Rural Drinking Water And Sanitation Department Tender

... More
Karnataka, also known as Karunadu, is a state in the southwestern region of India. Karnataka was formed originally as Mysore State on 1st November 1956 and currently is the biggest state in south India. Its capital and largest city is Bengaluru. It covers an area of 191,791 km2 (74,051 sq mi) and is the sixth largest state by area comprising 31 districts. Karnataka is also a state of multiple languages; Kannada being the official and most widely spoken language in Karnataka. Other languages spoken in the state include Tamil, Telugu, Malayalam, Kodava, Konkani and much more.Karnataka tenders are issued by the government of Karnataka, public & private sector organisations. The state government issues majority of the Karnataka tenders, which are for goods and services including construction, road and bridge construction, IT services, engineering services, medical services, educational services amongst many others. Bidassist is one of the largest eprocurement portals, which offers all government tenders from across the world in one place. Bidassist offers information on all Karnataka tenders and other state and authority tenders in no time. Bidassist is a platform where users can look for various Karnataka tenders as well as other tenders.

Rural Drinking Water And Sanitation Department Tender

Works
Civil And Construction
Water Storage And Supply
Opening Date8 Jan 2025
Closing Date18 Jan 2025
Tender Amount₹ 9,20,60,755.93 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
004 - Head Works: Construction of Coffer Dam: Construction of coffer dam for intake well and connecting pipes, jack well and removing coffer dam after completion of construction of head works etc. including any other components required for technically completing the works as per specifications and system design criteria Construction of Intake Well: Construction of intake well at the designed lowest bed level and ladder for access etc. including the cost of any other components required for technically completing the works as per specifications and system design criteria Laying of Connecting Pipes: Providing and laying of connecting pipe as per design from an intake well to jack well including cost of any other components required for technically completing the works as per specifications and system design criteria

1

3687000

3687000

... More
005 - Head Works: Construction of Jack Well: Construction of jack well structure cum pumping station including electrical panel room, LT room, battery / UPS room, EOT crane, SCADA control room, electrical control room, switch gear room etc. including cost of any other components required for technically completing the works as per specifications and system design criteria.

1

7155000

7155000

... More
006 - Head Works: Development of Layout at Head works including Chain link fencing etc. : Providing chain link fencing, spreading of metals, equipment foundations, pedestals etc., Construction of chain link fencing/ block masonry gated compound wall for head works premises, including all components like river training works including raising embankment to existing road formation level at the head works including layout preparation of head works with slope protective works any other components required for technically completing the works as specifications and system design criteria

1

1503000

1503000

... More
007 - Head Works: Raw Water Pumping Machineries: Providing, installation and commissioning of Vertical Turbine pumping machineries of suitable capacity as per design criteria including all electrical works, electrical panel, LT power, battery/ UPS & EOT crane, valves, piping, special, gadgets like valves, piping, specials, inlet gates, drain pumps, actuators, suitable surge protection system etc. complete for the raw water pumping station at head works for lifting raw water from jack well to aerator at wtp premises as per specifications as detailed in tender document including any other components required for technically completing the works as per specifications and system design criteria

1

610000

610000

... More
008 - Head Works: Electrical Works at Head Works including Electrical Sub Station, Electrical Express Feeder Line etc.: Providing and installation of electrical works including transformers, electrical sub station, express feeder mains, lightning protection system, light fixtures, earthing systems, etc. complete and instrumentation and control system works like soft starters, control panel board and cables for the pumping station at jack well as per requirements, internal lighting to pump house and yard lighting with all required accessories as per requirement and specifications as detailed in tender document etc. including cost of any other components required for technically completing the works as per specifications and system design criteria. Provision for solar backup for electrification to yard lighting and pump house.

1

1341097

1341097

... More
009 - Raw Water Rising Main from Jack well to WTP: Raw water rising main from jack well at head works to water treatment plant including thrust blocks, air valves, sluice valves, scour valves, pressure relief valves, valve chambers, electromagnetic flow meter and chambers, in-line valves with RCC valve chambers, pipe support structures, ducts, surge protection, including the construction of pipe bridges across major streams, irrigation canals, valleys etc., design, providing and jacking MS pipe across Railway line, NH, SH, canal crossings by horizontal direct drilling/thrust boring technology along the pipeline alignment etc., other crossings, pipe bridges, support structures, pedestals, utility shifting/relocation, road restoration, all Dept. deposits etc. road restoration, concrete encasing wherever required including the cost of any other components required for technically completing the works as per specifications and system design criteria.

