

-

-

... More
(b) Overhauling of regulating wheel along with auto/ manual change over mechanism.

2

-

-

... More
(c) Repair/ renewal of sentinel valve followed by setting and hot trials.

2

-

-

... More
(d) Renewal of working water filter body, change over filter mechanism and elements. QTY- 04.

2

-

-

... More
(e) Overhauling of HP drain 3-way valve view not holding.

2

-

-

... More
(f) Tuning and setting to work of PDR to achieve automatic and remote operation.

2

-

-

... More
(g) Gland packing renewal and tightening of feed pump and condensate pump.

2

-

-

... More
(h) Overhauling of manipulators inclusive of electrical backplane and securing cover.

2

-

-

... More
(i) Renewal of cooling manifold including diamond flange followed by application of putty.

2

-

-

... More
(j) Overhauling of mechanical control elements inclusive of PDR unit, booster relay, Protection and regulation block, lock up relay.

2

-

-

... More
(k) Operationalization of FCBT RPM indicator.

2

-

-

... More
(l) Hot SDCs of the FCBT pump to be proved.

2

-

-

... More
FCBT (Feed Condensate and Booster Pump) - FCBT 5 (SERVICE COST)

-

-

-

... More
(a) Inspection of Feed pump and condensate pump PTFE being along with pencil filters Renew if required.

1

-

-

... More
(b) Overhauling of regulating wheel along with auto/ manual change over mechanism.

1

-

-

... More
(c) Repair renewal of sentinel valve followed by setting and hot trials.

1

-

-

... More
(d) Renewal of working water filter body, change over filter mechanism and elements. QTY-04.

1

-

-

... More
(e) Overhauling of HP drain 3-way valve view not holding.

1

-

-

... More
(f) Tuning and setting to work of PDR to achieve automatic and remote operation.

1

-

-

... More
(g) Gland packing renewal and tightening of feed pump and condensate pump.

1

-

-

... More
(h) Overhauling of manipulators inclusive of electrical backplane and securing cover.

1

-

-

... More
(i) Renewal of cooling manifold including diamond flange followed by application of putty.

1

-

-

... More
(j) Overhauling of mechanical control elements inclusive of PDR unit, booster relay. Protection and regulation block, lock up relay.

1

-

-

... More
(k) Operationalization of FCBT RPM indicator.

1

-

-

... More
(l) Hot SDCs of the FCBT pump to be proved.

1

-

-

... More
FCBT (Feed Condensate and Booster Pump) - FCBT 7 & 8 (SERVICE COST)

-

-

-

... More
(a)Inspection of Feed pump and condensate pump PTFE bearing along with pencil filters, renew if required.

2

-

-

... More
(b) Misalignment in FCBT hand turning tool slot observed, adjustment of FC8T casing / Manufacturing of FCBT turning tool as per casing.

2

-

-

... More
(c) Overhauling of regulating wheel along with auto/ manual change over mechanism.

2

-

-

... More
(d) Repair/ renewal of sentinel valve followed by setting and hot trials.

2

-

-

... More
(e) High vibration observed on condensate pump top, inspection of bearing and overhauling of pump if required.

2

-

-

... More
(f) Renewal of working water filter body, change over fitter mechanism and elements. QTY – 04.

2

-

-

... More
(g) Overhauling of HP drain 3-way valve view not holding.

2

-

-

... More
(h) Tuning and setting to work of PDR to achieve automatic and remote operation.

2

-

-

... More
(i) Gland packing renewal and tightening of feed pump and condensate pump.

2

-

-

... More
(j) Overhauling of manipulators inclusive of electrical backplane and securing cover.

2

-

-

... More
(k) Operationalization of axial float mechanism of turbine.

2

-

-

... More
(l) Renewal of cooling manifold including diamond flange followed by application of putty.

2

-

-

... More
(m) Overhauling of mechanical control elements inclusive of PDR unit, booster relay, Protection and regulation block, lock up relay.

2

-

-

... More
(n) Operationalization of FCBT RPM indicator.

2

-

-

... More
(o) Hot SDCs of the FCBT pump to be proved.

2

-

-

... More
(p) Ultrasonic thickness gauging of Turbine Casing.

