Rajiv Gandhi Housing Corporation Limited Tender

Karnataka, also known as Karunadu, is a state in the southwestern region of India. Karnataka was formed originally as Mysore State on 1st November 1956 and currently is the biggest state in south India. Its capital and largest city is Bengaluru. It covers an area of 191,791 km2 (74,051 sq mi) and is the sixth largest state by area comprising 31 districts. Karnataka is also a state of multiple languages; Kannada being the official and most widely spoken language in Karnataka. Other languages spoken in the state include Tamil, Telugu, Malayalam, Kodava, Konkani and much more.Karnataka tenders are issued by the government of Karnataka, public & private sector organisations. The state government issues majority of the Karnataka tenders, which are for goods and services including construction, road and bridge construction, IT services, engineering services, medical services, educational services amongst many others. Bidassist is one of the largest eprocurement portals, which offers all government tenders from across the world in one place. Bidassist offers information on all Karnataka tenders and other state and authority tenders in no time. Bidassist is a platform where users can look for various Karnataka tenders as well as other tenders.

Rajiv Gandhi Housing Corporation Limited - RGRHCL Tender

Civil Works Roads
Opening Date16 Dec 2021
Closing Date17 Jan 2022
Tender Amount₹ 11,97,32,652 
This is an estimated amount, exact amount may vary.
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Add Tp 4.98%

-

-

-

... More
KSRRB 300-2. Earthwork excavation by manual means in hard soil involving an average horizontal throw upto 2 meters and an average lift upto 0.5 m, excavated surface leveled and sides neatly dressed, the disposed earth to be leveled neatly after breaking of clods complete as per specifications. MORTH / Chapter 3

-

-

-

... More
For 60m wide Road ( Drainage )

-

-

-

... More
For RCC drain

1572.48

-

-

... More
Deduct approach road

-118.3

-

-

... More
Deduct approach road

-50.96

-

-

... More
For Utility duct

4445.28

-

-

... More
Cross utility duct chambers at every 30mtrs

3292.8

-

-

... More
For Median Kerb Wall

1140.48

-

-

... More
For 24m wide Road

-

-

-

... More
For RCC drain

1230.32

-

-

... More
Deduct approach road

-4.2

-

-

... More
for Utility duct

3478.02

-

-

... More
Cross Utility Duct chambers at every 30mtrs

1034.88

-

-

... More
For Median Kerb Wall

892.32

-

-

... More
For 60m Road

-

-

-

... More
Culverts

157.3

-

-

... More
Culverts

67.76

-

-

... More
For 24m wide road

-

-

-

... More
Culverts

72.6

-

-

... More
For Highmast footing

8.64

-

-

... More
Box culvert to nala

201.6

-

-

... More
Pg No 143 It No 19.2 of PWD SR 2018-19

-

-

-

... More
Add Tp 4.98%

-

-

-

... More
KSRRB M2100-10: Providing and laying in position plain cement concrete of mix 1:3:6 with OPC cement @ 220kgs, with 40mm and down size graded granite metal coarse aggregates @ 0.89 cum and fine aggregates @ 0.46 cum, in foundation mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days including cost of all materials, labour, HOM of machinery, curing, formworks, scaffolding and centering complete as per specifications

-

-

-

... More
For 60m Wide Road

-

-

-

... More
For RCC drain

120.96

-

-

... More
Deduct approach road

-9.1

-

-

... More
Deduct approach road

-3.92

-

-

... More
For Utility duct

138.24

-

-

... More
Cross utility duct chambers at every 30mtrs

134.4

-

-

... More
Median Kerb Wall

69.12

-

-

... More
For footpath LHS & RHS

116.64

-

-

... More
For 24m wide Road

-

-

-

... More
For RCC drain

94.64

-

-

... More
Deduct approach road

-4.2

-

-

... More
For Utility duct

108.16

-

-

... More
Cross utility duct chambers at every 30mtrs

42.24

-

-

... More
Median Kerb Wall

54.08

-

-

... More
For footpath LHS& RHS

91.26

-

-

... More
For 60m Wide Road

-

-

-

... More
Culverts

11.05

-

-

... More
Culverts

4.76

-

-

... More
For 24m wide road

-

-

-

... More
Culverts

5.1

-

-

... More
Box culvert to nala

5.04

-

-

... More
For Highmast footing

0.86

-

-

... More
@ Nala Portion

-

-

-

... More
Culvert Raft

4.8

-

-

... More
Pg No 222 It No 27.18 of PWD SR 2018-19

-

-

-

... More
Add Tp 4.98%

-

-

-

... More
Providing laying palin / reinforced cement concrete for side drains using M20 nominal mix concrete with OPC at 300kgs with 20mm and downsize granite metal coarse aggregates at 0.69 cum and fine aggregates at 0.43 cum machine mixed, well compacted for walls and bottom including centering shuttering cost of materials, HOM of machinery, curing etc., complet excluding cost of steel as per MORTH specification No. 1500,1700,2200 including cost of materials, labour, HOM complete as per specifications wall & bottom thickness 15cm

-

-

-

... More
For 60m Wide Road

-

-

-

... More
For RCC drain Raft

155.52

-

-

... More
Deduct approach road

-11.7

-

-

... More
Deduct approach road

-5.04

-

-

... More
Median Kerb Wall

77.76

-

-

-

-

-

... More
For RCC drain Raft

155.52

-

-

... More
Deduct approach road

-23.4

-

-

... More
Deduct approach road

-10.08

-

-

... More
Median Kerb Wall

103.68

-

-

... More
Top slab

-

-

-

... More
For RCC drain Raft

155.52

-

-

... More
Deduct approach road

-11.7

-

-

... More
Deduct approach road

-5.04

-

-

... More
For 24m wide road

-

-

-

-

-

-

... More
For RCC drain Raft

121.68

-

-

... More
Deduct approach road

-5.4

-

-

... More
Median Kerb Wall

60.84

-

-

-

-

-

... More
For RCC drain Raft

121.68

-

-

... More
Deduct approach road

-43.2

-

-

... More
For Median U Shape Channel

81.12

-

-

... More
Top slab

-

-

-

... More
For RCC drain Raft

121.68

-

-

... More
Deduct approach road

-5.4

-

-

... More
Pg No 271 It No 37.59.2 of PWD SR 2018-19

-

-

-

... More
Add Tp 4.98%

-

-

-

... More
Wrought iron and mild steel welded work KSRRB M300-18. Wrought iron and mild steel welded work (using angles, square bars, tees and channel grills, grating frames, gates and tree guards of any size and design etc. including cost of screens and welding rods or bolts and nuts complete fixed in position but without the cost of excavation and concrete for fixing which will be paid separately complete as per specifications.

-

-

-

... More
For RCC drain Raft

-

-

-

... More
Gratings side of the drains

-

-

-

... More
for 60m road at every 10m interval

7.74

-

-

... More
0.3x0.3 size=0.09 sqm

-

-

-

... More
for 24m road at every 10m interval

6.12

-

-

... More
0.3x0.3 size=0.09 sqm

13.86

-

-

... More
at 35kg/sqm

485.1

-

-

... More
Pg No 150 It No 19.97 of PWD SR 2018-19

-

-

-

... More
Add Tp 4.98%

-

-

-

... More
KSRRB M2200-5.12.Design mix M25 with OPC cement @ 340kgs, with 20mm and down size graded granite metal coarse aggregates @0.7cum and fine aggregates @ 0.47cum, with superplastisiser @3lts confirming to IS9103-1999 Reaffirmed-2008 - i) Upto 5m height

-

-

-

... More
For 60m Wide Road

-

-

-

... More
For Utility duct

-

-

-

... More
Bottom Raft

241.92

-

-

... More
Cross utility duct chambers at every 30mtrs

235.2

-

-

1058.4

-

-

... More
Less for Cross Utility Duct

-5.67

-

-

... More
Utility Chmaber @ Median

9.58

-

-

... More
Top Slab

2.27

-

-

... More
For 24m wide road

-

-

-

... More
for Utility duct

189.28

-

-

... More
Cross Utility Duct chambers at every 30mtrs

73.92

-

-

811.2

-

-

... More
Less for Cross Utility Duct

-4.46

-

-

... More
For 60m Wide Road

-

-

-

... More
Culvert

-

-

-

... More
Culvert

19.5

-

-

13.65

-

-

... More
Culvert

8.4

-

-

5.88

-

-

... More
For 24m wide road

-

-

-

... More
Culvert Raft

9

-

-

... More
Culvert @ Nala Portion

-

-

-

... More
Culvert Raft

9.12

-

-

28.8

-

-

... More
Haunch Concrete

0.27

-

-

... More
For Highmast footing

3.07

-

-

... More
Pg No 227 It No 28.7.12 of PWD SR 2018-19

-

-

-

... More
Add Tp 4.98%

-

-

-

... More
KSRRB M2200-5.15. design mix M30 with OPC cement @ 360kgs, with 20mm and down size graded granite metal coarse aggregates @0.69cum and fine aggregates @ 0.46cum, with superplastisiser @3lts confirming to IS9103-1999 Reaffirmed-2008 - i) Upto 5m heigh

-

-

-

... More
For 60m Wide Road

-

-

-

... More
Top Slab

-

-

-

... More
For Utility duct

324

-

-

... More
Cross utility duct chambers at every 30mtrs

282.73

-

-

... More
Less for Chmaber @ Median

-3.78

-

-

... More
24.0m road

-

-

-

... More
Top Slab

-

-

-

... More
For Utility duct

253.5

-

-

... More
Cross utility duct chambers at every 30mtrs

83.55

-

-

... More
Culverts 60.0m road Top Slab

-

-

-

... More
Culverts 24.0m road Top Slab

-

-

-

... More
Culvert @ Nala Portion

-

-

-

... More
Top Slab

11.4

-

-

... More
Pg No 228It No 28.7.15 of PWD SR 2018-19

-

-

-

... More
Add Tp 4.98%

-

-

-

... More
KSRB 4-6.3: Providing and Removing centering, shuttering, strutting, propping etc., and removal of romwork for flat surface such as suspended floors, roofs, landings, balconies and likes, thickness above 200mm including cost of all materials, labour complete as per specifications. Specifcation No KBS 4.6.2

-

-

-

... More
60M Road

-

-

-

... More
RCC Drain

-

-

-

... More
Drain Raft ( 2*0.15 = 0.3 )

259.2

-

-

... More
Deduct Approach Road

-28.5

-

-

... More
Deduct Approach Road

-8.4

-

-

... More
Drain Wall ( 2*0.6 = 1.8 )

