Rural Water Supply And Sanitation Department Tender

Karnataka, also known as Karunadu, is a state in the southwestern region of India. Karnataka was formed originally as Mysore State on 1st November 1956 and currently is the biggest state in south India. Its capital and largest city is Bengaluru. It covers an area of 191,791 km2 (74,051 sq mi) and is the sixth largest state by area comprising 31 districts. Karnataka is also a state of multiple languages; Kannada being the official and most widely spoken language in Karnataka. Other languages spoken in the state include Tamil, Telugu, Malayalam, Kodava, Konkani and much more.Karnataka tenders are issued by the government of Karnataka, public & private sector organisations. The state government issues majority of the Karnataka tenders, which are for goods and services including construction, road and bridge construction, IT services, engineering services, medical services, educational services amongst many others. Bidassist is one of the largest eprocurement portals, which offers all government tenders from across the world in one place. Bidassist offers information on all Karnataka tenders and other state and authority tenders in no time. Bidassist is a platform where users can look for various Karnataka tenders as well as other tenders.

Rural Water Supply And Sanitation Department - RWSS Tender

Civil And Construction
Water Storage And Supply
Opening Date2 Jan 2023
Closing Date12 Jan 2023
Tender Amount₹ 3,01,51,509 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supplying, laying and jointing HDPE pipes of specified grade and conforming to IS 4984- 2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc.- .Including cost of all materials, labour, transportation and other incidental charges incur during the execution of work and as per directions of Engineer incharge of work.75mm diameter PE100 (PN 6.0 / 6 Kg/cm2)

4500

-

958770

... More
Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m , and lift upto 1.5 m.Including cost of all labour complete as per specifications..Including cost of all materials, labour, transportation and other incidental charges incur during the execution of work and as per directions of Engineer incharge of work. lead up to 50 m and lift upto 1.5 m

1093.5

-

133407

... More
corrugated and inner wall smooth piping system in accordance with IS 16098 part 2 and conveying to work site and lowering into trenches, laying true to line and level and perfect linking at joints with the help of two “O” rings and a coupler of suitable size, including loading and unloading at both destination including jointing with all labour, all lead and lift including encasing the special around to a depth of not less than 15 cm with screened soft soil available from the excavated soil. The testing commissioning including necessary hydraulic test to the required pressure as per ISS shall be done (the contractor shall have to make his own arrangement for procuring water for testing) Including cost of all materials, labour, transportation and other incidental charges incur during the execution of work and as per directions of Engineer incharge of work. 75mm diameter Electrofusion Coupler.

18

-

3222

... More
corrugated and inner wall smooth piping system in accordance with IS 16098 part 2 and conveying to work site and lowering into trenches, laying true to line and level and perfect linking at joints with the help of two “O” rings and a coupler of suitable size, including loading and unloading at both destination including jointing with all labour, all lead and lift including encasing the special around to a depth of not less than 15 cm with screened soft soil available from the excavated soil. The testing commissioning including necessary hydraulic test to the required pressure as per ISS shall be done (the contractor shall have to make his own arrangement for procuring water for testing) - .Including cost of all materials, labour, transportation and other incidental charges incur during the execution of work and as per directions of Engineer incharge of work. 75 mm Dia Electro Fusion Elbow

18

-

5184

... More
corrugated and inner wall smooth piping system in accordance with IS 16098 part 2 and conveying to work site and lowering into trenches, laying true to line and level and perfect linking at joints with the help of two “O” rings and a coupler of suitable size, including loading and unloading at both destination including jointing with all labour, all lead and lift including encasing the special around to a depth of not less than 15 cm with screened soft soil available from the excavated soil. The testing commissioning including necessary hydraulic test to the required pressure as per ISS shall be done (the contractor shall have to make his own arrangement for procuring water for testing).Including cost of all materials, labour, transportation and other incidental charges incur during the execution of work and as per directions of Engineer incharge of work. - 3 Inch MS Flange