1

4280000

4280000

... More
010 - WTP: Construction of Cascade Aerator:-Part of water treatment plant, construction of RCC cascade aerator including all necessary connections as per the requirement, construction of channel with all necessary connections as specified etc. including cost of any other components required for technically completing the works as per specifications and system design criteria. Construction of Lamella Clarifier, SMFT, Coagulant Dosing System and other components for WTP: Part of water treatment plant construction of Coagulant Dosing System, Static Mixer Flocculation Tank (SMFT), Lamella Clarifier, Clarified Water storage Tank, Multi Grade Pressure Filter, Disinfection Unit including foundations etc., as per requirement for all the components and all necessary connections electro-mechanical equipment and machinery, electrical connections and buildings as required as specified etc. any other components required for technically completing the works as per specifications and system design criteria. Construction of Chemical House in WTP: Construction of the chemical house as per the requirement including all necessary connections, piping, instrumentation, electromechanical works, fire fighting equipment/ arrangement, and buildings as specified etc. including the cost of any other components required for technically completing the works as per specifications and system design criteria.

1

8289000

8289000

... More
011 - WTP: Construction of Clear / Pure Water Storage Tank / Sump at WTP: Construction of pure / treated water storage tank and chlorine contact tank of suitable capacity as per the requirement, valve arrangements, valve chambers, ladder / staircase, electro mechanical equipment , enamel gauge & machineries as specified etc. complete as per the requirement as specified etc. including cost of any other components required for technically completing the works as per specifications and system design criteria.

1

1196000

1196000

... More
012 - WTP: Construction of Clear / Pure Water Pump House at WTP: Construction of pumping station (Pump house) of RCC framed structure for accommodating required pumping machineries, electrical panel room, maintenance area, LT room, battery / UPS room, SCADA control room, EOT gantry cranes etc. including electrification to pump house and cost of any other components required for technically completing the works as per the specifications and system design criteria.

1

811000

811000

... More
013 - Pure Water Rising Mains: Pure water rising mains from pumping station at WTP/ MBT/ IPS to MBT/ ZBT/ IPSs/ In-village existing and proposed reservoirs etc. including thrust blocks, air valves, sluice valves, scour valves, pressure relief valves, valve chambers, electromagnetic flow meter and chambers, in-line valves with RCC valve chambers, pipe support structures, ducts, surge protection, including the construction of pipe bridges across major streams, irrigation canals, valleys etc., design, providing and jacking MS pipe across Railway line, NH, SH, canal crossings by horizontal direct drilling/thrust boring technology along the pipeline alignment etc., other crossings, pipe bridges, support structures, pedestals, utility shifting/relocation, road restoration, all Dept. deposits etc. road restoration, concrete encasing wherever required including the cost of any other components required for technically completing the works as per specifications and system design criteria.

1

8130000

8130000

... More
014 - WTP: Pure Water Pumping Machineries: Providing, installation and commissioning of centrifugal pumping machineries of suitable capacity as per design criteria including all gadgets like valves, piping, specials, inlet gates, drain pumps, actuators, suitable surge protection system etc. complete for the pure water pumping station at pure water pump house in wtp premises for lifting pure water from WTP/ MBT/ IPS to MBTs/ ZBTs/ IPSs as per specifications as detailed in tender document including any other components required for technically completing the works as per specifications and system design criteria

1

688000

688000

... More
015 - WTP: Construction of Twin Type Staff Quarters and Associated Buildings: Construction of staff quarters for operator and watchman twin quarters 1 No. of twin quarters at WTP with all allied works including electrical, sanitation works, toilets, water supply and waste disposal facility, inspection chambers, soak pits, land area development works, etc. including cost of any other components required for technically completing the works as per the specifications and system design criteria.

1

1680000

1680000

... More
016 - WTP: Electrical Works at WTP Premises including Electrical Sub Station, Electrical Express Feeder Line etc.: Providing and installation of electrical works including transformers, electrical sub station, express feeder mains, lightning protection system, light fixtures, earthing systems, etc. complete and instrumentation and control system works like soft starters, control panel board and cables for the pumping station at WTP as per requirements, internal lighting to WTP components, Pump house, Administration building, Chemical room, Chlorination unit, Staff Quarters and Yard lighting with all required accessories as per requirement and specifications as detailed in tender document etc. including cost of any other components required for technically completing the works as per specifications and system design criteria. Provision for solar backup for electrification to yard lighting and pump house.