1036.8

-

-

... More
Deduct Approach Road

-114

-

-

... More
Deduct Approach Road

-33.6

-

-

... More
Top Slab

1296

-

-

... More
Deduct Approach Road

-142.5

-

-

... More
Deduct Approach Road

-42

-

-

... More
Median Kerb Wall

-

-

-

... More
Raft ( 2*0.15 = 0.3 )

259.2

-

-

... More
Side Wall ( 2*1.2 = 2.4 )

2073.6

-

-

... More
Cross Utility Duct Chamber

-

-

-

... More
Raft ( 2*0.2 = 0.4 )

336

-

-

... More
Side Wall ( 2*0.9 = 1.8 )

1454.04

-

-

... More
Top Slab

1534.82

-

-

... More
Culvert

-

-

-

... More
Raft ( 2*0.2 = 0.4 )

26

-

-

... More
Side Wall ( 4*.7 = 2.8)

182

-

-

... More
Top Slab

117

-

-

... More
Raft ( 2*0.2 = 0.4 )

11.2

-

-

... More
Side Wall ( 4*.7 = 2.8)

78.4

-

-

... More
Top Slab

50.4

-

-

... More
Utility Duct

-

-

-

... More
Raft (2*0.2=0.4)

345.6

-

-

... More
Side Wall (4*2.45=9.8)

2116.8

-

-

... More
Deduct for Cross Utility Duct Chamber

-45.36

-

-

... More
Top Slab

1036.8

-

-

... More
Median Utility Chamber

-

-

-

... More
Side Wall ( 2.4*2=4.8)

63.84

-

-

... More
Top Slab

19.85

-

-

... More
Culvert @ Nala Portion

-

-

-

... More
Raft ( 2*0.2 = 0.4 )

4.8

-

-

... More
Side Wall ( 4*3 = 12)

144

-

-

... More
Top Slab

51.6

-

-

... More
24M Road

-

-

-

... More
RCC Drain

-

-

-

... More
Drain Raft ( 2*0.15 = 0.3 )

202.8

-

-

... More
Deduct Approach Road

-9

-

-

... More
Drain Wall ( 2*0.9 = 1.8)

1216.8

-

-

... More
Deduct Approach Road

-54

-

-

... More
Top Slab

1014

-

-

... More
Deduct Approach Road

-45

-

-

... More
Median Kerb Wall

-

-

-

... More
Raft ( 2*0.15 = 0.3 )

202.8

-

-

... More
Side Wall ( 2*1.2 = 2.4 )

1622.4

-

-

... More
Cross Utility Duct Chamber

-

-

-

... More
Raft ( 2*0.2 = 0.4 )

95.48

-

-

... More
Side Wall ( 4*0.9 = 3.6)

859.32

-

-

... More
Top Slab

453.53

-

-

... More
Utility Duct

-

-

-

... More
Raft (2*0.2=0.4)

270.4

-

-

... More
Side Wall (4*2.45=9.8)

1656.2

-

-

... More
Deduct for Cross Utility Duct Chamber

-35.64

-

-

... More
Top Slab

811.2

-

-

... More
Culvert

-

-

-

... More
Raft ( 2*0.2 = 0.4 )

12

-

-

... More
Side Wall ( 4*0.7=2.8)

84

-

-

... More
Top Slab

54

-

-

... More
For High Mass Footing

2.56

-

-

... More
Retaining Wall

-

-

-

... More
For 24m Road

-

-

-

... More
Shear Key ( 1.5*2 = 3)

357

-

-

... More
Foundation ( 0.75*2=1.5)

178.5

-

-

... More
Retaining Wall Stem ( 2*3.5 = 7)

833

-

-

21865.94

8062844

368.74

... More
Add Tp 4.98%

-

-

-

... More
Height above 3.5mtrs

-

-

-

... More
For 24m Road

-

-

-

... More
Retaining Wall Stem ( 2*3.5 = 7)

833

-

-

... More
Add Tp 4.98%

-

-

-

... More
Height 3.5 to 7.0 mtrs

-

-

-

... More
For 24m Road

-

-

-

... More
Retaining Wall Stem ( 2*3.5 = 7)

833

-

-

... More
Add Tp 4.98%

-

-

-

... More
Height 7.0 to 10.5 mtrs

-

-

-

... More
For 24m Road

-

-

-

... More
Retaining Wall Stem ( 2*3.5 = 7)

833

-

-

... More
Add Tp 4.98%

-

-

-

... More
Height 10.50 to 14.0 mtrs

-

-

-

... More
For 24m Road

-

-

-

... More
Retaining Wall Stem ( 2*3.5 = 7)

833

-

-

... More
Add Tp 4.98%

-

-

-

... More
Height 14.0 to 17.50 mtrs

-

-

-

... More
For 24m Road

-

-

-

... More
Retaining Wall Stem ( 2*3.5 = 7)

833

-

-

... More
Add Tp 4.98%

-

-

-

... More
Height 17.50 21.0 mtrs

-

-

-

... More
For 24m Road

-

-

-

... More
Retaining Wall Stem ( 2*0.5 = 1)

119

-

-

... More
Add Tp 4.98%

-

-

-

... More
KSRRB M2200-6. Providing TMT steel reinforcement Fe500 for R.C.C work including straightening, cutting, bending, hooking, palcing in position, lapping and / or welding wherever required, tying with binding wire and anchoring to the adjoining memebrs wherever necessary complete as per design (laps, hooks and wastage shall not be measured and paid) cost of materials, labour, HOM of machinery complete as per specifications. MORTH specification No 1600 & 2200

-

-

-

... More
Consider 75 Kgs/cum for item No. only RCC Drain Qty

77.56

-

-

... More
Consider110 Kgs/cum for item No. only RCC Duct and Culverts Qty

458.22

-

-

... More
For Retaining wall Qty consider 125kg/cum

362.58

-

-

... More
Pg No 229 It No 28.8.2 of PWD SR 2018-19

-

-

-

... More
Add Tp 4.98%

-

-

-

... More
Supplying and fixing 2mm thick perforated cable GI tray with on existing MS angle support using necessary GI bolts/nuts and washer or welding as required Size 450x75mm

-

-

-

... More
For utility duct racks

-

-

-

... More
for ducts& extra length

250

-

-

... More
Add Tp 4.98%

-

-

-

... More
Providing and laying/fixing cement base, precast, pre polished cement concrete, designer tiles 25mm thick for flooring conforming to IS 1237 heavy duty tiles for flooring, treads of steps and landing, laid on a bed of 12mm thick cement mortar 1:3 mis finished with flush pointing using white cement, including cost of materials, including cutting, griding the edge to half/full round wherever required, labour, curing complete as per specification

-

-

-

... More
For 60m wide road

-

-

-

... More
For footpath LHS& RHS

583.2

-

-

... More
deduct chambers

-25.2

-

-

... More
For 24m wide road

-

-

-

... More
For footpath LHS& RHS

456.3

-

-

... More
deduct chambers

-19.8

-

-

... More
Pg No 112 It No 14.62 of PWD SR 2018-19

-

-

-

... More
Add Tp 4.98%

-

-

-

... More
Supplying of Red soil (New Earth Filling):Supplying of Good quality Red soil for Gardening and Growing of plants shrubs etc.,including the %weightage given to B.B.M.P.area

-

-

-

... More
for 24m wide road

912.6

-

-

... More
for 60m wide road

1166.4

-

-

... More
Rate from revised schedule of Rates Landscape Development works

-

-

-

... More
Add Tp 4.98%

-

-

-

... More
Planting of Shrubs in Isolated plants aigging of pits of size 0.45mX0.45mX0.45m and Filling up to 50% of the pits top excavated soil and Remaining 50% withmixture of sand (0.07cum),Fym(0.014cum),Red earth(0.021 cum)(i.e in the proportion of 1:2:3 & planting with well established plants.exclusive of cost of plants & inclusive of ingredients

-

-

-

... More
24m wide road at every 3.0m

230

-

-

... More
60m wide road at every 3.0m

300

-

-

... More
Rate from revised schedule of Rates Landscape Development works

-

-

-

... More
Add Tp 4.98%

-

-

-

... More
Planting of Trees a.)Cost of the plant 5' to 10' hieght

-

-

-

... More
24m wide road at every 3.0m

230

-

-

... More
60m wide road at every 3.0m

450

-

-

... More
Rate from revised schedule of Rates Landscape Development works

-

-

-

... More
Add Tp 4.98%

-

-

-

... More
Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with Disposal KSRRB M300-14. Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location and complete as per specifications. MORTH Specification No.301

-

-

-

... More
For Roads

-

-

-

... More
As per Earthwork calculation sheet

595700.12

-

-

... More
60M wide road including

4328.64

-

-

... More
24M wide road

-

-

-

... More
As per Earthwork calculation sheet

104396.04

-

-

... More
Main road from 60-291

1081.08

-

-

... More
As per Earthwork calculation sheet

-

-

-

... More
Existing Approach Road to 9A

326.48

-

-

... More
For 60m road

-

-

-

... More
Foundation for RW

-

-

-

... More
For Toe

-

-

-

... More
shear key

-

-

-

... More
RW around the temple

-

-

-

... More
For Toe

-

-

-

... More
shear key

-

-

-

... More
For 24m road

-

-

-

... More
Foundation for RW

4284

-

-

... More
For Toe

892.5

-

-

... More
shear key

178.5

-

-

... More
Deduct 45% for Soft rock

-321751.51

-

-

... More
Deduct 5% for Hard rock

-35750.17

-

-

... More
Pg No 143 It No 19.15 of PWD SR 2018-19

-

-

-

... More
Add Tp 4.98%

-

-

-

... More
KSRRB 300-5. Excavation in soft rock with blasting for formation of roads including stacking neatly, to uniform line and level including cost of explosives, labour, HOM of machineries and equipments complete as per specifications. (with all lead and lift) MORTH / Chapter 3

-

-

-

... More
For Roads

-

-

-

... More
Pg No 143 It No 19.5of PWD SR 2018-19

-

-

-

... More
Add Tp 4.98%

-

-

-

... More
KSRRB 300-7. Excavation in hard rock by blasting for formation of roads including stacking to uniform line and level as directed by the engineer including cost of explosives, labour, HOM of machineries and equipments complete as per specifications. (with all lead and lift) MORTH / Chapter 3

-

-

-

... More
For Roads

-

-

-

... More
Pg No 143 It No 19.7of PWD SR 2018-19

-

-

-

... More
Add Tp 4.98%

-

-

-

... More
KSRRB 300-Compaction KSRRB 300-58. Compaction of original ground with maximum of 6 passes of 8 to 10 tonnes power roller including filling in depression occuring during rolling including cost of all labour, HOM of machinery complete as per specifications. MORTH / Chapter 3

-

-

-

... More
For road

-

-

-

... More
for 60m road

7214.4

-

-

... More
For 24m road

2636.4

-

-

... More
Approach Road to 9A

6360

-

-

... More
Pg No 8 It No 19.64of PWD SR 2018-19

-

-

-

... More
Add Tp 4.98%

-

-

-

... More
KSRRB M300-Construction of Embankment with Material deposited from Roadway cutting. KSRRB M300-54. Construction of embankment with approved material deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Table 300-2 complete asper specifications.which includes , watering charges & compaction by vibratory roller) MORTH Specification No. 305

-

-

-

... More
For 60m road

-

-

-

... More
AS per earth work calculation sheet

16064.25

-

-

... More
For 24m road

-

-

-

... More
from 0-60 E/w direction as per earth work calculation sheet

14786.82

-

-

... More
for 60m road

-

-

-

... More
For 24m road

-

-

-

... More
For Existing Approach Road As per Earth Work Calculation Sheet

9271.54

-

-

... More
Retaining Wall @ 60 M, 24M & Around the Temple

-

-

-

... More
60M Road

-

-

-

... More
24M Road

5890.5

-

-

... More
Around Temple

-

-

-

... More
For Shoulders at Sides of Road

-

-

-

... More
For 60M Road

549.5

-

-

... More
For 24M Road

429.94

-

-

... More
Pg No 147 It No 19.61of PWD SR 2018-19

-

-

-

... More
Add Tp 4.98%

-

-

-

... More
KSRRB M400-6.2: Construction of granular sub-base Grading-V as sub base and drainage layer by providing course graded crushed aggregates of granite/trap/basalt/ material mixing in a mechanical mix plant at OMC, carriage of mixed material to work site,dpreading in uniform layers with motor grader on prepeared surface and compacting with vibratory roller to achieve the desired density, complete as per specifications. A Plant Mix methad For Grading II Material (P.No.153, I.No.20.5of PW,P&IWTD SR 2018-19)

-

-

-

... More
60.0M wide road

-

-

-

... More
Main carriage way

1213.06

-

-

... More
24.0 wide road

-

-

-

... More
Main carriage way

492.8

-

-

... More
Existing Approach Road

744.12

-

-

... More
Approach road for 24M

42.12

-

-

... More
Approach road for 60M

91.26

-

-

... More
Pg No 153 It No 20.5 PWD SR 2018-19

-

-

-

... More
Add Tp 4.98%

-

-

-

... More
Providing, laying, spreading and compacting crushed stone aggregates of granite / trap / basalt to wet mix macadam specifications including pre mixing the material with water at OMC in mechanical mix plant carriage of mixed method of tipper to site, laying in uniform layers with paver in sub-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density complete as per specifications. MORTH Specification No. 406

-

-

-

... More
60.0M wide road

-

-

-

... More
Main carriage way

1620

-

-

... More
below footpath

86.4

-

-

... More
24.0 wide road

-

-

-

... More
Main carriage way

684.45

-

-

... More
below footpath

84.5

-

-

... More
Existing Approach Road

1033.5

-

-

... More
Approach road for 60M

126.75

-

-

... More
Approach road for 24M

58.5

-

-

... More
Pg No 155 It No 20.18 of PWD SR 2018-19

-

-

-

... More
Add Tp 4.98%

-

-

-

... More
KSRRB M500-6. Providing and applying primer coat with S.S. bitumen emulsion on prepared surface of granular base such as WMM including cleaning of road surface and spraying primer at the rate of 0.60 kg / sqm using mechanical means complete as per specifications. MORTH Specification No. 502

-

-

-

... More
60.0M wide road

-

-

-

... More
Service road& cycle track area

6480

-

-

... More
24.0 wide road

-

-

-

... More
Main carriage way

2535

-

-

... More
Entrance road

-

-

-

... More
Main carriage way

3975

-

-

... More
Approach road for 60M

487.5

-

-

... More
Approach road for 24M

234

-

-

... More
Pg No 158 It No 21.6 of PWD SR 2018-19 & Issue Rates as on 01.01.2021

-

-

-

... More
Add Tp 4.98%

-

-

-

... More
KSRRB 500-7. Providing and applying tack coat using 80/100 grade bitumen(VG10) on the prepared black topped surfaces at 2.5 kg per 10 sqm, heating bitumen in boiler fitted with spray set (excluding cleaning of road surface) including cost of all materials, labour, HOM of machineries complete as per specifications. MORTH/Chapter 5

-

-

-

... More
FOR DBM

-

-

-

... More
60.0M wide road

-

-

-

... More
Service road& cycle track area

6480

-

-

... More
24.0 wide road

-

-

-

... More
Main carriage way

2535

-

-

... More
Entrance road

-

-

-

... More
Main carriage way

3975

-

-

... More
Final Rate

487.5

-

-

... More
Approach road for 24M

225

-

-

... More
FOR BC

-

-

-

... More
60.0M wide road

-

-

-

... More
Service road& cycle track area

6480

-

-

... More
24.0 wide road

-

-

-

... More
Main carriage way

2535

-

-

... More
Entrance road

-

-

-

... More
Main carriage way

3975

-

-

... More
Approach road for 60M

487.5

-

-

... More
Approach road for 24M

225

-

-

... More
Pg No 158 It No 21.7 of PWD SR 2018-19 Issue Rates as on 01.01.2021

-

-

-

... More
Add Tp 4.98%

-

-

-

... More
KSRRB M500-17. Providing and laying dense graded bituminous macadam using crushed aggregates of specified grading, premixed with VG30 grade bituminous binder and, transporting the hot mix to work site, laying to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH table 500-10 complete in all respects complete as per specifications.. MORTH Specification No. 507 - using 40/60 TPH capacity H.M.P. with Mechanical paver Gr-II (50 mm to 75 mm) with 4.5 % VG-30 Bitumen

-

-

-

... More
for DBM

-

-

-

... More
60.0M wide road

-

-

-

... More
Service road& cycle track area

388.8

-

-

... More
24.0 wide road

-

-

-

... More
Main carriage way

152.1

-

-

... More
Entrance road

-

-

-

... More
Main carriage way

238.5

-

-

... More
Approach road for 60M

29.25

-

-

... More
Approach road for 24M

14.04

-

-

... More
Pg No 160 It No 21.17.6 of PWD SR 2018-19 Issue Rates as on 01.01.2021

-

-

-

... More
Add Tp 4.98%

-

-

-

... More
Providing and laying bituminous concrete 40mm thick with hot mix plant, using crushed aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site, laying with a paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction in all respects complete as per specifications. Clause 507 of MORTH V revision as per IRC SP-53-2015. – do – using 40-60 TPH capacity HMP with mechanical paver grading II (30-45mm) with 5.4 % of modified bituminus binder consisting of 4.97% of VG-30 bitumen (60/70 grade) and 0.43% of plastomeric thermoplastics (waste plastic)(KPWD SR 2018-19, Page No.162, Item No.21.78.12)

-

-

-

... More
60.0M wide road

-

-

-

... More
Service road& cycle track area

259.2

-

-

... More
24.0 wide road

-

-

-

... More
Main carriage way

101.4

-

-

... More
Entrance road

-

-

-

... More
Main carriage way

159

-

-

... More
Approach road for 60M

19.5

-

-

... More
Approach road for 24M

9

-

-

... More
Pg No 162 It No 21.78.12 of PWD SR 2018-19 & Issue Rates as on 01.01.2021

-

-

-

... More
Add Tp 4.98%

-

-

-

... More
Providing and fixing pre cast solid cement concrete kerb stones made out of CC 1:2:4 with top and bottom width 114 and 165 mm respectively, 400mm high and 450mm in length finished with CM 1:3 plastering and finishing cutting including formwork, curing, including cost of materials, labour charges of machinery, loading and unloading, lead and lift, transportation ete.,complete

-

-

-

... More
60.0M wide road

-

-

-

... More
for main rod

1920

-

-

... More
24.0M wide road

-

-

-

... More
for main rod

1502

-

-

... More
Pg No 27 It No 5.30 of PWD SR 2018-19

-

-

-

... More
Add Tp 4.98%

-

-

-

... More
KSRRB 800-1. Painting two coats after filling the surface with synthetic enamel paint in approved shades on new plastered concrete surfaces, with materials, labour complete as per specifications. MORTH Chapter 8

-

-

-

... More
60.0M wide road

-

-

-

... More
for main rod

302.4

-

-

... More
24.0M wide road

-

-

-

... More
for main rod

236.6

-

-

... More
Pg No 180 It No 24.1 of PWD SR 2018-19

-

-

-

... More
Add Tp 4.98%

-

-

-

... More
KSRRB M800-13.Road Marking with Hot Applied Thermoplastic Compound with Reflectrising Glass Beads on Bituminous Surface:- Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads at 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes complete as per specifications. MORTH Specification No. 803

-

-

-

... More
60.0M wide road

-

-

-

... More
for main rod

259.2

-

-

... More
24.0M wide road

-

-

-

... More
for main rod

102

-

-

... More
Approach Road

-

-

-

... More
for main rod

159

-

-

... More
Approach road for 60M

19.5

-

-

... More
Approach road for 24M

9

-

-

... More
Pg No 182 It No 24.15 of PWD SR 2018-19

-

-

-

... More
Add Tp 4.98%

-

-

-

... More
KSRRB M800-4. Direction and Place Identification Signs with size more than 0.9 sqm Size Board:-Manufacturing, supply and installation of retro- reflectorised cautionary, mandatory and informatory signboards made out of cube corner micro prismatic grade sheeting confirming to type XI standards of IRC :67:2012 specifications & fixed over 4 mm thick aluminium composite panel sheet having minimun 0.30 thick aluminium skin on both sides & fixed over a support frame of 25x25x3 mm MS angle and mounted on 75mm dia OR 75x75x6mm Mild steel angle of total height 2.70m with clear height of not less than 2.10 m from the ground level to the bottom of the sign board & 60 cm below ground level. The sign post should be painted with one coat of red oxide paint and white colour with brands of 30 cm height alternatively firmly fixed to the ground by means of foundation with M20 grade cement concrete of 45 cm x45 cm x 60 cm including cost & conveyance of all materials, equipment, machinery & labour with all leads and lifts, loading charges necessary for satisfactory completion of the work as directed by engineer in charge. 10 years warranty for retro reflective sheeting from the original sheeting manufacturer as per clause 6.9 in IRC 2012 & a certified copy of three years outdoor exposure report from an independent test lab for the product offered shall be obtained from the supplier.