2

-

-

... More
Hot Lagging & Cladding (SERVICE COST)

-

-

-

... More
1. 42. 5 Cladding over Steam auxiliary machineries 1.42.5.3 FCBT

300

-

-

... More
Boilers and TD Auxiliaries (SERVICE COST)

-

-

-

... More
1.102 Repair of Outer Insulation materials and Cement lagging TD Auxilliaries (FCBTs)

1

-

-

... More
FCBT (Feed Condensate and Booster Pump) - FCBT 1 (MATERIAL COST)

-

-

-

... More
(a) Inspection of Feed pump and condensate pump PTFE bearing along with pencil filters, renew if required.

1

-

-

... More
(b) Misalignment in FCBT hand turning tool slot observed, adjustment of FCBT casing/ Manufacturing of FCBT turning tool as per casing.

1

-

-

... More
(c) Overhauling of regulating wheel along with auto/ manual change over mechanism.

1

-

-

... More
(d) Repair/ renewal of sentinel valve followed by setting and hot trials.

1

-

-

... More
(e) High vibration observed on condensate pump top, inspection of bearing and overhauling of pump if required.

1

-

-

... More
(f) Renewal of working water filter body, change over filter mechanism and elements. QTY- 04.

1

-

-

... More
(g) Overhauling of HP drain 3-way valve view not holding.

1

-

-

... More
(h) Tuning and setting to work of PDR to achieve automatic and remote operation.

1

-

-

... More
(i) Gland packing renewal and tightening of feed pump and condensate pump.

1

-

-

... More
(j) Overhauling of manipulators inclusive of electrical backplane and securing cover.

1

-

-

... More
(k) Operationalization of axial float mechanism of turbine.

1

-

-

... More
(l) Renewal of cooling manifold including diamond flange followed by application of putty.

1

-

-

... More
(m) Overhauling of mechanical control elements inclusive of PDR unit, booster relay, Protection and regulation block, lock up relay.

1

-

-

... More
(n) Operationalization of FCBT RPM indicator.

1

-

-

... More
(o) Hot SDCs of the FCBT pump to be proved.

1

-

-

... More
(p) Ultrasonic thickness gauging of Turbine Casing.

1

-

-

... More
FCBT (Feed Condensate and Booster Pump) - FCBT 2 & 3 (MATERIAL COST)

-

-

-

... More
(a) Inspection of Feed pump and condensate pump PTFE bearing along with pencil fitters, renew if required.

2

-

-

... More
(b) Overhauling of regulating wheel along with auto/ manual change over mechanism.

2

-

-

... More
(c) Repair/ renewal of sentinel valve followed by setting and hot trials.

2

-

-

... More
(d) Renewal of working water filter body, change over filter mechanism and elements. QTY –04.

2

-

-

... More
(e) Overhauling of HP drain 3-way valve view not holding.

2

-

-

... More
(f) Tuning and setting to work of PDR to achieve automatic and remote operation.

2

-

-

... More
(g) Gland packing renewal and tightening of feed pump and condensate pump.

2

-

-

... More
(h) Overhauling of manipulators inclusive of electrical backplane and securing cover.

2

-

-

... More
(i) Renewal of cooling manifold including diamond flange followed by application of putty.

2

-

-

... More
(j) Overhauling of mechanical control elements inclusive of PDR unit, booster relay. Protection and regulation block, lock up relay.

2

-

-

... More
(k) Operationalization of FCBT RPM indicator.

2

-

-

... More
(l) Hot SDCs of the FCBT pump to be proved.

2

-

-

... More
FCBT (Feed Condensate and Booster Pump) - FCBT 4 & 6 (MATERIAL COST)

-

-

-

... More
(a) High vibrations observed during operation . Under inspection FCBT pumps and Box assembly, overhauling/ renew as necessary.

2

-

-

... More
(b) Overhauling of regulating wheel along with auto/ manual change over mechanism.

2

-

-

... More
(c) Repair/ renewal of sentinel valve followed by setting and hot trials.

2

-

-

... More
(d) Renewal of working water filter body, change over filter mechanism and elements. QTY- 04.

2

-

-

... More
(e) Overhauling of HP drain 3-way valve view not holding.

2

-

-

... More
(f) Tuning and setting to work of PDR to achieve automatic and remote operation.

2

-

-

... More
(g) Gland packing renewal and tightening of feed pump and condensate pump.

2

-

-

... More
(h) Overhauling of manipulators inclusive of electrical backplane and securing cover.

2

-

-

... More
(i) Renewal of cooling manifold including diamond flange followed by application of putty.

2

-

-

... More
(j) Overhauling of mechanical control elements inclusive of PDR unit, booster relay, Protection and regulation block, lock up relay.

2

-

-

... More
(k) Operationalization of FCBT RPM indicator.

2

-

-

... More
(l) Hot SDCs of the FCBT pump to be proved.

2

-

-

... More
FCBT (Feed Condensate and Booster Pump) - FCBT 5 (MATERIAL COST)

-

-

-

... More
(a) Inspection of Feed pump and condensate pump PTFE being along with pencil filters Renew if required.

1

-

-

... More
(b) Overhauling of regulating wheel along with auto/ manual change over mechanism.

1

-

-

... More
(c) Repair renewal of sentinel valve followed by setting and hot trials.

1

-

-

... More
(d) Renewal of working water filter body, change over filter mechanism and elements. QTY-04.

1

-

-

... More
(e) Overhauling of HP drain 3-way valve view not holding.

1

-

-

... More
(f) Tuning and setting to work of PDR to achieve automatic and remote operation.

1

-

-

... More
(g) Gland packing renewal and tightening of feed pump and condensate pump.

1

-

-

... More
(h) Overhauling of manipulators inclusive of electrical backplane and securing cover.

1

-

-

... More
(i) Renewal of cooling manifold including diamond flange followed by application of putty.

1

-

-

... More
(j) Overhauling of mechanical control elements inclusive of PDR unit, booster relay. Protection and regulation block, lock up relay.

1

-

-

... More
(k) Operationalization of FCBT RPM indicator.

1

-

-

... More
(l) Hot SDCs of the FCBT pump to be proved.

1

-

-

... More
FCBT (Feed Condensate and Booster Pump) - FCBT 7 & 8 (MATERIAL COST)

-

-

-

... More
(a)Inspection of Feed pump and condensate pump PTFE bearing along with pencil filters, renew if required.

2

-

-

... More
(b) Misalignment in FCBT hand turning tool slot observed, adjustment of FC8T casing / Manufacturing of FCBT turning tool as per casing.

2

-

-

... More
(c) Overhauling of regulating wheel along with auto/ manual change over mechanism.

2

-

-

... More
(d) Repair/ renewal of sentinel valve followed by setting and hot trials.

2

-

-

... More
(e) High vibration observed on condensate pump top, inspection of bearing and overhauling of pump if required.

2

-

-

... More
(f) Renewal of working water filter body, change over fitter mechanism and elements. QTY – 04.

2

-

-

... More
(g) Overhauling of HP drain 3-way valve view not holding.

2

-

-

... More
(h) Tuning and setting to work of PDR to achieve automatic and remote operation.

2

-

-

... More
(i) Gland packing renewal and tightening of feed pump and condensate pump.

2

-

-

... More
(j) Overhauling of manipulators inclusive of electrical backplane and securing cover.

2

-

-

... More
(k) Operationalization of axial float mechanism of turbine.

2

-

-

... More
(l) Renewal of cooling manifold including diamond flange followed by application of putty.

2

-

-

... More
(m) Overhauling of mechanical control elements inclusive of PDR unit, booster relay, Protection and regulation block, lock up relay.

2

-

-

... More
(n) Operationalization of FCBT RPM indicator.

2

-

-

... More
(o) Hot SDCs of the FCBT pump to be proved.

2

-

-

... More
(p) Ultrasonic thickness gauging of Turbine Casing.

2

-

-

... More
Hot Lagging & Cladding (MATERIAL COST)

-

-

-

... More
1. 42. 5 Cladding over Steam auxiliary machineries 1.42.5.3 FCBT

300

-

-

... More
Boilers and TD Auxiliaries (MATERIAL COST)

-

-

-

... More
1.102 Repair of Outer Insulation materials and Cement lagging TD Auxilliaries (FCBTs)

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.