Cochin International Airport Limited Tender

Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Cochin International Airport Limited - CIAL Tender

Goods
Software and IT Solutions
Eprocure
Opening Date6 Jan 2025
Closing Soon10 Feb 2025
Tender Amount₹ 5,00,00,000 
Notes
Download

Costs

Summary

Sitc Of Hyper-converged Infrastructure Solution

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supply of HCI License (As per the Technical Specification)

1

-

-

... More
ITC of HCI License (With License Key and all other accessories required for the completion of work)

1

-

-

... More
HCI Node to TOR Switch Network Connectivity

-

-

-

... More
Supply of Top-of-Rack Switch (As per the Technical Specification)

4

-

-

... More
ITC of Top-of-Rack Switch (With Enclosure, Mounting Accessories, Cable,Optical transceivers, and all other accessories required for the completion of work)

4

-

-

... More
Supply of 25G BASE Active Optical SFP28 Cable, 10M (Same Make as TOR Switch)

30

-

-

... More
Supply of 25G BASE Active Optical SFP28 Cable, 3M (Same Make as TOR Switch)

10

-

-

... More
Supply of 100G QSFP28 100G-LR, 10km SMF, duplex, LC Connector (Same Make as TOR Switch)

10

-

-

... More
Supply of Back Up cum Witness Server (As per the Technical Specification)

1

-

-

... More
ITC of Back Up cum Witness Server(With Enclosure, Mounting Accessories and all other accessories required for the completion of work)

1

-

-

... More
Supply of Backup Software (As per the Technical Specification)

1

-

-

... More
ITC of Backup Software (With License Key and all other accessories required for the completion of work)

1

-

-

... More
Supply of Microsoft Windows Server 2025 Data Centre (As per the Technical Specification)

1

-

-

... More
ITC of Microsoft Windows Server 2025 Data Centre(With License Key and all other accessories required for the completion of work)

1

-

-

... More
Miscellaneous Items

1

-

-

... More
Comprehensive Annual Maintenance Contract for 2 years, inclusive of spares and accessories. AMC starts after the warranty period of 5 years. All amounts in Rs inclusive of all taxes, levies, transportation, etc.

-

-

-

... More
The total Manpower cost for 7 years (5-year warranty + 2-year AMC) is fixed at 8% of the SITC cost, with a yearly increase of 6% (minimum requirement).

-

-

-

... More
1st Year Manpower Cost

12

-

-

... More
2nd Year Manpower Cost

12

-

-

... More
3rd Year Manpower Cost

12

-

-

... More
4th Year Manpower Cost

12

-

-

... More
5th Year Manpower Cost

12

-

-

... More
6th Year Manpower Cost

12

-

-

... More
7th Year Manpower Cost

12

-

-

... More
1st Year AMC Cost

12

-

-

... More
2nd Year AMC Cost

12

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.