6

-

1200

... More
Supplying and fixing DI Resilient seated soft sealing SLUICE VALVE of variouis dia. with body bonnet of ductile iron (DI) conforming to IS 1865 and of grade GGG 40/50, shaft of stainless steel, wedge fully rubber lined with EDPM seals of NBR and the valves should be vacum tight and 100% leak proof with face to face dimensions as per IS 14846-2000 only. The stem sealing should be with toroidal sealing rings (minimum 2 “ O “ rings). Body and bonut should be coated with Electrostatically applied Epoxy Powder Coating with minimum coating thickness of 250 micron both inside and outside. The rate is inclusive of cost of valves, T.P set, galvanized bolts & nuts and rubber insertions etc. but excluding earth work. (Note: TP set should be considered only for DI pipes estimate. For MS pipes estimates, TP sets cost of corresponding dia shall be deducted from the SR rates of valves and provision for corresponding dia MS flanges should be made in the estimate.) Including cost of all materials, labour, transportation and other incidental charges incur during the execution of work and as per directions of Engineer incharge of work.For Suilce Valve of PN -10.0 and 80mm diameter

2

-

16026

... More
Supply and fixing of fixed height surface box H-4057 MD-KU with PP 40% GF Lid, Housing of PA+, Locking clip of PP with Notched bolt M 12 x 130 hexagon head A2-70 for service connection valves, design derived from DIN 4057, should be supplied with Support tile I (FSL, FSS, SI). Should be able to receive class AA traffic loads.Including cost of all materials, labour, transportation and other incidental charges incur during the execution of work and as per directions of Engineer incharge of work.

2

-

5462

... More
Providing, Laying and Fixing GI pipes conforming to IS 1239:1990 with latest amendments complete with GI fittings (excluding the cost of fittings) with cuts and threads wherever necessary, including testing for water tightness, with all lead and commissioning. (contractor will make his own arrangements for procuring water for testing) For Heavy Duty GI pipe .Including cost of all materials, labour, transportation and other incidental charges incur during the execution of work and as per directions of Engineer incharge of work.GI 100 mm dia

25

-

37242.75

... More
Earth work in surface excavation for stripping, seating of bund, Roadway, by manual means for lowering & leveling the ground for all works other than foundation & depth in all kinds of soil not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage & other appurtenances required to complete the work. In all kinds of Soil

4.41

-

308.7

... More
Providing and laying in poisiton plain cement concrete for levelling course for all works in foundation.The Granite/trap/basalt Crushed graded coarse aggregates as per relevant IS Codes machine mixed,laid in layers not exceeding 150 mm thickness,well compacted using plate vibrators,including all lad&lift,plywood/steel formwork,cost of all the other appurtenances required to complete the work as per technical specification,(the cost of steel reinforcement shall be paid separately) - Mix 1:3:6 (M10) using 40mm normal size graded crushed coarse aggregates. Including cost of all materials, labour, transportation and other incidental charges incur during the execution of work and as per directions of Engineer incharge of work.PCC 1:2:4 using 40 mm aggregate

0.661

-

3907.17

... More
Providing Brick work with common burnt clay modular bricks of class designation 3.5 in foundation and plinth in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. Including cost of all materials, labour, transportation and other incidental charges incur during the execution of work and as per directions of Engineer incharge of work.

1.387

-

10281.83

... More
Providing plastering in cement mortar 1:3 proportion with minimum 2% of approved quality water proof compound, including scaffolding, racking out joints 25mm deep, smooth finishing, curing etc. with all lead and lifts for all materials etc. complete for.Including cost of all materials, labour, transportation and other incidental charges incur during the execution of work and as per directions of Engineer incharge of work. 20mm thick plastering

18.5

-

6234.5

... More
Providing & fixing corrugated G.S. sheet roofing including vertical / curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete as per design drawings (up to any pitch in horizontal/ vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required as per the direction of Engineer in charge. Including cost of all materials, labour, transportation and other incidental charges incur during the execution of work and as per directions of Engineer incharge of work.0.63 mm thick with zinc coating not less than 275 g/ m2

5

-

3975

... More
Finishing walls with textured exterior paint of required shade :New work (Two coats applied @ 3.28 ltr/10 m2) over and including priming coat of exterior primer applied @ 2.20kg/10 m2 to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.

