Rural Drinking Water And Sanitation Department Tender

Karnataka, also known as Karunadu, is a state in the southwestern region of India. Karnataka was formed originally as Mysore State on 1st November 1956 and currently is the biggest state in south India. Its capital and largest city is Bengaluru. It covers an area of 191,791 km2 (74,051 sq mi) and is the sixth largest state by area comprising 31 districts. Karnataka is also a state of multiple languages; Kannada being the official and most widely spoken language in Karnataka. Other languages spoken in the state include Tamil, Telugu, Malayalam, Kodava, Konkani and much more.Karnataka tenders are issued by the government of Karnataka, public & private sector organisations. The state government issues majority of the Karnataka tenders, which are for goods and services including construction, road and bridge construction, IT services, engineering services, medical services, educational services amongst many others. Bidassist is one of the largest eprocurement portals, which offers all government tenders from across the world in one place. Bidassist offers information on all Karnataka tenders and other state and authority tenders in no time. Bidassist is a platform where users can look for various Karnataka tenders as well as other tenders.

Rural Drinking Water And Sanitation Department Tender

Works
Electrical and Electronics
Opening Date19 Nov 2024
Closing Soon5 Dec 2024
Tender Amount₹ 7,65,957.6 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
GESCOMGH04 - Labour cost -Head loading of the pole 25 to 105Mtrs

27

285

7695

... More
GESCOMGH05 - Labour cost -Loading & unloading of 9 mtr RCC/PSC poles

27

142

3834

... More
GESCOMGH06 - Material cost -200105-RCC Pole-9.0M Long,145 kg WL

2

7076

14152

... More
GESCOMGH07 - Labour cost -Erection of RCC/PSC poles 9 to 10 mtr long but in a pit of 1.8 mtr depth

2

1113

2226

... More
GESCOMGH08 - Labour cost -Hard Soil

2

1132

2264

... More
GESCOMGH09 - Labour cost -Head loading of the pole 25 to 105Mtrs

2

285

570

... More
GESCOMGH10 - Labour cost -Loading & unloading of 9 mtr RCC/PSC poles

2

142

284

... More
GESCOMGH11 - Material cost -27901206-11 kV Horizontal cross arm wit

28

643

18004

... More
GESCOMGH12 - Labour cost -Fixing of V-Shape/Horizontal cross arm including single top support Braces and Insulators fixing.

28

257

7196

... More
GESCOMGH13 - Material cost -279100-11 KV D.P.Structure

1

6401

6401

... More
GESCOMGH14 - Labour cost -Hard Soil

1

1006

1006

... More
GESCOMGH15 - Labour cost -Same as above using RCC poles 7.5/8 mtr long in pits of 1.5 mtr depth.

1

4134

4134

... More
GESCOMGH16 - Material cost -279130-EG Stirrups (MS)

27

276

7452

... More
GESCOMGH17 - Labour cost -Fixing of Earth Guard Stirrup

27

160

4320

... More
GESCOMGH18 - Material cost -2811101-Guy with Complete set

5

1170

5850

... More
GESCOMGH19 - Labour cost -a) Fixing of GUY Sets with break insulators making use of 7/3.15 mm (7/10 SWG) galvanised steel wire with turn buckle and anchoring arrangement as per approved drawing. (Excluding excavation of PIT)

5

266

1330

... More
GESCOMGH20 - Labour cost -Hard Soil

5

629

3145

... More
GESCOMGH21 - Material cost -281683-Spiral Earth Electrode

27

239

6453

... More
GESCOMGH22 - Labour cost -providing spiral earth electrode type earthing along with pole (without charcoal, salt etc.,)

27

93

2511

... More
GESCOMGH23 - Material cost -283008-11kV, 5KN Composite/Polymeric

51

205

10455

... More
GESCOMGH24 - Material cost -283320-Silcon rubber composite insula

12

186

2232

... More
GESCOMGH25 - Material cost -284108-Rabbit ACSR Conductor

4250

46

196477.5

... More
GESCOMGH26 - Labour cost -For Rabbit ACSR

4250

4

18530

... More
GESCOMGH27 - Material cost -285508-Rabbit to Rabbit (P G Clamps)

6

102

612

... More
GESCOMGH28 - Material cost -200105-RCC Pole-9.0M Long,145 kg WL

2

7076

14152

... More
GESCOMGH29 - Labour cost -Erection of RCC/PSC poles 9 to 10 mtr long but in a pit of 1.8 mtr depth

2

1113

2226

... More
GESCOMGH30 - Labour cost -Hard Soil

2

1132

2264

... More
GESCOMGH31 - Labour cost -Head loading of the pole 25 to 105Mtrs

2

285

570

... More
GESCOMGH32 - Labour cost -Loading & unloading of 9 mtr RCC/PSC poles

2

142

284

... More
GESCOMGH33 - Material cost -279111-25/63kVA T.C.Sets (For star ra

1

17564

17564

... More
GESCOMGH34 - Labour cost- for 25/63 kVA on the existing 9 mtrs. RCC pole (square section) (excluding erection of pole)

1

1709

1709

... More
GESCOMGH35 - Material cost -279800-fish plate MS

8

78

624

... More
GESCOMGH36 - Material cost -281008-8 SWG G.I.Wire

5

75

375.2

... More
GESCOMGH37 - Material cost -281110-7/10 SWG Guy Wire

10

77

772.3

... More
GESCOMGH38 - Material cost -2811101-Guy with Complete set

4

1170

4680

... More
GESCOMGH39 - Labour cost -a) Fixing of GUY Sets with break insulators making use of 7/3.15 mm (7/10 SWG) galvanised steel wire with turn buckle and anchoring arrangement as per approved drawing. (Excluding excavation of PIT)

4

266

1064

... More
GESCOMGH40 - Labour cost -Hard Soil

4

629

2516

... More
GESCOMGH41 - Material cost -2811103-Earthing Materials Type for gr

3

1729

5187

... More
GESCOMGH42 - Labour cost -Hard Soil

3

2990

8970

... More
GESCOMGH43 - Material cost -284503-LT Spacer for TC Wiring

8

42

336

... More
GESCOMGH44 - Material cost -284828-Pre Insulated lugs -CPTAU for 5

8

305

2440

... More
GESCOMGH45 - Material cost -288634-50Sq mm (AI end terminal Lug

8

9

72

... More
GESCOMGH46 - Material cost -289029-PVC Wire-50 Sq.mm

40

64

2567.6

... More
GESCOMGH47 - Material cost -301107-L.T.Protection kit

1

2023

2023

... More
GESCOMGH48 - Labour cost -Fixing of LT Protection Kit

1

356

356

... More
GESCOMGH49 - Material cost -302122-11kV Class, Solid core (Set/3 nos.)

1

1069

1069

... More
GESCOMGH50 - Labour cost -HG fuse 11 kv Solid core type(3 nos)

1

237

237

... More
GESCOMGH51 - Material cost -303200-L.A. 9kV, 5kA, Metal Oxide

3

1584

4752

... More
GESCOMGH52 - Labour cost -Fixing of 3 Nos lightning arrestors including wiring.

1

119

119

... More
GESCOMGH53 - Material cost -304212-11kV G.O.S 200A Single break

1

9450

9450

... More
GESCOMGH54 - Labour cost -Fixing of GOS including wiring (11kV SB 200A)

1

1104

1104

... More
GESCOMGH55 - Material cost -321465-25 Kva,Aluminium wdg,star 2(5

1

105994

105994

... More
GESCOMGH56 - Labour cost -a) Erection of 25-63 kVA Transformer on Transformer structure.

1

1193

1193

... More
GESCOMGH57 - Labour cost -Loading of Transformer 25 kVA

1

285

285

... More
GESCOMGH58 - Labour cost -Un loading of Transformer 25 kVA

1

285

285

... More
GESCOMGH59 - Material cost -357511-L.T. Electronic Tri-Vector Met

1

3312

3312

... More
GESCOMGH60 - Labour cost -LT Electroic Tri-Vector Meter 5A, Class-0.5/1.0 Accuracy

1

798

798

... More
GESCOMGH61 - Material cost -358061-With CT ratio 100/5 for 50/63

1

6293

6293

... More
GESCOMGH62 - Labour cost -LT Metering Box For Housing ETV Meter with CT

1

650

650

... More
GESCOMGH63 - Material cost -200003-PCC Pole-8.0M Long, 140 kg WL

2

2674

5348

... More
GESCOMGH64 - Labour cost -Hard Soil

2

1006

2012

... More
GESCOMGH65 - Labour cost -Head loading of the pole 25 to 105Mtrs

2

285

570

... More
GESCOMGH66 - Labour cost -Loading & unloading of 8 mtr RCC/PSC poles

2

94

188

... More
GESCOMGH67 - Labour cost -Same as above but erection of RCC/PCC/PSC poles of 7.5 to 8 mtr long in pit of 1.5 mtr depth.

2

922

1844

... More
GESCOMGH68 - Material cost -200103-RCC Pole-8.0M Long,115 kg WL

1

5129

5129

... More
GESCOMGH69 - Labour cost -Hard Soil

1

1006

1006

... More
GESCOMGH70 - Labour cost -Head loading of the pole 25 to 105Mtrs

1

285

285

... More
GESCOMGH71 - Labour cost -Loading & unloading of 8 mtr RCC/PSC poles

1

110

110

... More
GESCOMGH72 - Labour cost -Same as above but erection of RCC/PCC/PSC poles of 7.5 to 8 mtr long in pit of 1.5 mtr depth.

1

922

922

... More
GESCOMGH73 - Material cost -27901203-4 pin cross arm with pole clam

4

423

1692

... More
GESCOMGH74 - Labour cost -Fixing of 4 Pin cross arm with insulator and Braces fixing.

4

160

640

... More
GESCOMGH75 - Material cost -2811101-Guy with complete set

3

1170

3510

... More
GESCOMGH76 - Labour cost -a) Fixing of GUY Sets with break insulators making use of 7/3.15 mm (7/10 SWG) galvanised steel wire with turn buckle and anchoring arrangement as per approved drawing. (Excluding excavation of PIT)

3

266

798

... More
GESCOMGH77 - Labour cost -Hard Soil

3

629

1887

... More
GESCOMGH78 - Material cost -281683-Spiral Earth Electrode

3

239

717

... More
GESCOMGH79 - Labour cost -providing spiral earth electrode type earthing along with pole (without charcoal, salt etc.,)

3

93

279

... More
GESCOMGH80 - Material cost -283008-11kV, 5KN Composite/Polymeric

4

205

820

... More
GESCOMGH81 - Material cost -283158-No.8 Strain Insulator

16

27

432

... More
GESCOMGH82 - Material cost -284108-Rabbit ACSR Conductor

600

46

27738

... More
GESCOMGH83 - Labour cost -For Rabbit ACSR

600

4

2616



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.