1

1663000

1663000

... More
017 - WTP: Layout Development and Construction of Internal Roads and Drains and Chain link fencing/ Compound Wall for WTP Premises: Development of layout for WTP and construction of approach road to WTP layout, internal roads and drains with approach road connecting to all civil structures inside the WTP layout , including diversion of drains inside the layout etc., construction of chain link fencing/ block masonry gated compound wall for protecting all components of WTP by trespass, construction of electrical sub station including gated chain link fencing, spreading of metals, equipment foundations, pedestals etc., including cost of any other components required for technically completing the works as per specifications and system design criteria.

1

3515000

3515000

... More
018 - MBR/ ZBR: Construction of Master Balancing Reservoirs (MBRs) / Zonal Balancing Tanks (ZBTs) : Construction of Master Balancing Reservoirs (MBRs) / Zonal Balancing Tanks (ZBTs) including required piping, valve chambers other necessary appurtenances for the reservoirs, disinfection arrangement Re-chlorination, operator restroom, toilets, pressure valves, including development of layout for MBRs / ZBTs and construction of chain link fencing/ block masonry gated compound wall for protecting all components of MBRs / ZBTs by trespass, equipment foundations, pedestals etc., including cost of any other components required for technically completing the works as per the specifications and system design criteria.

1

1301000

1301000

... More
019 - Pure Water gravity feeder mains from MBTs/ ZBTs/ IPSs to ZBTs/ Existing / Proposed OHTs / Storage Tanks at Villages / Habitations: Pure water gravity mains from MBTs/ ZBTs/ IPSs to ZBTs/ existing / proposed OHTs / storage tanks at villages / habitations including thrust blocks, air valves, sluice valves, scour valves, pressure relief valves, valve chambers, electromagnetic flow meter and chambers, in-line valves with RCC valve chambers, pipe support structures, ducts, surge protection, including construction of pipe bridges across major streams, irrigation canals, valleys etc., design, providing and jacking MS pipe across Railway line, NH, SH, canal crossings by horizontal direct drilling/thrust boring technology along the pipeline alignment etc., other crossings, pipe bridges, support structures, pedestals, utility shifting/relocation, road restoration, all Dept. deposits etc. road restoration, concrete encasing wherever required including the cost of any other components required for technically completing the works as per specifications and system design criteria.

1

17550000

17550000

... More
020 - OHT/ ELSR: Construction of Proposed/ Rehabilitation of existing OHTs / ELSRs / Storage Tanks for Villages / Habitations: New OHTs at habitations including chain link fencing with gate, etc. including all accessories as per requirement of operational point of view, valve chambers, down take pipes etc. piping, valves specials etc. complete including cost of any other components required for technically completing the works as specifications and system design criteria including fixing of enamelled water level indicator gauges to existing OHTs, repairs and rehabilitation of existing over head tanks wherever necessary including repairs to existing valves, lighting arrangement, pipes and chambers.

1

9307467

9307467

... More
021 - MONITORING AND MEASURING: Providing electro magnetic bulk flow meters with actuators at raw water pumping station, clear water pumping station, raw water rising main, clear water rising mains and inlet of all tanks along with altitude control valves as per design including all accessories as per requirement on operational point of view and measuring the flow and discharge etc., complete including cost of any other components required for technically completing the works as specifications and system design criteria.