18.5

-

3848

... More
Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer. Using M.S. angels 40x40x6 mm for diagonal braces including cost of materials, labour,usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge

2.52

-

9223.2

... More
Chlorinator 200gms/Batch Production capacity : 25 gms/hr Total time per Batch : 8Hrs. Total volume of chlorine generation : 200gms/batch. Salt Required per hr. : 800gms/batch. Electrical power required : 230V, 1phase AC 50Hz. DC power supply unit with Input 230 V AC :1 NO FRP Brain water tank :35litrs PP/PVC Chlorine storage tank :35 Liters Dosing pump Type of Dosing : Automatic Proportionate Dosing Dosing flow rate :1to 30 lph Min actuating pressure :0.3kg/cm2 Max working pressure :5kg/ cm2 Inle/Outlet connections :¾” B.S.P Max Temoerature :50ºC Dosing externally adjustable :0.5-2% Chlorine test kit : 1 set . Including cost of all materials, labour, transportation and other incidental charges incur during the execution of work and as per directions of Engineer incharge of work.

1

-

135000

... More
Providing two coats of water proof cement painting with approved colour and shade over one coat of primer including necessary scaffolding and scrapping of old paint and stain with wire brushes and cleaning of paint stains etc. wherever necessary for old RCC over head tanks with all lead and lifts etc. Including cost of all materials, labour, transportation and other incidental charges incur during the execution of work and as per directions of Engineer incharge of work. complete for:Tanks staging above 6 Mtrs. and upto 9 Mtrs.

1160.548

-

190329.87

... More
Providing plastering in CM 1:3 proportion after removing old plaster of existing RCC over head tanks, including smooth finishing, minimum 2% of approved quality water proofing compound, curing, scaffolding and giving satisfactory water proof testing as per direction etc. complete with all lead lifts etc. for side walls, shell portions, bottom doom, bottom slab and ribs etc.Including cost of all materials, labour, transportation and other incidental charges incur during the execution of work and as per directions of Engineer incharge of work. for:12mm thick for exposed surfaces 6.0 to 9.0 m staging.

1160.548

-

393425.77

... More
Providing and applying integral crystalline slurry of hydrophilic in nature for waterproofing treatment to RCC structures like floor and walls of reservoirs, sewe, effluent and water treatment plants, over head tanks, etc. prepared by mixing in the ratio of 5:2 (5 parts integral crystalline slurry 2 parts water) for horizontal and vertical surfaces and applying the same from negative (internal) side with the help of synthetic fibre brush. The material shall meet the requirements as specified in ACI - 212-3R-2010 ie. by reducing permeability of concrete by more than 90% compared with control concrete as per DIN 1048 and resistant to 16 Bar hydrostatic pressure on negative side. The crystalline slurry shall be capable of self healing of cracks upto a width of 0.50 mm. The work shall be carried out all complete as per specification and the direction of the Engineer in charge. The product performance shall carry guarantee for 10 years against any leakage. For horizontal and vertical surfaces in two coats @ 0.70 kg per sqm per coat.Including cost of all materials, labour, transportation and other incidental charges incur during the execution of work and as per directions of Engineer incharge of work.

272.64

-

118053.12

... More
Painting with synthetic enamel paint of approved brand andmanufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.

24

-

2160

... More
Painting new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade complete as per specifications. English and Roman .Including cost of all materials, labour, transportation and other incidental charges incur during the execution of work and as per directions of Engineer incharge of work.

4000

-

2800

... More
Providing and laying 52 mm thick cement concrete flooring with concrete hardener topping, under layer 40 mm thick cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and top layer 12 mm thick cement hardener consisting of mix 1:2 (1 cement hardener mix : 2 graded stone aggregate 6 mm nominal size) by volume, hardening compound mixed @ 2 litre per 50 kg of cement or as per direction of Engineer incharge.Including cost of all materials, labour, transportation and other incidental charges incur during the execution of work and as per directions of Engineer incharge of work.

139

-

100636

... More
Grouting cement slurry in grout holes under specified pressure for consolidation / contact grouting including cost of all materials, machinery, labour, predrilling wherever necessary, ventilation, lighting, drainage and other ancillary operations etc. complete as per Drawing and Technical specifications.Including cost of all materials, labour, transportation and other incidental charges incur during the execution of work and as per directions of Engineer incharge of work

19.16

-

596278.36

... More
Earth work excavation by manual means for drains,canals, waste weir,draft, approach channels, key trenches, foundation of bridges and such simillar works in all kinds of soils , as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work.. Including cost of all materials, labour, transportation and other incidental charges incur during the execution of work and as per directions of Engineer incharge of work. In all kinds of soils Depth up to 1.5 m

36

-

6696

... More
Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Including cost of all materials, labour, transportation and other incidental charges incur during the execution of work and as per directions of Engineer incharge of work. Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates

3.6

-

21029.76

... More
Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, plywood / steel formwork, cost of all materials of quality, labour, Usage charges of machineries, curing and all the other appurtenances required to complete the work as per technical specifications. ( The cost of steel reinforcement shall be paid separately) .Including cost of all materials, labour, transportation and other incidental charges incur during the execution of work and as per directions of Engineer incharge of work.P&L PCC 1:1.5:3 (20mm aggregates)

19.77

-

129493.5

... More
Providing Thermo-Mechanically Treated bars of grade Fe-500D or more Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position, binding and anchoring to adjacent members whereev`er necessary complete as per Design including cost of material, labour, usage charges complete as per specifications. (The laps and wastages shall not be measured separately)

1779.3

-

147681.9

... More
Supply and delivery of Woltman model with removal mechanism water meters confirming to ISO 4064 part I,II,III class B or IS 779 and IS 2373 with life cycle test certificate from FCRI/ NABL accredited lab. The water meters shall have magnetic drivers or mechanical drivers and shall be versatile for installation in any position. The meters shall be hydrodynamically, hydrostatically balanced. The runner, runner chamber, pointer of the meter shall be as per ISO 4064 class B specification. Dry dial excavated counter housing fully protected against flooding ensuring easy reading in all climates.Including cost of all materials, labour, transportation and other incidental charges incur during the execution of work and as per directions of Engineer incharge of work..80 mm dia

8

-

155656

... More
Cutting road surfaces for pipeline trenches and disposing of the excavated stuff as directed including barricading, danger lighting etc. in the classifications for: .Including cost of all materials, labour, transportation and other incidental charges incur during the execution of work and as per directions of Engineer incharge of work. Cutting in Cement Concrete Road Surface

612.18

-

582183.18

... More
Cutting asphalt Road surface by Machine cutting to demarcate the trench width of the surface.Including cost of all materials, labour, transportation and other incidental charges incur during the execution of work and as per directions of Engineer incharge of work.Cutting Asphalt Road

694.23

-

618558.93

... More
Earth work excavation for pipelines/cables by Manual means upto 600 mm trench width, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, including dressing of excavated surfaces, disposing off or leveling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m. Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering and lift upto 1.5 m including cost of labour, tools, usage& other appurtenances required to complete the work.In all kinds of soils. Depth upto 1.50m

4712.625

-

1748383.88

... More
Earth work excavation for pipeline trenches in all kinds of soils by mechanical means above 600 mm trench width as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & boning rods at every 100 mm whevere necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata. .Including cost of all materials, labour, transportation and other incidental charges incur during the execution of work and as per directions of Engineer incharge of work. All kinds of soils. Depth upto 1.50 m

8078.787

-

1567284.68

... More
Earth work excavation by manual means for drains,canals, waste weir draft, approach channels, key trench, foundation of Bridges and such similar works, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, excavated surface leveled and sides neatly dressed disposing off or leveling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage& other appurtenances required to complete the work. In ordinary/soft rock without blasting upto 1.5 m depth

673.232

-

154170.13

... More
Supplying, laying and jointing HDPE pipes of specified grade and conforming to IS 4984- 2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc.Including cost of all materials, labour, transportation and other incidental charges incur during the execution of work and as per directions of Engineer incharge of work.- 63 mm dia PE100 (PN 6.0 / 6 Kg/cm2)

46720

-

7888204.8

... More
Supplying, laying and jointing HDPE pipes of specified grade and conforming to IS 4984- 2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc.Including cost of all materials, labour, transportation and other incidental charges incur during the execution of work and as per directions of Engineer incharge of work.- 90 mm dia PE100 (PN 6.0 / 6 Kg/cm2)