-

-

-

... More
60.0m wide road

2.88

-

-

... More
24.0m wide road

1.44

-

-

... More
Approach Road

1.44

-

-

... More
Pg No 180 It No 24.4 of PWD SR 2018-19

-

-

-

... More
Add Tp 4.98%

-

-

-

... More
Supply and fixing of Retro Reflective Single Arrow Sign Road Name sign Board of size 1600mm X 900mm made out of retro reflective sheeting confirming to Type XI standards of ASTM D 4956-09 & as per IRC 672012 for full back grouind of blue colour & white letters and fixed over 4mm thick Aluminium Composite Material sheet having minimum 0.5mm thick Aluminium skin on both sides with back side painted grey colour and fixed over back support frame SS angle of 15mm X 20mm X 1.2mm, supported by 38mm OD stainless steel pipe all around in 304 grade and 2 nos of vertical posts of 50mm OD stainless ateel pipe of 202 grade firmly fixed to the ground by means of properly designed foundation of size 450mm X 450mm X 600mm in 1:1.5:3 ratio cement concrete . The background shall be blue in colour with letters and border in white, the item includes earthwork excavation, cost of all materials, loading unloading, lead, lift, transportation etc., complete as per direction of engineer incharge of the work clause 6.9 of IRC 67-2012 for type XI retro reflective sheeting from the sheeting manufacturer & certified copy of test reports from an independent test laboratory conforming to clause 6.7 of IRC 67-2012 including outdoor weather exposure report for the retro reflective sheeting offered shall be submitted by the contractor for technical qualification in the tender

-

-

-

... More
60.0m wide road

5.76

-

-

... More
24.0m wide road

5.76

-

-

... More
For Approach Road

5.76

-

-

... More
Pg No 190 It No 24.59 of PWD SR 2018-19

-

-

-

... More
Add Tp 4.98%

-

-

-

... More
KSRB 2.8 : Providing and Filling in foundation with granite / trap broken metal 100mm. and down size, with approved sand including hand packing, ramming, watering, including cost of all materials and labour with all lead and lift. complete as per specifications. specification. No. KBS

-

-

-

... More
for 60.0m road temple area

-

-

-

... More
retaining wall

-

-

-

... More
Foundation

-

-

-

... More
RW around the temple

-

-

-

... More
For Toe

-

-

-

... More
For 24 m Road

-

-

-

... More
retaining wall

202.3

-

-

... More
Foundation

14.28

-

-

... More
Total Qty

216.58

541855

2501.87

... More
Pg No 7 It No 2.15 of PWD SR 2018-19

-

-

-

... More
Add Tp 4.98%

-

-

-

... More
KSRB 4-1.2 : Providing and laying in position plain cement concrete of mix 1:3:6 with OPC cement @ 220kgs, with 40mm and down size graded granite metal coarse aggregates @0.892cum and fine aggregates @ 0.465cum machine mixed, machine mixed, concrete laid in layers not exceeding 15 cms. thick, well compacted, in foundation including cost of all materials, labour, HOM of machinery, curing complete as per specifications. Specification No. KBS 4.1, 4.2

-

-

-

... More
For 60m Road

-

-

-

... More
For 60 m Road around temple

-

-

-

-

-

-

... More
shear key

-

-

-

... More
RW around the temple

-

-

-

... More
For Toe

-

-

-

... More
For 24 m Road

-

-

-

151.73

-

-

... More
shear key

17.85

-

-

... More
Pg No 13 It No 4.2 of PWD SR 2018-19

-

-

-

... More
Add Tp 4.98%

-

-

-

... More
KSRRB M2200-5.12.Design mix M25 with OPC cement @ 340kgs, with 20mm and down size graded granite metal coarse aggregates @0.7cum and fine aggregates @ 0.47cum, with superplastisiser @3lts confirming to IS9103-1999 Reaffirmed-2008 - i) Upto 5m height

-

-

-

... More
Retaining wall

-

-

-

... More
retaining wall Shear key

-

-

-

... More
Foundtion

-

-

-

... More
For 24.0m road

-

-

-

... More
retaining wall Shear key

142.8

-

-

... More
Foundtion

758.63

-

-

... More
Up to 5m ht from ground

-

-

-

... More
retaining wall stem

-

-

-

... More
Retaining wall around temple

-

-

-

... More
retaining wall stem

-

-

-

... More
For 24.0m road

-

-

-

... More
retaining wall Shear key

-

-

-

-

-

-

... More
Up to 5m ht from ground

-

-

-

... More
retaining wall stem

-

-

-

... More
Pg No 227 It No 28.7.12 of PWD SR 2018-19

-

-

-

... More
Add Tp 4.98%

-

-

-

... More
KSRRB M2200-5.15. design mix M30 with OPC cement @ 360kgs, with 20mm and down size graded granite metal coarse aggregates @0.69cum and fine aggregates @ 0.46cum, with superplastisiser @3lts confirming to IS9103-1999 Reaffirmed-2008 - i) Upto 5m heigh

-

-

-

... More
for 60.0m road

-

-

-

... More
Above 5.0m hieght

-

-

-

... More
retaining wall stem

-

-

-

... More
For 24.0m road

-

-

-

... More
Up to 5m ht from Raft

714

-

-

... More
Up to 10m ht

595

-

-

... More
Pg No 228It No 28.7.15 of PWD SR 2018-19

-

-

-

... More
Add Tp 4.98%

-

-

-

... More
KSRRB M2200-5.12.Design mix M25 with OPC cement @ 340kgs, with 20mm and down size graded granite metal coarse aggregates @0.7cum and fine aggregates @ 0.47cum, with superplastisiser @3lts confirming to IS9103-1999 Reaffirmed-2008 -Above 10m hieght

