Public Works Department Tender

Karnataka, also known as Karunadu, is a state in the southwestern region of India. Karnataka was formed originally as Mysore State on 1st November 1956 and currently is the biggest state in south India. Its capital and largest city is Bengaluru. It covers an area of 191,791 km2 (74,051 sq mi) and is the sixth largest state by area comprising 31 districts. Karnataka is also a state of multiple languages; Kannada being the official and most widely spoken language in Karnataka. Other languages spoken in the state include Tamil, Telugu, Malayalam, Kodava, Konkani and much more.Karnataka tenders are issued by the government of Karnataka, public & private sector organisations. The state government issues majority of the Karnataka tenders, which are for goods and services including construction, road and bridge construction, IT services, engineering services, medical services, educational services amongst many others. Bidassist is one of the largest eprocurement portals, which offers all government tenders from across the world in one place. Bidassist offers information on all Karnataka tenders and other state and authority tenders in no time. Bidassist is a platform where users can look for various Karnataka tenders as well as other tenders.

Public Works Department - PWD Tender

Civil And Construction
Building Construction
Opening Date14 Mar 2024
Closing Date30 Mar 2024
Tender Amount₹ 4,13,23,539.78 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Chapter 1 vol- 1P.No.9-1.15.2 - Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work-In ordinary/soft rock without blasting Depth exceeding 1.5 m, but not exceeding 3 m ---- including cost of all materials, labour, HOM, I

242.49

446

108211.1625

... More
Chapter 4 vol- 2P.No.5-4.1) - Providing and injecting chemical emulsion for Pre-constructional Anti-Termite Treatment, creating continuous chemical barrier under and around the column pits, walls, trenches, basement excavation, top surface of the plinth filling, junction of wall and floor, along the external perimeter of building, expansion joints, over the top surface of consolidated earth on which apron is to be laid, surrounding of pipes and conduits with Chlorpyriphos 20% E.C. / Lindane 20% E.C. @ 3.19 l/m2 including cost of chemical, diluting in water to one percent concentration, labour, usage charges of machinery, complete as per specifications. ---- including cost of all materials, labour, HOM, I

1648.77

123

204282.603

... More
Chapter 2 vol- 1 P.No.15-2.1.4 - Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:3:6 Using 20 mm nominal size graded crushed coarse aggregates ---- including cost of all materials, labour, HOM, I

213.4

6527

1393043.19

... More
Vol-1 Formwork Pg No 111 SI No. 1a of 2023-24 - Providing and removing centering, shuttering, strutting, propping etc., and removal of form work for foundations, footings, bases of columns for mass concrete including cost of all materials, labour complete as per specifications.FOUNDATION UP TO PLINTH=8% OF CONCRETE QNTY ---- including cost of all materials, labour, HOM, I

432.93

532

230414.0046

... More
Vol-1 Formwork Pg No 111 SI No. 2 of 2023-24 - Providing and removing centering, shuttering, strutting, propping etc., and removal of form work for foundations, footings, bases of columns for mass concrete including cost of all materials, labour complete as per specifications.Plinth Beams=50% OF CONCRETE QNTY ---- including cost of all materials, labour, HOM, I

39.52

3326

131459.328

... More
Vol-1 Formwork Pg No 112 SI No. 11 of 2023-24 - Providing and removing centering, shuttering, strutting, propping etc., and removal of form work for vertical surface such as walls at any thickness, including attached pilasters, buttresses, plinth cills and string courses cost of all materials, labour complete as per specifications.RETAINING STRUCTURES=10% OF CONCRETE QNTY ---- including cost of all materials, labour, HOM, I

4.05

718

2910.006

... More
Vol-1 Formwork Pg No 112 SI No. 14 of 2023-24 - Providing and removing centering, shuttering, strutting, propping etc., and removal of form work for sides and soffits of beams, beam haunchings, cantilever girders, bressumers and lintels not exceeding 1m in depth including cost of all materials, labour complete as per specifications.BEAMS AND LINTEL=60% OF CONCRETE QNTY ---- including cost of all materials, labour, HOM, I

