Rural Drinking Water And Sanitation Department Tender

Karnataka, also known as Karunadu, is a state in the southwestern region of India. Karnataka was formed originally as Mysore State on 1st November 1956 and currently is the biggest state in south India. Its capital and largest city is Bengaluru. It covers an area of 191,791 km2 (74,051 sq mi) and is the sixth largest state by area comprising 31 districts. Karnataka is also a state of multiple languages; Kannada being the official and most widely spoken language in Karnataka. Other languages spoken in the state include Tamil, Telugu, Malayalam, Kodava, Konkani and much more.Karnataka tenders are issued by the government of Karnataka, public & private sector organisations. The state government issues majority of the Karnataka tenders, which are for goods and services including construction, road and bridge construction, IT services, engineering services, medical services, educational services amongst many others. Bidassist is one of the largest eprocurement portals, which offers all government tenders from across the world in one place. Bidassist offers information on all Karnataka tenders and other state and authority tenders in no time. Bidassist is a platform where users can look for various Karnataka tenders as well as other tenders.

Rural Drinking Water And Sanitation Department Tender

Works
Electrical and Electronics
Opening Date19 Nov 2024
Closing Soon28 Nov 2024
Tender Amount₹ 6,71,757.1 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
GESCOMBSKDR04 - Labour cost -Head loading of the pole 25 to 105Mtrs

22

285

6270

... More
GESCOMBSKDR05 - Labour cost -Loading & unloading of 9 mtr RCC/PSC poles

22

142

3124

... More
GESCOMBSKDR06 - Material cost -200105-RCC Pole-9.0M Long,145 kg WL

3

7076

21228

... More
GESCOMBSKDR07 - Labour cost -Erection of RCC/PSC poles 9 to 10 mtr long but in a pit of 1.8 mtr depth

3

1113

3339

... More
GESCOMBSKDR08 - Labour cost -Hard Soil

3

1132

3396

... More
GESCOMBSKDR09 - Labour cost -Head loading of the pole 25 to 105Mtrs

3

285

855

... More
GESCOMBSKDR10 - Labour cost -Loading & unloading of 9 mtr RCC/PSC poles

3

142

426

... More
GESCOMBSKDR11 - Material cost -27901206-11 kV Horizontal cross arm wit

25

643

16075

... More
GESCOMBSKDR12 - Labour cost -Fixing of V-Shape/Horizontal cross arm including single top support Braces and Insulators fixing.

25

257

6425

... More
GESCOMBSKDR13 - Material cost -279100-11 KV D.P.Structure

1

6401

6401

... More
GESCOMBSKDR14 - Labour cost -Hard Soil

1

1006

1006

... More
GESCOMBSKDR15 - Labour cost -Same as above using RCC poles 7.5/8 mtr long in pits of 1.5 mtr depth.

1

4134

4134

... More
GESCOMBSKDR16 - Material cost -279130-EG Stirrups (MS)

23

276

6348

... More
GESCOMBSKDR17 - Labour cost -Fixing of Earth Guard Stirrup

23

160

3680

... More
GESCOMBSKDR18 - Material cost -2811101-Guy with Complete set

6

1170

7020

... More
GESCOMBSKDR19 - Labour cost -a) Fixing of GUY Sets with break insulators making use of 7/3.15 mm (7/10 SWG) galvanised steel wire with turn buckle and anchoring arrangement as per approved drawing. (Excluding excavation of PIT)

6

266

1596

... More
GESCOMBSKDR20 - Labour cost -Hard Soil

6

629

3774

... More
GESCOMBSKDR21 - Material cost -281683-Spiral Earth Electrode

23

239

5497

... More
GESCOMBSKDR22 - Labour cost -providing spiral earth electrode type earthing along with pole (without charcoal, salt etc.,)

23

93

2139

... More
GESCOMBSKDR23 - Material cost -283008-11kV, 5KN Composite/Polymeric

66

205

13530

... More
GESCOMBSKDR24 - Material cost -283320-Silcon rubber composite insula

18

186

3348

... More
GESCOMBSKDR25 - Material cost -284108-Rabbit ACSR Conductor

3600

46

166428

... More
GESCOMBSKDR26 - Labour cost -For Rabbit ACSR

3600

4

15696

... More
GESCOMBSKDR27 - Material cost -285508-Rabbit to Rabbit (P G Clamps)

6

102

612

... More
GESCOMBSKDR28 - Material cost -200105-RCC Pole-9.0M Long,145 kg WL

2

7076

14152

... More
GESCOMBSKDR29 - Labour cost -Erection of RCC/PSC poles 9 to 10 mtr long but in a pit of 1.8 mtr depth

2

1113

2226

... More
GESCOMBSKDR30 - Labour cost -Hard Soil

2

1132

2264

... More
GESCOMBSKDR31 - Labour cost -Head loading of the pole 25 to 105Mtrs

2

285

570

... More
GESCOMBSKDR32 - Labour cost -Loading & unloading of 9 mtr RCC/PSC poles

2

142

284

... More
GESCOMBSKDR33 - Material cost -279111-25/63kVA T.C.Sets (For star ra

1

17564

17564

... More
GESCOMBSKDR34 - Labour cost- for 25/63 kVA on the existing 9 mtrs. RCC pole (square section) (excluding erection of pole)