182

-

50483.16

... More
Supplying and installation of Class SN8 Double Wall Corrugated HDPE pipe Specials outer wall corrugated and inner wall smooth piping system in accordance with IS 16098 part 2 and conveying to work site and lowering into trenches, laying true to line and level and perfect linking at joints with the help of two “O” rings and a coupler of suitable size, including loading and unloading at both destination including jointing with all labour, all lead and lift including encasing the special around to a depth of not less than 15 cm with screened soft soil available from the excavated soil. The testing commissioning including necessary hydraulic test to the required pressure as per ISS shall be done (the contractor shall have to make his own arrangement for procuring water for testing) .Including cost of all materials, labour, transportation and other incidental charges incur during the execution of work and as per directions of Engineer incharge of work. .- 63 dia MM ELECTRO FUSION COUPLER

234

-

28080

... More
Supplying and installation of Class SN8 Double Wall Corrugated HDPE pipe Specials outer wall corrugated and inner wall smooth piping system in accordance with IS 16098 part 2 and conveying to work site and lowering into trenches, laying true to line and level and perfect linking at joints with the help of two “O” rings and a coupler of suitable size, including loading and unloading at both destination including jointing with all labour, all lead and lift including encasing the special around to a depth of not less than 15 cm with screened soft soil available from the excavated soil. The testing commissioning including necessary hydraulic test to the required pressure as per ISS shall be done (the contractor shall have to make his own arrangement for procuring water for testing) - 90mm dia Electrofusion Coupler.Including cost of all materials, labour, transportation and other incidental charges incur during the execution of work and as per directions of Engineer incharge of work. 90 dia MM ELECTRO FUSION COUPLER

1

-

197

... More
Supplying and installation of Class SN8 Double Wall Corrugated HDPE pipe Specials outer wall corrugated and inner wall smooth piping system in accordance with IS 16098 part 2 and conveying to work site and lowering into trenches, laying true to line and level and perfect linking at joints with the help of two “O” rings and a coupler of suitable size, including loading and unloading at both destination including jointing with all labour, all lead and lift including encasing the special around to a depth of not less than 15 cm with screened soft soil available from the excavated soil. The testing commissioning including necessary hydraulic test to the required pressure as per ISS shall be done (the contractor shall have to make his own arrangement for procuring water for testing) .Including cost of all materials, labour, transportation and other incidental charges incur during the execution of work and as per directions of Engineer incharge of work.- 63MM dia ELECTRO FUSION TEE

584

-

122640

... More
Supplying and installation of Class SN8 Double Wall Corrugated HDPE pipe Specials outer wall corrugated and inner wall smooth piping system in accordance with IS 16098 part 2 and conveying to work site and lowering into trenches, laying true to line and level and perfect linking at joints with the help of two “O” rings and a coupler of suitable size, including loading and unloading at both destination including jointing with all labour, all lead and lift including encasing the special around to a depth of not less than 15 cm with screened soft soil available from the excavated soil. The testing commissioning including necessary hydraulic test to the required pressure as per ISS shall be done (the contractor shall have to make his own arrangement for procuring water for testing) Including cost of all materials, labour, transportation and other incidental charges incur during the execution of work and as per directions of Engineer incharge of work.- 90 MM dia ELECTRO FUSION TEE

2

-

902

... More
Supplying and installation of Class SN8 Double Wall Corrugated HDPE pipe Specials outer wall corrugated and inner wall smooth piping system in accordance with IS 16098 part 2 and conveying to work site and lowering into trenches, laying true to line and level and perfect linking at joints with the help of two “O” rings and a coupler of suitable size, including loading and unloading at both destination including jointing with all labour, all lead and lift including encasing the special around to a depth of not less than 15 cm with screened soft soil available from the excavated soil. The testing commissioning including necessary hydraulic test to the required pressure as per ISS shall be done (the contractor shall have to make his own arrangement for procuring water for testing) .Including cost of all materials, labour, transportation and other incidental charges incur during the execution of work and as per directions of Engineer incharge of work.- 63 dia MM ELECTRO FUSION ELBOW

234

-

49374

... More
Supplying and installation of Class SN8 Double Wall Corrugated HDPE pipe Specials outer wall corrugated and inner wall smooth piping system in accordance with IS 16098 part 2 and conveying to work site and lowering into trenches, laying true to line and level and perfect linking at joints with the help of two “O” rings and a coupler of suitable size, including loading and unloading at both destination including jointing with all labour, all lead and lift including encasing the special around to a depth of not less than 15 cm with screened soft soil available from the excavated soil. The testing commissioning including necessary hydraulic test to the required pressure as per ISS shall be done (the contractor shall have to make his own arrangement for procuring water for testing) .Including cost of all materials, labour, transportation and other incidental charges incur during the execution of work and as per directions of Engineer incharge of work.- 90 dia MM ELECTRO FUSION ELBOW

