Cochin Shipyard Limited Tender

Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Cochin Shipyard Limited - CSL Tender

Services
Aerospace and Defence
Eprocure
Opening Date27 Dec 2024
Closing Date2 Jan 2025
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Domestic fresh water system (MATERIAL COST)

-

-

-

... More
1.14.3 Operational checks of hydrophore controls. Calibration of all control components. Cleaning and pressure testing of hydrophores, undertake painting (if required). 1. Renewal of limit switches (02) 2. Running indication of fresh water pump in PDCR to be operationalised including Suction and Discharge pressure. 3. Renewal of digital flow meter of all fresh water distribution line in Fwd & Aft distribution station. 1.14.4 Tank level indicators for 03 in nos tank to be operationalised local as well as PDCR.

1

-

-

... More
SYSTEM 2

-

-

-

... More
Domestic Sea water system (SERVICE COST)

-

-

-

... More
Running indication of Sea water pump in PDCR to be operationalised including Suction and Discharge pressure

1

-

-

... More
Domestic Sea water system (MATERIAL COST)

-

-

-

... More
Running indication of Sea water pump in PDCR to be operationalised including Suction and Discharge pressure

1

-

-

... More
SYSTEM 3

-

-

-

... More
Chilled Water System (SERVICE COST)

-

-

-

... More
1.16.4 Check operation of thermostat in the chilled water line and calibrate if required -454nos 1.16.6 Check and calibrate all instrumentation and safety cut-outs in the system. The instrumentation should include all pressure/temperature gauges, venturimeter /rotameters in the chilled water system. 1. Repair/Renewal of solenoid valves of auto filling system in all Exapansion tank (08). 2. Tank level indication for TDACs as well as PDCR to be operationalised. 3. Renewal of RTDs (50) 4. Renewal of pressure switches (20) & Rotameters (10) 1.16.10 Undertake functional checks of all RCVs. Repair/ renew defective RCVs. Check remote operation from PDCR. Repair and renew instrumentation and electrical components as required. 1. Air conditioning plant chilled water temp, salinity, trip indication to be integrated with common integrated display at PDCR. 2. Additional thermo pocket for temp sensor to be manufactured and installed. 3. Remote operation of hydraulic valve from PDCR to be calibrated including repair of manipulator.

1

-

-

... More
Chilled Water System (MATERIAL COST)

-

-

-

... More
1.16.4 Check operation of thermostat in the chilled water line and calibrate if required -454nos 1.16.6 Check and calibrate all instrumentation and safety cut-outs in the system. The instrumentation should include all pressure/temperature gauges, venturimeter /rotameters in the chilled water system. 1. Repair/Renewal of solenoid valves of auto filling system in all Exapansion tank (08). 2. Tank level indication for TDACs as well as PDCR to be operationalised. 3. Renewal of RTDs (50) 4. Renewal of pressure switches (20) & Rotameters (10) 1.16.10 Undertake functional checks of all RCVs. Repair/ renew defective RCVs. Check remote operation from PDCR. Repair and renew instrumentation and electrical components as required. 1. Air conditioning plant chilled water temp, salinity, trip indication to be integrated with common integrated display at PDCR. 2. Additional thermo pocket for temp sensor to be manufactured and installed. 3. Remote operation of hydraulic valve from PDCR to be calibrated including repair of manipulator.

1

-

-

... More
SYSTEM 4

-

-

-

... More
Fire main system (SERVICE COST)

-

-

-

... More
1.17.5 1.Carry out calibration of measuring instruments as per their certificates 2. Renewal of KRD relay with DANFOSS sensor. Qty-26, range-0-25bar 3. Renewal of PRESSURE SWITCH (VALCOM sensor with Honey well sensor).Qty-26, range-0-25bar. 4.Renewal of Hydraulic Valve open/ close Position Indication Sensor. Qty - 120 (Press/Pull type). 5. Renewal of KD- MID sensors at FCPs with Honeywell sensors with Pressure indications. Qty 10

1

-

-

... More
Fire main system (MATERIAL COST)

-

-

-

... More
1.17.5 1.Carry out calibration of measuring instruments as per their certificates 2. Renewal of KRD relay with DANFOSS sensor. Qty-26, range-0-25bar 3. Renewal of PRESSURE SWITCH (VALCOM sensor with Honey well sensor).Qty-26, range-0-25bar. 4.Renewal of Hydraulic Valve open/ close Position Indication Sensor. Qty - 120 (Press/Pull type). 5. Renewal of KD- MID sensors at FCPs with Honeywell sensors with Pressure indications. Qty 10

1

-

-

... More
SYSTEM 5

-

-

-

... More
OXYGEN PLANT (SERVICE COST)

-

-

-

... More
1.25.2 Carry out calibration/ checks of all safety devices fitted in the system as well as on sub-assemblies. Upgradation of control panel with replacement of heater assembly

1

-

-

... More
OXYGEN PLANT (MATERIAL COST)

-

-

-

... More
1.25.2 Carry out calibration/ checks of all safety devices fitted in the system as well as on sub-assemblies. Upgradation of control panel with replacement of heater assembly

1

-

-

... More
SYSTEM 6

-

-

-

... More
Chemical Fire Smothering System (07 stations) (SERVICE COST)

-

-

-

... More
1.18.5 Check automatic and remote start of system without HALON release from the extinguishers