1

3400000

3400000

... More
024 - OPERATION AND MAINTENANCE for First Year. Operation and maintenance of the scheme, which includes, providing technical staff, valve man, operators, and others who are required to run the system in a complete manner and providing all materials & chemicals required, for the operation of jack wells / WTP /pipeline repair works 1. Regular maintenance of civil structures like Jack well, WTP, PWS, pump house, ZBR, IPS, OHT and all other civil structures. The maintenance consists of all kinds of repairs to damaged structures, cleaning and washing, and painting for civil structures once in two years 2. Repairs and replacement of damaged pipelines, valves etc. If found necessary. It includes the cost of materials and labour charges and also monitoring of the systems. The maintenance involves raw water rising main, pure water gravity mains, and pure water rising mains. maintaining the required discharge in each pipe including controlling all the valves so that each village will get the required designed quantum of water. 3. Operation and maintenance of water treatment plant including dosing of required quantity of alum, chlorine and other chemicals including replacement of sand/filter media as required as per standard of established norms from time to time. Maintaining the quality of water as per the guidelines of the CPHEEO manual and ISI specifications including the cost of testing of water at a laboratory at regular intervals. 4. Operation and maintenance of all kinds of pumping machinery, and other mechanical components of this scheme including electrical maintenance covering all repairs/replacement of transformers / Electrical cable/switchboards/replacement of burnt parts of machinery All the above repairs & maintenance will be carried out as per the direction of the Engineer-in-charge for the satisfactory functioning of the scheme to provide designed LPCD of drinking water to all the habitations of the Project villages. Note: Helpers / Watchman / Valve man / Technical staff made available round the clock for maintenance period at Jack well, WTP, Pure water Sump, IPS, ZBR, and OHT points. The contractor should maintain a Log Book on the working of pumping machinery at Jack well, WTP etc. The payment will be made based on the Engineer-in-charges' satisfactory report of every month's end.

1

2319083

2319083

... More
025 - OPERATION AND MAINTENANCE for Second Year. Operation and maintenance of the scheme, which includes, providing technical staff, valve man, operators, and others who are required to run the system in a complete manner and providing all materials & chemicals required, for the operation of jack wells / WTP /pipeline repair works 1. Regular maintenance of civil structures like Jack well, WTP, PWS, pump house, ZBR, IPS, OHT and all other civil structures. The maintenance consists of all kinds of repairs to damaged structures, cleaning and washing, and painting for civil structures once in two years 2. Repairs and replacement of damaged pipelines, valves etc. If found necessary. It includes the cost of materials and labour charges and also monitoring of the systems. The maintenance involves raw water rising main, pure water gravity mains, and pure water rising mains. maintaining the required discharge in each pipe including controlling all the valves so that each village will get the required designed quantum of water. 3. Operation and maintenance of water treatment plant including dosing of required quantity of alum, chlorine and other chemicals including replacement of sand/filter media as required as per standard of established norms from time to time. Maintaining the quality of water as per the guidelines of the CPHEEO manual and ISI specifications including the cost of testing of water at a laboratory at regular intervals. 4. Operation and maintenance of all kinds of pumping machinery, and other mechanical components of this scheme including electrical maintenance covering all repairs/replacement of transformers / Electrical cable/switchboards/replacement of burnt parts of machinery All the above repairs & maintenance will be carried out as per the direction of the Engineer-in-charge for the satisfactory functioning of the scheme to provide designed LPCD of drinking water to all the habitations of the Project villages. Note: Helpers / Watchman / Valve man / Technical staff made available round the clock for maintenance period at Jack well, WTP, Pure water Sump, IPS, ZBR, and OHT points. The contractor should maintain a Log Book on the working of pumping machinery at Jack well, WTP etc. The payment will be made based on the Engineer-in-charges' satisfactory report of every month's end.

1

2808760

2808760.4

... More
026 - OPERATION AND MAINTENANCE for Third Year. Operation and maintenance of the scheme, which includes, providing technical staff, valve man, operators, and others who are required to run the system in a complete manner and providing all materials & chemicals required, for the operation of jack wells / WTP /pipeline repair works 1. Regular maintenance of civil structures like Jack well, WTP, PWS, pump house, ZBR, IPS, OHT and all other civil structures. The maintenance consists of all kinds of repairs to damaged structures, cleaning and washing, and painting for civil structures once in two years 2. Repairs and replacement of damaged pipelines, valves etc. If found necessary. It includes the cost of materials and labour charges and also monitoring of the systems. The maintenance involves raw water rising main, pure water gravity mains, and pure water rising mains. maintaining the required discharge in each pipe including controlling all the valves so that each village will get the required designed quantum of water. 3. Operation and maintenance of water treatment plant including dosing of required quantity of alum, chlorine and other chemicals including replacement of sand/filter media as required as per standard of established norms from time to time. Maintaining the quality of water as per the guidelines of the CPHEEO manual and ISI specifications including the cost of testing of water at a laboratory at regular intervals. 4. Operation and maintenance of all kinds of pumping machinery, and other mechanical components of this scheme including electrical maintenance covering all repairs/replacement of transformers / Electrical cable/switchboards/replacement of burnt parts of machinery All the above repairs & maintenance will be carried out as per the direction of the Engineer-in-charge for the satisfactory functioning of the scheme to provide designed LPCD of drinking water to all the habitations of the Project villages. Note: Helpers / Watchman / Valve man / Technical staff made available round the clock for maintenance period at Jack well, WTP, Pure water Sump, IPS, ZBR, and OHT points. The contractor should maintain a Log Book on the working of pumping machinery at Jack well, WTP etc. The payment will be made based on the Engineer-in-charges' satisfactory report of every month's end.

