Cochin Shipyard Limited Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
0Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CSL_215595_1Bid Award Id
ViewTender No
CSL/SR1/ADV357Tender Authority
Cochin Shipyard Limited ViewPurchaser Address
-Website
http://https://cochinshipyard.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
1.3.17. Open TBU flap spindle shaft bearings and intermediate shaft bearings, valves, wash them down and fill with lubrication grease lithol-24 gost 21150-87. Assemble and install the valve. check the proper operation of the valve. qty - 8
4
-
-
... More
1.3.18. Check the settings for the key components of regulation, control, and protection system 1.3.18.1. Command block, 1.3.18.2. Over speed regulator, 1.3.18.3. Locking device 1.3.18.4. Lubrication lock-up valve
Qty - 04 components
4
-
-
... More
1.3.20. Check condition of turning gear assembly, engaging/disenganing mechanism, overhauling as required
8
-
-
... More
1.3.21. Inspect condition of bellows and compensators of system of various sizes, Repair/ renew as required (05 per TBU)
40
-
-
... More
1.3.22. Overhauling of lub oil flow orifices, fliter body and filter element.
20
-
-
... More
1.3.23. Inspection of mounts and foundation of gearbox and pump casing.
8
-
-
... More
Hot Lagging & Cladding - SERVICE COST
-
-
-
... More
1. 42. 5 Cladding over Steam auxiliary machineries
1.42.5.3 TBU
200
-
-
... More
TBU AIR INTAKE AND EXHAUST SYSTEM - SRVICE COST
-
-
-
... More
Carry out visual inspection of the damping branch pipes and their cleaning. replace the branch pipes, in case of deterioration of the rubber surfaces. qty - 08 units ,job includes removal /repair /renewal /degutting if required/fitment
8
-
-
... More
Boilers and TD Auxiliaries - SERVICE COST
-
-
-
... More
Renewal /Repair of Outer Insulation materials and Cement lagging TD Auxilliaries (TBU's)
1
-
-
... More
TD Auxiliaries - TBU (Turbo Blower Unit) - MATERIAL COST
-
-
-
... More
1.3.15. The regular maintenance of TBU shall be made in 5 years of operation. The maintenance shall be made with removal of upper halves of steam turbine, gas turbine, compressor and inspection of flow part. The content and the sequence of inspection are set out in operational manual.
4
-
-
... More
1.3.16. Remove air bypass flap from the line. clear the innner part of housing and valve housing.
4
-
-
... More
1.3.17. Open TBU flap spindle shaft bearings and intermediate shaft bearings, valves, wash them down and fill with lubrication grease lithol-24 gost 21150-87. Assemble and install the valve. check the proper operation of the valve. qty - 8
4
-
-
... More
1.3.18. Check the settings for the key components of regulation, control, and protection system 1.3.18.1. Command block, 1.3.18.2. Over speed regulator, 1.3.18.3. Locking device 1.3.18.4. Lubrication lock-up valve
Qty - 04 components
4
-
-
... More
1.3.20. Check condition of turning gear assembly, engaging/disenganing mechanism, overhauling as required
8
-
-
... More
1.3.21. Inspect condition of bellows and compensators of system of various sizes, Repair/ renew as required (05 per TBU)
40
-
-
... More
1.3.22. Overhauling of lub oil flow orifices, fliter body and filter element.
20
-
-
... More
1.3.23. Inspection of mounts and foundation of gearbox and pump casing.
8
-
-
... More
Hot Lagging & Cladding - MATERIAL COST
-
-
-
... More
1. 42. 5 Cladding over Steam auxiliary machineries
1.42.5.3 TBU
200
-
-
... More
TBU AIR INTAKE AND EXHAUST SYSTEM - MATERIAL COST
-
-
-
... More
Carry out visual inspection of the damping branch pipes and their cleaning. replace the branch pipes, in case of deterioration of the rubber surfaces. qty - 08 units ,job includes removal /repair /renewal /degutting if required/fitment
8
-
-
... More
Boilers and TD Auxiliaries - MATERIAL COST
-
-
-
... More
Renewal /Repair of Outer Insulation materials and Cement lagging TD Auxilliaries (TBU's)
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements