Rural Drinking Water And Sanitation Department Tender

... More
Karnataka, also known as Karunadu, is a state in the southwestern region of India. Karnataka was formed originally as Mysore State on 1st November 1956 and currently is the biggest state in south India. Its capital and largest city is Bengaluru. It covers an area of 191,791 km2 (74,051 sq mi) and is the sixth largest state by area comprising 31 districts. Karnataka is also a state of multiple languages; Kannada being the official and most widely spoken language in Karnataka. Other languages spoken in the state include Tamil, Telugu, Malayalam, Kodava, Konkani and much more.Karnataka tenders are issued by the government of Karnataka, public & private sector organisations. The state government issues majority of the Karnataka tenders, which are for goods and services including construction, road and bridge construction, IT services, engineering services, medical services, educational services amongst many others. Bidassist is one of the largest eprocurement portals, which offers all government tenders from across the world in one place. Bidassist offers information on all Karnataka tenders and other state and authority tenders in no time. Bidassist is a platform where users can look for various Karnataka tenders as well as other tenders.

Rural Drinking Water And Sanitation Department Tender

Works
Electrical and Electronics
Opening Date16 Jan 2025
Closing Date24 Jan 2025
Tender Amount₹ 4,72,344.6 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
GESCOMBSK04 - Labour cost -Head loading of the pole 25 to 105Mtrs

14

285

3990

... More
GESCOMBSK05 - Labour cost -Loading & unloading of 9 mtr RCC/PSC poles

14

142

1988

... More
GESCOMBSK06 - Material cost -27901206-11 kV Horizontal cross arm wit

15

643

9645

... More
GESCOMBSK07 - Labour cost -Fixing of V-Shape/Horizontal cross arm including single top support Braces and Insulators fixing.

15

257

3855

... More
GESCOMBSK08 - Material cost -2811101-Guy with Complete set

3

1170

3510

... More
GESCOMBSK09 - Labour cost -a) Fixing of GUY Sets with break insulators making use of 7/3.15 mm (7/10 SWG) galvanised steel wire with turn buckle and anchoring arrangement as per approved drawing. (Excluding excavation of PIT)

3

266

798

... More
GESCOMBSK10 - Labour cost -Hard Soil

3

629

1887

... More
GESCOMBSK11 - Material cost -281683-Spiral Earth Electrode

14

239

3346

... More
GESCOMBSK12 - Labour cost -providing spiral earth electrode type earthing along with pole (without charcoal, salt etc.,)

14

93

1302

... More
GESCOMBSK13 - Material cost -283008-11kV, 5KN Composite/Polymeric

42

205

8610

... More
GESCOMBSK14 - Material cost -283320-Silcon rubber composite insula

6

186

1116

... More
GESCOMBSK15 - Material cost -284108-Rabbit ACSR Conductor

2250

46

104017.5

... More
GESCOMBSK16 - Labour cost -For Rabbit ACSR

2250

4

9810

... More
GESCOMBSK17 - Material cost -285508-Rabbit to Rabbit (P G Clamps)

6

102

612

... More
GESCOMBSK18 - Material cost -200105-RCC Pole-9.0M Long,145 kg WL

2

7076

14152

... More
GESCOMBSK19 - Labour cost -Erection of RCC/PSC poles 9 to 10 mtr long but in a pit of 1.8 mtr depth

2

1113

2226

... More
GESCOMBSK20 - Labour cost -Hard Soil

2

1132

2264

... More
GESCOMBSK21 - Labour cost -Head loading of the pole 25 to 105Mtrs

2

285

570

... More
GESCOMBSK22 - Labour cost -Loading & unloading of 9 mtr RCC/PSC poles

2

142

284

... More
GESCOMBSK23 - Material cost -279111-25/63kVA T.C.Sets (For star ra

1

17564

17564

... More
GESCOMBSK24 - Labour cost- for 25/63 kVA on the existing 9 mtrs. RCC pole (square section) (excluding erection of pole)

1

1709

1709

... More
GESCOMBSK25 - Material cost -279800-fish plate MS

8

78

624

... More
GESCOMBSK26 - Material cost -281008-8 SWG G.I.Wire

5

75

375.2

... More
GESCOMBSK27 - Material cost -281110-7/10 SWG Guy Wire

10

77

772.3

... More
GESCOMBSK28 - Material cost -2811101-Guy with Complete set

4

1170

4680

... More
GESCOMBSK29 - Labour cost -a) Fixing of GUY Sets with break insulators making use of 7/3.15 mm (7/10 SWG) galvanised steel wire with turn buckle and anchoring arrangement as per approved drawing. (Excluding excavation of PIT)