-

-

-

... More
for 60.0m road

-

-

-

... More
Above 10.0m hieght

-

-

-

... More
retaining wall stem

-

-

-

... More
For 24.0m road

-

-

-

... More
Up to 15m ht

476

-

-

... More
Up to 18m ht

214.2

-

-

... More
Pg No 227 It No 28.7.12 of PWD SR 2018-19

-

-

-

... More
Add Tp 4.98%

-

-

-

... More
KSRRB M2200- Providing Weep Holes KSRRB M2200-8. Providing weep holes in Brick masonry / Plain / Reinforced concrete abutment, wing wall / return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications complete as per specifications MORTH Specification No.2706 & 2200

-

-

-

... More
weep holes at every

-

-

-

... More
at every 2m 7nos

-

-

-

... More
For 24.0m road

280

-

-

... More
Pg No 229 It No 28.10of PWD SR 2018-19

-

-

-

... More
Add Tp 4.98%

-

-

-

... More
Providing and laying of filter media with granular materials / stone crushed aggregates stisfying the requirements laid down in Clause 2500.4.2.2 of MORTH specificationsn to a thickness of not less than 600mm with similar size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wingwalland return wall to the full height compacted to a firm condition with all lead and lifts, loading and unloading charges, cost of all materials, labour, equipment etc, complete as per drawing and technical specification and directions of the engineer incharge of work

-

-

-

... More
Retaining Wall @ 60M Road

-

-

-

... More
Around the Temple

-

-

-

... More
@ 24M Road

803.25

-

-

... More
Pg No 229 It No 28.10of PWD SR 2018-19

-

-

-

... More
Add Tp 4.98%

-

-

-

... More
Supplying and fixing M.S. Rectangular poles made out of 2 equal angles of 65x65x6 mm welded together and fixed in CC (1:2:4) WITH 2 NOS 16mm dia M.S. hold fast rods each of length 25 cms. Including cost of all materials cutting, bending scaffolding wherever necessary, nicely finishing the welded joints with all lead lifts and as per the directions of the Engineerin - charge of the work and including providing 2 coats of approved quality paint over one coat of shop painting ( excluding cost of earthwork and concrete),(P.No.214, I.No.37.2of PW,P&IWTD S.R S.R 2018-19)

-

-

-

... More
Chain link fencing

-

-

-

... More
at every 2m 145/2=76

-

-

-

... More
Add Tp 4.98%

-

-

-

... More
Providing chain link fencing 50mm size of 8 guage properly stretched between existing rectangular poles and fixed with suitable bolts & nuts, the free ends shall be welded to the pole and block pipe at top and bottom as required including cost of all materials, labour, lead and lifts and as per the directions of the Engineer-in-charge of work including two coats of approved quality paint over one coat of shop paint(P.No.226 , I.No.37.3 of PW,P&IWTD S.R S.R 2018-19)

-

-

-

... More
Chain link fencing

-

-

-

... More
Add Tp 4.98%

-

-

-

... More
Providing and fixing M.S. Block pipe of 38mm dia, of heavy guage of 14 including removing the bends, cutting the pipe, and fixing pipe in between the existing two verticle poles (M.S. rectangular poles) and spot welding the chain link with M.S. block pipe including cost of all materials wastage in cutting, and scaffolding wherever necessary with all lead and lift as directed by the Engineer-in-charge of work etc., complete including two coats of approved quality paint over one coat of shop paint.(P.No.218 , I.No.37.4 of PW,P&IWTD S.R 2018-19)

-

-

-

... More
Chain link fencing

-

-

-

... More
Add Tp 4.98%

-

-

-

... More
Providing and constucting pithcing / Revetment of 30 cm thick on slopes using granite/basalt/trap/stones of surface area not less than 0.04 sqm and wedged with spalls including cost of all materials, labour etc., complete as per specification. ---- With all lead and lifts, loading and unloading charges, cost of all material, Labour, Equipment etc., Complete the work as per specification and direction of the engineer of incharge of work

-

-

-

... More
Pitching

-

-

-

... More
Pg No 229 It No 34.14 of PWD SR 2018-19

-

-

-

... More
Add Tp 4.98%

-

-

-

... More
KSRRB M100-4.2. Haulage of materials by tipper excluding cost of loading, unloading and stacking complete as per specifications. MORTH -100/ Chapter 1 Case-II : Unsurfaced Gravelled Road

-

-

-

... More
same as drain exavation qty

17421.02

-

-

... More
Same as Earthwork Quantity It no 14

715003.37

-

-

... More
Deduct embankment Qty

-46992.55

-

-

... More
Pg No 136 It No 17.15 of PWD SR 2018-19

-

-

-

... More
Add Tp 4.98%

-

-

-

... More
A.CivilTotal Construction Cost

-

375954493

-

... More
Sub Total

-

389477843

-

... More
Add GST 12%

-

46737341

-

... More
Sub Total

-

436215184

-

... More
The workspot was inspected and work is found to be necessary.

-

-

-

... More
The area comes within the BMRDA limits.

-

-

-

... More
The rates adopted based on the PWD SR, Bangalore circle for year 2018-19 and Issue Rates as on 01-01-2021.& KPWD Ele SR 19-20

-

-

-

... More
The provisions made in the estimate are necessary and essential.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.