Rural Drinking Water And Sanitation Department Tender

Karnataka, also known as Karunadu, is a state in the southwestern region of India. Karnataka was formed originally as Mysore State on 1st November 1956 and currently is the biggest state in south India. Its capital and largest city is Bengaluru. It covers an area of 191,791 km2 (74,051 sq mi) and is the sixth largest state by area comprising 31 districts. Karnataka is also a state of multiple languages; Kannada being the official and most widely spoken language in Karnataka. Other languages spoken in the state include Tamil, Telugu, Malayalam, Kodava, Konkani and much more.Karnataka tenders are issued by the government of Karnataka, public & private sector organisations. The state government issues majority of the Karnataka tenders, which are for goods and services including construction, road and bridge construction, IT services, engineering services, medical services, educational services amongst many others. Bidassist is one of the largest eprocurement portals, which offers all government tenders from across the world in one place. Bidassist offers information on all Karnataka tenders and other state and authority tenders in no time. Bidassist is a platform where users can look for various Karnataka tenders as well as other tenders.

Rural Drinking Water And Sanitation Department Tender

Works
Electrical and Electronics
Opening Date16 Jan 2025
Closing Soon24 Jan 2025
Tender Amount₹ 6,37,722.1 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
GESCOMBSKBH04 - Labour cost -Head loading of the pole 25 to 105Mtrs

20

285

5700

... More
GESCOMBSKBH05 - Labour cost -Loading & unloading of 9 mtr RCC/PSC poles

20

142

2840

... More
GESCOMBSKBH06 - Material cost -200105-RCC Pole-9.0M Long,145 kg WL

3

7076

21228

... More
GESCOMBSKBH07 - Labour cost -Erection of RCC/PSC poles 9 to 10 mtr long but in a pit of 1.8 mtr depth

3

1113

3339

... More
GESCOMBSKBH08 - Labour cost -Hard Soil

3

1132

3396

... More
GESCOMBSKBH09 - Labour cost -Head loading of the pole 25 to 105Mtrs

3

285

855

... More
GESCOMBSKBH10 - Labour cost -Loading & unloading of 9 mtr RCC/PSC poles

3

142

426

... More
GESCOMBSKBH11 - Material cost -27901206-11 kV Horizontal cross arm wit

24

643

15432

... More
GESCOMBSKBH12 - Labour cost -Fixing of V-Shape/Horizontal cross arm including single top support Braces and Insulators fixing.

24

257

6168

... More
GESCOMBSKBH13 - Material cost -279100-11 KV D.P.Structure

1

6401

6401

... More
GESCOMBSKBH14 - Labour cost -Hard Soil

1

1006

1006

... More
GESCOMBSKBH15 - Labour cost -Same as above using RCC poles 7.5/8 mtr long in pits of 1.5 mtr depth.

1

4134

4134

... More
GESCOMBSKBH16 - Material cost -279130-EG Stirrups (MS)

21

276

5796

... More
GESCOMBSKBH17 - Labour cost -Fixing of Earth Guard Stirrup

21

160

3360

... More
GESCOMBSKBH18 - Material cost -2811101-Guy with Complete set

5

1170

5850

... More
GESCOMBSKBH19 - Labour cost -a) Fixing of GUY Sets with break insulators making use of 7/3.15 mm (7/10 SWG) galvanised steel wire with turn buckle and anchoring arrangement as per approved drawing. (Excluding excavation of PIT)

5

266

1330

... More
GESCOMBSKBH20 - Labour cost -Hard Soil

5

629

3145

... More
GESCOMBSKBH21 - Material cost -281683-Spiral Earth Electrode

21

239

5019

... More
GESCOMBSKBH22 - Labour cost -providing spiral earth electrode type earthing along with pole (without charcoal, salt etc.,)

21

93

1953

... More
GESCOMBSKBH23 - Material cost -283008-11kV, 5KN Composite/Polymeric

63

205

12915

... More
GESCOMBSKBH24 - Material cost -283320-Silcon rubber composite insula

18

186

3348

... More
GESCOMBSKBH25 - Material cost -284108-Rabbit ACSR Conductor

3300

46

152559

... More
GESCOMBSKBH26 - Labour cost -For Rabbit ACSR

3300

4

14388

... More
GESCOMBSKBH27 - Material cost -285508-Rabbit to Rabbit (P G Clamps)

6

102

612

... More
GESCOMBSKBH28 - Material cost -200105-RCC Pole-9.0M Long,145 kg WL

2

7076

14152

... More
GESCOMBSKBH29 - Labour cost -Erection of RCC/PSC poles 9 to 10 mtr long but in a pit of 1.8 mtr depth

2

1113

2226

... More
GESCOMBSKBH30 - Labour cost -Hard Soil

2

1132

2264

... More
GESCOMBSKBH31 - Labour cost -Head loading of the pole 25 to 105Mtrs

2

285

570

... More
GESCOMBSKBH32 - Labour cost -Loading & unloading of 9 mtr RCC/PSC poles

2

142

284

... More
GESCOMBSKBH33 - Material cost -279111-25/63kVA T.C.Sets (For star ra

1

17564

17564

... More
GESCOMBSKBH34 - Labour cost- for 25/63 kVA on the existing 9 mtrs. RCC pole (square section) (excluding erection of pole)