1

-

387

... More
Supplying and installation of Class SN8 Double Wall Corrugated HDPE pipe Specials outer wall corrugated and inner wall smooth piping system in accordance with IS 16098 part 2 and conveying to work site and lowering into trenches, laying true to line and level and perfect linking at joints with the help of two “O” rings and a coupler of suitable size, including loading and unloading at both destination including jointing with all labour, all lead and lift including encasing the special around to a depth of not less than 15 cm with screened soft soil available from the excavated soil. The testing commissioning including necessary hydraulic test to the required pressure as per ISS shall be done (the contractor shall have to make his own arrangement for procuring water for testing).Including cost of all materials, labour, transportation and other incidental charges incur during the execution of work and as per directions of Engineer incharge of work.- 75 x 63 mm Dia Electro Fusion Reducer

187

-

44880

... More
Supplying and installation of Class SN8 Double Wall Corrugated HDPE pipe Specials outer wall corrugated and inner wall smooth piping system in accordance with IS 16098 part 2 and conveying to work site and lowering into trenches, laying true to line and level and perfect linking at joints with the help of two “O” rings and a coupler of suitable size, including loading and unloading at both destination including jointing with all labour, all lead and lift including encasing the special around to a depth of not less than 15 cm with screened soft soil available from the excavated soil. The testing commissioning including necessary hydraulic test to the required pressure as per ISS shall be done (the contractor shall have to make his own arrangement for procuring water for testing).Including cost of all materials, labour, transportation and other incidental charges incur during the execution of work and as per directions of Engineer incharge of work.- 90 x 63 mm Dia Electro Fusion Reducer

1

-

377

... More
Supplying and installation of Class SN8 Double Wall Corrugated HDPE pipe Specials outer wall corrugated and inner wall smooth piping system in accordance with IS 16098 part 2 and conveying to work site and lowering into trenches, laying true to line and level and perfect linking at joints with the help of two “O” rings and a coupler of suitable size, including loading and unloading at both destination including jointing with all labour, all lead and lift including encasing the special around to a depth of not less than 15 cm with screened soft soil available from the excavated soil. The testing commissioning including necessary hydraulic test to the required pressure as per ISS shall be done (the contractor shall have to make his own arrangement for procuring water for testing).Including cost of all materials, labour, transportation and other incidental charges incur during the execution of work and as per directions of Engineer incharge of work.- 90 x 75 mm Dia Electro Fusion Reducer

1

-

430

... More
Supplying and fixing DI Resilient seated soft sealing SLUICE VALVE of variouis dia. with body bonnet of ductile iron (DI) conforming to IS 1865 and of grade GGG 40/50, shaft of stainless steel, wedge fully rubber lined with EDPM seals of NBR and the valves should be vacum tight and 100% leak proof with face to face dimensions as per IS 14846-2000 only. The stem sealing should be with toroidal sealing rings (minimum 2 “ O “ rings). Body and bonut should be coated with Electrostatically applied Epoxy Powder Coating with minimum coating thickness of 250 micron both inside and outside. The rate is inclusive of cost of valves, T.P set, galvanized bolts & nuts and rubber insertions etc. but excluding earth work. (Note: TP set should be considered only for DI pipes estimate. For MS pipes estimates, TP sets cost of corresponding dia shall be deducted from the SR rates of valves and provision for corresponding dia MS flanges should be made in the estimate.) Including cost of all materials, labour, transportation and other incidental charges incur during the execution of work and as per directions of Engineer incharge of work.For Suilce Valve of PN -10.0 and 80mm diameter

2

-

16026

... More
Supply and fixing of fixed height surface box H-4057 MD-KU with PP 40% GF Lid, Housing of PA+, Locking clip of PP with Notched bolt M 12 x 130 hexagon head A2-70 for service connection valves, design derived from DIN 4057, should be supplied with Support tile I (FSL, FSS, SI). Should be able to receive class AA traffic. loads.Including cost of all materials, labour, transportation and other incidental charges incur during the execution of work and as per directions of Engineer incharge of work.

