Public Works Department Tender

... More
Karnataka, also known as Karunadu, is a state in the southwestern region of India. Karnataka was formed originally as Mysore State on 1st November 1956 and currently is the biggest state in south India. Its capital and largest city is Bengaluru. It covers an area of 191,791 km2 (74,051 sq mi) and is the sixth largest state by area comprising 31 districts. Karnataka is also a state of multiple languages; Kannada being the official and most widely spoken language in Karnataka. Other languages spoken in the state include Tamil, Telugu, Malayalam, Kodava, Konkani and much more.Karnataka tenders are issued by the government of Karnataka, public & private sector organisations. The state government issues majority of the Karnataka tenders, which are for goods and services including construction, road and bridge construction, IT services, engineering services, medical services, educational services amongst many others. Bidassist is one of the largest eprocurement portals, which offers all government tenders from across the world in one place. Bidassist offers information on all Karnataka tenders and other state and authority tenders in no time. Bidassist is a platform where users can look for various Karnataka tenders as well as other tenders.

Public Works Department - PWD Tender

Works
Civil And Construction
Building Construction
Opening Date30 Nov 2024
Closing Date12 Dec 2024
Tender Amount₹ 84,02,146.29 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
VOL I for the year 2023-24. I. No. 1.23 P.No. 11 - Providing and Filling in foundation with granite / trap broken metal 100mm. And down size & with approved sand including hand packing, ramming, watering, including cost of all materials and labour with all lead and lift complete as per specifications.

6.85

2816

19290.285

... More
VOL I for the year 2023-24. I. No. 2.1.3 P.No. 15 - Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates

15.66

6288

98477.127

... More
VOL I for the year 2023-24. I. No. 2.1.4 P.No. 15 - Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregates

1.66

6527

10836.231

... More
VOL I for the year 2023-24. Sl. No. 14 P.No. 112 - Addendum I -Percentage Additionalities for Formwork, Centering & Scaffolding for RCC Beams, Lintels & Troughs of Aqueducts 60PERCENT

1.66

3916

6501.7386

... More
VOL II for the year 2023-24. I. No. 5.1.1 P.No. 9 - Providing Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand)

10.13

5891

59681.4015

... More
VOL II for the year 2023-24. I. No. 5.2 P.No. 9 - Providing Coursed rubble masonry (first sort) with hard stone in foundation and plinth with Cement mortar 1:6 (1 cement : 6 coarse sand)

10.04

6948

69766.956

... More
VOL I for the year 2023-24. I. No. 1.11 P.No. 07 - Filling approved earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.

76.25

454

34667.0625

... More
VOL I for the year 2023-24. I. No. 2.2.3 P.No. 15 - Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates

8.26

6652

54952.128

... More
VOL I for the year 2023-24. Sl. No. 1(a) P.No. 111 - Addendum I -Percentage Additionalities for Formwork, Centering & Scaffolding for isolated footings 8%

8.26

532

4396.1372

... More
VOL I for the year 2023-24. I. No. 2.2.3 P.No. 15 - Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates

1.07

6652

7118.496

... More
VOL I for the year 2023-24. Sl. No. 9 P.No. 111 - Addendum I -Percentage Additionalities for Formwork, Centering & Scaffolding for RCC Columns / Shaft (Slip Centering) 70%

1.07

4656

4982.9472

... More
VOL I for the year 2023-24. I. No. 2.2.3 P.No. 15 - Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates

3.61

6652

24016.608

... More
VOL I for the year 2023-24. Sl. No. 2 P.No. 111 - Addendum I -Percentage Additionalities for Formwork, Centering & Scaffolding for Plinth Beams of Buildings 50%

3.61

3326

12008.304

... More
VOL I for the year 2023-24. I. No. 2.5.2 P.No. 16 - Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates

3.61

7185

25938.3915

... More
VOL I for the year 2023-24. Sl. No. 9 P.No. 111 - Addendum I-Percentage Additionalities for Formwork, Centering & Scaffolding for RCC Columns / Shaft (Slip Centering) 70%

3.61

5029

18156.8921

... More
VOL I for the year 2023-24. I. No. 2.5.2 P.No. 16 - Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates

5.86

7185

42104.979

... More
VOL I for the year 2023-24. Sl. No. 14 P.No. 112 - Addendum I Percentage Additionalities for Formwork, Centering & Scaffolding for RCC Beams, Lintels & Troughs of Aqueducts 60%

5.86

4311

25262.9874

... More
VOL I for the year 2023-24. I. No. 2.5.2 P.No. 16 - Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates

1.9

7185

13651.785

... More
VOL I for the year 2023-24. Sl. No. 16 P.No. 112 - Addendum I Percentage Additionalities for Formwork, Centering & Scaffolding for Staircase and other similar structures 50%

1.9

3592

6825.902

... More
VOL I for the year 2023-24. I. No. 2.5.2 P.No. 16 - Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates

13.07

7185

93909.9105

... More
VOL I for the year 2023-24. Sl. No. 15 P.No. 112 - Addendum I -Percentage Additionalities for Formwork, Centering & Scaffolding for RCC Roof Slabs 50%

13.07

3592

46955.0206

... More
VOL I for the year 2023-24. I. No. 2.5.2 P.No. 16 - Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates

0.22

7185

1580.733

... More
VOL I for the year 2023-24. Sl. No. 19 P.No. 112 - Addendum I -Percentage Additionalities for Formwork, Centering & Scaffolding for Chejjas, Canopy & Other Architectural projections of minor sections 45%

0.22

3233

711.3304

... More
VOL II for the year 2023-24. I. No. 6.32 P.No. 17 - Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications.

98.14

1375

134991.57

... More
VOL II for the year 2023-24. I. No. 8.2.2 P.No. 41 - Providing 15 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.

125.87

292

36873.6165

... More
VOL II for the year 2023-24. I. No. 8.2.2 P.No. 41 - Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.

122.2

292

35798.49

... More
VOL II for the year 2023-24. I. No. 8.22 P.No. 44 - Providing lime wash on walls with one coat with lime of approved quality to give an even shade, including cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.

203.93

10

2141.265

... More
VOL II for year 2023-24. I. No. 12.13.1 P.No. 100 - Providing Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications.

0.3

103755

31126.725

... More
VOL II for year 2023-24. I. No. 12.57.6 P.No. 105 - Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per specification. 35 mm thick both side commercial

5.04

3488

17580.024

... More
VOL II for year 2023-24. I. No. 12.51 P.No. 104 - Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications.

2

1066

2133.6

... More
VOL II for year 2023-24. I. No. 12.90 P.No. 110 - Providing fixing of 3-track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 108mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm x 75mm with GI reinforcement of 2mm and mesh sash of size 37mm x 58mm. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24 mm. Windows shall be provided with 6mm plain float glass, standard hardware& Multi point locking system with touch lock. Wall thickness of frame & sash shall be of 2mm-2.5mm. Maximum possible size 2419mm x 2200mm. The cost is inclusive of all fixtures and separate charges for minor T&Ps shall not be made

5.04

7070

35636.328

... More
VOL II for year 2023-24. I. No. 11.34B P.No. 86 - Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings / wooden frames with rawl plugs screws etc.

105.84

192

20337.156

... More
VOL II for year 2023-24. I. No. 9.17.2 P.No. 61 - Providing and laying Vitrified tiles in different sizes (thickness to be specified by manufacturer), with water absorption less than 0.08 % and conforming to I.S. 15622, of approved make, in all colours & shade, over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joint with white cement & matching pigments etc. complete. Size of Tile 600x600 mm

44.97

1233

55481.7375

... More
VOL II for the year 2023-24. I. No. 9.31 P.No. 64 - Providing and laying Polished Sadarahalli Grey Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 20 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing , curing and polishing etc. all complete as specified and as directed by the Engineer-in- harge.

59.65

2189

130588.7625

... More
VOL II for the year 2023-24. I. No. 10.2 P.No. 69 - Providing edge moulding to 18mm thick Granite stone counters, vanities etc including machine polishing to edge to give high gloss finish etc. complete as per design approved by Engineer-in-charge.

48

344

16531.2

... More
VOL II for year 2023-24. I. No. 8.33.3 P.No. 47 - Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @ 0.80 ltr/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.

21.35

145

3116.0325

... More
VOL II for year 2023-24. I. No. 11.26.1 P.No. 84 - Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. M.S. tube including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineerin- Charge.

459.63

144

66600.387

... More
VOL II for year 2023-24. I. No. 8.33.1 P.No. 46 - Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 ltr/10 m² over and including one coat of Special primer applied @ 0.75 ltr /10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.

125.96

165

20896.764

... More
VOL II for year 2023-24. I. No. 8.33.1 P.No. 46 - Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 ltr/10 m² over and including one coat of Special primer applied @ 0.75 ltr /10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.

79.18

165

13135.962

... More
VOL II for the year 2023-24. I. No. 8.30 P.No. 46 - Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including riming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.

122.56

182

22391.712

... More
VOL II for the year 2023-24. I. No. 8.84 P.No. 55 - Providing wall black boards in 12mm thick with CM 1:3 and applied with primer & two coats of acrylic emulsion black paint including finishing etc.,complete.

3.6

498

1795.5

... More
VOL II for year 2023-24. I. No. 8.19.1 P.No. 44 - Providing Flush/ Ruled pointing: Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand) after raking joints to depth nicely lining, including cost of materials, labour, curing as per specifications and as per directions of Engineer-in-charge.

26.02

267

6966.855

... More
VOL I for the year 2023-24. I. No. 2.11.a P.No. 18 - Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. a.Buildings

3.09

93929

290243.2365

... More
VOL II for the year 2023-24. I. No. 8.49 P.No. 49 - Lettering with black Japan paint of approved brand and manufacture to give an even shade including preparing the surface after thoroughly cleaning the surface to remove all dirt, dust and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.

1520

4

6384

... More
VOL I for the year 2023-24. I. No. 1.8 P.No. 7 - Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with alllifts and lead, transportation to site, spreading, grading to required slope andcompacting to meet the requirement complete as per specifications,includingcostoflabour ,rolling,water,all materials,usage& all other appurtenaces requiredto complete the work.

9

497

4479.3



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.