4

266

1064

... More
GESCOMBSK30 - Labour cost -Hard Soil

4

629

2516

... More
GESCOMBSK31 - Material cost -2811103-Earthing Materials Type for gr

3

1729

5187

... More
GESCOMBSK32 - Labour cost -Hard Soil

3

2990

8970

... More
GESCOMBSK33 - Material cost -284503-LT Spacer for TC Wiring

8

42

336

... More
GESCOMBSK34 - Material cost -284828-Pre Insulated lugs -CPTAU for 5

8

305

2440

... More
GESCOMBSK35 - Material cost -288634-50Sq mm (AI end terminal Lug

8

9

72

... More
GESCOMBSK36 - Material cost -289029-PVC Wire-50 Sq.mm

40

64

2567.6

... More
GESCOMBSK37 - Material cost -301107-L.T.Protection kit

1

2023

2023

... More
GESCOMBSK38 - Labour cost -Fixing of LT Protection Kit

1

356

356

... More
GESCOMBSK39 - Material cost -302122-11kV Class, Solid core (Set/3 nos.)

1

1069

1069

... More
GESCOMBSK40 - Labour cost -HG fuse 11 kv Solid core type(3 nos)

1

237

237

... More
GESCOMBSK41 - Material cost -303200-L.A. 9kV, 5kA, Metal Oxide

3

1584

4752

... More
GESCOMBSK42 - Labour cost -Fixing of 3 Nos lightning arrestors including wiring.

1

119

119

... More
GESCOMBSK43 - Material cost -304212-11kV G.O.S 200A Single break

1

9450

9450

... More
GESCOMBSK44 - Labour cost -Fixing of GOS including wiring (11kV SB 200A)

1

1104

1104

... More
GESCOMBSK45 - Material cost -321465-25 Kva,Aluminium wdg,star 2(5

1

105994

105994

... More
GESCOMBSK46 - Labour cost -a) Erection of 25-63 kVA Transformer on Transformer structure.

1

1193

1193

... More
GESCOMBSK47 - Labour cost -Loading of Transformer 25 kVA

1

285

285

... More
GESCOMBSK48 - Labour cost -Un loading of Transformer 25 kVA

1

285

285

... More
GESCOMBSK49 - Material cost -357511-L.T. Electronic Tri-Vector Met

1

3312

3312

... More
GESCOMBSK50 - Labour cost -LT Electroic Tri-Vector Meter 5A, Class-0.5/1.0 Accuracy

1

798

798

... More
GESCOMBSK51 - Material cost -358061-With CT ratio 100/5 for 50/63

1

6293

6293

... More
GESCOMBSK52 - Labour cost -LT Metering Box For Housing ETV Meter with CT

1

650

650

... More
GESCOMBSK53 - Material cost -200103-RCC Pole-8.0M Long,115 kg WL

1

5129

5129

... More
GESCOMBSK54 - Labour cost -Hard Soil

1

1006

1006

... More
GESCOMBSK55 - Labour cost -Head loading of the pole 25 to 105Mtrs

1

285

285

... More
GESCOMBSK56 - Labour cost -Loading & unloading of 8 mtr RCC/PSC poles

1

110

110

... More
GESCOMBSK57 - Labour cost -Same as above but erection of RCC/PCC/PSC poles of 7.5 to 8 mtr long in pit of 1.5 mtr depth.

1

922

922

... More
GESCOMBSK58 - Material cost -27901203-4 pin cross arm with pole clam

2

423

846

... More
GESCOMBSK59 - Labour cost -Fixing of 4 Pin cross arm with insulator and Braces fixing.

2

160

320

... More
GESCOMBSK60 - Material cost -2811101-Guy with complete set

1

1170

1170

... More
GESCOMBSK61 - Labour cost -a) Fixing of GUY Sets with break insulators making use of 7/3.15 mm (7/10 SWG) galvanised steel wire with turn buckle and anchoring arrangement as per approved drawing. (Excluding excavation of PIT)

1

266

266

... More
GESCOMBSK62 - Labour cost -Hard Soil

1

629

629

... More
GESCOMBSK63 - Material cost -281683-Spiral Earth Electrode

1

239

239

... More
GESCOMBSK64 - Labour cost -providing spiral earth electrode type earthing along with pole (without charcoal, salt etc.,)

1

93

93

... More
GESCOMBSK65 - Material cost -283158-No.8 Strain Insulator

8

27

216

... More
GESCOMBSK66 - Material cost -284108-Rabbit ACSR Conductor

200

46

9246

... More
GESCOMBSK67 - Labour cost -For Rabbit ACSR

200

4

872



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.