1

-

-

... More
Chemical Fire Smothering System (07 stations) (MATERIAL COST)

-

-

-

... More
1.18.5 Check automatic and remote start of system without HALON release from the extinguishers

1

-

-

... More
SYSTEM 7

-

-

-

... More
Foam Fire Fighting System (SERVICE COST)

-

-

-

... More
1.19.6.Carry out maintenance of measuring instruments as per their certificates. - 100Nos 1.19.9 Carry out refurbishment/ replacement of control replay board outer cover.- 1 System 1.19.10 Overhauling/ Replacemet of defective pressure sensor - 1 System

1

-

-

... More
Foam Fire Fighting System (MATERAIL COST)

-

-

-

... More
1.19.6.Carry out maintenance of measuring instruments as per their certificates. - 100Nos 1.19.9 Carry out refurbishment/ replacement of control replay board outer cover.- 1 System 1.19.10 Overhauling/ Replacemet of defective pressure sensor - 1 System

1

-

-

... More
SYSTEM 8

-

-

-

... More
Drainage Pump (SERVICE COST)

-

-

-

... More
1.20.3. Calibrate all instrumentation. Undertake survey of clamping of complete system. Repair/ renew as necessary.

24

-

-

... More
Drainage Pump (MATERIAL COST)

-

-

-

... More
1.20.3. Calibrate all instrumentation. Undertake survey of clamping of complete system. Repair/ renew as necessary.

24

-

-

... More
SYSTEM 9

-

-

-

... More
Bekas (Work Boat) ( SERVICE COST)

-

-

-

... More
1.29.2.3 Carry out cabling, calibration of instrumentation panel/ console and instrumentation checks.

2

-

-

... More
Bekas (Work Boat) ( MATERIAL COST)

-

-

-

... More
1.29.2.3 Carry out cabling, calibration of instrumentation panel/ console and instrumentation checks.

2

-

-

... More
SYSTEM 10

-

-

-

... More
OFB (Officers Boat) (SERVICE COST)

-

-

-

... More
1.30.4.2 Carry out cabling, calibration of instrumentation panel/ console and instrumentation checks. Qty - 02

2

-

-

... More
OFB (Officers Boat) (MATERIAL COST)

-

-

-

... More
1.30.4.2 Carry out cabling, calibration of instrumentation panel/ console and instrumentation checks. Qty - 02

2

-

-

... More
SYSTEM 11

-

-

-

... More
GAS ANALYSER FOR FUEL & OXYGEN (SERVICE COST)

-

-

-

... More
Carryout following annual routines on gas analyser.Qty-04 1.86.1 Inspect oxygen sampling pump membrane and replace if required 1.86.2 Calibration of gas detectors . 1.86.3 Inspect avcat sampling pump membrane and replace if required .

4

-

-

... More
GAS ANALYSER FOR FUEL & OXYGEN (MATERIAL COST)

-

-

-

... More
Carryout following annual routines on gas analyser.Qty-04 1.86.1 Inspect oxygen sampling pump membrane and replace if required 1.86.2 Calibration of gas detectors . 1.86.3 Inspect avcat sampling pump membrane and replace if required .

4

-

-

... More
SYSTEM 12

-

-

-

... More
Electromagnetic bleed valve (SERVICE COST)

-

-

-

... More
Electromagnetic bleed valve of venilation system malfunctioning. Overhauling of bleed valve to be carried out. Qty- 30

30

-

-

... More
Electromagnetic bleed valve (MATERIAL COST)

-

-

-

... More
Electromagnetic bleed valve of venilation system malfunctioning. Overhauling of bleed valve to be carried out. Qty- 30

30

-

-

... More
SYSTEM 13

-

-

-

... More
Resistor-E (SERVICE COST)

-

-

-

... More
3.30.9. Serviceability check/calibration of 07 in number temperature sensor and sensor cable of radar beacon, secondary radar, localizer beacon, and glide Scope beacon, approach control system 1 and 2 of of rezistor-e complex. Calibration of pressure guages 12nos in each system

2

-

-

... More
Resistor-E (MATERIAL COST)

-

-

-

... More
3.30.9. Serviceability check/calibration of 07 in number temperature sensor and sensor cable of radar beacon, secondary radar, localizer beacon, and glide Scope beacon, approach control system 1 and 2 of of rezistor-e complex. Calibration of pressure guages 12nos in each system

2

-

-

... More
SYSTEM 14

-

-

-

... More
Gas detection system (SERVICE COST)

-

-

-

... More
rCA-K 3.204.2 Serviceability / calibration checks of gas detection system . Renew if defective

2

-

-

... More
Gas detection system (MATERIAL COST)

-

-

-

... More
rCA-K 3.204.2 Serviceability / calibration checks of gas detection system . Renew if defective

2

-

-

... More
SYSTEM 15

-

-

-

... More
Vent Flap (SERVICE COST)

-

-

-

... More
Serviceability checks of vent flap coil auto operation at all PGRs, EPS and EBRs. Rewinding,replacement of vent flap coils, limit switches and indications.

46

-

-

... More
Vent Flap (MATERIAL COST)

-

-

-

... More
Serviceability checks of vent flap coil auto operation at all PGRs, EPS and EBRs. Rewinding,replacement of vent flap coils, limit switches and indications.

46

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.