Cochin International Airport Limited Tender
... More
The CIAL has issued a formal invitation for competitive bids for the Cochin International Airport Limited project, for Widening Of Runway Approach Roads And Strengthening in Ernakulam, Kerala, with an estimated contract value of Rs. 11,48,85,810. The bid opening date for this tender is 14-12-2021 and the last date for bid submission is 21-12-2021. Interested bidders for Cochin International Airport Limited tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Costs
EMD
₹ 10,00,000Document Cost
₹ 2,800Tender Fee
Refer Documents
Summary
Widening Of Runway Approach Roads And Strengthening
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_CIAL_460435_1Bid Award Id
ViewTender No
CIAL/CIVIL/578/E04Tender Authority
Cochin International Airport Limited ViewPurchaser Address
-Website
http://https://cial.aero/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Tender document for Widening of Runway Approach Roads and Grading and Strengthening of Runway Strip 2021 22
BOQ Items
... More
Construction of dry lean cement concrete sub base over a prepared sub-grade with coarse and fine aggregate conforming to IS:383, the size of coarse aggregate not exceeding 40 mm, aggregate cement ratio not to exceed 13.5:1, aggregate gradation after blending to be as per specifications, cement content not to be less than 160 kg/cu.m., optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, for all leads & lifts, laid with a mechanical paver, compacting with 8-10 tonne vibratory roller, finishing and curing etc. complete as per direction of Engineer-in-charge.
400
-
-
... More
Providing and laying design mix of Dense Graded Bituminous Macadam (grading 2), 50 to 100 mm average compacted thickness, using crushed stone aggregates of specified grading, premixed with bituminous binder of grade VG-30 @ minimum 4.5% (percentage by weight of total mix) and lime/cement filler @ 2% (percentage by weight of aggregate), prepared in Drum/Weigh batch Type Hot Mix Plant of 60-90 TPH capacity, transporting the hot mix to the work site by tippers, laying over a previously prepared surface (All cracks to be sealed properly with bitumen) with paver finisher equipped with electronic sensor to the required grade, level and alignment, and rolling with smooth-wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction, density and surface accuracy, etc. complete as per MORTH specifications and directions of the Engineer-in-Charge. (The rate quoted is inclusive of all material, including rate of VG-30 and operation of all activities to complete this item)
400
-
-
... More
Providing and laying Bituminous concrete using crushed stone aggregates of specified grading (grading 1), premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equiped with electronic sensor to the required grade, level and alignment, and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction, density and surface accuracy as per the approved the mix design, MORTH specifications and as per the directions of Engineer-in-Charge: 40/50 mm compacted thickness with bitumen of grade VG-30 @ minimum 5.2% (percentage by weight of total mix) and lime/cement filler @ 2% (percentage by weight of Aggregate) prepared in Drum Type/Weigh Batch Type Hot Mix Plant of 60-90 TPH capacity. (The rate quoted is inclusive of all material, including rate of VG-30 and operation of all activities to complete this item)
380
-
-
... More
Supplying and laying longitudinally cut/ as whole 200 mm dia single-RCC hume pipes of NP2 class as cable ducts/drain including collars, jointed with stiff mixture of cement mortar 1(cement): 2 (fine sand), encased all around in PCC 1:3:6, 150 mm thick including excavation, all centering and shuttering works, provision of pull through wires and end caps, tying the two halves of the pipe with GI wires, etc. complete as per specification and as directed by the engineer in charge
50
-
-
... More
Excavating, supplying and filling of available local earth (including royalty) by mechanical transport up to a lead of 7 km, spreading the same, grading using motor grader, also including ramming and watering of the earth in layers not exceeding 20 cm in depth, breaking clods, rolling each layer with vibratory roller of minimum 8 -10 tonnes, levelling and fine dressing, to the required camber, grade and slopes etc. complete. (The rate of the item includes excavating, transporting locally available earth up to a lead of 7 km and filling the same at the Runway strip, spreading and grading using motor grader for slope correction of the ground, and consolidating the same using vibratory roller of 8-10 tonnes capacity after water rolling)
12650
-
-
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size)
20
-
-
... More
Supplying and filling 40 mm to 12 mm broken stone aggregates of specified grading, along the length of the trenches, in layers of specified thickness etc. complete and as directed by the Engineer-in-Charge
370
-
-
... More
Providing and laying plum concrete in layers using 40% stone soling of average size 300 mm (stone size 250 mm- 350 mm), and 60% plain cement concrete 1:2:4 (1 cement: 2 manufactured crusher sand: 4 graded stone aggregate 25 mm nominal size, using cement 320 kg/cu.m), as per specifications and as directed by the Engineer in Charge.
1390
-
-
... More
Earthwork in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 1.5 m in width as well as 10 sq.m on plan and of an average depth 30 cm) in all type of soils including soft rock, in areas marked for cutting to correct lines and grade/levels and transporting selected fill materials obtained from cutting within the boundary including lead up to 5 km, and all lifts, disposed or transported soil to be levelled and neatly dressed using vibratory roller as per technical specifications and subgrade consolidation using vibratory roller, under 98% modified proctor density (IS: 2720 Part VIII-1983), and as directed by the Engineer in Charge (The item includes cost of all labour, transportation, manual and /or mechanical, machinery etc. involved in all operations as mentioned above).
35800
-
-
... More
Providing and laying rubble packing by doing extra excavation for a depth of 40 cm and packing the voids with granular sub-base material and consolidating with a vibratory roller etc. complete as directed by the Engineer-in-Charge.
100
-
-
... More
Supplying and laying 120 GSM geotextiles along the full width and depth of the trenches for subsurface drain, the section area to be laid being 0.6 m x 0.70 m, as per the specification and drawings, with adjacent widths of the mat along the length and wrapping at the top, both to be overlapped by 30 cm, and as per the directions of the Engineer-in-charge.
870
-
-
... More
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means for all kinds of soil, including soft rock, in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, and all lifts, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. The disposed soil is to be levelled and neatly dressed using vibratory roller as per technical specifications and as directed by the Engineer-in-Charge. The item includes cost of all labour, transportation, manual and/or mechanical, machinery etc. involved in all operations as mentioned above.
440
-
-
... More
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 5 km outside the periphery of the area cleared and as directed by the Engineer-in-Charge.
160330
-
-
... More
Dismantling bituminous road, including granular materials, manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 1 km lead as per direction of Engineer-in-charge : 30 cm average depth. The disposed material to be levelled, neatly dressed and compacted with a vibratory roller.
700
-
-
... More
Construction of granular sub-base by providing close graded material conforming to specifications of Grade-I (size range 75 mm to 0.075 mm) having CBR Value-30, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge.
20520
-
-
... More
Providing and applying tack coat using hot straight run bitumen of grade VG-30, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler/pressure distributor at the rate of 0.3 kg/sq.m on the prepared bituminous surface and granular/concrete surface, after cleaning etc. complete as per the specifications and as directed by the Engineer-in-charge
9600
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements