South Western Railway Tender

Karnataka, also known as Karunadu, is a state in the southwestern region of India. Karnataka was formed originally as Mysore State on 1st November 1956 and currently is the biggest state in south India. Its capital and largest city is Bengaluru. It covers an area of 191,791 km2 (74,051 sq mi) and is the sixth largest state by area comprising 31 districts. Karnataka is also a state of multiple languages; Kannada being the official and most widely spoken language in Karnataka. Other languages spoken in the state include Tamil, Telugu, Malayalam, Kodava, Konkani and much more.Karnataka tenders are issued by the government of Karnataka, public & private sector organisations. The state government issues majority of the Karnataka tenders, which are for goods and services including construction, road and bridge construction, IT services, engineering services, medical services, educational services amongst many others. Bidassist is one of the largest eprocurement portals, which offers all government tenders from across the world in one place. Bidassist offers information on all Karnataka tenders and other state and authority tenders in no time. Bidassist is a platform where users can look for various Karnataka tenders as well as other tenders.

South Western Railway - SWR Tender

Civil And Construction
Bridge Construction
Civil Works Roads
Railway
Civil Construction
Ireps
Opening Date7 Mar 2022
Closing Date29 Mar 2022
Tender Amount₹ 15,24,49,344 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supply of reinforcement steel items covered under USSOR-21

-

-

65079000

... More
Collection & Supply of Ballast items not covered under USSOR-21

-

-

198400

... More
Track work items covered under USSOR-21

-

-

1602015.61

... More
COMPLETION DRAWING: Preparation and submission of GAD/Completion drawing for the Major bridges/ROBS/RUBs based on soil exploration and water way calculation for fixing suitable span as per RDSO 7 design and drawing in AutoCAD on 100micon film double mat finish as per Railway standard approved by the Engineer-in-charge to specified scales including submission of check print for proof check to incorporate suggested corrections and modifications and supply final copy in compact disk and 6 copies in ammonia print in A0 size with all contractor's materials, labours, tools, plants etc., complete.

2

14427

28854

... More
(i) Leading and dumping of Railway's stone ballast without rail traffic block from stacks collected on either side of formation in mid section / at yards at top of steep cuttings / side or bottom of high banks as directed; (ii) Spreading the ballast on the formation as per standard section and required cushion with extra width on curves and; (iii) Boxing of ballast to standard sectional profile. All of the above shall be executed with contractor's skilled personnel, tools and plant, vehicles, machinery, fuel, consumables, loading, unloading with all incidental charges and in all kinds of weather conditions and site conditions including crossing of tracks wherever required duly observing all safety precautions and including all ascent, descent, taxes, duties, cess, surcharges, fees etc. completely as per the special conditions / specifications / regulations, as directed by the Engineer-in-Charge and as per the note(s) below. NOTES: 1. This item consists of 3 stages of payment as mentioned in the sub-items. The first 3 stages are for a lead of 150 m, the next 3 stages are for a lead between 150 m and 750 m and the last 3 stages are for a lead between 750 m and 5000 m. Dumping shall be undertaken in these 3 stages as 7 instructed; 2. While operating sub-items d, e and f, sub- items a, b and c need not be and shall not be operated as sub-items d, e and f are all-inclusive and not extra over sub- items a, b and c. Similarly while operating sub- items g, h and i, sub- items a, b and c need not be and shall not be operated as sub-items g, h and i are all- inclusive and not extra over sub- items a, b and c; 3. Stage - 1 i.e. dumping of ballast shall be done in two phases - a) initial spreading and b) further dumping after laying the sleepers and linking the track as directed; 4. Stage -2 i.e. boxing of ballast to the required BG standard ballast profile as per the cushion specified as per IRPWM includes finishing to the specified BG profile; 5. Payment shall be done as per stack measurement without deduction for any voids; 6. Stack wise prior written permission of Engineer-in-Charge shall be taken for dumping of ballast. No payment shall be made in case no such prior written permission is obtained by the contractor. In addition, penal action shall be taken for disturbing the ballast stacks without the permission of the competent authority of Railway; 7. The rate includes leading and lifting / lowering of ballast at the top of steep cuttings or at the bottom of high banks on either side of the bank / cutting to the formation. a. For dumping of ballast on track for lead up to 150 m

800

68

54400

... More
(i) Leading and dumping of Railway's stone ballast without rail traffic block from stacks collected on either side of formation in mid section / at yards at top of steep cuttings / side or bottom of high banks as directed; 7 (ii) Spreading the ballast on the formation as per standard section and required cushion with extra width on curves and; (iii) Boxing of ballast to standard sectional profile.All of the above shall be executed with contractor's skilled personnel, tools and plant, vehicles, machinery, fuel, consumables, loading, unloading with all incidental charges and in all kinds of weather conditions and site conditions including crossing of tracks wherever required duly observing all safety precautions and including all ascent, descent, taxes, duties, cess, surcharges, fees etc. completely as per the special conditions / specifications / regulations, as directed by the Engineer-in-Charge and as per the note(s) below. NOTES: 1. This item consists of 3 stages of payment as mentioned in the sub-items. The first 3 stages are for a lead of 150 m, the next 3 stages are for a lead between 150 m and 750 m and the last 3 stages are for a lead between 750 m and 5000 m. Dumping shall be undertaken in these 3 stages as instructed; 2. While operating sub-items d, e and f, sub- items a, b and c need not be and shall not be operated as sub-items d, e and f are all inclusive and not extra over sub- items a, b and c. Similarly while operating sub- items g, h and i, sub- items a, b and c need not be and shall not be operated as sub-items g, h and i are all- inclusive and not extra over sub- items a, b and c; 3. Stage - 1 i.e. dumping of ballast shall be done in two phases - a) initial spreading and b) further dumping after laying the sleepers and linking the track as directed; 4. Stage -2 i.e. boxing of ballast to the required BG standard ballast profile as per the cushion specified as per IRPWM includes finishing to the specified BG profile; 5. Payment shall be done as per stack measurement without deduction for any voids; 6. Stack wise prior written permission of Engineer-in-Charge shall be taken for dumping of ballast. No payment shall be made in case no such prior written permission is obtained by the contractor. In addition, penal action shall be taken for disturbing the ballast stacks without the permission of the competent authority of Railway; 7. The rate includes leading and lifting / lowering of ballast at the top of steep cuttings or at the bottom of high banks on either side of the bank / cutting to the formation. b. For boxing to sectional profile for a lead up to 150 m

800

34

27200

... More
(i) Leading and dumping of Railway's stone ballast without rail traffic block from stacks collected on either side of formation in mid section / at yards at top of steep cuttings / side or bottom of high banks as directed; (ii) Spreading the ballast on the formation as per standard section and required cushion with extra width on curves and; (iii) Boxing of ballast to standard sectional profile. All of the above shall be executed with contractor's skilled personnel, tools and plant, vehicles, machinery, fuel, consumables, loading, unloading with all incidental charges and in all kinds of weather conditions and site conditions including crossing of tracks wherever required duly observing all safety precautions and including all ascent, descent, taxes, duties, cess, surcharges, fees etc. completely as per the special conditions / specifications / regulations, as directed by the Engineer-in-Charge and as per the note(s) below.NOTES: 1. This item consists of 3 stages of payment as mentioned in the sub-items. The first 3 stages are for a lead of 150 m, the next 3 stages are for a lead between 150 m and 750 m and the last 3 stages are for a lead between 750 m and 5000 m. Dumping shall be undertaken in these 3 stages as 7 instructed; 2. While operating sub-items d, e and f, sub- items a, b and c need not be and shall not be operated as sub-items d, e and f are all-inclusive and not extra over sub- items a, b and c. Similarly while operating sub- items g, h and i, sub- items a, b and c need not be and shall not be operated as sub-items g, h and i are all- inclusive and not extra over sub- items a, b and c; 3. Stage - 1 i.e. dumping of ballast shall be done in two phases - a) initial spreading and b) further dumping after laying the sleepers and linking the track as directed; 4. Stage -2 i.e. boxing of ballast to the required BG standard ballast profile as per the cushion specified as per IRPWM includes finishing to the specified BG profile; 5. Payment shall be done as per stack measurement without deduction for any voids; 6. Stack wise prior written permission of Engineer-in-Charge shall be taken for dumping of ballast. No payment shall be made in case no such prior written permission is obtained by the contractor. In addition, penal action shall be taken for disturbing the ballast stacks without the permission of the competent authority of Railway; 7. The rate includes leading and lifting / lowering of ballast at the top of steep cuttings or at the bottom of high banks on either side of the bank / cutting to the formation. c. For fully salvaging all the ballast at stack locations / that fallen in drains / side slopes of formation etc. and dumping the same uniformly in track up to a lead of150 m

800

12

9600

... More
i) Manufacturing of Retro-reflective board - Caution Indicator / Stop indicator / Speed indicator / Whistle Board / any other board with 1.50 mm thick MS plate and MS plate stiffeners on M.S. 'T' angles 75 mm x 75 mm x 6 mm and 4.75 m long approximately as per the specified drawing including cutting, drilling holes in the angles, providing hold fasts, bolts and nuts with washers of required size, bolting, welding and; (ii) Painting the angles with colour bands of specified colours over one coat of primer as per the specified size and painting on the M.S. plate the required parameters in specified colour(s) on specified background colour(s) in a professional manner with font size as directed with contractor's retro-reflective enamel paints of approved quality over one 7 coat of primer and; (iii) Supplying the board. All of the above shall be executed with contractor's skilled personnel, tools and plant, vehicles, machinery, fuel, consumables, loading, unloading with all incidental charges and in all kinds of weather conditions and site conditions including crossing of tracks wherever required duly observing all safety precautions and including all lead, ascent, descent, taxes, duties, cess, surcharges, fees etc. completely as per the special conditions / specifications / regulations, as directed by the Engineer-in-Charge and as per the note(s) below. NOTE: The length of angles given is approximate and may vary as per site condition as directed by the Engineer-in-Charge. The rate is the same for any additional requirement up to a maximum of 2.0 m additional length.

14

4000

56000

... More
Supplying and fixing of grip expansion bolt and nut 16 mm dia. 140 mm / 150 mm long as specified with MS Clip / washer as specified in PSC Sleepers including drilling of holes in PSC sleeper / CC block at LC / 7 Trolley path to facilitate fixing of check rail / guard rail etc. without rail traffic block with contractor's skilled personnel, tools and plant, vehicles, machinery, fuel, consumables, loading, unloading with all incidental charges and in all kinds of weather conditions and site conditions including crossing of tracks wherever required duly observing all safety precautions and including all lead, ascent, descent, taxes, duties, cess, surcharges, fees etc. completely as per the special conditions / specifications / regulations and as directed by the Engineer-in-Charge. Per Track

150

110

16500

... More
JOINTING of precast RCC box units. by applying epoxy mortar with all contractor's materials laboures, T & P consumables, crew fuel transportation etc, complete as directed by the EIC during day/night and during permitted line block.

650

300

195000

... More
Jacking & rolling/Launching of box units on previously laid concrete bed by approved method with all contractor materials labours , tool & plants, consumables, crew fuel ,transportation,etc,complete as directed by 7 the EIC durung day/night and during permitted line Block. 1)Tenderer should use the suitable road crane(min@46<47@ton/perferably 100 tonnes) with standby arrangements for insertion and removal of ty. Girder during line block 2) Tenderer should deploy atleast two poclains of EX 80/perferably EX 100 for earth work excavation (with standby atleast one) and filling during line block 3) Tenderer should arrange his own lighting arrangments at work spot if works of line block is planned at night hours.

4300

1800

7740000

... More
Transportation of steel cribs with contractors vehicle, labour, crew and consumables including loading and unloading as directed by the Engineer-in-charge. A) for a lead upto 100kms.

400

100

40000

... More
Excavation along the alignment of signalling cable/OFC/power cable carefully and exposing the same without any damage, and excavating the new trench along the railway alignment or along the alignment as 7 specified by the railway Engineer-in-charge, laying or removed cable, filling up all complete with sand and laying a layer of brick with contractor's own material, tools and plants etc., as directed by the Engineer-in-charge. NOTE: 1. In case the cable is damaged cost of restoration and the cost of cable will be recovered from the contractor. The decision of the railways with regard the cost to be recovered will be final.

500

207

103500

... More
Providing speed breakers as per type plan No CE/LC/SK-5 and CE/LC/SK-6 including painting 7 white and yellow bands, diagonals etc. Complete with contractors labour, men, materials, machinery, consumables, approved paint, T&P, crew, fuel etc., complete including all lead and lifts and directed by the Engineer-in-charge.

16

2398

38368

... More
Kali,Venteak,Pillamarudhu or locally available comparable species of good country wood ( to be listed by respective railway)

5

25069

125348.45

... More
Removal of temporary girder from the track including removal of crib staging,sleeper matting,dismantling temporary girder duly removing the fish plated joints at the approaches, spreading of ballast 7 over the prepared formation , linking of track and connecting to the approach alignment at required line and level and giving one round of packing all under LINE BLOCK , with contractors labour tools and plants complete as instructed by the Engineer-in-charge. e : 1) The released temporary , girder should be trucked out to the nearest station and stacked ea f e track at the location as instructed by the Engineer- in- charge. 2) Dumping of ballast and linking of track shall be paid separately under relevant schedule.With all contractors men,materials.complete.

120

1228

147434.4

... More
Supply and laying concrete canvas of 5mm thickness of approved quantity

150

5302

795390

... More
Fabricating, supplying and fixing colour coated galvanished steel/galvalume self supporting sheeting system like proflex OR similar in roofing made from mild steel having thickness minimum of 0.80 BMT 7 having coaling; of zinc /AluminiumI zinc including cutting to size and shape including fixing at all height. Rate inclusive of all materials, labour, tools & plants, machineries, transportation, leading slaching. fixtures, taxes etc., complete as per the direction of engineer in charge. Note: Contractor will have to the design of the roofing for approval by railways. Roofing shall be provided only after getting it approved from the Railways

2200

2150

4730000

... More
Preparation and submission of Final report giving complete and comprehensive record of investigations, laboratory test reports and calculations in approved format.

4

2323

9292



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.