2

-

5462

... More
Providing, Laying and Fixing GI pipes conforming to IS 1239:1990 with latest amendments complete with GI fittings (excluding the cost of fittings) with cuts and threads wherever necessary, including testing for water tightness, with all lead and commissioning. (contractor will make his own arrangements for procuring water for testing) .Including cost of all materials, labour, transportation and other incidental charges incur during the execution of work and as per directions of Engineer incharge of work.- Heavy Duty GI pipe of 100mm dia

25

-

37242.75

... More
Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m , and lift upto 1.5 m.Including cost of all labour complete as per specifications. Including cost of all materials, labour, transportation and other incidental charges incur during the execution of work and as per directions of Engineer incharge of work.lead up to 50 m and lift upto 1.5 m

13938.681

-

1700519.08

... More
Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M20 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 m3 capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including construction joints, primer, sealant , curing of concrete slabs for 14- days, and water finishing to lines and grade as per drawing and technical specification clause 1501 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work.Including cost of all materials, labour, transportation and other incidental charges incur during the execution of work and as per directions of Engineer incharge of work.Restoration For CC road cutting

612.18

-

3766131.36

... More
For Cement Concrete road Cutting - Cutting road surfaces for pipeline trenches and disposing of the excavated stuff as directed including barricading, danger lighting etc. in the classifications for: Cutting Cement Concrete Road Surface by Machine cutting to demacrate the trench width of the surface Including cost of all materials, labour, transportation and other incidental charges incur during the execution of work and as per directions of Engineer incharge of work.For 2m road cutting

103.23

-

98171.73

... More
Earth work excavation for pipelines/cables by Manual means upto 600 mm trench width, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, including dressing of excavated surfaces, disposing off or leveling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m. Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering and lift upto 1.5 m including cost of labour, tools, usage& other appurtenances required to complete the work. - In Ordinary Soil.Including cost of all materials, labour, transportation and other incidental charges incur during the execution of work and as per directions of Engineer incharge of work.For 2m road cutting

378.51

-

140427.21

... More
Providing and fixing chlirinated chloride (CPVC) pipes, having thermal stability for Hot and Cold water supply including all CPVC plain & brass threaded fittings this includes jointing of pipes & fittings with one step CPVC solvent cement, trenching,refilling & testing of joints complete as per direction of Engineers in charge. external work Including cost of all materials, labour, transportation and other incidental charges incur during the execution of work and as per directions of Engineer incharge of work. 25 mm Dia Pipe

1147

-

342953

... More
Providing and fixing chlirinated chloride (CPVC) pipes, having thermal stability for Hot and Cold water supply including all CPVC plain & brass threaded fittings this includes jointing of pipes & fittings with one step CPVC solvent cement, trenching,refilling & testing of joints complete as per direction of Engineers in charge. external work Including cost of all materials, labour, transportation and other incidental charges incur during the execution of work and as per directions of Engineer incharge of work. 20 mm Dia Pipe

4588

-

986420

... More
Providing,laying and fixing GI pipes confirming to IS 1239:1990 with latest amendments complete with GI fittings (excluding the cost of fittings) with cuts and threads wherever necessary, including testing for water tightness, with all lead and commissioning( contractor will make his own arrangements for procuring water for testing)Including cost of all materials, labour, transportation and other incidental charges incur during the execution of work and as per directions of Engineer incharge of work. Medium Duty GI pipe of 20mm dia

3441

-

839053.44

... More
Approved make electro fusion saddle comply with BS EN 12201 - 3:2011, PN-12.5 rating and food grade raw material as per BS 6920 for effect on water quality intended for human consumption. Material of construction: PE 80 or PE 100 and colour of fitting - Blue/Black for water applications, EF tapping saddle is V-Regulated type. Designed to fuse at a fusion voltage of 40 volt AC. EF tapping saddle shall have moulded SS/Brass metal female threaded outlet. EF tapping saddle is fused by using a top loading piller type pressure exerting 1500N (150 kilograms approx.) top load on EF saddle Fusion time is 170 secs and cooling time is 10 mins, exerted pressure shoud be removed after completing the 10 mins cooling time. 63x20,75x20,90x20,110x20,140x20.Including cost of all materials, labour, transportation and other incidental charges incur during the execution of work and as per directions of Engineer incharge of work.For 15mm connections