1

2948009

2948009.97

... More
027 - OPERATION AND MAINTENANCE for Fourth Year. Operation and maintenance of the scheme, which includes, providing technical staff, valve man, operators, and others who are required to run the system in a complete manner and providing all materials & chemicals required, for the operation of jack wells / WTP /pipeline repair works 1. Regular maintenance of civil structures like Jack well, WTP, PWS, pump house, ZBR, IPS, OHT and all other civil structures. The maintenance consists of all kinds of repairs to damaged structures, cleaning and washing, and painting for civil structures once in two years 2. Repairs and replacement of damaged pipelines, valves etc. If found necessary. It includes the cost of materials and labour charges and also monitoring of the systems. The maintenance involves raw water rising main, pure water gravity mains, and pure water rising mains. maintaining the required discharge in each pipe including controlling all the valves so that each village will get the required designed quantum of water. 3. Operation and maintenance of water treatment plant including dosing of required quantity of alum, chlorine and other chemicals including replacement of sand/filter media as required as per standard of established norms from time to time. Maintaining the quality of water as per the guidelines of the CPHEEO manual and ISI specifications including the cost of testing of water at a laboratory at regular intervals. 4. Operation and maintenance of all kinds of pumping machinery, and other mechanical components of this scheme including electrical maintenance covering all repairs/replacement of transformers / Electrical cable/switchboards/replacement of burnt parts of machinery All the above repairs & maintenance will be carried out as per the direction of the Engineer-in-charge for the satisfactory functioning of the scheme to provide designed LPCD of drinking water to all the habitations of the Project villages. Note: Helpers / Watchman / Valve man / Technical staff made available round the clock for maintenance period at Jack well, WTP, Pure water Sump, IPS, ZBR, and OHT points. The contractor should maintain a Log Book on the working of pumping machinery at Jack well, WTP etc. The payment will be made based on the Engineer-in-charges' satisfactory report of every month's end.

1

3093365

3093365.02

... More
028 - OPERATION AND MAINTENANCE for Fifth Year. Operation and maintenance of the scheme, which includes, providing technical staff, valve man, operators, and others who are required to run the system in a complete manner and providing all materials & chemicals required, for the operation of jack wells / WTP /pipeline repair works 1. Regular maintenance of civil structures like Jack well, WTP, PWS, pump house, ZBR, IPS, OHT and all other civil structures. The maintenance consists of all kinds of repairs to damaged structures, cleaning and washing, and painting for civil structures once in two years 2. Repairs and replacement of damaged pipelines, valves etc. If found necessary. It includes the cost of materials and labour charges and also monitoring of the systems. The maintenance involves raw water rising main, pure water gravity mains, and pure water rising mains. maintaining the required discharge in each pipe including controlling all the valves so that each village will get the required designed quantum of water. 3. Operation and maintenance of water treatment plant including dosing of required quantity of alum, chlorine and other chemicals including replacement of sand/filter media as required as per standard of established norms from time to time. Maintaining the quality of water as per the guidelines of the CPHEEO manual and ISI specifications including the cost of testing of water at a laboratory at regular intervals. 4. Operation and maintenance of all kinds of pumping machinery, and other mechanical components of this scheme including electrical maintenance covering all repairs/replacement of transformers / Electrical cable/switchboards/replacement of burnt parts of machinery All the above repairs & maintenance will be carried out as per the direction of the Engineer-in-charge for the satisfactory functioning of the scheme to provide designed LPCD of drinking water to all the habitations of the Project villages. Note: Helpers / Watchman / Valve man / Technical staff made available round the clock for maintenance period at Jack well, WTP, Pure water Sump, IPS, ZBR, and OHT points. The contractor should maintain a Log Book on the working of pumping machinery at Jack well, WTP etc. The payment will be made based on the Engineer-in-charges' satisfactory report of every month's end.

1

3246015

3246015.92



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.