1

1709

1709

... More
GESCOMBSKDR35 - Material cost -279800-fish plate MS

8

78

624

... More
GESCOMBSKDR36 - Material cost -281008-8 SWG G.I.Wire

5

75

375.2

... More
GESCOMBSKDR37 - Material cost -281110-7/10 SWG Guy Wire

10

77

772.3

... More
GESCOMBSKDR38 - Material cost -2811101-Guy with Complete set

4

1170

4680

... More
GESCOMBSKDR39 - Labour cost -a) Fixing of GUY Sets with break insulators making use of 7/3.15 mm (7/10 SWG) galvanised steel wire with turn buckle and anchoring arrangement as per approved drawing. (Excluding excavation of PIT)

4

266

1064

... More
GESCOMBSKDR40 - Labour cost -Hard Soil

4

629

2516

... More
GESCOMBSKDR41 - Material cost -2811103-Earthing Materials Type for gr

3

1729

5187

... More
GESCOMBSKDR42 - Labour cost -Hard Soil

3

2990

8970

... More
GESCOMBSKDR43 - Material cost -284503-LT Spacer for TC Wiring

8

42

336

... More
GESCOMBSKDR44 - Material cost -284828-Pre Insulated lugs -CPTAU for 5

8

305

2440

... More
GESCOMBSKDR45 - Material cost -288634-50Sq mm (AI end terminal Lug

8

9

72

... More
GESCOMBSKDR46 - Material cost -289029-PVC Wire-50 Sq.mm

40

64

2567.6

... More
GESCOMBSKDR47 - Material cost -301107-L.T.Protection kit

1

2023

2023

... More
GESCOMBSKDR48 - Labour cost -Fixing of LT Protection Kit

1

356

356

... More
GESCOMBSKDR49 - Material cost -302122-11kV Class, Solid core(Set/3 nos.)

1

1069

1069

... More
GESCOMBSKDR50 - Labour cost -HG fuse 11 kv Solid core type(3 nos)

1

237

237

... More
GESCOMBSKDR51 - Material cost -303200-L.A. 9kV, 5kA, Metal Oxide

3

1584

4752

... More
GESCOMBSKDR52 - Labour cost -Fixing of 3 Nos lightning arrestors including wiring.

1

119

119

... More
GESCOMBSKDR53 - Material cost -304212-11kV G.O.S 200A Single break

1

9450

9450

... More
GESCOMBSKDR54 - Labour cost -Fixing of GOS including wiring (11kV SB 200A)

1

1104

1104

... More
GESCOMBSKDR55 - Material cost -321465-25 Kva,Aluminium wdg,star 2(5

1

105994

105994

... More
GESCOMBSKDR56 - Labour cost -a) Erection of 25-63 kVA Transformer on Transformer structure.

1

1193

1193

... More
GESCOMBSKDR57 - Labour cost -Loading of Transformer 25 kVA

1

285

285

... More
GESCOMBSKDR58 - Labour cost -Un loading of Transformer 25 kVA

1

285

285

... More
GESCOMBSKDR59 - Material cost -357511-L.T. Electronic Tri-Vector Met

1

3312

3312

... More
GESCOMBSKDR60 - Labour cost -LT Electroic Tri-Vector Meter 5A, Class-0.5/1.0 Accuracy

1

798

798

... More
GESCOMBSKDR61 - Material cost -358061-With CT ratio 100/5 for 50/63

1

6293

6293

... More
GESCOMBSKDR62 - Labour cost -LT Metering Box For Housing ETV Meter with CT

1

650

650

... More
GESCOMBSKDR63 - Material cost -200103-RCC Pole-8.0M Long,115 kg WL

1

5129

5129

... More
GESCOMBSKDR64 - Labour cost -Hard Soil

1

1006

1006

... More
GESCOMBSKDR65 - Labour cost -Head loading of the pole 25 to 105Mtrs

1

285

285

... More
GESCOMBSKDR66 - Labour cost -Loading & unloading of 8 mtr RCC/PSC poles

1

110

110

... More
GESCOMBSKDR67 - Labour cost -Same as above but erection of RCC/PCC/PSC poles of 7.5 to 8 mtr long in pit of 1.5 mtr depth.

1

922

922

... More
GESCOMBSKDR68 - Material cost -27901203-4 pin cross arm with pole clam

2

423

846

... More
GESCOMBSKDR69 - Labour cost -Fixing of 4 Pin cross arm with insulator and Braces fixing.

2

160

320

... More
GESCOMBSKDR70 - Material cost -2811101-Guy with complete set

1

1170

1170

... More
GESCOMBSKDR71 - Labour cost -a) Fixing of GUY Sets with break insulators making use of 7/3.15 mm (7/10 SWG) galvanised steel wire with turn buckle and anchoring arrangement as per approved drawing. (Excluding excavation of PIT)

1

266

266

... More
GESCOMBSKDR72 - Labour cost -Hard Soil

1

629

629

... More
GESCOMBSKDR73 - Material cost -281683-Spiral Earth Electrode

1

239

239

... More
GESCOMBSKDR74 - Labour cost -providing spiral earth electrode type earthing along with pole (without charcoal, salt etc.,)

1

93

93

... More
GESCOMBSKDR75 - Material cost -283158-No.8 Strain Insulator

8

27

216

... More
GESCOMBSKDR76 - Material cost -284108-Rabbit ACSR Conductor

200

46

9246

... More
GESCOMBSKDR77 - Labour cost -For Rabbit ACSR

200

4

872



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.