1147

-

401450

... More
Flow control Valve 10 LPM: Providing, & fixing Flow control valve using food grade materials SS 316 ball /1/2" [15mm] including cost of all materials, labour charges, HOM and testing complete as per of following specification. The ELV nominal design is for 10Ltr/Min. Discharges at 0.5 bar pressure loss and should not exceed the flow the range of 7 Lt/Min at 1 bar or more pressure MOC of valve Food grade stainless steel SS 316 MOC of Ball stainless steel-316. Flow direction arrow embossed on its outside surface. The Valve should act as flow control valve and non-return valve.Including cost of all materials, labour, transportation and other incidental charges incur during the execution of work and as per directions of Engineer incharge of work.15mm dia

1147

-

292485

... More
Providing and fixing brass bib cock of approved quality : Including cost of all materials, labour, transportation and other incidental charges incur during the execution of work and as per directions of Engineer incharge of work.15 mm nominal bore

1147

-

373922

... More
Supply and Fixing of RCC demarcation stones of 30 cms x 15 cms and 90 cms deep using 1:2:4 cc and 6mm dia rods for verticals and stirrups and rendered smooth , including engraving letters "KWB and Arrow" 6mm deep on the top including fixing demarcation stones 45 cms below ground level and CC 1:3:6, 15 cms height with 8 cms offset around the stone and curing for 10 days including earthwork excavation in all types of soils with all lead and lift Including cost of all materials, labour, transportation and other incidental charges incur during the execution of work and as per directions of Engineer incharge of work.

918

-

403920

... More
Supply and fixing pot rest slab of size 0.45 x 0.30 x 0.20 meters with central dip for resting the pot including two line dressing and edges rounded and with all lead. . Including cost of all materials, labour, transportation and other incidental charges incur during the execution of work and as per directions of Engineer incharge of work.

1147

-

588411

... More
Supply and fixing of HDPE water meter box to protect the water meter of class 'B: multijet type of size 15 to 32mm including HDPE box with base dia 300mmxlid dia 200mmxheight 250mm with openable lid and the cover is buried below GL with lid flush with GL including earthwork excavation for 600mmx600mm and base sand filling for 100mm thick over which the cover is placed and enclosed by PCC 1:2:4 using 12 to 20mm BG jelly for an height of 150mm and refilling with excavated earth for balance 100mm height,disposal of excess earth with all lead and lifts etc complete as per drawing enclosed Including cost of all materials, labour, transportation and other incidental charges incur during the execution of work and as per directions of Engineer incharge of work.

1147

-

583823

... More
Supplying and fixing Multijet class B inferential type, AMR compatible water meters with IP 68 protection totalizer confoming to IS 779 with its latest amendments of following size to service connections including conveying and fixing of necessary G.I. specials with appurtenances.complete, with all lead and lift.Including cost of all materials, labour, transportation and other incidental charges incur during the execution of work and as per directions of Engineer incharge of work.20mm dia

1147

-

1891403

... More
Providing and fixing ball valve(brass) of approved quality, high or low pressure with plastic float complete as per specification.20mm nominal bore Including cost of all materials, labour, transportation and other incidental charges incur during the execution of work and as per directions of Engineer incharge of work.20mm dia

1147

-

412920

... More
Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade :New work (two coats) over and including water thinnable priming coat with cement primer after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge Including cost of all materials, labour, transportation and other incidental charges incur during the execution of work and as per directions of Engineer incharge of work.Vericle post

980.685

-

102971.92

... More
Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, plywood / steel formwork, cost of all materials of quality, labour, Usage charges of machineries, curing and all the other appurtenances required to complete the work as per technical specifications. ( The cost of steel reinforcement shall be paid separately) Including cost of all materials, labour, transportation and other incidental charges incur during the execution of work and as per directions of Engineer incharge of work.For 2m road

103.23

-

635070.96

... More
Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge & MoRTH specification 804.Including cost of all materials, labour, transportation and other incidental charges incur during the execution of work and as per directions of Engineer incharge of work.

1

-

9000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.