75.46

4311

325314.8514

... More
Vol-1 Formwork Pg No 112 SI No. 15 of 2023-24 - Providing and removing centering, shuttering, strutting, propping etc., and removal of form work for suspended floors, landings,balconies and likes, thickness upto 200 mm including cost of all materials, labour complete as per specifications for heights more than 3.50m from ground level.Roof (Straight & Arched)=50% ---- including cost of all materials, labour, HOM, I

119.54

3592

429457.0132

... More
Vol-1 Formwork Pg No 112 SI No. 14 of 2023-24 - Providing and removing centering, shuttering, strutting, propping & removal of form work etc., for edges of slabs and breaks in floor including cost of all materials, labour complete as per specifications.BEAMS AND LINTEL=60% OF CONCRETE QNTY ---- including cost of all materials, labour, HOM, I

4.4

4311

18968.796

... More
Vol-1 Formwork Pg No 112 SI No. 15 of 2023-24 - Providing and removing centering, shuttering, strutting, propping etc., and removal of form work for Stairs (excluding landing) except spiral staircase including cost of all materials, labour complete as per specificaiton. RCC Roof Slabs ---- including cost of all materials, labour, HOM, I

21.17

3592

76054.9186

... More
Vol-1 Formwork Pg No 112 SI No. 19 of 2023-24 - Providing and removing centering, shuttering, strutting, propping etc., and removal of form work for chajja, corbels etc., including edges including cost of all materials, labour complete as per specificationsChejjas, Canopy & Other Architectural projections of minor sections=45% ---- including cost of all materials, labour, HOM, I

1.82

3132

5701.4776

... More
vol-1P.No.15-2.2.3 - Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finishedlayers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- including cost of all materials, labour, HOM, I

472.81

6652

3145510.368

... More
vol- 1P.No.16-2.5.2 - Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- including cost of all materials, labour, HOM, I

256.15

7185

1840476.1725

... More
vol- 1P.No.16-2.5.1 - Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- including cost of all materials, labour, HOM, I

1.83

6961

12739.545

... More
vol- 1P.No.18-2.11 A - Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification ---- including cost of all materials, labour, HOM, I

57.35

93929

5386876.8975

... More
vol- 2 P.No.9-5.4 - Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) ---- including cost of all materials, labour, HOM, I

5.43

6708

36426.8835

... More
vol- 2P.No.17-6.32 - Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. ---- including cost of all materials, labour, HOM, I

589.54

1375

810912.27

... More
vol- 2P.No.17-6.34 - Providing and constructing load bearing wall with Solid Concrete blocks of size 400x100x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications ---- including cost of all materials, labour, HOM, I

38.7

1159

44861.04

... More
vol- 2P.No.43-8.16.3 - Providing and fixing suitable plaster mesh 100mm wide manufactured out of hot dipped galvanised iron of nominal thickness 0.35mm with a zinc coating of 120g/m2 width, along route of walls chipped for services, junction between RCC and brick walls including cost of materials, labour for fixing complete as per specifications. ( length of mesh only be measured for paymentPlaster mesh 100mm wide ---- including cost of all materials, labour, HOM, I

1455.06

46

67223.772

... More
vol- 2P.No.41-8.1.2 - Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- including cost of all materials, labour, HOM, I

913

253

231034.65

... More
vol- 2P.No.42-8.9 - Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) and a top layer 6 mm thick cement plaster with cement mortar 1:3 (1 cement : 3 coarse sand) finished rough with sponge to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge ---- including cost of all materials, labour, HOM, I

691.5

404

279538.875

... More
vol- 2 P.No.41-8.2.1 - Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- including cost of all materials, labour, HOM, I

412.89

309

127892.6775

... More
vol- 2 P.No.50-8.51 - Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- including cost of all materials, labour, HOM, I

1759.17

105

184712.85

... More
vol- 2P.No.46-8.30 - Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge ---- including cost of all materials, labour, HOM, I

691.51

182

126338.877

... More
vol- 2 P.No.48-8.39 - Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge ---- including cost of all materials, labour, HOM, I

913

133

121748.55

... More
vol- 2P.No.48-8.39 - Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- including cost of all materials, labour, HOM, I

846.16

133

112835.436

... More
vol- 2 P.No.64-9.30 - Providing and laying flooring and steps fine machine polished granite stone slabs 20 mm thick on cement mortar bed 1:6, 20 mm thick, and joints finished with cement mortar 1:3 over existing cement concrete bed , including cost of materials, mortar, labour, curing complete as per specifications ---- including cost of all materials, labour, HOM, I

84.88

5594

474852.672

... More
vol- 2P.No.63-9.24 - Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. MORTH/Chapter 9 vol- 2 (PWD SR 2023-24/P.No.63/9.24) ** Polished Granite stone slab Black, Cherry Red, Brown, Cat Eye, River Pink or equivalent. ---- including cost of all materials, labour, HOM, I

425.73

2994

1274891.058

... More
Vol-2 Pg.no 72 It No. 10.19 - Providing and fixing 20mm thick gang saw water cut Lakared granite for cladding in CM 1:3 (1 cement : 3 coarse sand) proportion with a coat of rough plastering using CM 1:4 (1 cement : 4 fine sand), cut to required shape, pattern with paper joints, finished with cement mortar using white cement and colour pigments to match the colour of slab making through jointing with sealant, grooves in joints including cost of curing etc., complete including cost and conveyance of all materials, mortar, labour for all items of work, usage charges of machinery etc., complete as per specification ---- including cost of all materials, labour, HOM, I

75.67

3787

286588.7745

... More
Approved by SE Vide ltr No 1598 Dt.13.09.2023 - Providing half nosing for 20mm thick granite slab using required machinery including cost and conveyanceof all materials, labour for all items of work, HOM of equipment etc., complete as per specification ---- including cost of all materials, labour, HOM, I

700.72

180

126129.6

... More
vol- 2 P.No.61-9.17.3 - Providing and laying Vitrified tiles in different sizes (thickness to bespecified by manufacturer), with water absorption less than 0.08 % andconforming to I.S. 15622, of approved make, in all colours & shade, over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joint with white cement & matching pigments etc. complete. Size of Tile 800x800 mm ---- including cost of all materials, labour, HOM, I

297.32

1351

401783.382

... More
vol- 2 P.No.60-9.11 - Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in all colours, shades, except White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick bed of cement mortar 1:4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including pointing the joints with white cement and matching pigments etc., complete ---- including cost of all materials, labour, HOM, I

36.12

933

33716.214

... More
Approved by SE Vide ltr No 1598 Dt.13.09.2023 - Providing and laying plat form using prepolished water cut/gang saw 40mm thick telephonic Black granite. Laid on existing vertical supports and fixing in CM 1:3 proporation. Including cutting to required shape, pattern with paper joints, including full rounding for nosing, finished with cement mortar, painted with colour pigments to match the colour of slab making through jointing with sealant, making holes 25mm x 12mm grooves in joints including curing ---- including cost of all materials, labour, HOM, I

12.1

3524

42640.4

... More
vol- 2 P.No.71-10.14 - Providing and fixing 1st quality ceramic glazed wall tiles conforming to IS: 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer- in-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg per m2, including pointing in white cement mixed with pigment of matching shade complete ---- including cost of all materials, labour, HOM, I

79.6

1161

92439.48

... More
vol- 2 P.No.99-12.10 - Providing Teak wood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps ), but including cost of materials, labour, usage charges complete as per specifications ---- including cost of all materials, labour, HOM, I

0.15

247431

37114.7175

... More
vol- 2 PWD SR 2023-24-P.No.100-12.14 - Providing and fixing in position fully panelled Teak wood shutters for doors with stiles and rails of 40mm. thick with bottom and lock rails 180mm wide top rail and stiles 100mm wide as per drawing and panels of 25mm thick including cost of materials, labour, usage charges complete as per specifications. (excluding cost of fixtures) ---- including cost of all materials, labour, HOM, I

6.48

9800

63508.536

... More
vol- 2 P.No.54-8.82 - Polishing in high gloss/matt finish melamine clear polish on wood work in required color/wooden shade texture ---- including cost of all materials, labour, HOM, I

6.48

622

4034.772

... More
vol- 2 PWD SR 2023-24-P.No.99-12.11 - Providing Honne wood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications ---- including cost of all materials, labour, HOM, I

0.78

144977

113082.606

... More
vol- 2 P.No.105-12.57.7 - Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification-do- 40 mm thick both side Teak ---- including cost of all materials, labour, HOM, I

32.76

5208

170614.08

... More
Approved by SE Vide ltr No 1598 Dt.13.09.2023 - Providing and fixing engineered wood door frame of requires size fabricated using Wood Plastic Composites profiles (WPC) of cross section 55 mm X 110 mm with a density of 1250-1300 kg/m3, resistant to water, termite, fungal and UV, using four numbers of L shaped MS or plastic clamps at the corners of the frame to fix it firmly to form a rectangular shape door frame and provided with six numbers of 260mmx25mmx5mm size z shaped MS flat hold fasts for fixing the door frame in the wall and the material and process for manufacturing the door frame confirming to Designs and Specifications including all costs of labour, materials, fabrication, assembling, transportation, erection, incidental and unforeseen charges complete as per the directions of the engineer in charge of the work, but excluding the cost of fixtures and painting. ---- including cost of all materials, labour, HOM, I

11.7

700

8190

... More
Approved by SE Vide ltr No 1598 Dt.13.09.2023 - Providing and fixing engineered coir composite flush door shutter manufactured using infill solid core with coir and wood particle blended with high quality polymer encased with 28mm thick wooden styles and rails all-round the boundary of the shutter and veneer laminated with non oven coir felt impregnated with high temperature cure phenol formaldehyde resin of density 800kg/cum with high quality adhesive processed at 155 Deg.C , using 650 tonnage hot compression moulding press and all four sides of the door shutter coated with water resistant coating and whole process of manufacturing confirming to Designs and Specifications including all costs of labour, materials, fabrication, assembling, transportation, erection, incidental and unforeseen charges complete as per the directions of the engineer in charge of the work , but excluding the cost of fixtures and painting. ---- including cost of all materials, labour, HOM, I

4.32

2000

8640

... More
vol- 2 P.No.104-12.51 - Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. ---- including cost of all materials, labour, HOM, I

11

1066

11734.8

... More
vol- 2 P.No.110-12.90 - Providing & fixing of 3-track x2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016)sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets-grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 108mm width x45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mmx 75mm with GI reinforcement of 2mm and mesh sash of size 37mm x58mm. Coextruded Glazing bead for fixing of glass shall be of size 20mmx24 mm. Windows shall be provided with 6mm plain float glass, standard hardware& Multi point locking system with touch lock. Wall thickness of frame & sash shall be of 2mm-2.5mm. Maximum possible size2419mm x 2200mm. (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- including cost of all materials, labour, HOM, I

58.5

7070

413635.95

... More
vol- 2 P.No.109-12.85 - Providing & fixing of louvered ventilator made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm.Maximum possible size1000mm x 1000mm.(The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- including cost of all materials, labour, HOM, I

8.55

6004

51342.3225

... More
vol- 2 SR 2023-24-P.No.86-11.34B - Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings / wooden frames with rawl plugs screws etc ---- including cost of all materials, labour, HOM, I

1408.05

192

270556.8075

... More
vol- 2 SR 2023-24-P.No.48-8.40 - Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge ---- including cost of all materials, labour, HOM, I

67.05

120

8096.2875

... More
vol- 2 SR 2023-24-P.No.50-8.55.1 - Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound) content. With ready mixed pink or grey primer on wood work (hard and soft wood) having VOC content less than 50 grams/ litre as per specifications and as per directions of Engineer in charge. ---- including cost of all materials, labour, HOM, I

78.62

58

4622.856

... More
vol- 2 SR 2023-24-P.No.48-8. - Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- including cost of all materials, labour, HOM, I

78.62

120

9493.365

... More
vol- 2 SR 2023-24-P.No.85-11.28 - Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in- charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- including cost of all materials, labour, HOM, I

238.45

593

141460.4625

... More
vol- 2 SR 2023-24-P.No.63-9.25 - Providing and laying 60mm thick factory made cement concrete paver block of approved shape and colour of M -30 grade made of C&D waste by block making machine with vibratory compaction laid in required pattern and including over 50mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge ---- including cost of all materials, labour, HOM, I

138.44

840

116289.6

... More
Approved by SE Vide ltr No 1598 Dt.13.09.2023 - KSRB 4-2.12 : Extra for providing throating or drip moulding to R.C.C. chajja with plastering ( labour charges only ) as per specifications. Specification No. KBS-4.21 ---- including cost of all materials, labour, HOM, I

142.84

33

4713.72

... More
Approved by SE Vide ltr No 1598 Dt.13.09.2023 - KSRRB M100-1 & M100-4.1. Conveying by Loading and unloading of moorum/debris. Placing tipper at loading point, loading with front end loader, dumping, turning for return trip, including time for haulage and return trip complete as per specifications. MORTH-100-4.1/Chapter 1. Case-I : Surface Road. ---- including cost of all materials, labour, HOM, I

2853.99

59

168385.41

... More
Approved by SE Vide ltr No 1598 Dt.13.09.2023 - KSRB 2.5 : Earthwork excavation in all soil deposits and filling sides of foundation upto plinth in layers not exceeding 20cms. in depth, compacting each deposited layer by ramming after watering with all lead and lift including cost of all labour complete as per specifications. specification. No. KBS 2.9.9 / 2.9.10.1 / 2.1.1 ---- including cost of all materials, labour, HOM, I

3071.52

403

1237822.56

... More
PWD SR 2023-24-P.No.A25 - 448 Honne wood beading 20x20 mm ---- including cost of all materials, labour, HOM, I

79.2

57

4573.8

... More
vol- 5 SR 2023-24-P.No.188-16.3.5 - Providing S&S RCC SPUN / VIBRATED CAST PIPES (REINFORCED) pipes NP-3 Class conforming to IS:458-1988 with latest amentments using ordinary portland cement, for sanitary works and conveying to work site, rolling and lowering into trenches, laying true to line and level including loading and unloading at both destinations and jointing of pipes and specials, perfect linking of joints with jack to correct position including cost of jointing materials, i.e, rubber rings conforming to IS: 5382 for S&S RCC pipes, with all leads and lifts as directed and giving necessary hydraulic test as per ISS to the required pressure and commissioning etc. complete. (Contractor will make his own arrangements for procuring water for testing). Before the execution of the work, the contractor shall carry out the survey RCC NP3 Class pipe of 450 mm dia. ---- including cost of all materials, labour, HOM, I

20

2470

49413

... More
vol- 2 SR 2023-24-P.No.127-13.55 - Constructing brick masonry chamber for underground C.I. inspection chamber and bends with bricks in cement mortar 1:4 (1 cement : 4 coarse sand) C.I. cover with frame (light duty) 600X850 mm internal dimensions, total weight of cover with frame to be not less than 38 kg (weight of cover 23 kg and weight of frame 15 kg), R.C.C. top slab with 1:1.5:3 mix (1 cement : 1.5 fine sand : 3 graded stone aggregate 20 mm nominal size), foundation concrete 1:5:10 (1 cement : 5 fine sand : 10 graded stone aggregate 40 mm nominal size), inside plastering 12 mm thick with cement mortar 1:3 (1 cement : 3 coarse sand), finished smooth with a floating coat of neat cement on walls and bed concrete etc.complete as per standard design: Inside dimensions 600x 850 mm and 45 cm deep for pipe line with three or more inlets : With common burnt clay (non modular) bricks of class designation3.5 MORTH/Chapter 13 ---- including cost of all materials, labour, HOM, I

2

7771

15542.1

... More
Vol-1 Formwork Pg No 111 SI No. 9 of 2023-24 - Providing and removing centering, shuttering, strutting, propping etc., and removal of form work for columns, pillars, post and struts, square / rectangular/ polygon in plan including cost of all materials, labour complete as per specifications COLUMNS=70% OF CONCRETE QNTY ---- including cost of all materials, labour, HOM, I

31.68

5029

159338.0448

... More
Approved by SE Vide ltr No 1598 Dt.13.09.2023 - Mortice Lock Make: Silver Satin (SS). ---- including cost of all materials, labour, HOM, I

10

1030

10300

... More
Approved by SE Vide ltr No 1598 Dt.13.09.2023 - SS/BRASS Handle Make: Silver Satin , SEP Type of size 8" inch hole to hole size, (total size 8.5inch) anti rust anti-corrosion ---- including cost of all materials, labour, HOM, I

10

1496

14960

... More
Approved by SE Vide ltr No 1598 Dt.13.09.2023 - SS/Antique Bolt 300mm Long Godrej tower bolt SS 300mm. ---- including cost of all materials, labour, HOM, I

20

450

9000

... More
Approved by SE Vide ltr No 1598 Dt.13.09.2023 - SS/Antique Hinges 8" heavy duty SS Seamless butt door hinges of size 8"x1.5"x3mm finish brass antique made with high glass precision.Fire resistant and rust free. ---- including cost of all materials, labour, HOM, I

80

175

14000

... More
Approved by SE Vide ltr No 1598 Dt.13.09.2023 - MS Hold fast Make: MS hold fast wih 12-14 mm gauge and 6" in length ---- including cost of all materials, labour, HOM, I

80

50

4000

... More
Approved by SE Vide ltr No 1598 Dt.13.09.2023 - Magnetic catch Make: MDC SS304, and PVC with Brown or Ivory ---- including cost of all materials, labour, HOM, I

20

110

2200

... More
Approved by SE Vide ltr No 1598 Dt.13.09.2023 - SS/Antique Alldrop Make: brass antiquealdrop 300mm thick ---- including cost of all materials, labour, HOM, I

10

1200

12000

... More
Approved by SE Vide ltr No 1598 Dt.13.09.2023 - Door Closure Make: Aluminium 23x3.2x5.7 cm weighing 830grams, screw in. ---- including cost of all materials, labour, HOM, I

10

1650

16500

... More
Approved by SE Vide ltr No 1598 Dt.13.09.2023 - Door Stopper Make: Aluminium Jagger 17Lx4wx5h cm, and coated with zinc ---- including cost of all materials, labour, HOM, I

10

320

3200

... More
Approved by SE Vide ltr No 1598 Dt.13.09.2023 - Brass Screws of varying sizes For the fixing of tower bolts and door hinges ---- including cost of all materials, labour, HOM, I

720

10

7200

... More
Approved by SE Vide ltr No 1598 Dt.13.09.2023 - Nails of varying sizes ---- including cost of all materials, labour, HOM, I

20

80

1600

... More
Vol-2 Pg No. 63 It no. 9.25 of 2023-24 - Providing and laying 60mm thick factory made cement concrete paver block of approved shape and colour of M -30 grade made of C&D waste by block making machine with vibratory compaction laid in required pattern and including over 50mm thick compacted bed of coarse sand, flling the joints with fne sand etc. all complete as per the direction of Engineer-incharge ---- including cost of all materials, labour, HOM, I

541.6

840

454944



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.