1

1709

1709

... More
GESCOMBSKBH35 - Material cost -279800-fish plate MS

8

78

624

... More
GESCOMBSKBH36 - Material cost -281008-8 SWG G.I.Wire

5

75

375.2

... More
GESCOMBSKBH37 - Material cost -281110-7/10 SWG Guy Wire

10

77

772.3

... More
GESCOMBSKBH38 - Material cost -2811101-Guy with Complete set

4

1170

4680

... More
GESCOMBSKBH39 - Labour cost -a) Fixing of GUY Sets with break insulators making use of 7/3.15 mm (7/10 SWG) galvanised steel wire with turn buckle and anchoring arrangement as per approved drawing. (Excluding excavation of PIT)

4

266

1064

... More
GESCOMBSKBH40 - Labour cost -Hard Soil

4

629

2516

... More
GESCOMBSKBH41 - Material cost -2811103-Earthing Materials Type for gr

3

1729

5187

... More
GESCOMBSKBH42 - Labour cost -Hard Soil

3

2990

8970

... More
GESCOMBSKBH43 - Material cost -284503-LT Spacer for TC Wiring

8

42

336

... More
GESCOMBSKBH44 - Material cost -284828-Pre Insulated lugs -CPTAU for 5

8

305

2440

... More
GESCOMBSKBH45 - Material cost -288634-50Sq mm (AI end terminal Lug

8

9

72

... More
GESCOMBSKBH46 - Material cost -289029-PVC Wire-50 Sq.mm

40

64

2567.6

... More
GESCOMBSKBH47 - Material cost -301107-L.T.Protection kit

1

2023

2023

... More
GESCOMBSKBH48 - Labour cost -Fixing of LT Protection Kit

1

356

356

... More
GESCOMBSKBH49 - Material cost -302122-11kV Class, Solid core Set/3 nos.

1

1069

1069

... More
GESCOMBSKBH50 - Labour cost -HG fuse 11 kv Solid core type(3 nos)

1

237

237

... More
GESCOMBSKBH51 - Material cost -303200-L.A. 9kV, 5kA, Metal Oxide

3

1584

4752

... More
GESCOMBSKBH52 - Labour cost -Fixing of 3 Nos lightning arrestors including wiring.

1

119

119

... More
GESCOMBSKBH53 - Material cost -304212-11kV G.O.S 200A Single break

1

9450

9450

... More
GESCOMBSKBH54 - Labour cost -Fixing of GOS including wiring (11kV SB 200A)

1

1104

1104

... More
GESCOMBSKBH55 - Material cost -321465-25 Kva,Aluminium wdg,star 2(5

1

105994

105994

... More
GESCOMBSKBH56 - Labour cost -a) Erection of 25-63 kVA Transformer on Transformer structure.

1

1193

1193

... More
GESCOMBSKBH57 - Labour cost -Loading of Transformer 25 kVA

1

285

285

... More
GESCOMBSKBH58 - Labour cost -Un loading of Transformer 25 kVA

1

285

285

... More
GESCOMBSKBH59 - Material cost -357511-L.T. Electronic Tri-Vector Met

1

3312

3312

... More
GESCOMBSKBH60 - Labour cost -LT Electroic Tri-Vector Meter 5A, Class-0.5/1.0 Accuracy

1

798

798

... More
GESCOMBSKBH61 - Material cost -358061-With CT ratio 100/5 for 50/63

1

6293

6293

... More
GESCOMBSKBH62 - Labour cost -LT Metering Box For Housing ETV Meter with CT

1

650

650

... More
GESCOMBSKBH63 - Material cost -200103-RCC Pole-8.0M Long,115 kg WL

1

5129

5129

... More
GESCOMBSKBH64 - Labour cost -Hard Soil

1

1006

1006

... More
GESCOMBSKBH65 - Labour cost -Head loading of the pole 25 to 105Mtrs

1

285

285

... More
GESCOMBSKBH66 - Labour cost -Loading & unloading of 8 mtr RCC/PSC poles

1

110

110

... More
GESCOMBSKBH67 - Labour cost -Same as above but erection of RCC/PCC/PSC poles of 7.5 to 8 mtr long in pit of 1.5 mtr depth.

1

922

922

... More
GESCOMBSKBH68 - Material cost -27901203-4 pin cross arm with pole clam

2

423

846

... More
GESCOMBSKBH69 - Labour cost -Fixing of 4 Pin cross arm with insulator and Braces fixing.

2

160

320

... More
GESCOMBSKBH70 - Material cost -2811101-Guy with complete set

1

1170

1170

... More
GESCOMBSKBH71 - Labour cost -a) Fixing of GUY Sets with break insulators making use of 7/3.15 mm (7/10 SWG) galvanised steel wire with turn buckle and anchoring arrangement as per approved drawing. (Excluding excavation of PIT)

1

266

266

... More
GESCOMBSKBH72 - Labour cost -Hard Soil

1

629

629

... More
GESCOMBSKBH73 - Material cost -281683-Spiral Earth Electrode

1

239

239

... More
GESCOMBSKBH74 - Labour cost -providing spiral earth electrode type earthing along with pole (without charcoal, salt etc.,)

1

93

93

... More
GESCOMBSKBH75 - Material cost -283158-No.8 Strain Insulator

8

27

216

... More
GESCOMBSKBH76 - Material cost -284108-Rabbit ACSR Conductor

200

46

9246

... More
GESCOMBSKBH77 - Labour cost -For Rabbit ACSR

200

4

872



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.